Laserfiche WebLink
<br />Just wanted to talk about a proposed condition change to Condition No. 6 that we sent out to you <br />the other day. The reason that we made this change is, as the condition was written, it was <br />unworkable; it initially said prior to the issuance of Final Plan Approval, the applicant would <br />have to either secure applicable building permits or remove all unpermitted structures. In our <br />process, in order to secure the building permits, you need to get Plan Approval first, so we <br />changed that to clarify it and make it workable. The intention of the condition was always to <br />take care of the unpermitted structure issue within a year of the permit, so the way we have it <br />written now would keep to that intent and fix the functional problem. <br /> <br />With that said, the Director is recommending approval of this amendment request with <br />conditions. That’s the conclusion of my presentation. I’d be happy to answer any questions the <br />Commission may have. <br /> <br />UNGER: Thank you. Commissioners, any questions? \[None.\] Thank you. <br /> <br />KAY: Thank you. <br /> <br />UNGER: Would the Applicant please come forward? Please raise your right hand. Do you <br />swear or affirm to tell the truth before the Planning Commission? <br /> <br />MOOERS: I do. <br /> <br />EDNEY: I do. <br /> <br />UNGER: Please state your name and area of residence. <br /> <br />MOOERS: My name is Greg Mooers. I’m a planning consultant. My residence is in Waimea. <br /> <br />EDNEY: John Edney. I’m the owner of the property, and I live in Hawi. <br /> <br />UNGER: Thank you. You can, this is your opportunity to talk about your application, so. <br /> <br />MOOERS: Thank you, Mr. Chairman. We have reviewed the background report and <br />recommendation prepared by the Planning Department. I think it accurately reflects the <br />situation, and we support the recommendation. I might point out that the applicant was <br />previously represented by another planner who has since retired or at least cut back on his work. <br />I’ve kind of come in late in the process, but it was the opinion of that planner that the Special <br />Permit was in effect void because the bakery and the fitness center were no longer in operation, <br />and that’s why the applicant did not proceed with getting Plan Approval because he didn’t think <br />it was required. The previous planner submitted a letter to the Planning Department, and the <br />Planning Department indicated that that was not their interpretation, that they wanted us to go <br />ahead, through with the Plan Approval process, and so that’s what we are doing. And so the <br />request is to allow us time to do that. I will point out that we have hired a civil engineer. The <br />civil engineer has prepared the studies requested for Plan Approval as far as solid waste and <br />3 <br />EXHIBIT A <br /> <br />