Laserfiche WebLink
<br /> G. NORTH KONA SEWER PUMP STATION <br />• This new sewer pump station will be located on the mauka side of Queen <br />Kaʻahamanu Highway. It is to receive wastewater from a portion of the area <br />below Ane Keohokalole Highway between Hina Lani Street and Kealakehe <br />Parkway. The wastewater will be pumped to the Kealakehe WWTP via new <br />forcemains tentatively scheduled to be installed by mid-2020. <br />• The pre-design phase, including the archaeological and permitting <br />assessments, has begun. The archaeological and cultural consultation began <br />with a site visit on 2/8/18 conducted by Cultural Services Hawaiʻi (CSH) and <br />invitees representing various interest groups in the local area. A summary <br />report of the site visit is being prepared by CSH. <br /> <br />H. WASTEWATER EQUIPMENT REPLACEMENT PROJECTS: <br />• Pua Sewage Pump Station (SPS) Upgrade: Design of the upgrade to the Pua <br />SPS is in progress. It includes a complete renovation to include the structural, <br />electrical and mechanical upgrades to the pump station. Cause for renovation <br />is due to deterioration of the wet well from H2S; electrical component damage <br />due to H2S corrosion and the overall age of the facility; and mechanical <br />damage due to faulty discharge line valves due to hydraulic surging. Work is <br />to include upgrading the HVAC; replacing/upgrading components of the <br />electrical system; replacing corroded duct work; upgrading the wet well level <br />control system and improving on safety issues by eliminating fire and electrical <br />hazards to achieve compliance with NFPA 820 and 70E. The project is funded <br />by CWSRF monies. <br />• Hilo WWTP Administration Building Reroofing: Work on mold remediation is <br />complete. The remaining work is sheetrock installation, painting, and HVAC <br />work. This work will commence once the Contractor’s change order request <br />receives County approval. <br />• ZOM Dilution and Assimilative Capacity Study: Due to inclement weather <br />conditions, the field work for the Dilution and Assimilative Capacity Study for <br />the Pāpa‘ikou, and Kula‘imano WWTPs has been re-scheduled to early May <br />2018. <br /> <br />I. ULU WINI WASTEWATER TREATMENT PLANT: <br />• The WWD continues to maintain stability of the treatment plant with the goal <br />of achieving consistent process data and meeting the regulatory as well as <br />expected effluent limits. The treatment system currently meets DOH <br />regulatory requirements, and nutrient removal is taking place. The longer term <br />goal is to cut down on operation and maintenance. <br />• Progress on the design plans and specifications (for the installation of the <br />immediately planned treatment plant upgrades aimed at maintaining treatment <br />plant stability and reliability plus lowered operations and maintenance cost for <br />the next several years) is on hold due to OHCD’s notification to the <br />Department that they are working with a Consultant to assess the condition of <br />the treatment plant . <br />• The State DOH is being kept apprised of the progress. <br /> <br /> <br /> <br /> <br />