My WebLink
|
Help
|
About
|
Sign Out
Home
2018-05-23 EMC Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2010-2019
>
2018
>
2018-05-23 EMC Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2018 10:55:37 AM
Creation date
5/16/2018 10:44:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Sewer Maintenance Repairer (Kona): interviews scheduled <br />• Wastewater Treatment Plant Supervisor III (Kona): recruitment in progress <br /> <br />B. VACANT POSITIONS AT RAILROAD OFFICE: <br /> Engineering Support Tech IV: interviews scheduled <br /> Civil Engineer IV: interviews completed <br /> Engineering Student: requesting reallocation to Env. Eng. III <br /> Student Helper I: requesting reallocation to Env. Eng. III <br /> <br />4. WASTEWATER CAPITAL IMPROVEMENTS <br />A. NĀ‘ĀLEHU LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Based on feedback from the community, alternative potential sites are being <br />investigated. <br />• The State Environmental Assessment process is to be completed prior to the <br />acquisition of land for the treatment/disposal facility. <br />• Closure of the large capacity cesspools as mandated by the EPA will occur <br />once the treatment and disposal system has been constructed and properties <br />have been connected to the new collection system. <br />• The project is funded by Clean Water State Revolving Funds (CWSRF) <br />monies. <br /> <br />B. PĀHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Public outreach meetings following the talk story sessions are tentatively <br />planned to take place sometime in May 2018. <br />• As a result of EPA funding for this project, the NEPA process in addition to the <br />State EA process are required. Both processes are to be completed prior to the <br />acquisition of land for the treatment/disposal facility. <br />• The WWD has been teleconferencing with the EPA and their consultants on a <br />bi-weekly basis to ensure all items in the NEPA process are completed. <br />• Closure of the large capacity cesspools as mandated by the EPA will occur <br />once the treatment and disposal system has been constructed and properties <br />have been connected to the new collection system. <br />• The project is funded by Clean Water State Revolving Funds (CWSRF) <br />monies and partially by a federal EPA grant. <br /> <br />C. NORTH KONA SEWER AND EFFLUENT REUSE UPGRADE: <br />• The fully executed MOU has been received by DEM. The project itself is <br />about 90% complete. The only remaining wastewater project item in progress <br />is the manhole rim adjustments to final grade. <br />• The State DOT began the overall project construction in September 2015. <br />Currently, the anticipated completion date is August 2018. <br />• The project is funded by Clean Water State Revolving Fund (CWSRF) monies. <br /> <br />8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.