My WebLink
|
Help
|
About
|
Sign Out
Home
2017-COH - Comprehensive Annual Financial Report
PublicDocuments
>
Legislative Auditor
>
Audit Reports
>
Annual Comprehensive Financial Report
>
2017-COH - Comprehensive Annual Financial Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2018 2:23:50 PM
Creation date
7/12/2018 1:01:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The $75 million improvements at the Kona International Airport include a centralized security <br />area, a six -lane passenger screening checkpoint building and new restrooms, The expansion i� <br />anticipated to be completed by February 2019. <br />Major Initiatives <br />UU37=11 "71 <br />MAN <br />0w; <br />MmmWffl,") I OT WS - R, <br />and to improve responses and services to the community, such as 1) an online training and <br />records management system, which is training software that allows all personnel to complete <br />,fidactic based training directly from the stations' computers and maintain training records, 2) a <br />riew Computer Aided Dispatch (CAD) software and Emergency Dispatch Center Console <br />upgrades to provide the most current CAD service and, 3) the implementation *.n <br />the <br />W,epartment's intranet which enables direct sharing of critical information amongst personnel <br />within the department. <br />Public Works — Over the past fiscal year the Department of Public Works (DPW) completed <br />majM r projects in our community including: <br />The Kapi'olani Steet project, valued at $14.1 million, was completed in August, 2016. The extension <br />provides an alternate emergency evacuation route and improves traffic flow on Kilauea Avenue, <br />Kino'ole Street, and the surrounding streets, The project involved the construction of concrete curbs, <br />gutters and sidewalks; drainage improvements, utility installation, and relocation; traffic signals at <br />two intersections and a concrete bridge across Waifikea Stream. <br />The Mdmalahoa Highway Bypass Road and Nap6'opo'o Road Intersection Improvement project, <br />valued at $30 million, was completed in November, 2016. This project involved the construction of a <br />two-lane roadway from Haleki'i Street 2.2 miles to the vicinity of the Nap6'opo'o Road/Mamalahoa <br />Highway intersection, The project included two travel lanes, paved shoulders, and traffic signals at <br />the Nap6'opo'o intersection, driveway tie-ins, water utilities, and drainage improvements, The <br />b ass road mitigates traffic cqn V',�. e rt i an <br />such congested areas as Honalo, Kainaliu and Konawaena schools. <br />The Komohana Street Reconstruction (Waidnuenue Avenue to K5k5au Street), valued at $4,6 million, <br />was completed in May 2017. The project involved the reconstruction of approximately 4000 feet of <br />roadway, traffic signal upgrades, pavement striping, and replacing utility valves and boxes. The <br />project was completed in May 2017. <br />all <br />
The URL can be used to link to this page
Your browser does not support the video tag.