August 30, 1999 ~ _
N
O
TO: Chairman James Arakaki and Members
Hawaii County Council
FROM: Dominic Yagong, Chairman ~1~
Public Works & Parks Committee
RE: Comm. 365.001
At the Public Works & Parks Committee meeting held on July 27, 1999,
Comm. 365.001, a copy of which is attached, was deferred because it was
erroneously given a "point number" to Comm. 365, regarding the State
Health Department's reports for the East and West Hawaii County Sewer
System Maintenance Inspections.
We have recently received a copy of Thomas Arizumi's letter to Deputy
Chief Engineer Jiro Sumada, dated May 19, 1999, which is the correct report
which Comm. 365.001 addresses. Therefore, Mr. Arizumi's May 19, 1999
letter has been numbered Comm. 428 and this memo with the attached
previously numbered Comm. 365.001 will be numbered Comm. 428.001.
Thank you for your attention to this matter.
Att.
~/,ZS'. ool
Comm. No.
F51e No. .SEW
Ref. To: P G
Ref. Date ~ 3 1 1999
J+,v,w y~
~
Stephen K. Yamashiro -
Mayor Jiro A Sumach
~~ir~ O1~H~+~~ Dep~fy Chief Engnien
~II1Int~J IIf ~ttht~it
DEPARTMENT OF PUBLIC WORKS ~ ~
25 Aupuni Suect, Room 202 • Hilo, Hawaii 96720-4252 C ~ ~ rl
(808)961-8321 • Fu (808)961-8630 ~
J - 1,
July 14, 1999 _ 3
. .
Thomas. E. Arizumi, P.E. G-'
Chief, Environmental Management Division _ N
State Department of Health
P.O. Box 3378
Honolulu, Hawaii 96801
Subject: Hilo Wastewater Treatment Facility
Operation and Maintenance InspeMion - EMD/WB 971337
Corrective Action Plan
The County of Hawaii Wastewater Division has received the annual operation and maintenance
inspection report dated 5/19/99 and provides the following corrective action plan to address the
deficiencies cited in the report.
1. Maintenance:
Preventive Maintenance: Backlogged
Corrective Maintenance: Unsatisfactory
The County is committed to an aggressive combination of filling staff vacancies and
contracting out various repairs in order to improve the existing condition and the
future maintenance of the Hilo Wastewater Treatment Plant.
Major items requiring repair/replacement:
a. Influent Screen No. 2 - Geaz reducer problem -Gear reducer has been replaced
and Barscreen is operational. Completed
b. Primary Clarifier No. 1 -Malfunctioning VFD -Wastewater Division evaluating
removal of VFD and replacement with gear reduction system. Tareet
Completion 12/30/99
c. Grit Screw -Rebuild screw and replace housing -Estimates from Contractors
indicate repair cost of approximately $25,000 each. Wastewater Division is
evaluating replacement of the Grit Classifiers with new classifiers due to the
high repair costs. Tareet Completion for replacement of classifiers is 6/30/%/0,0.
Comm. No. ?~OrJ.t7~l
File No. SEW
Ref. To: ~pG
Ref. Date tAll- 1 5 1999
Letter to Thomas E. Arizumi
Page 2 of 4
July 14, 1999
d. Aeration Tank Diffusers -Needs replacement -Diffusers for Solids Contact Tank
have been replaced. Completed
e. Centrifuge No. 1 -Tiles are falling off. -The Wastewater Division has had
several discussions with the manufacturer regarding repair of the unit.
Humbolt-Decanter has acknowledged that loss of tiles would result in
accelerated deterioration of the screw conveyor but that repair of the screw
could be accomplished at the point where efficiency of the unit is affected.
Estimated cost for file replacement is $25,000/unit. Tile replacement will be
accomplished when efficiency of the unit is affected.
f. Biotower Pump No. 2 and 4 -The Wastewater Division has attempted repairs
and currently has a unit at a local machine shop. One (1) each pump will be
replaced and the Wastewater Division will evaluate repair or replacement of
remaining pump. Tareet completion 12/03/00.
g. Final Clarifier No. 1 - No skimmer arm. -The Wastewater Division previously '
solicited bids for the project and received no bids for the project. The project
will be re-bid. Tareet Completion 10/30/99.
h. Final Clarifier No. 3 -Sludge Pump -The system has been modified such that
the existing pumps have been replaced with a submersible pump. The pump is
installed and final electrical hook-up is pending receipt of material. Tareet
completion 7/30/99.
2. NPDES or Chapter 62 Violations:
a. Sewage spill at Septage Receiving Pit. -The Waste Hauler was contacted
regarding the spill and afollow-up letter was issued informing the Hauler that
future spills may result in suspension or revocation of their Permit to
Discharge. The Hauler was also billed for the clean-up costs. Completed
3. Facility's Present Deficiencies:
a. Infiltration and Inflow -The Wastewater Division has purchased Grout Sleeve
equipment as part of an )n Reduction program and is currently in the process
of purchasing Chemical Grouting equipment to aid in the IR Reduction
program. The program would be ap on-goine preeram.
b. Influent Sampler Tube Bracket -The sample tube has been secured. Completed.
c. Refrigerated Influent Sampler Unlocked -The facility is secured in accordance
with the requirements of HRS 11-62-08(d) to prevent tampering. However,
due to concern by the DOH, the influent sampler has been locked. Completed.
d. Bazscreen No. 2 -Repairs to the barscreen were completed. Completed. _
e. Headworks Foul Air System -The enclosures at the barscreens were removed to
eliminate Confined Space Hazards when performing maintenance on the
Letter to Thomas E. Arizumi
Page 3 of 4
July 14, 1999
equipment. No increase in odor problems were caused. Re-evaluation of the
system would occur in the event odor problems are encountered in the future.
No further action at this time is aroposed.
f. Primary Clarifier No. I - Refer to Item l.b.
g. Preaeration basin diffusers -The diffusers will be replaced. Target Completion
Date 10/30/99.
h. Biotower Pumps -Refer to Item l.f:
i. Secondary Clarifier No. 1 -Refer to Item l.g.
j. Secondary Clarifier No. 3 -Refer to Item l.h
k. Effluent Flowmeter Calibration -The flowmeter has been put on a 6 month
calibration interval. Completed.
1. Sludge Mix Pump No. 1 Packing leak -The pump was modified and a _
mechanical seal has been installed. Completed
m. Waste Gas Burner -The system was designed with a continuous LPG flame to
provide automatic re-ignition. The system is not utilized due to the exorbitant
costs (1000 gal. LPG/week) of the continuous flame and since samples in the
area verifies no accumulation of unburned gas. The system will be re-designed
by a consultant to provide automatic re-ignition without a continuous flame.
Target Completion 6/30/00.
n. Thickened Sludge Pump No. 2 -The stator has been replaced. Completed.
o. Centrifuge No. 1 -Refer to Item l.e.
p. Electrical Conduits not painted - The conduits will be painted. Target
Completion Date 9/30!99.
q. Odor Control Pre-Chlorination System Inoperable -The system is not utilized due
to the high operating costs and since odor problems are not severe. Re-
evaluation of the system would occur in the event odor problems are
encountered in the future. No further action at this time is proposed.
r. Flow proportioned Chlorination system -The Wastewater Division has obtained
a flow proportioned system. Installation is pendigg receipt of all material.
Target Completion 12/30/99.
s. Chlorine Contact Detention Time -Chlorine Contact is provided in the effluent
line. The Wastewater Division will perform a dye test to confirm detention
times from the effluent facility to the old Hilo STP facility and will perform
bacterial and chorine sampling to ensure NPDES permit requirements are
being met. Target Completion 8/30/99.
t. Staff' Vacancies -The Sewer Maintenance Supervisor's position has been
permanently filled. The County intends to fill the vacant mechanic and
Letter to Thomas E. Arizum~
Page 4 of 4
July 14, 1999
assistant operator positions and is pursuing a Tinal resolution to the WTP
Supervisor position. Tareet Completion 6/30/00.
u. Stairway Railing - An additional rail has been installed. Completed.
v. Non-Portable Water Warning Sign -The warning sign has been replaced.
Completed.
w. Main Security Gate at Access Roadway -Access to the Wastewater Treatment
plant during working hours is controlled at the facility by a gate to the plant
The gate is posted with a sign indicating that only Authorized Entrants are
allowed entry. The access road gate is chained during non-working hours.
Failure to connect electrical power to the automatic access road gates was due
to an inability to obtain electrical easements. Since access into the facility is
controlled, no further action is aroaosed.
x. Sewer User Charge Inadequate -The Wastewater Division will be proposing
revisions to the Hawaii County Code to increase user rates. Tareet Completion
6/30/00.
y. Equipment Replacement Fund -The Wastewater Division will be increasing
repairs and replacement of equipment. The County intends to hire a new civil
engineer who would be responsible for designing and/or contracting the
necessary equipment upgrades or replacement. Consultants will be hired to
assist in the work.
Should you have any comments or questions on the above please contact Peter Boucher at 961-
8338.
Ji A. S ada
Dep 'ef Engineer
cc: Wastewater Division