Laserfiche WebLink
or I'm not sure if a particular entity was specifically identified. My understanding is that there <br />currently, the County is currently engaged in the RFP process so no awardee has been identified, <br />so the process is still going through the, the competitive, bid process, whereas in this case, the <br />Claimant specifically identified a particular entity with actual funds, you know—you know, <br />assigned to the work, and you know that, and it doesn't afford the opportunity for anybody else <br />who would be able, or feels that they're qualified to do the work, to competitively present a <br />proposal to do the work. <br />HEAUKULANL Yeah, I didn't anticipate this position showing up, so I didn't review those, but <br />I, I thought that when the proposal came to us for the meta -study or the meta -data study or <br />whatever that was, that it was the, the medical school that was the identified procurement entity. <br />BRILHANTE: In that case, under Procurement Law, if the UH or a educational component of <br />the UH system is identified as the fund's recipient, then it's, that's one of the exemptions, <br />exceptions within the Procurement Code, so that is affordeda contract with the University of <br />Hawaii or one of its entities. <br />HEAUKULANL Okay, you lost me. So, it, are they in the bidding process or are they exempted <br />from the bidding process? <br />BRILHANTE: As—there were two studies funded, right? Back in NovemberI'm, you know, <br />I'm just recalling from memory-- <br />HEAUKULANL Me too. <br />BRILHANTE: I don't know it just off the top of my head—There were four items identified, <br />approved. <br />KANUHA: Yeah, there was a study to assess the ground water quality, the meta-analysis, and <br />the soil contamination for the brine ponds at HGP -A one. <br />BRILHANTE: Director Kanuha, you have the communication from the Mayor's office <br />regarding the status of the current application? <br />KANUHA: According to the Mayor's office, those three are underway. They're in the final <br />stages of the RFP for the, the health study component, and this was as of January. <br />BRILHANTE: My understanding is that the meta -data study was specific to the UH so, yeah, I <br />believe, and you know I don't want to give a firm response, but it's my understanding that, that <br />contract went forward because it's contracting with the UH school to do the analysis. The health <br />study, which was approved for $750,000, that's the study that I was referring to that it's currently <br />within, in the RFP progress. So, this study would be more analogous to the health study because <br />the proposal is for an independent entity outside of the UH system to conduct the study. <br />MOSES: Commissioners, any other questions? <br />5 <br />EXHIBIT E <br />