My WebLink
|
Help
|
About
|
Sign Out
Home
2017-05-05 CIP Budget 2017-2018
PublicDocuments
>
Office of the Mayor
>
Office of the Mayor Documents
>
2016-2020
>
Correspondence
>
2017
>
05-2017
>
2017-05-05 CIP Budget 2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 2:49:56 PM
Creation date
5/8/2017 8:44:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawai'i <br />PROJECT DATA/FINANCIAL IMPACT STATEMENT <br />Fiscal Year 2017 - 2018 <br />1. DEPARTMENT AND DIVISION: Department of Environmental Management, Wastewater Division 2. DATE: 1/6/2017 <br />3. PROJECT NAME: Repair Hilo Outfall (Reapp. 5691.87) 4. SUBMITTER: Dora Beck <br />5. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6. TMK/JUDICIAL: (3) 2-1/South Hilo <br />7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000 <br />9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement; Planning, feasibility, engineering, or design studies <br />10. PROJECT/PROGRAM DESCRIPTION: 1. Temporary repair of existing joint leaks from the exterior as well as a 30 -foot section of undermining caused by strong underwater currents beneath pipe <br />outfall identified during the 2010 inspection; 2. Replace the protection around the outfall pipe portion exposed at the shoreline as a result of years of erosion. 3. Perform an Internal Inspection and <br />Assessment of Ocean Outfall and Repair leaking joints as per EPA Findings of Violation and Order for Compliance Docket No. CWA-309(a)-14-005. <br />11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Repair/Maintenance of infrastructure; Enhances quality of life, Regulatory requirement <br />12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment and providing a safe shoreline area for users. <br />13. COUNTY MATCHING FUNDS REQ'D? (Y/N) <br />N <br />DESCRIBE: <br />14. LEGAL MADATE? (Y/N) <br />Y <br />DESCRIBE: <br />As of 9/18/2014, mandated under EPA Docket No. CWA-309(a)-14-005 (Findings of Violation & Order for Compliance) <br />15. IMPACT ON OPERATIONAL BUDGET: None <br />16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Strengthens & sustains our community; Promotes health & safety <br />17. PROJECT READINESS (List all that apply): Project underway. <br />18. EXPENDITURE PHASING (X $1000): <br />Prior Funds <br />Allotted <br />(not lapsed) <br />This FY 17-18 <br />Request <br />FY 18-19 <br />FY 19-20 <br />FY 20-21 <br />FY 21-22 <br />FY 22-23 <br />Beyond 6 <br />Years <br />TOTAL: <br />Planning <br />Land Acquisition <br />Design/Survey <br />Construction <br />2,800 <br />500 <br />$3,300 <br />TOTAL: <br />$2,800 <br />$500 <br />$3,300 <br />19. 0 & M COSTS (x $1000): <br />20. FUNDING SOURCE (x $1000): <br />Cty G.O. Bond/Other <br />2,800 <br />500 <br />$3,300 <br />State Revolving Fund <br />State CIP <br />Federal <br />Private (Grants) <br />CBA (Fair Share, Park Dedication, etc) <br />TOTAL: <br />$2,800 <br />$500 <br />$3,300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.