My WebLink
|
Help
|
About
|
Sign Out
Home
2018-04-25 Meeting Minutes (EMC)
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Minutes
>
2010-2019
>
2018
>
2018-04-25 Meeting Minutes (EMC)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 2:37:52 PM
Creation date
5/29/2018 2:33:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Commissioner Osborne said she would like to discuss the Nāālehu Large Capacity ʻ <br />Cesspool Replacement project, on page 8 of Director Kucharski’s report. She said she is very <br />concerned and distressed by the testimony received today. At an earlier meeting she expressed <br />her concern about condemning private property in Pāhala. Now she is distressed to hear there is <br />consideration of condemning a family owned ranch which is located by a school. She is <br />astounded this is happening and would like the director’s update on this. <br /> <br /> Director Kucharski said that for the Pāhala facility, it has been redesigned and the County <br />will only take a portion of the property. They are in discussions with Kamehameha Schools, and <br />there is no conflict at this point. For Nāālehu, over the past 12 to 1ʻ5 years they have looked at <br />between 23 and 28 sites in the area. None of the sites were deemed acceptable, for one reason or <br />another. When the process was started, the property in question was up for sale. It was <br />examined and believed it could be an appropriate location. Before any property can be <br />condemned, an EA needs to be done on it. Part of the EA review is to look an alternative sites <br />that could be used. The talk story sessions that occurred recently were to bring the issue to the <br />forefront in the community, and it was eminently successful in that regard. The EPA’s <br />administrative order of consent was publicly noticed last year. There were full sets of comments <br />received on the plan, and the EPA responded to each public comment received. What was going <br />to happen was not a secret, and the proposed location is not the final location. The final location <br />is unknown until such time as the EA is complete. If a facility is not constructed, the County is <br />subject to $10,000 per day in penalties for violations. The cesspools were to have been closed by <br />2005, and they have failed miserably in doing their duty to the environment and local residents. <br /> <br /> Commissioner Osborne said she did not see how they could consider having the facility <br />placed by a school. There are long-term issues these facilities face. She is also unclear on how <br />the talk story sessions were successful. If 23 to 28 sites were looked at, surely something can be <br />found that is not by a school. There has to be somewhere in the vast Kaū area that could be ʻ <br />considered. She asked what the community’s recourse is, the timelines, and what the EMC can <br />do to address this, as it is not sitting well with her. <br /> <br /> Director Kucharski said the talk story sessions were to talk to the community about the <br />fact that an EA was about to be presented. It was not to come in and say this is what the County <br />is doing. It was to come in and have the community understand what was under consideration <br />and what the EA would look at. The EA has not started. <br /> <br /> Commissioner Osborne asked whether, if the County goes forward with an EA, the next <br />step is serious consideration, and Director Kucharski said that is not correct. The EA is <br />proceeding. Until it is completed, a final site will not be selected. This is part of the process. <br /> <br /> Commissioner Osborne ask if the EA would be on several sites. Director Kucharski said <br />the EA will look at the site and do an engineering analysis of all the sites. This is what was done <br />in Pāhala as well. It is based on having already reviewed the other sites, which for one reason or <br />another were not acceptable. He explained that when he said the talk story sessions were <br />successful, he meant the community became fully aware of what is potentially going to happen. <br />A sewage treatment plant is going to happen. Where it will be placed is not yet determined. <br />This location right now has been deemed, from an engineering perspective, an acceptable site. <br />13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.