Laserfiche WebLink
<br />Bill McCowatt of Koa Architects (Applicant) described his renderings and floor plan. He showed that <br />ADA access aisles and ingress and egress were accounted for throughout the floor plan. He further <br />stated that the color scheme remains the same and that the roof will be a steel roof. Additionally, Mr. <br />McCowatt announced the building will be an open air building. <br /> <br />nd <br />Commissioner Andreae asked about the bridge for ADA access from the parking lot to the 2 Floor. <br /> <br />nd <br />Mr. McCowatt explained that the grade of the property allows the 2 floor to be close to the same <br />elevation as the parking area behind the restaurant. <br /> <br />Commissioner Au Hoy asked if the upper lanai would be operational 7 days a week and stated that <br />the unroofed areas may be extremely hot. <br /> <br />Mr. McCowatt stated that no air conditioning is currently planned and that they may decide to use <br />umbrellas for shading and ceiling fans in the future. <br /> <br />Commissioner Kern stated that the restaurant is currently using unapproved signs/banners on their <br />property. Discussion occurred and it was stated that this should be considered as part of their <br />approval. <br /> <br />Mr. McCowatt stated that there would be no changes to landscaping. <br /> <br />Commissioner Andreae asked for more information on the window plan. <br /> <br />Mr. McCowatt described the types of windows and framing used on each side of the building. <br /> <br />Commissioner Au Hoy asked about the number of exits. <br /> <br />rdnd <br />Mr. McCowatt stated that there will be two exits on the 3 floor and two exits on the 2 floor. He <br />showed where these exits will be on the floor plan. He further stated that sprinklers for fire protection <br />will be installed on all floors. <br /> <br />Commissioner Andreae asked what the current landscaping is. <br /> <br />Mr. McCowatt showed and described the existing landscaping by indicating what is existing on the <br />site plan and through the use of pictures. <br /> <br />ndrd <br />Commissioner Sullenberger asked if the 2 and 3 floors would be finished in stucco and would use <br />the existing color scheme. <br /> <br />Mr. McCowatt stated that stucco would be used, the existing color scheme would be kept and that <br />the roof plan also includes gutters. <br /> <br />Commissioner Andreae moved to recommend the plan as submitted with the condition that the Sign <br />Code be complied with, the unapproved banners/signs currently on the building be removed and any <br />future signage go through the appropriate application process for approval. <br /> <br />The motion was seconded by Commissioner Au Hoy. <br /> <br />There was no additional discussion. <br /> <br />2 <br /> <br />