My WebLink
|
Help
|
About
|
Sign Out
Home
PCDP ProgressReport May 2015 to April 2016-FINAL
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Public Information
>
2016
>
PCDP ProgressReport May 2015 to April 2016-FINAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 9:17:28 AM
Creation date
11/23/2016 9:17:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The FY 2013-14 CIP Budget included an appropriation of $300,000 to develop a police <br />station for the Puna region. <br />DEPARTMENT OF PUBLIC WORKS <br />1. South Lauko Road Connectivity (PCDP 4.3.1a, 4.3.2c, 4.3.3a.5) <br />Champions: Patti Pinto <br />The FY 2014-15 CIP Budget included an appropriation of $1 million for land acquisition <br />and infrastructure improvement to reconnect South Lauko Road with Puhala Street. <br />2. Puna Inner -Connectivity and Emergency Access Routes (PCDP 4.3.3a.3, 4.3.3a.5) <br />Champion: Patti Pinto <br />The FY 2014-15 CIP Budget included an appropriation of $1 million for land acquisition, <br />infrastructure improvement, planning, feasibility, engineering and design studies for <br />various connectivity and emergency access routes. <br />3. Highway 137 Biking/Walking Path Feasibility Study (PCDP 3.5.3d.1, 3.5.3d.3, <br />4.5.3f.5) <br />Champion: Farris Etterlee <br />The FY 2014-15 CIP Budget included an appropriation of $35,000 for a feasibility study <br />on developing a biking and walking path for the Highway 137 corridor. <br />4. Highway 137 Scenic Turnouts (PCDP 4.5.3£5) <br />Champion: Farris Etterlee <br />The FY 2014-15 CIP Budget included an appropriation of $40,000 for local community <br />effort to create scenic overlook pullouts and walking/biking pathways along the Red <br />Road corridor. <br />5. Puna CDP Road Projects (PCDP 4.5.3.f) <br />Champion: Patti Pinto <br />The FY 2013-14 CIP Budget included an appropriation of $400,000 for associated <br />community efforts. <br />6. Pahoa Town Center Land (PCDP 3.5.3c2) <br />Champions: Elmer Solis <br />The FY 2013-14 CIP Budget included an appropriation of $3.259 million to purchase <br />land in Pahoa Village to create a public parking lot. <br />7. Highway 132 Road Shoulder repair, widening & clearing (PCDP 4.3.1c) <br />Champion: Oshi Simsarian <br />The FY 2014-15 CIP Budget included an appropriation of $200,000 to clear vegetation, <br />prepare and widen the shoulder of Highway 132 between the 0.5mm and the 4mm to <br />allow for safer pedestrian and bicycle movement. <br />8. Post Office Road Extension (PCDP 4.3.2c) <br />Champions: Elmer Solis & Patti Pinto <br />The FY 2014-15 CIP Budget included an appropriation of $201,000 for planning and <br />land acquisition to extend the road to provide for an alternate connection between Pahoa <br />Village Road and the new Pahoa Regional Park. <br />9. Kuauli Road Traffic Improvements (PCDP 4.3.1d) <br />Champion: Patti Pinto & Farris Etterlee <br />The FY 2013-14 CIP Budget included an appropriation of $1 million to create a right turn <br />lane from Kuauli Road onto Highway 11. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.