My WebLink
|
Help
|
About
|
Sign Out
Home
2016-25 Report of the Ad Hoc Committee on Puna Connectivity 9.14.16
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2016
>
2016-25 Report of the Ad Hoc Committee on Puna Connectivity 9.14.16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2016 11:17:50 AM
Creation date
10/26/2016 11:16:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INDEX <br />I. Executive Summary.......................................................................3 <br />II. Background and review of past activities..........................................4 <br />III. Discussion and recommendations...................................................6 <br />o Improve and extend county roads to connect with Highway 11 <br />■ South Lauko Road Extension..........................................7 <br />■ South Oshiro Road Extension.........................................8 <br />o Private road connections <br />■ CL -1 (Connecting Fern Forest and Eden Roc Estates).............9 <br />■ CL -2 (Connecting Eden Roc with Kopua Farm Lots).............10 <br />■ CL -4 (Connecting Fern Acres and Hawaiian Acres)...............11 <br />■ CL -5 (Connecting Hawaiian Acres and Orchidland)..............12 <br />■ Alternates to CL -5 ......................................................1 2 <br />■ CL -14 (Connecting Kopua Farm Lots and Fern Acres ............ 14 <br />■ Alternates to CL -14 ....................................................1 5 <br />IV. Acknowledgments....................................................................16 <br />V. APPENDIX <br />Criteria for Points of Connectivity..............................................................A <br />Communication No. 363.1 — CERS Annual Report..........................................B <br />Communication No. 363 — Requesting formation of an Ad Hoc Committee.............0 <br />Report on the Upper Puna Driving Field Study...............................................D <br />Funding.............................................................................................E <br />SouthLauko Road.................................................................................F <br />Early Consultation Letter from Geometrician Associates ........................F-1 <br />Map of South Lauko Road...........................................................F-2 <br />Statement of Glenn Toyama, in opposition.........................................F-3 <br />Statement of Roddy Nagata, in opposition.........................................F-4 <br />Statements of Anita Owen and John Owen, in support ...........................F-5 <br />Statement of Neena Roumell, in support...........................................F-6 <br />Commentson CL-5................................................................................G <br />Orchidland Community Association (President Steve Lyon)....................G-1 <br />Orchid Land Community Association (President Barbara Arthurs).............G-2 <br />Letter from Hawaiian Acres Road Corporation................................................H <br />Letters from Hawaiian Acres Community Association.....................................................I <br />Letter from Fern Acres Community Association..............................................................J <br />
The URL can be used to link to this page
Your browser does not support the video tag.