My WebLink
|
Help
|
About
|
Sign Out
Home
2017-06-15 Leeward Exh A (USE 17-000068)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2017
>
2017-06-15 Leeward Exh A (USE 17-000068)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2017 2:08:54 PM
Creation date
8/21/2017 2:08:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
site from Paniolo Avenue, this is looking east to the site toward Paniolo Avenue, and then this is <br />looking south to the site from above the parcel. That gives you an idea of where that will be located. <br />And here is generally of the area we’ll be accessing off of Paniolo Avenue to go back to the facility <br />site. And here is, on the bottom left, a picture of Paniolo Avenue looking north and we’ve got <br />Waikoloa School over here, and again looking south with the subject parcel on the right hand side. <br /> <br />Our Planning Director is recommending approval of the Use Permit with conditions. There is one <br />other thing that I wanted to mention: You got the background and recommendation reports last week <br />or a couple of weeks ago, and then a few days later you received an addendum, or an amended <br />analysis and condition. We overlooked one of the comments from Public Works but we were able to <br />catch it in time so that all we are asking here is to add the additional language in our background <br />report and then add the following condition relative to a flood study that was done as a requirement <br />of the Use Permit that was granted in 1993; there is some concern that the roadway that’s being <br />proposed is within an area of flooding inundation, so Public Work wanted to make sure that it was <br />either outside of the area or, if it was within the area, they have the possibility of conducting <br />additional studies to make sure there wouldn’t be any impacts on surrounding properties. <br /> <br />With that, that’s my presentation, I’m happy to entertain any questions that the Commission may <br />have. <br /> <br />UNGER: Thank you. Commissioners, any questions? <br /> <br />CARR SMITH: I have two. <br /> <br />KAY: Yes. <br /> <br />CARR SMITH: I was wondering who owns the property that’s vacant between there and the school. <br />Do you know? <br /> <br />KAY: You know, I’m not sure, I’d have to check on that. <br /> <br />CARR SMITH: Okay. And was any outreach done within the Village? <br /> <br />KAY: I know that the applicant did send out the required notice to surrounding property owners, and <br />I believe that we sent the application for comment to the Village Association. <br /> <br />CARR SMITH: Thank you. <br /> <br />KAY: Thank you. <br /> <br />UNGER: And no responses? <br /> <br />KAY: No responses. We didn’t get any complaints or objections from the mailing nor did we <br />receive response from the Village Association. <br /> <br />UNGER: Thank you. <br />3 <br />EXHIBIT A <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.