My WebLink
|
Help
|
About
|
Sign Out
Home
2017-03-16 Leeward Exh A (AMEND SMA 03-007)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2017
>
2017-03-16 Leeward Exh A (AMEND SMA 03-007)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 4:58:54 PM
Creation date
4/10/2017 4:58:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CARR SMITH: Okay. Forgive me if I don’t know all the details of how this works, but on the <br />SMA Permit are the plans for the proposed building a part of that or are they separate? Like, are <br />we just dealing with the conditions of the SMA Permit or — <br /> <br />DARROW: Correct. <br /> <br />CARR SMITH: — not the structure? <br /> <br />DARROW: The, this particular request was for a time extension, so that’s what we are working <br />with. <br /> <br />CARR SMITH: Right, okay. <br /> <br />DARROW: The original request got into all the issues, and that’s not to say you can’t bring up <br />those issues now, but basically the issue at hand is a time extension request. <br /> <br />CARR SMITH: I understand that. <br /> <br />DARROW: Normally, even representations made at a hearing for proposed structures, those are <br />proposed plans and they may change as they go through the permitting process. So you never <br />know what’s going to happen, you know, you find out, oh, I can’t build what I was proposing, I’ve <br />got to downsize or I have to make it — <br /> <br />CARR SMITH: Right. <br /> <br />DARROW: So you just never know. So we kind of leave the actual details to when they go <br />through the, but they cannot go beyond what is permitted through zone. <br /> <br />CARR SMITH: All right, very good. Thank you. <br /> <br />UNGER: Any other questions? <br /> <br />SHIMAOKA: I just have one in, because of the time frame, I know that the Director’s <br />recommendation is that within seven years from the date that we approve the amendment, correct? <br />And the conditions may change between now and then, though, as far as the requirements will <br />change, zoning requirements. I’m looking at, like what Nancy said, that joint access to the road it <br />seems so small. If you are building a twelve-unit, you know, we are dealing with the problem on <br />Ali‘i Drive already as it is — <br /> <br />DARROW: Right, right. <br /> <br />SHIMAOKA: — with the space. <br /> <br />DARROW: Sure. <br /> <br />SHIMAOKA: So, how do we address that? <br />4 <br />EXHIBIT A <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.