Laserfiche WebLink
<br />• Exclusion of necessary acreage on Waikapuna land for ongoing <br />consideration as a future WWTP/Disposal was passed by BLNR. Final land <br />selection is still in progress. <br />• The second public outreach meeting was conducted on 02/26/19. <br />• The next public meeting is tentatively planned for some time in June 2019, <br />following the publication of the Nāālehu ʻDraft EA. <br />• The State EA process is to be completed prior to purchase of land for the <br />treatment/disposal facility. <br />• Closure of the large capacity cesspools as mandated by the EPA will occur <br />once the treatment and disposal system has been constructed and <br />properties have been connected to the new collection system. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies. <br /> <br />B. PĀHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Responses to comments on the draft EA continue to progress. The Final EA <br />is estimated to be completed in the April to May 2019 time frame. <br />• The draft EA was re-submitted (unchanged) on 10/26/18 for publication on <br />11/8/18 in order to extend the comment period to 12/10/18 in response to <br />public request during the initial comment period. <br />• As a result of EPA funding for this project, the NEPA process in addition to <br />the State EA process are required. Both processes are to be completed prior <br />to selection of land for the treatment/disposal facility. <br />• Closure of the large capacity cesspools as mandated by the EPA will occur <br />once the treatment and disposal system has been constructed and <br />properties have been connected to the new collection system. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies and partially by a federal EPA grant. <br /> <br />C. LONO KONA SEWER IMPROVEMENT DISTRICT: <br />• The first excavation work for the sewer line began on 03/11/19. <br />• The project is scheduled to be substantially complete by 09/06/19. <br />• USDA Rural Development has obligated loan and grant funds of $2,437,000 <br />and $4,024,800 respectively to this project. DEM is working with USDA to <br />finalize a subsequent loan of $3,699,000 and subsequent grant of <br />$1,071,000. Low construction bid received was $8,531,814.43. <br /> <br />D. KEALAKEHE AERATION UPGRADE AND SLUDGE REMOVAL: <br />• Final approval of the project will be issued pending the review and <br />acceptance of all close-out documents. There are also remaining equipment <br />issues that are being addressed by the contractor. <br />• Final invoice from the contractor was received on 01/03/19. <br />• The final change order (C.O. #7) is complete. <br />• The project is funded by CWSRF monies. <br /> <br />10 <br /> <br />