My WebLink
|
Help
|
About
|
Sign Out
Home
2017-09-25 Leeward Exh B (CZM SMA PowerPoint)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2017
>
2017-09-25 Leeward Exh B (CZM SMA PowerPoint)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 2:27:38 PM
Creation date
11/17/2017 2:11:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Purpose of the SMA Permit <br />• The SMA permit was established in 1975 with the <br />enactment of Act 176, SLH, the Shoreline Protection Act <br />• Special controls on developments within an area along the <br />shoreline to <br />1) avoid permanent losses of valuable resources and the <br />foreclosure of management options; and <br />2) ensure that adequate access, by dedication or other <br />means, to public owned or used beaches, recreation <br />areas, and natural reserves is provided. <br />Coastal Zane Manage- <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.