Loading...
HomeMy WebLinkAboutCOM 0038.011 2020-2022Mitchell D. Roth Mavor Lee E. Lord ANlanaging Director ` Robert H. Command Deputv Managing Director � 0unt of (Paival-I Of irr of for nvar 25 Aupuni Street, Suite 2603 • Hilo, Hawai'i 96720 • (808) 961-8211 • Fax (808) 961-6553 KONA: 74-5044 Ane Keohokalole Hwy., Bldg C • Kailua-Kona, Hawai'i 96740 (808) 323-4444 Fax (808) 323-4440 January 19, 2021 Honorable Chair Maile David And Members of the Hawaii County Council County of Hawaii 25 Aupuni Street Hilo, HI 06720 Dear Chair David and Members of the Hawaii County Council: We are submitting additional information from Mr. Steven I. Rodenhurst, in the form of an' addendum to his resume. We thank you for your consideration and look forward to your favorable consideration of Mr. Rodenhurst's appointment as Director for the County of Hawai'i Department *of Public Works, pursuant to Section 6-2.2 of the Hawaii County Charter. f you have any questions about this matter, please feel free to call me. With Aloha, 4a,F- - " Lee E. Lord Acting Mayor Attachment County of Hawaii is an Equal Opportunity Provider and Employer. Comm. No. 3 8 ' 11 Ref. To: P CQLA- -' Ref. Bate_ JAN Ikaika Rodenhurst, PE Supplemental Information and Explanation Project Engineer A Project Engineer applies 'sound and diversified knowledge of engineering and practices in broad areas of assignments and related fields. They make decisions independently on engineering problems and methods. They work closely with clients, contractors, and third parties (including, but not limited to other consultants, government agencies, utility companies, etc.) that are involved with projects. Position requirements include (but not limited to): • Ability to provide quality customer service and support • Good time management skills, ability to balance demand amongst different projects • Creative, persuasive, critical thinker, and must be aware of ethical issues of an engineer Essential job functions: • Ensure projects are on schedule and within budget • Coordinate projects with clients, contractors, and third parties involved with the projects (including, but not limited to other consultants, government agencies, utility companies, etc.) • Coordinate project and schedule updates • Workforce scheduling • Coordinate field inspectors and ensure they have all pertinent information • Perform work site visits, field measurements, and maintain logs Construction Management Encompasses the following services: • Construction planning, coordination, and construction oversight • Project scheduling, cost control, and estimating • Constructability review and value engineering • Claim analysis • Project documentation and closeout • Special inspection services Direct Supervision Includes the following: • Scheduling o Project assignments o Overtime (OT) and vacation approval • Performance review • Conflict resolution Page 2 Expansion of Duties City and County of Honolulu, Department of Transportation Services, Waipio Point Access Road Improvements (Waipahu, HI) 2011-2013 ROLE: Project Engineer SCOPE: Construction Management Services for resurfacing and reconstruction of existing roadway pavement, installation of shared use path, installation of drainage improvements, and relocation of existing trees and fence. DUTIES: Direct supervision of inspector and administrative assistant. Coordinate with HECO, HTEL, Oceanic Time Warner Cable (OTWC), Board of Water Supply (BWS), Department of Environmental Services (DES), DOH, DOT, Arborist Consultant, Department of Facility Maintenance (DFM), Department of Design and Construction (DDC), Department of Planning and Permitting (DPP), DTS, Designer, and Contractor. City and County of Honolulu, Department of Transportation Services, Kalaeloa Boulevard Improvements (Kapolei, HI) 2011-2014 ROLE: Project Engineer SCOPE: Construction Management Services for roadway improvements along Kalaeloa Boulevard, OR&L Railroad to Lauwiliwili Street (Mauka). Roadway improvements included widening and reconstructing the existing four lane roadway to six lanes, installation of sewer, storm drain and water utilities, curb, gutter, sidewalk, streetlight, new striping, roadway, landscaping and new traffic signals at Lauwiliwili. DUTIES: Direct supervision of inspector and administrative assistant. Coordinate with HECO, HTEL, OTWC, Tesoro, BWS, DES, DOH, DOT, Arborist Consultant, DFM, DDC, DPP, DTS, Designer, and Contractor. PROJECT COST: $5,400,000 (FHWA Funded) State of Hawaii, Department of Transportation - Highways Division, Installation of Pavement Preservation Strategies and Surface Treatments at Various Locations (Hawaii County) 2018-2020 ROLE: Project Engineer SCOPE: Construction management services for the resurfacing and reconstruction of existing roadway pavement. DUTIES: Direct supervision of inspector, engineer, and administrative assistant. Coordinate with DOT and Contractor. State of Hawaii, Department of Transportation - Highways Division, Installation of Enhanced Pavement Marking and New Milled Rumble Strip at Various Locations (Hawaii County) 2018-2020 . ROLE: Project Engineer SCOPE: Construction management services for the removal and installation of pavement striping, marking, and rumble strips. DUTIES: Direct supervision of inspector, engineer, and administrative assistant. Coordinate with DOT and Contractor. State of Hawaii, Department of Transportation - Highways Division, Emergency Projects, Kilauea Lava Event (Hawaii County) 2018-2020 ROLE: Project Engineer SCOPE: Construction management support services for the repairs and maintaining project records for the required repairs due to damages to the highways caused by reactions to the Kilauea Lava Event of 2018 (earthquakes, steam vents caused by underground lava tubes). DUTIES: Direct supervision of inspector, engineer, and administrative assistant. Coordinate with DOT, Consultants, and Contractor. Page 3 State of Hawaii, Department of Transportation - Highways Division, Emergency Projects, Hurricane Lane (Hawaii County) 2018-2020 ROLE: Project Engineer SCOPE: Construction management support services for the repairs and maintaining project records for the required repairs due to damages by Hurricane Lane in 2018 (landslides, drain damages due to flooding, pavement and bridge erosion due to flooding). DUTIES: Direct supervision of inspector, engineer, and administrative assistant. Coordinate with DOT, Consultants, and Contractor. State of Hawaii, Department of Transportation - Highways Division, Hawaii Belt Road Resurfacing, Pepeekeo to Hakalau (Hamakua, HI) 2014-2016 ROLE: Project Engineer SCOPE: Construction management services for the resurfacing of existing roadway, reconstruction of deteriorating existing pavement, replacement of guardrails, and repairing bridge expansion joints. DUTIES: Direct supervision of inspector. Coordinate with Department of Water Supply (DWS), HELCO, HTEL, DPW, DOH, DOT, Designer, and Contractor. PROJECT COST: $14,400,000 (FHWA Funded) State of Hawaii, Department of Transportation - Highways Division, Keaau-Pahoa Road, Intersection Improvements at Old Government Road (Pahoa, HI) 2014 ROLE: Project Engineer SCOPE: Construction management services for the conversion of existing intersection into a single -lane roundabout, pavement reconstruction, and installation of ADA compliant curbs and sidewalks. DUTIES: Direct supervision of inspector. Coordinate with DWS, HELCO, HTEL, DPW, DOH, DOT, Designer, and Contractor. State of Hawaii, Department of Education, Various DOE Central District Schools ADA Improvements (Various Locations, HI) 2017-2018 ROLE: Project Engineer SCOPE: Construction management services for the construction of new accessible parking spaces, ramps, walkways, restrooms, elevators, and other miscellaneous ADA improvements at various schools throughout the Honolulu District. DUTIES: Coordinate with various schools staff:, DOE, DOH, DPP, DFM, DDC, HECO, BWS, The Gas Company (GasCo), Fire Department (HFD), Honolulu Police Department, U.S. Army Operations & Maintenance Division, Consultants, and Contractors. PROJECTS: • Aiea Elementary School Miscellaneous Repair and Maintenance (R&M) • Aiea Intermediate School Electrical System Upgrade • Aiea Intermediate School Miscellaneous R&M • Aiea High School Miscellaneous R&M • Aiea High School Fire Alarm Upgrade • Aliamanu Elementary School Campus Replace Sewer Line Phase 2 • Aliamanu Middle School Miscellaneous R&M • Alvah Scott Elementary School Miscellaneous R&M • McKinley High School Hirata Hall Replace A/C • Moanalua Elementary School Miscellaneous R&M • Moanalua Elementary School Fire Alarm Upgrade • Moanalua Middle School Miscellaneous R&M • Moanalua High School Recrown Football Field • Pearl City Highlands Elementary School Electrical Upgrade Page 4 • Pearl Harbor Kai Elementary School Miscellaneous R&M • Radford High School Miscellaneous R&M • Red Hill Elementary School Miscellaneous R&M • Salt Lake Elementary School Building E Renovate Classrooms • Shafter Elementary School Miscellaneous R&M • Waimalu Elementary School Buildings D&E • Washington Middle School Campus Replace Sinks Cabinet Phase 2 Additional Projects State of Hawaii, Department of Education, Various Schools Statewide for DOCS Projects (Various Locations, HI) 2020 ROLE: Project Engineer SCOPE: Construction management services for the routine construction and maintenance work for various schools and offices across the State of Hawaii. Scope includes monitoring construction activities for contract compliance, review submittals, and review general contractor project schedule for milestone compliance with the school performance review project acceptance. DUTIES: Direct supervision of engineers and administrative assistant. Coordinate with various schools staff, DOE, DPW, Consultants, and Contractors. PROJECT COST: $20,000,000 State of Hawaii, Department of Transportation - Highways Division, Keaau-Pahoa Road Shoulder Lane Conversion, Phase 2, Shower Drive Intersection Improvements (Puna, HI) 2017-2018 ROLE: Project Engineer SCOPE: Construction management services for the resurfacing of existing roadway, reconstruction of deteriorating existing pavement, replacement of guardrails, relocation of water system facilities and utility poles, installation of pavement markings, striping, and signage, and installation of new traffic signal system. DUTIES: Direct supervision of inspector. Coordinate with DWS, HELCO, HTEL, DPW, DOH, DOT, Designer, and Contractor. City and County of Honolulu, Department of Transportation Services, Kapolei Parkway Urban Core 4A (Kapolei, HI) 2013-2014 ROLE: Project Engineer SCOPE: Construction Management Services for a new 4 -lane highway intersection, including installation of all underground utilities. DUTIES: Direct supervision of inspector and administrative assistant. Coordinate with BWS, DTS, DOT, DOH, DES, HECO, HTEL, OTWC, DPW, DPP, DDC, Designer, and Contractor. PROJECT COST: $3,800,000 (FHWA Funded) City and County of Honolulu, Department of Transportation Services, Kapolei Parkway Urban Core 5 (Kapolei, HI) 2013-2014 ROLE: Project Engineer SCOPE: Construction Management Services for the construction of a new roadway and modification of existing roadway, including installation of all underground utilities and lighting. Project involved the completion of the final segment of Kapolei Parkway, designed as a part of the Kapolei Urban Core master plan. It joined the two previously constructed segments of the roadway, and spanned between Kama'aha Avenue and Kamokila Blvd, a length of approximately 1800 ft. This was a long awaited project with much anticipation from nearby residents because this roadway allowed for a direct path through the developing town of Kapolei. The roadway was constructed on undeveloped land, and involved over 52,000 cubic Page 5 yards of material excavation work along with trenching work for multiple utilities. A new 66" drain line was placed underneath the roadway to accommodate the increased amount of storm water through the area. DUTIES: Direct supervision of inspector and administrative assistant. Coordinate with BWS, HECO, HTEL, OTWC, DES, DFM, DPP, DDC, DOH, DOT, Designer, and Contractor. PROJECT COST: $10,000,000 (FHWA Funded) State of Hawaii, Department of Transportation -Airports Division, HNL TMP Commuter, Phase III (Apron, Vehicle Parking) (Honolulu, HI) 2011-2012 ROLE: Project Engineer SCOPE: The project involves the construction of a loop road around a new 300 -stall parking lot, tarmac striping, pedestrian walkways, relocation of security entrance access points, utility relocation, traffic mitigation, and wayfinding signage. DUTIES: Assisted in the design phase. PROJECT COST: $11,700,000