My WebLink
|
Help
|
About
|
Sign Out
Home
2016-11-30 KCDP Minutes Final
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Kona Community Development Plan Action Committee
>
Minutes
>
2016
>
2016-11-30 KCDP Minutes Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 12:44:23 PM
Creation date
1/19/2017 12:44:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />47 On Line 74, add in ii. Hina Lani Street to Kealakaʻa Street Connection and <br />48 insert line return after. <br />49 <br />50 There was no opposition to the amendments. Chair Rivera called a voice vote <br />51 and the motion to amend the minutes carried unanimously. Chair Rivera call a <br />52 voice vote for the main motion to approve the amended minutes and the motion <br />53 carried unanimously. <br />54 <br />55 2. Approval of Addendum and/or Supplemental Agenda <br />56 <br />57 None noted <br />58 <br />59 STATEMENTS FROM THE PUBLIC REGARDING ITEMS ON AGENDA <br />60 Ken Melrose: Thanked Mr. Dunlap for his years of service and presented him <br />61 with lei. Mr. Melrose also encouraged the Action Committee to continue to <br />62 pursue roads that provide connectivity as part of the CIP. <br />63 <br />64 UNFINISHED BUSINESS for DISCUSSION AND ACTION <br />65 1. Open discussion of Action Committee members on Capital Improvement Project <br />66 (CIP) recommendations to the Planning Director. <br />67 <br />68 Mr. Tyler made a motion that CIP funds be allotted for final design of a two-lane <br />69 Aliʻi Bypass between Puapuaʻanui and Kamehameha III Road. The motion failed <br />70 due to lack of a second. <br />71 <br />72 The Action Committee discussed the CIP priorities and decided on the following: <br />73 A. Feasibility and Preliminary Design Study: Revised Keauhou-Kahului <br />74 Parkway (Aliʻi Hwy.) Design, Alignment and Phasing. <br />75 <br />76 I. A new or updated conceptual feasibility and design study, possibly <br />77 including preliminary design, for construction of the previously <br />78 proposed Keauhou-Kahului Parkway (a.k.a. Aliʻi Highway or Aliʻi <br />79 Bypass) as a two-lane highway, including bicycle and pedestrian <br />80 travelways, between: <br />81 <br />82 a. Its proposed southern terminus/junction with Aliʻi Drive fronting <br />83 Keauhou Shopping Center, and <br />84 <br />85 b. A revised, relocated northern terminus/junction with Queen <br />86 Kaʻahumanu Highway, in accordance with recommendation No. 2 <br />87 below. <br />88 <br />89 II. The Committee recommends that the feasibility and preliminary <br />90 design product include the option of constructing this highway in two <br />91 or more phases according to functionalities of existing and planned <br />92 “mauka - makai” connector streets (Laʻaloa, Lako, Royal Poinciana) <br />93 with which this proposed highway will inter-connect. Such phasing <br />94 plan should propose the priority of the respective road construction <br />Page 2 of 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.