Laserfiche WebLink
FORCE FIELD ANALYSIS <br /> Alternative: Assign the Wastewater Division to the Department of Water Supply. <br /> EVALUATION <br /> "FOR" FACTORS "AGAINST" <br /> o Water Commission is already in place. Policy Setting ° County Council relinquishes policy role. <br /> o Would become semi-autonomous. Semi-Autonomy ° Would discontinue being a county-type <br /> operation. <br /> o DWS is fully staffed with the Administration ° DWS will have to be diverse in its area <br /> administrative capabilities. of responsibility. <br /> • Addition of another division to DWS: <br /> division Chief, superintendent, <br /> 2-fiscal/clerical , 33 operations <br /> positions. <br /> o Wastewater is a special fund called Fiscal-Special Funds ° Wastewater is currently subsidized <br /> the "Sewer" fund. 40%-45%. This policy would need to be <br /> defined. <br /> ° The addition of the Sewer fund will <br /> have toeither be amended in the <br /> Charter or be adopted as an addition to <br /> the water fund. . <br /> (Sec. 8-4, Charter 1980) <br /> • <br /> o Billing system already in-place. Revenue Collections <br /> o Non-payment procedures of DWS (water <br /> shut-off) is better incentive to <br /> assure payment. <br />