My WebLink
|
Help
|
About
|
Sign Out
Home
2018-06-27 Meeting Minutes (EMC)
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Minutes
>
2010-2019
>
2018
>
2018-06-27 Meeting Minutes (EMC)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 10:35:21 AM
Creation date
7/31/2018 10:23:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />using the term “waste reduction” should be user, as it is broader. She asked for the <br />director’s thoughts. <br /> <br />Director Kucharski said he essentially is hearing that any contracts that are <br />entered into by DEM should have an education component as part of that contract. <br />Contracts are only entered into with outside entities, so it may be redundant to have <br />“outside organizations” in the motion. He believes the motion has a solid point and <br />would be a good step. <br /> <br />Vice Chair Olson questioned whether they were in discussion, and Chair Bennett <br />said he thought an amended motion had been made. He asked Commissioner Osborne <br />to restate her amended motion. <br /> <br />Discussion was held back and forth on how the motion should be worded and <br />what it should contain. <br /> <br />Amended motion and second: Commissioner Osborne moved that any contracts <br />entered into with DEM contain a percentage of the contract dedicated to education and <br />outreach component for waste reduction. Commissioner Gaffney seconded the motion. <br /> <br />Vice Chair Olson said he thought the component already existed, but setting a <br />minimum would be an appropriate thing. There’s a problem with so many moving <br />parts, and the cost of achieving a meaningful outcome becomes tricky. If it is cast into <br />stone, then even the best intentioned may not be able to achieve the outcome being <br />sought, but it would be better than nothing. He would like to see it move forward, but <br />perhaps later it could be defined better by the scope of what the agency is capable of <br />doing and setting some other goals. <br /> <br />Director Kucharski said he was running numbers in his head, and if they set it at <br />1%, it would be $1,000 for a $100,000 contract. You would not get a whole lot of <br />education for that. If the amount is set too high, it would bump the budget up by that <br />amount. Some contracts, such as those for recycling and composting, have a much <br />more important education aspect. If DEM gets into a true litter program, the education <br />necessary will be significantly higher than on compost. He believes it will allow for <br />more flexibility if it has to be contained in every proposal and every bid. If it is a fixed <br />amount, it will be difficult to go above that. <br /> <br />Chair Bennett said there may be some value to build into the motion a request <br />that as RFPs are being developed, the education component come back to the <br />commission for advice. If it would have a significant public involvement, the EMC could <br />say it needs to be more significant. Commissioner Osborne that may cause the EMC to <br />overstep their role as commissioners, which does not include day-to-day management. <br />She asked Director Kucharski to speak to that. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.