Laserfiche WebLink
8. MONTHLY TRANSFER STATION TONNAGES (FY 18-19) <br /> <br />Month/Year SHSL WHSL <br />Jul 2018 3,422.47 4,434.41 <br />Aug 2018 3,448.69 4,206.27 <br />Sept 2018 3,373.07 4,100.10 <br />Oct 2018 <br />Nov 2018 <br />Dec 2018 <br /> <br />Jan 2019 <br />Feb 2019 <br />Mar 2019 <br />Apr 2019 <br />May 2019 <br />Jun 2019 <br />Totals 10,244.23 12,740.78 <br /> <br />The above table is to include data on the waste disposed of in the landfill (not the <br />greenwaste or recycling data). <br /> <br /> <br />WASTEWATER DIVISION PROJECTS AND UPDATES <br />1. COMPLIANCE <br />• TREATMENT AND DISPOSAL: No report. <br />• COLLECTION SYSTEM: No report. <br /> <br />2. OPERATIONS <br />A. TREATMENT/COLLECTION SYSTEMS AND PUMPING STATIONS/ <br />FORCE MAINS: <br />• Unscheduled repairs/upgrades/replacement of failing equipment due to age and <br />prolonged wear and tear continue where necessary throughout the wastewater <br />facilities. <br /> <br />B. SAFETY PRACTICES/TRAINING: <br />• WWD Administration continues to review and update the Emergency <br />Response Procedures and the Standard Safety Procedures, and the weekly <br />safety meeting agendas. <br /> <br />3. ADMINISTRATION <br /> A. VACANT POSITIONS IN OPERATIONS: <br />• Trades Helper (temporary: Hilo – 1 position; Kona – 1 position): recruitment <br />in progress <br />8 <br /> <br />