My WebLink
|
Help
|
About
|
Sign Out
Home
2017-07-06 Hearing Transcript - HI Island Distilling SLU 17-047 & REZ 17-218
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2017
>
2017-07-06 Hearing Transcript - HI Island Distilling SLU 17-047 & REZ 17-218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2017 12:20:20 PM
Creation date
8/4/2017 12:20:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
will include a 2,000 -square foot supportive retail sales tasting center with about a 300 -square <br />foot kitchen for preparing food for the tasting center and visitors. Other improvements will <br />include improvements to the access road, improvements to the County waterline, and on-site <br />parking and landscaping will be provided. <br />This is the Applicant's proposed site plan. This road here, it's actually not a road lot. It's a <br />series of easements, side-by-side road and utility easements. It's known as Slaughterhouse Road, <br />and this comes off of Shipman Road. The property is currently developed right now with a <br />photovoltaic system field which is in this location here and then the proposed facility would be <br />located kind of in the west corner of the property. So, you would have a circular parking lot, one <br />entrance in, one exit out, and then you can see the proposed microbrewery and then the visitor <br />area. <br />This is the zoning map for the area, and you can see the subject property is zoned Agricultural — <br />20 acres which is shown in the dark green. To the south are three lots which were recently <br />zoned, rezoned to Family Agricultural — 2 acres. And, then further down Slaughterhouse Road is <br />a lot that is Agricultural — 5 acres, and there's currently an existing water bottling facility on that <br />property. It's known as Hawaiian Springs. <br />This is the General Plan LUPAG Map, and you can see that the subject property is shown in the <br />orange which is Medium Density Urban which usually allows for Commercial and Multi -Family <br />Residential. This area of Railroad Avenue to the east and then a portion of it to the west where <br />the existing HELCO facility is located has been designated for Industrial uses, and the Planning <br />Director has interpreted the map to allow for Industrial uses in this general area of the subject <br />property as well. <br />This is the State Land Use map which shows the property in an Agricultural District. And <br />nearby areas that are in the Urban District are the Shipman Industrial Park, Kea`au, and then <br />some of the industrial areas near the HELCO plant and along Milo Street. <br />And, this is an aerial photo of the property that shows the Shipman Road paralleling the <br />highway. You have the papaya packing facility and a vegetable pickling facility here. And, <br />then, at this point, the road drops down to road easements. This is the Hawaiian Springs water <br />bottling facility, and then this is the general area of the subject property here. <br />So, this is an old aerial photo. It doesn't show the PV field, but that PV field is generally located <br />in this location here, and then the proposed facility would be over on the west end of the property <br />here. <br />These are some site photos of the road. There is about 22 feet of pavement, and you can see the <br />water botting facility at the end of the road here, and then this is looking the other direction back <br />towards Shipman Road. <br />And, these are some views of the property. Hard to see, but you can see the PV field over in this <br />area here. That's on the east side of the property. And, then, this is the middle area and the west <br />side of the property. So, the proposed facility is, would be located in this area here. <br />EXHIBIT C <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.