My WebLink
|
Help
|
About
|
Sign Out
Home
2018-10-24 EMC Meeting Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2010-2019
>
2018
>
2018-10-24 EMC Meeting Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2018 1:53:38 PM
Creation date
10/17/2018 1:53:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. ULU WINI WASTEWATER TREATMENT PLANT: <br />• WWD continues to maintain stability of the treatment plant with the goal of <br />achieving consistent process data and meeting the regulatory as well as <br />expected effluent limits. The treatment system currently meets DOH <br />regulatory requirements, and nutrient removal is taking place. The longer term <br />goal is to cut down on operation and maintenance. <br />• Progress on the design plans and specifications (for the installation of the <br />immediately planned treatment plant upgrades aimed at maintaining treatment <br />plant stability and reliability plus lowered operations and maintenance cost for <br />the next several years) is on hold due to the Office of Housing and Community <br />Development’s notification to the Department that they are working with a <br />consultant to assess the condition of the treatment plant. <br />• The State DOH is being kept apprised of the progress. <br /> <br />I. SEWER RATE STUDY UPDATE: <br />• Work on the Sewer Rate Study continues. DEM is currently working with the <br />consultant on finalizing the rate study. <br /> <br />J. UPDATE ON WATER SHUT-OFF FOR NON PAYMENT OF SEWER BILLS: <br />• DEM is currently drafting administrative rules for the implementation of water <br />shut-off for non-payment of sewer fees. The Department of Water Supply <br />(DWS) is also drafting amendments to its rules to allow for water shut-off due <br />to non-payment of sewer fees. Both DEM and DWS rules need to be amended <br />for the water shut-off to be implemented. In the meantime, we continue to <br />work with delinquent customers to bring their accounts current and refer <br />accounts to the Office of the Corporation Counsel to pursue judgments when <br />necessary. <br /> <br />K. FISCAL SUSTAINABILITY PLAN/ASSET MANAGEMENT PROGRAM <br />• PG Environmental has completed the data collection for all of the critical <br />assets, and is now working on the criticality analysis. The next deliverable will <br />be the Draft Condition Based Assessment due early November. <br /> <br /> <br /> <br /> <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.