My WebLink
|
Help
|
About
|
Sign Out
Home
2018-08-22 EMC Agenda and Director's Informational Report (CANCELLED)
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2010-2019
>
2018
>
2018-08-22 EMC Agenda and Director's Informational Report (CANCELLED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2018 1:11:24 PM
Creation date
8/15/2018 9:15:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
was a pump discharge valve that was left in the closed position. The area was <br />disinfected. Per HAR 11-62 for spills within property, formal notification and <br />reporting is not necessary for the spill volume, and a record of the event will be <br />maintained onsite. <br /> <br />2. OPERATIONS <br />A. TREATMENT/COLLECTION SYSTEMS AND PUMPING STATIONS/ <br />FORCE MAINS: <br />• Unscheduled repairs/upgrades/replacement of failing equipment due to age and <br />prolonged wear and tear continue where necessary throughout the wastewater <br />facilities. <br /> <br />B. SAFETY PRACTICES/TRAINING: <br />• WWD Administration continues to review and update the Emergency <br />Response Procedures and the Standard Safety Procedures. Reviewing and <br />updating weekly safety meeting agendas. <br /> <br />3. ADMINISTRATION <br /> A. VACANT POSITIONS IN OPERATIONS: <br />• Trades Helper (temporary, Hilo – 2 positions): recruitment in progress. <br />• Operator II (Hilo): requesting reallocation to Operator IV. <br />• Wastewater Treatment Plant Supervisor IV (Hilo): Position has been filled <br />with an effective date of 8/16/2018 <br />• Assistant Operator (Hilo – 2 positions): recruitment in progress. <br />• Assistant Operator (Kona – 2 position): recruitment in progress. <br />• Wastewater Treatment Plant Supervisor III (Kona): recruitment in progress. <br /> <br />B. VACANT POSITIONS AT RAILROAD OFFICE: <br />• Engineering Support Tech IV: recruitment in progress. <br />• Civil Engineer IV: position has been offered and accepted; start date is <br />8/16/18. <br /> <br />4. WASTEWATER CAPITAL IMPROVEMENTS <br />A. NĀ‘ĀLEHU LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Alternative potential sites are being investigated. <br />• Public outreach meetings will be scheduled for late September 2018. <br />• The State EA process is to be completed prior to purchase of land for the <br />treatment/disposal facility. <br />• Closure of the large capacity cesspools as mandated by the EPA will occur <br />once the treatment and disposal system has been constructed and properties <br />have been connected to the new collection system. <br />• The project is funded by Clean Water State Revolving Funds (CWSRF) <br />monies. <br /> <br />B. PĀHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Public outreach meetings will be scheduled for late September 2018. <br />8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.