My WebLink
|
Help
|
About
|
Sign Out
Home
2018-11-28 EMC Meeting Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2010-2019
>
2018
>
2018-11-28 EMC Meeting Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 10:13:49 AM
Creation date
11/21/2018 9:56:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• Closure of the large capacity cesspools as mandated by the EPA will occur <br />once the treatment and disposal system has been constructed and properties <br />have been connected to the new collection system. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies and partially by a federal EPA grant. <br /> <br />C. LONO KONA SEWER IMPROVEMENT DISTRICT: <br />• Project was awarded on July 27, 2018. <br />• Public meeting is scheduled for December 11, 2018. <br />• Construction contract is currently being routed for signatures, and NTP will be <br />issued once the contract is fully executed. <br />• The USDA Rural Development has obligated loan and grant funds of <br />$2,437,000 and $4,024,800 respectively to this project. DEM is working with <br />USDA to finalize a Subsequent Loan $3,699,000 and Subsequent Grant <br />$1,071,000. Low construction bid received was $8,531,814.43. <br /> <br />D. KEALAKEHE AERATION UPGRADE AND SLUDGE REMOVAL: <br />• Final approval of the project will be issued pending the review and <br />acceptance of all close-out documents. <br />• The final change order is being processed. <br />• The project is funded by CWSRF monies. <br /> <br />E. KEALAKEHE WWTP EFFLUENT R-1 UPGRADE: <br />• 60% plans are to be submitted to the WWD by November 20, 2018. <br />• The environmental process for the R-1 system is ongoing. A draft EIS is <br />anticipated to be published in January 2019 followed by a 45-day comment <br />period. <br />• The long range plans for R-1 quality effluent began in 2007 as a phased <br />approach. Phase I, which installs a reuse line between the Kohanaiki area and <br />Kealakehe Parkway, is planned under the State DOT’s Phase II Queen <br />Ka‘ahumanu Highway Project (see item C above). <br />• The DOH has earmarked SRF monies in the amount of $54 million to fund <br />both design and construction of the R-1 upgrade at the Kealakehe WWTP. <br /> <br /> F. NORTH KONA SEWER PUMP STATION <br />• This new sewer pump station will be located on the mauka side of Queen <br />Kaʻahamanu Highway. It is to receive wastewater from a por?on of the area <br />below Ane Keohokalole Highway between Hina Lani Street and Kealakehe <br />Parkway. The wastewater will be pumped to the Kealakehe WWTP via new <br />forcemains tentatively scheduled to be installed by late 2020. <br />• The pre-design phase, including the archaeological and permitting <br />assessments, has begun. The Preliminary Engineering Report (PER) is in <br />process, and once the design concept is determined, a follow-up meeting will <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.