My WebLink
|
Help
|
About
|
Sign Out
Home
09 - 25 thru 30 Permits Issued Details
PublicDocuments
>
Public Works
>
Building Division
>
Permits Issued
>
2017
>
Weekly Details
>
09 - September
>
09 - 25 thru 30 Permits Issued Details
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2017 9:28:57 AM
Creation date
10/2/2017 9:28:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor NameTMK <br />ALOHA PETROLEUM LTDMARIA CARIAGA( SUNRUN INSTALLATION SERVICES INC )8-1-009-0132-4-058-047 <br />81-6255 MAMALAHOA HIGHWAY HI ( 81009527 AWELA ST HI (24058047) ( 24058047 )PPB <br />Permit No.Owner NameTo Be Occupied AsSite AddressTYPE / PRJCD <br />GAS STATIONDWELLING325.00337.0045,00046,400 <br />BK2017-01420BK2017-01421 <br />Alteration,ElectricalAlteration,Electrical,PhotovoltaicM9/29/20179/29/2017 <br />Architect/EngineerScope of Work <br />LLOYD M HIGAKEVIN M MURAR <br />OCCP / DateFeesEst Value <br />1 <br />FlrArea Units Stories <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.