Laserfiche WebLink
<br />, 2014 <br />Orion Solar Racking <br />2917 Vail Ave. <br />Commerce, California 90040 <br />TEL: (310) 258-9900 <br />FAX: (310) 258-9909 <br />Attn.: Engineering Department, <br />Re: Engineering Certification for the Orion Solar Venus Racking Mounting System <br />PZSE, Inc.-rail span chart, rail allowable <br />uplift wind force table and performed rail components capacity check including the L foot <br />bracket, end clamp, mid-clamp and stand off base. All information, data and analysis are based <br />on,and comply with the following: <br />1.Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-05 <br />2.2009 International Building Code, by International Code Council, Inc. <br />3.2005 Aluminum Design Manual, by The Aluminum Association <br />Venus rail span chart, <br />rail allowable uplift wind force table and rail components capacity check are in compliance with the <br />above Codes. <br />If you have any questions on the above, do not hesitate to call. <br />Sincerely, <br />Paul Zacher, SE - President <br /> <br />