My WebLink
|
Help
|
About
|
Sign Out
Home
2016-25 Report of the Ad Hoc Committee on Puna Connectivity 9.14.16 (2)
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2016
>
2016-25 Report of the Ad Hoc Committee on Puna Connectivity 9.14.16 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 8:31:31 AM
Creation date
11/10/2016 8:30:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Improve and extend county roads to provide new connections from Highway 11 <br />South Lauko Road extension (Connecting Hi way 11 and Fern Acres) <br />The Committee recommends a consideration of the improvement of South Lauko Road and <br />connection to Puhala Street in Fern Acres, in conjunction with other options to improve nearby <br />roads. Currently, S. Lauko Road branches off from Highway 11 and is a narrow, one -lane road <br />that is gated and severely eroded where it crosses a stream bed. <br />The Committee notes the objections raised by several owners of land adjacent to South Lauko <br />Road, as well as support of other landowners. The written comments provided by those in <br />support of and in opposition to this connection. <br />The Committee understands that the Department of Public Works is considering a number of <br />roads for improvement, including South Lauko Road, South Pszyk Road, and the extension of <br />Puhala Road to South Kopua Road, and defers to the judgment of Department in this matter. <br />An environmental assessment for these roads has begun and is expected to conclude by the end <br />of 2016. The scope of this proposed project is described in the early consultation letter (attached <br />in Appendix F-1) for the environmental assessment. <br />Figure 2. Connection between Highway 11 and Fern Acres. <br />
The URL can be used to link to this page
Your browser does not support the video tag.