My WebLink
|
Help
|
About
|
Sign Out
Home
Chapter 10 Erosion and Sedimentary control
PublicDocuments
>
County Clerk - Council
>
County Clerk
>
County Code
>
Chapter 10 Erosion and Sedimentary control
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 2:32:57 PM
Creation date
10/14/2016 8:28:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 10-17 HAWAII COUNTY CODE <br /> (b) The permittee shall notify the director of public works at least two days before the <br /> permittee or the permittee's agent begins any grading, grubbing or stockpiling. A <br /> copy of the permit, approved plans and specifications for grading, grubbing, or <br /> stockpiling shall be maintained at the site during the progress of any work. Where <br /> it is found by inspection that the soil or other conditions are not the same as stated <br /> or shown in the application for grading, grubbing, or stockpiling permit, the <br /> director of public works may stop the grading, grubbing, or stockpiling until revised <br /> plans, based upon the existing conditions, are submitted by the permittee and <br /> approved by the director of public works. Approval or disapproval of applicant's <br /> revised plan shall be made within fourteen days from the date of receipt by the <br /> director of public works. <br /> (c) If the director of public works or the director's representative finds that the work is <br /> not being done in conformance with this chapter or the plans and specifications <br /> approved by the director of public works, the director shall immediately notify the <br /> person in charge of the grading work of the nonconformity and immediately notify <br /> the responsible party of need for corrective measures to be taken. Grading <br /> operations shall cease until corrective measures satisfactory to the director of <br /> public works have been taken. <br /> (d) When a permittee has been served with a written notice, either by mail or personal <br /> service for failure to comply with any provision of this chapter, or when a permittee <br /> has had the permittee's permit suspended or revoked by the director of public <br /> works, the permittee and any person connected with execution of the work <br /> authorized by the permit shall be denied a grading, grubbing, or stockpiling permit <br /> for such work until the permittee has complied and initiated action satisfactory to <br /> the director of public works to comply with the provisions of this chapter. <br /> (1983 CC, c 10, art 2, sec 10-17; am 2001, ord 01-108, sec 1.) <br /> Article 3. Conditions and Specifications. <br /> Section 10-18. Conditions of permit. <br /> (a) The requirements of this section may be waived by the director of public works <br /> after the permittee submits an engineer's soils report substantiating data regarding <br /> the stability of the cut or fill slopes without complying with any of the requirements <br /> therein. <br /> (1) Height. Where a cut or fill is greater than fifteen feet in height, terraces or <br /> benches shall be constructed at vertical intervals of fifteen feet except that <br /> where only one bench is required, it shall be at the midpoint. The minimum <br /> width of such terraces or benches shall be eight feet or as determined by the <br /> director of public works, based upon the type of material encountered and <br /> shall have suitable drainage provisions to control erosion on the slope face. <br /> 10-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.