My WebLink
|
Help
|
About
|
Sign Out
Home
180427 DHMMP Final Plan with Larger LOGO
PublicDocuments
>
Planning Department
>
General Planning Department Information
>
180427 DHMMP Final Plan with Larger LOGO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2018 1:32:01 PM
Creation date
12/6/2018 1:24:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DOWNTOWN HILO MULTIMODAL MASTER PLAN TABLE OF CONTENTS <br />TABLE OF CONTENTS <br />ExecutiveSummary.......................................................................................................................................1 <br />Proposed Improvements to North-South Streets............................................................................5 <br />Proposed Improvements to East-West Streets................................................................................ <br />8 <br />PART ONE: INTRODUCTION AND BACKGROUND..........................................................................................1 <br />1.0 Introduction............................................................................................................................................1 <br />1.1 Purpose and Need for the Plan.....................................................................................................1 <br />1.2 Complete Streets: Its Benefits and Regulatory Context................................................................ <br />2 <br />1.3 How the Plan Was Developed.......................................................................................................4 <br />1.4 Community Engagement Process.................................................................................................5 <br />1.4.1 Connectors Forum...................................................................................................................7 <br />1.4.2 Focus Groups and Stakeholder Interviews..............................................................................7 <br />1.4.3 Agency Consultation and Technical Advisory Committee.......................................................8 <br />1.4.4 Meetings with Downtown Businesses.................................................................................... <br />8 <br />1.4.5 Community Meetings..............................................................................................................8 <br />1.4.6 Zoom In Zoom Out Sessions..................................................................................................10 <br />1.5 Study Area Boundary..................................................................................................................10 <br />1.6 Organization of the Plan..............................................................................................................13 <br />2. Vision, Guiding Principles, & Organizing Themes...............................................................................15 <br />2.1 Vision for Downtown Hilo...........................................................................................................15 <br />2.2 Guiding Principles.......................................................................................................................17 <br />2.3 Organizing Themes......................................................................................................................18 <br />3. Existing Conditions & Data..................................................................................................................27 <br />3.1 Project Site Context & Community Character.............................................................................27 <br />3.2 Review of Existing Plans, Policies, and regulations.....................................................................31 <br />3.3 Data Collection & Analysis.......................................................................................................... <br />32 <br />3.3.1 Regional Trip Generation......................................................................................................33 <br />3.3.2 Parking Demand Study..........................................................................................................35 <br />3.3.3 Parking Turnover Study.........................................................................................................36 <br />3.3.4 Traffic Impact Analysis........................................................................................................... <br />39 <br />3.3.5 Accident Data for Downtown Hilo........................................................................................40 <br />3.3.6 Roadway Additions and Changes to the Network Currently in Progress..............................42 <br />3.3.7 Planned and Completed Development.................................................................................42 <br />PART TWO: ALTERNATIVES & RECOMMENDATIONS...................................................................................43 <br />4. Transportation Components...............................................................................................................45 <br />April 2018 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.