MEMORANDUM
4
TO: Maile David, Chair
and Member of the 14awai`i County Council
k
FROM: Ramzi I. Mansour Dir ' tor # 0. }
t r ;
Department of EnvironnibntaljManagement u
DATE: January 13, 2022
SUBJECT: Re: Communication No. 436.2; Requests a discussion with the Department of
Environmental Management regarding Wastewater Division priorities, challenges,
and solutions.
Please see the attached hard copy of the PowerPoint slides for a presentation regarding
Communication No. 436.2, scheduled for the January 18, 2022,meeting of the Regenerative
Agriculture, Water, Energy, and Environmental Management Committee.
Please distribute copies of these slides for the Committee meeting.
RIMlps
Att.
Comm. No, 3�'
Ief. oate AN 1 4 207
County of Hawai'i is an Equal Opportunity Provider and Employer
r
-
�...--.
t.«
M0i1.1 .... 4 � Berl` :_i � r+ A �J •'� _ M1i�
�4
,
i
v
---------------------
a
Januar S, 202
�� Iy
r
Wastewater Priorities
• Staffing
• Funding for CIP program
• Compliance/Environmental Protection
Staffing — Current and Proposed Organizational
Structure
• Current Structure has one Division and two Sections (Engineering and
Operations) (83 positions)
• Proposed Structure will consist of two Divisions 1) Engineering and
Operations and 2) Environmental Quality Control (adding 80
positions)
For Reference:
County of Maui: One Division with Three Branches: 1) Planning and Permitting, 2)
Design and Construction, and 3) Operations.
City and County of Honolulu: Four Divisions; 1) Environmental Quality;
2) Treatment and Disposal; 3) Collection System Maintenance; and 4) Design and
Construction
County of Hawaii and County of Maui, compared
County of Hawaii (1 island) County of Maui (3 islands)
• Population : 200,629 (2020) • Population : 164,754 (2020)
• WW Treatment Plants: 7 • WW Reclamation Facilities: 5
• WWD personnel : 83 • WRD personnel : 122
• Sewer Fund Rev 21-22 : $ 16.2M • Sewer Fund Rev 21-22 : $71.8M
• Monthly SFR sewer fee: • Monthly SFR sewer fee:
• $44 flat $35 flat + $4.50/1,000 gallons
(for first 9K gallons)
Staffing Challenges
• Wastewater supplemental budget requests have largely gone unfunded
due to limited financial resources
• Recruitment and retention (nationwide shortage of engineers and certified
wastewater operators)
• County's recruitment process and procedures (lengthy)
• Salaries not competitive with Private Sector
• Current Levels are not sufficient to meet:
o Project Management Oversight (Konno Decision hinders staff augmentation)
o Aging facilities repair and maintenance needs
o Operations not up to par with Operations & Maintenance Manual's recommended
staffing levels
o Safety
o Supporting $1.0 billion CIP program
o Pretreatment Program AOC and future regulatory enforcement actions
Staffing Possible Solutions
• Adjust Sewer Fees need to support the increases in salaries for these
additional staff. Rates will be increased over 5 years to fund full
staff i ng.
■ Proposed organizational structure adds 80 positions
• Hiring Human Resource support staff for recruitment
• Recognize that "status quo" budget requests for Wastewater may not
adequately serve the public's interest.
Funding Challenges
• Insufficient revenue to support operations
• Insufficient number of user accounts
• Although an annual CIP budget gets appropriated - funding is not
guaranteed (projects get deferred)
Funding Possible Solutions
• Increase rates
■ Hiring a funding strategist along with performing a sewer rate study
■ Consider switching from a flat rate structure (residential) to a base charge and volume
charge similar to other counties.
■ Consider imposing sewer connection fees and inspection/permit fees
• Increase number of sewer accounts
■ Expand sewer collection area by increasing sewer collection system
■ Need funding for updating Facilities Plan for Hilo and Kealakehe
■ Need staff to implement expansion
• For CIP funding, follow City and County Honolulu's financial
commitment procedures
Moving Forward
Getting us the staffing and funding will allow:
• Pursuing resource recovery opportunities such as methane gas
utilization, biosolids reuse, and wastewater reuse.
• Establishes program to control sanitary sewer overflows (SSOS)
• Establishes program to control WWTP process bypasses
• Perform needed maintenance on existing structures that support our
WWTP and SPS
• Avoiding additional regulatory enforcement actions (AOC or Consent
Decree/Order)
Progress since October Briefing
..............................................................."ILl"LIM............................................
Hilo WWTP Phase 1 — Design (Headworks and Solids Digestion) — 7/11/2023 Contract being Finalized $5,090,000
Pua SPS Renovation (Design) — 1/23/2023 ree i-,roposai accepteo, uratt Contract being prepared $2,400,000
Kapehu WWTP Perimeter Fence — 8/31/2022 Construction Bid RFP is being finalized with DPW $125,000
Papa`ikou (Kapu'e) Bridge Emergency Repair (Design $150K; Constr. $650K + $200K Cont.) — 12/20/2021 $1,000,000
Construction work is on-going; completion anticipated Feb. 28, 2022
Kealakehe R-1 OSFL Phase 2 — Design of North & South Pipelines PER completed, Design effort to start. $1,750,000
Project 19 SPS Emergency Repair — 3/31/2022 ,epair \Nork Completed January 6, 2022 $90,000
North Kona SPS Project (EDA Grant $19 million) Working to finalize AIS with SHPD. NTP for SA-1 issued $68,000
1/10/22
10
Progress since October Briefing
...........................
Hired a Civil Engineer V (12/1/2021) and Civil Engineer IV (1/3/2022) for Kona
Office
Finalizing Specialty Engineering Support Contract ( to help with current engineering $200,000
staff shortage)
Pretreatment Program AOC: Consultant contract NTP expected by mid-February $200,000
2022 (to help develop program)
Developing Pretreatment Program Ordinance — Revise County Code and
Administrative Rules
Pursuing USDA Grant/Loan for Pahala LCC and Puako Force Main Replacement
Project
Pursuing WIFIA Loan from EPA/DOH
Puna Programmatic Environmental Impact Statement — Scope of Work
revieweuraccepied by EDA. Draft c.onsurianz t-oncract is being reviewed by EDA.
CURRENT FUNDING PRIORITIES
Additional Funding Needed for FY 21/22
Na`alehu LCC — EA SA-1 (Addt'I AIS) Norking on contract modification $180,000
Pahala LCC New EA (w/ rev. Preliminary Engineering Report, DOH Flow variance) — $500,000
Fee proposal received from Consultant. Waiting on letter from EPA on revised AOC.
**Funding identified **
Kealakehe R-1 Sand Filters — Fee negotiations with Consultant has been initiated. $300,000
FEMA Generators for East side Ops (FEMA Grant of $1.3 million) $500,000
Pua FM Replace (Design) — SA-1 (Airport runway ext) — (CWSRi- Funding w/Com Ltr $580,000
for Design) Design in-progress. Funding identitied**
Subtotal: $910,000
( Note: SA = supplemental agreement)
CURRENT FUNDING PRIORITIES
Additional Funding Needed for FY 21/22
CM
Subtotal (from previous slide) $910,000
Hale Halawai New Force Main — Design $500,000
Wailoa SPS Pump/Control Upgrade $1,500,000
Kealakehe WWTP New Headworks — Design (CWSRF funding) $3,000,000
Hilo Facility Plan Update $2,000,000
Kaloko WWTP 311 Train (Construction via CDBG) $1,300,000
Papa`ikou WWTP Clarifier Upgrade (Design/Build) $500,000
Kealakehe SPS Upgrade — Design (incl. PER, State Revolving Fund $2,000,000
Cross-cutters)
Kealakehe Facility Plan Update $2,000,000
TOTAL $13,710,000
Project Priorities by Fiscal Year Budget
CIP
Hilo WWTP Phase 1 Construction $50,000,000
Pahala LCC Collection System Construction (Pending EPA Letter revising AOC) $7,000,000
Pahala LCC WWTP Construction 'ending EPA Letter revising AOC $15,000,000
Pua SPS Force Main — New Pipe $25,000,000
Hale Halawai Force Main - Construction $2,500,000
Keopu SPS & FM Relocation - Design $3,000,000
Project 19 SPS Upgrade $500,000
Pauka`a Force Main Replacement - Design $800,000
Wailuku Force Main Replacement - Design $800,000
Kealakehe WWTP R-1 Upgrade $5,000,000
TOTAL $109,600,000
14
Additional Staff FY22/23 Operating Budget
22 New Positions are proposed (11 Operations- Operators + Line Crew;
4 Engineering; 7 Env Quality Control)
• $2,000,000 (funding for 6 months)
..........
a7z"Aw.
Pua Force Main — New Pipe Construction $12,000,000
Hilo WWTP Phase 1 Upgrades — Second phase of construction $30,000,000
Pua SPS Renovation - Construction $20,000,000
Wailoa SPS and FM Upgrade - Design $2,000,000
Na'aIehu LCC Wastewater System - Construction $20,000,000
Project 19 SPS Upgrade $2,500,000
Keopu SPS and FM Relocation $8,000,000
Pauka`a Force Main Replacement $8,000,000
Onekahakaha SPS & FM Upgrade - Construction $4,400,000
Kolea SPS & FM Upgrade - Construction $3,000,000
Kulai`mano WWTP Upgrade - Construction $3,000,000
Papa`ikou WWTP Upgrade — Construction $2,000,000
Subtotal $114,900,000
Project Priorities by Fiscal Year Budget
(page • •
Subtotal (from previous slide) $114,900,000
Kealakehe SPS Renovation $15,000,000
North Kona SPS, Dual FM, Hina Lani gravity sewer $15,000,000
Hilo WWTP Secondary Process Upgrade w/ UV Disinfection - Design $5,000,000
TOTAL $149,900,000
Additional Staff FY23/24 Operating Budget
14 New Positions will be proposed ( 1 Admin; 7 Operations; 6
Engineering)
• $1,200,000 (funding for 6 months)
Project Priorities by Fiscal Year Budget
II ' m m m '
Various Projects $180,000,000
Additional Staff FY 24-25 Operating Budget
15 New positions will be proposed (1 Admin, 3 Operations, 10 Engineers)
• $1,200,000 (funding for 6 months)