My WebLink
|
Help
|
About
|
Sign Out
Home
2018-04-25 EMC Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2010-2019
>
2018
>
2018-04-25 EMC Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2018 2:25:01 PM
Creation date
4/18/2018 2:03:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Station early in the day, then the remainder is sent to the landfill. Just recently is the <br />SWD at the point where they have enough space in the sort station to receive waste. <br /> <br />8. MONTHLY LANDFILL TONNAGES (FY 17-18) <br />July 2017: 6,285.01 tons (SHSL); 11,599.78 (WHSL) <br />August 2017: 6,363.62 (SHSL); 11,580.58 (WHSL) <br />September 2017: 6,037.19 (SHSL); 10,132.09 (WHSL) <br />October 2017: 6,404.06 (SHSL); 11,406.20 (WHSL) <br />November 2017: 5,956.18 (SHSL); 11,773.83 (WHSL) <br />December 2017: 6,906.55 (SHSL); 10,988.65 (WHSL) <br />January 2018: 6,510.36 (SHSL); 10,134.36 (WHSL) <br />February 2018: 5,730.29 (SHSL); 9,517.57 (WHSL) <br />March 2018: 6,702.33 (SHSL); 11,387.65 (WHSL) <br />Totals: 56,895.59 (SHSL); 98,520.71 (WHSL) <br /> <br /> <br />WASTEWATER DIVISION PROJECTS AND UPDATES <br /> <br />1. COMPLIANCE <br />• TREATMENT AND DISPOSAL: No report. <br />• COLLECTION SYSTEM: No report. <br /> <br />2. OPERATIONS <br />A. TREATMENT/COLLECTION SYSTEMS AND PUMPING STATIONS/ <br />FORCE MAINS: <br />• Unscheduled repairs/upgrades/replacement of failing equipment due to age and <br />prolonged wear and tear continue where necessary throughout the wastewater <br />facilities. <br />B. SAFETY PRACTICES/TRAINING: <br />• WWD Administration continues to review and update the Emergency <br />Response Procedures and the Standard Safety Procedures. <br /> <br />3. ADMINISTRATION <br /> A. VACANT POSITIONS: <br />• Progress continues in filling vacant positions in Operations: Operator I and II <br />(Hilo); Sewer Maintenance Working Supervisor (Hilo); WWTP Operator <br />Supervisor III (Kona). <br />• Interview in progress: Civil Engineer IV. <br /> <br />7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.