My WebLink
|
Help
|
About
|
Sign Out
Home
2017-12-07 Hearing Transcript - HICDC SLU 17-050
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2017
>
2017-12-07 Hearing Transcript - HICDC SLU 17-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 8:10:22 AM
Creation date
1/5/2018 8:10:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposed are three, 2 -level apartment buildings and a community center. The Applicant <br />proposes improvements to the access road, County waterline, on-site parking, and landscaping. <br />Further, the Applicant has stated that they will comply with all applicable Federal, State, and <br />County requirements including floodplain management, fire control, and wastewater system <br />design. <br />This is the Applicant's proposed overall site plan. Phase 1 is highlighted in green and was <br />completed in 2014. Phase 2 consisted of a 32 -unit senior apartment building which is completed <br />and occupied, and, the Hilo Adult Care Center, which is currently under construction. Phase 3, <br />highlighted in yellow, will consist of the 92 units plus the community center. <br />This is the Applicant's proposed site plan. The proposed work includes the three senior <br />apartment buildings shown in purple; the community center shown in the teal; and the proposed <br />parking shown in the pink. <br />This is the Applicant's proposed elevation plans. On the left is the community center, a one - <br />level building with walkways leading to the senior apartment buildings on either side, and this is <br />a sample of the senior apartment building elevation which is a two-level building on the right. <br />This is the Zoning Map. The subject property is highlighted in red and is in the Agricultural <br />District. The Sunrise Ridge Subdivision to the north is zoned Residential, Single -Family. The <br />University is in purple. Other Residential zoning in yellow; the Multiple -Family Residential in <br />the brown, and Project District in the bluish, purple, gray color in the upper left hand corner. <br />This is the State Land Use Boundary Map. The subject property is in the State Land Use <br />Agricultural District. <br />This is the General Plan Land Use Pattern Allocation Guide Map. The subject property is <br />designated as Medium Density Urban. <br />This is an aerial photograph of the subject property highlighted in yellow. As this picture was <br />taken a while ago, it does not show the 32 -senior apartment building and the Hilo Adult Day <br />Care Center. <br />This photograph was taken standing on Kupuna Place looking towards the Mohouli Street <br />intersection. <br />This photo was taken on the road easement just off of Kupuna Place leading towards Phase 3. <br />This photo was taken standing at the proposed upper portion of Phase 3 looking makai towards <br />the Komohana Street and Mohouli Street intersection. <br />These photos were of Phase 2. The photo in the center shows the Hilo Adult Day Care that's <br />under construction, and I apologize this photo is a little dark. On the left side is the apartment <br />building which is a continuation of the building that you see in the middle, and on the right, we <br />had the emergency access gate leading towards Kahikini Street in the Sunrise Ridge Subdivision. <br />EXHIBIT A <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.