My WebLink
|
Help
|
About
|
Sign Out
Home
Comm. No. 2018-03 Pre-Consultation for Draft Environmental Assessment for the Pahoa Library Site Selection
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2018
>
03.06.2018
>
Comm. No. 2018-03 Pre-Consultation for Draft Environmental Assessment for the Pahoa Library Site Selection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 9:44:39 AM
Creation date
2/21/2018 9:44:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pahoa Public Library Site Selection <br />Pre -consultation for Draft Environmental Assessment <br />Site 2 Pahoa District Park <br />The Pahoa District Park site is located on Tax Map Key (TMK) 1-5-002:02o and is owned by the <br />County of Hawaii (Figure 1.3). The 71 -acre site is located to the south of the main Pahoa urban <br />commercial core, adjacent to a residential housing development off Kauhale Street. The parcel is <br />located near the Pahoa Community Center, with the surrounding lands to the west and south <br />currently undeveloped. The site is located at an elevation between foo and 704 feet above MSL <br />and slopes from southwest to northeast at 2.0% to 4.o% grade. The parcel is currently a <br />functioning County District Park. The addition of a library to the project site would potentially <br />be situated at either the future Community Center location or near the third undeveloped <br />baseball field area. <br />The Pahoa Park Expansion Master Plan Final Environmental Assessment (EA), prepared by <br />PBR Hawaii in December 2013, describes a two-phase expansion plan for the district park <br />facility. Phase I of the park was completed in 2017, and Phase 11 is currently undeveloped, with <br />the timing of Phase II completion currently unlmown. The HSPLS has identified the future <br />Community Center location in Phase II of the Master Plan (Facility number 24) as the most <br />ideal location for the library site within the Park Master Plan. If Phase H does not reach <br />completion by the time of the library's design process, an alternate site would be considered <br />adjacent to Phase I in place of the ball field Facility number 17 for purposes of cost savings for <br />clearing, grubbing, and infrastructure quantities. <br />Site 3 Highway 130 Mauka (Dgprtment of Lands and Natural Resources) <br />Site 3 is located mauka of Highway 130, approximately 0.4 miles to the northwest of the <br />intersection of Niaulani Street and Highway 130. Site 3 is a 5 -acre highway -adjacent portion of a <br />larger 5,125 acre DLNR-owned site, which is currently vacant. The site has slopes ranging from <br />1.0% to 2.0% with elevations ranging from 592 to 603 feet above MSL. The site is located 1.5 <br />miles north of Pahoa Town (Figure 1.4). <br />1.4 PURPOSE OF ENVIRONMENTAL ASSESSMENT <br />This Environmental Assessment is required pursuant to Chapter 343, Hawaii Revised Statutes <br />(HRS), the Environmental Impact Statement Rules, Title 11, Chapter 200 of the Hawaii <br />Administrative Rules (HAR). This EA provides written evaluation of the technical, <br />environmental, social and economic aspects of the proposed project. This EA identifies the <br />possible impacts of the proposed project and their significance. Strategies to mitigate those <br />potential impacts and possible alternatives to the proposed project are also identified. This EA <br />then compares potential project impacts against 13 significance criteria listed in §11-200-12 to <br />provide a determination as to whether an Environmental Impact Statement shall be required or <br />not. <br />1.5 AGENCIES AND PUBLIC CONTACTED IN PRE -CONSULTATION <br />The following agencies and groups will be consulted for this consultation period. <br />Federal Agency <br />United States Fish and Wildlife Service <br />State of Hawaii Agencies <br />State Department of Accounting and General Services <br />State Department of Agriculture <br />1-3 G70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.