Laserfiche WebLink
Here's the Applicant's submitted site plan. Again, we've got Saddle Road running toward the <br />top of the slide here. The public right-of-way connecting to the subject parcel which is outlined <br />here. And, again, this is going to generally be the location of the project area is. Here on the <br />right is zoomed in a little bit showing the project area and the road that's gonna come down and <br />connect to that from the public right-of-way. <br />Here's the elevations of the 195, four -legged steel -195 -foot, four -legged steel lattice <br />telecommunications facility. Again, just showing it in relationship to some of the height of the <br />vegetation in the area. <br />And, here are some photographs. Just a bit of a caveat. These are from Google Earth taken in <br />2011. There's been some significant construction going on with the Saddle Road Realignment <br />so it doesn't look exactly like this right now, but this is just showing the view of the entrance to <br />the public right-of-way from Saddle Road currently gated so access is keyed. <br />Here's Saddle Road, again, in 2011, looking west with the subject parcel on the left-hand side, <br />and then Saddle Road looking eastsorry, other way around—on the right-hand side of Saddle <br />Road looking east; the subject parcel on the left hand side. <br />The Planning Director is recommending approval with conditions. And, just one more piece of <br />correspondence that we handed out this morning that came in after the Background and <br />Recommendation went out is from June 13th, 2016, State of Hawaii, Department of <br />Transportation sharing a comment letter on the project. <br />That's my presentation. If there are any questions the Commission may have, I'm happy to <br />answer them. <br />HENKEL: Any questions of staff from the Commissioners? <br />MIYASATO: Chair, I have a question. Christian, could you go back to, I think it was the <br />second slide. Is that, yeah that slide—is that white roadway the Daniel K? <br />KAY: This is theI believe this is going to be where the realignment right-of-way, so as, when <br />it's realigned it will generally follow this, this right-of-way, yes. <br />MIYASATO: Okay, so this letter from the State Department of Transportation pertains to <br />what's existing now? On the Old Saddle Road? <br />KAY: As I read it, it doesn't indicate. My assumption is that it would be, based on their <br />comments, they have no issue with it, whether it's where it is now or where it's going to be. <br />They indicate that the Applicant shall comply with all procedures to obtain all necessary permits <br />required by the Highways Division so as they come through, they're gonna have to follow those <br />requirements as well. <br />3 <br />EXHIBIT A <br />