Laserfiche WebLink
They've provided a site plan here which shows the layout of the proposed buildings. You can <br />see that the buildings here are up front next to the road along with the parking area. And, this <br />will be the gardens, the rain gardens, the terrace, the outdoor educational facilities in the back in <br />trying to keep with the natural topography of the parcel. So, the idea is to minimize the amount <br />of grading and land -moving activities and utilize the flat area up front for the construction of the <br />buildings, and this kind of undulating topography in the back as for their gardening and other <br />activities. <br />County zoning is A -20a, which is common for this area other than the A -la's, which is a <br />residential subdivision just behind the parcel. It's zoned State Land Use Agriculture. It is in the <br />LUPAG General Plan as Medium Density Urban. <br />Here is an aerial photograph. As you can see, it is completely undeveloped. There are no <br />structures. There's nothing there other than a small swale that runs along the road diverting <br />storm water from this area down towards a culvert. <br />This is a topography map I threw in just to kind of show, and it's a little hard to see, but you can <br />see the flat area, or flatter area up front where they are going to do the construction of the <br />buildings and then the sloping in the rear of the parcel which is going to have the agriculture. <br />And, again, their attempt is to try to maintain as much of that topography as possible. <br />Here's a street view looking north. This would be looking towards the elementary school which <br />would be on your left. The parcel is on your left right here, and then the elementary school is <br />just up here. The next view is to the south. The parcel in question is on your right, and then you <br />can see the high school over here. <br />The Planning Director is recommendation is to approve the Special Permit, and at this time, I <br />wanted to let the Commissioners know that we did submit updated amended conditions <br />essentially just to clean up, but the one condition that is of substance is the 10 -year, they asked <br />for ten years to do the construction, so we have provided that time for them to do that with <br />another ten years after as for an extension. So, it was an increase in the time necessary to <br />develop this type of facility, which could take some time due to a number of reasons from <br />funding to just development. That's it. Any questions? <br />CLARKSON: Are there any questions from the Commission to staff? <br />RAFFIPIY: Question on the conditions, the Condition D and E. Just for my clarification. <br />Condition D, so the first ten-year extension, if there's an extension, will be granted by the <br />Planning Director, and if they come back later on for another ten-year extension, that will be <br />granted by the Commission. Is that what it is? <br />ROY: Yes. <br />RAFFIPIY: Okay, thank you. <br />EXHIBIT A <br />2 <br />