My WebLink
|
Help
|
About
|
Sign Out
Home
ACT 203 Instructions (5_4_18)
PublicDocuments
>
Public Works
>
Building Division
>
Forms & Permit Applications
>
ACT 203 Declaration of Compliance
>
Archive
>
ACT 203 Instructions (5_4_18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 12:22:09 PM
Creation date
5/25/2018 3:06:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SUBMIT THE FOLLOWING: <br />✓ 1 - completed DECLARATION OF COMPLIANCE form <br />✓ 1 - 8'/" x 11" exhibit showing approximate location of structure, property <br />lines, other structures, setbacks to other structures, dimensions of structure, <br />and any other pertinent information. Attach extra sheets as necessary. <br />(SUBMIT HARD COPIES ONLY; NO EMAIL OR FAX SUBMITTALS) <br />• SUBMIT DECLARATION TO: <br />Department of Public Works <br />Building Division <br />101 Pauahi Street, Suite 7 <br />Hilo, Hawaii 96720 <br />Phone: (808) 961-8331 <br />• PLUMBING AND ELECTRICAL PERMITS: <br />✓ HRS 46-88 does NOT provide exemptions from Plumbing and Electrical Permits. <br />In order to apply for a Plumbing or Electrical Permit for an exempted structure, an <br />applicant must first submit the Declaration of Compliance form and have it <br />accepted by Public Works. An exemption declaration number (BX) will be issued <br />upon acceptance. This declaration number must be referenced in any Plumbing <br />or Electrical Permit application. <br />• POST CONSTRUCTION REQUIREMENTS: <br />✓ A FINAL AS -BUILT NOTIFICATION FORM must be submitted upon completion <br />of construction. Failure to submit the form will cause the DECLARATION OF <br />COMPLIANCE to be declared INVALID and shall VOID the building permit and/or <br />code exemption. A single Final As -Built Notification Form must be submitted in <br />compliance with both of the following deadlines: <br />1. Submit form within 1 year of Declaration of Compliance acceptance date. <br />2. Submit form within 30 days of completion, use, or occupancy of structure. <br />✓ If the as -built conditions of the structure have changed from what was indicated <br />on the original declaration and/or site plan, Planning Department re -approval is <br />required on the FINAL AS -BUILT NOTIFICATION form and a new site plan shall <br />be submitted. <br />END <br />County of Hawai' i is an Equal Opportunity Provider and Employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.