My WebLink
|
Help
|
About
|
Sign Out
Home
SW-4349 - Bid Results (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Bid Results
>
2015 - Bid Results
>
2015 - Formal Construction Projects - Bid Results
>
SW-4349 - Bid Results (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:14:36 PM
Creation date
12/3/2015 4:14:18 PM
Metadata
Document Relationships
SW-4349 - Bid Results
(ADA Compliant Text Version)
Path:
\Public Works\Administration Division\99_Archive\02_Bid Information\Bid Results\2015 - Bid Results\2015 - Formal Construction Projects - Bid Results
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pahoa Transfer Station Water Catchment Tank <br /> Project Title: and Appurtenances Replacement Project Date: December 3, 2015 <br /> Job No.: SW-4349 <br /> Claimed Hawaii <br /> CONTRACTOR BASIC BID Products REMARKS <br /> Preference <br /> Isemoto Contracting Co Ltd $521380.00 Witnesses: Toni Nakatani - DEM/WWD <br /> �I William K Kapololu Jr $391500.00 Iris Oshiro - DPW Admin <br /> Eva Braman - DPW Admin <br /> Silvia Nagai - Constructors Hawaii Inc <br /> Desirae Midel-Shafer- Heartwood Pacific LLC <br /> Stanford Kepoo - S&L Excavation LLC <br /> Sean Kepoo - S&L Excavation LLC <br /> Estimated Cost by County of Hawaii $451000.00 Leighton Bell - Willocks Construction Corp <br /> County of Hawaii is an Equal Opportunity Provider and Employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.