My WebLink
|
Help
|
About
|
Sign Out
Home
2019-02-07 Hearing Transcript - Christian Liberty Amend SPP 925
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2019
>
2019-02-07 Hearing Transcript - Christian Liberty Amend SPP 925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2019 9:10:21 AM
Creation date
3/11/2019 9:10:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
slide, and the subject property gets its primary access off of Milo Street. Just for further <br />reference, Kea`au High School is in this area here. <br />The Applicant is requesting an amendment to Condition No. 3 to allow a 15 -year extension to <br />the deadline for completing construction. Additionally, they are requesting an amendment to <br />Condition No. 6 to remove the requirement to install rolled asphalt -concrete berms along the <br />subject property's Milo Street and 18-1/2 [sic] Mile Camp Road frontage. And, finally, they are <br />requesting an amendment to the permit to allow the construction of four additional classrooms, <br />bathrooms, parking, and other related improvements. <br />The stated reasons for request is the Applicant has been diligently working toward the <br />development of the subject property in accordance with the Special Permit since 1996 and has <br />completed all of Increment I and a portion of Increment IL As the project is self-funded, the <br />Applicant has attempted to balance the construction of the campus as well as the funding for <br />school, church, and summer camp operations over the years. <br />The request to build four new classrooms, bathrooms, parking, and related improvements will <br />accommodate expanded preschool and kindergarten classrooms, and finally, for students' safety, <br />school policy prohibits students from walking along the road fronting the school property. <br />Students and faculty only use a striped crosswalk to access the upper campus. Otherwise, they <br />remain on school property at all times. Based on the proceeding, the Applicant believes that the <br />requirement of rolled asphalt -concrete berms along the properties frontages is not necessary. <br />The County zoning for the subject property issorry, Ag -20, my apologies. I thought we made <br />the changes to the presentation. The underlying zoning is Ag -20. Surrounding zoning includes <br />Agricultural — 5 acres across Milo Street, some Limited Industrial zoning and some Industrial - <br />Commercial Mixed Use zoning which is the site of the Ulupono Park. <br />The State Land Use designation for the subject property is Urban, pardon me, Agricultural as <br />indicated in green, and there is some surrounding Urban State Land Use designations as <br />indicated in the pink. <br />Finally, the subject property is mixed designation under the General Plan's Land Use Pattern <br />Allocation Guide Map as Medium Density Urban indicated in the orange color and Industrial <br />indicated in the gray. Other surrounding designations are Important Agricultural Lands indicated <br />in the green color and Low Density Urban indicated in the mustard color. <br />Here is an aerial photograph of the subject property and surrounding areas. Again, we've got <br />Milo Street as the access in the 8-1/2 Mile Camp Road which is a private road here. Access is <br />currently from Milo Street, and there is an access from the side road as well. This is the extent of <br />the existing development on the property, and we'll look at the site plan to show where <br />additional development is planned. Again, Milo Street running generally east -west through the <br />slide, and the 8-1/2 Mile Camp Road here. The proposed additional classrooms and bathrooms <br />will be here with taking access off of the 8-1/2 Mile Camp Road, and the additional development <br />is going to be here and here around the fieldhouse with some additional parking, other <br />classrooms, and amenities. <br />EXHIBIT A <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.