My WebLink
|
Help
|
About
|
Sign Out
Home
Communication Number 2018-07 CIP Spreadsheet
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
South Kohala Community Development Plan Action Committee
>
Communications
>
2018
>
Communication Number 2018-07 CIP Spreadsheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 1:43:38 PM
Creation date
5/29/2018 1:48:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17 <br />County of Hawaii <br />PROJECT DATA/FINANCIAL IMPACT STATEMENT <br />Fiscal Year 20I6 - 20I7 <br />Communication No. 2018-07 <br />1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 1/15/2016 P <br />3- PROJECT NAME: Mamalahoa Highway (Route 19) Widening (Mud Lane to Mnaa Road) 4. SUBMITTER: Casey K. Yanagihara <br />5. COUNCIL BENEFIT DISTRICT(S): Island Wide 6. TMK/JUDICIAL: 6-4-01 / South Kohala <br />7. LOCATION (COUNCIL DISTRICT): 1,9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,000,000 <br />9- CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement, Planning, Feasibility, Engineering, Design and Construction. <br />10 PROJECT/PROGRAM DESCRIPTION: Drainage and roadway improvements. Work includes widening eighteen (18) intersections to install left -turn pockets, along the Mamalahoa Highway (Route 19), <br />asphalt Concrete paving, concrete/CRM watts, drainage improvements and utility relocations. <br />11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): This project seeks to improve vehicular, bicycle and pedestrian safety; and also improve vehicular circulation and the drainage <br />conditions in the area. <br />12. LONG RANGE PLANS/COMMUNITY VALUES: #1; Department's vision, mission, core values and goals to promote and ensure the health and safety to the public. <br />13. REQ) Y <br />~ <br />,14. <br />DESCRIBE: <br />FHWA will fund 80% of eligible costs. <br />� <br />LEGAL MADATE? (Y/N) Y <br />DESCRIBE: <br />15. IMPACT ON OPERATIONAL BUDGET: Upon completion, Highway Maintenance Division and Traffic Division will maintain the proposed improvements in the future. <br />16. SUSTAINABILITY FOCUS (List all that apply): #5; Promotes health and safety. This project will provide improved pedestrian, bicycle and vehicular traffic circulation and safety in the area. <br />17. PROJECT READINESS (List all that apply): Progressing with environmental and design; with construction to follow. <br />18. EXPENDITURE PHASING (X $1000): <br />Prior Funds <br />Allotted <br />(not lapsed) <br />This FY 16-17 <br />Request <br />FY 17-18 <br />FY 18-19 <br />FY 19-20 <br />FY 20-21 <br />FY 21-22 <br />Beyond 6 <br />Years <br />TOTAL: <br />Planning <br />Land Acquisition <br />Design/Survey <br />1,50[7 <br />$1,500 <br />Construction <br />15,000 <br />$15,000 <br />TOTAL: <br />$1,500 <br />$15,000 <br />$16,500 <br />19. O & M COSTS (x $1000): <br />20. FUNDING SOURCE (x $1000): <br />•' <br />Cty G.O. Bond/Other <br />30a <br />3,000 <br />53..3i7.`� <br />State Revolving Fund <br />State CIP <br />Federal <br />1,200. 12.000 <br />$13,200 <br />Private (Grants) <br />CBA (fair Share, Park Dedication, etc) <br />TOTAL :1 <br />51,500]j $15,000 <br />i <br />$16,500 <br />147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.