HomeMy WebLinkAboutCOM 0228.028 2020-2022 Mitchell D. Moth 4°'c� Paul K.Ferreira
Mayor Pollee Chief
,rF OP'FyFJ6
Kenneth Bugado Jr.
Deputy Police Chief
County of Hawai'i
POLICE DEPARTMENT
349 Kapiolani Street Hilo,Hawaii 96720-3998
(808)935-3311 o Fax(808)961-8865
DATE: November 22, 2021CD
j
TO: MAILS DAVID, COUNCIL CHAIRWOMAN AND
COUNCIL MEMBERS 1
VIA: KAY PSHIRO, ONTROLLER
FROM: 40K. FERREI , P ICE CHIEF W
i
RE: NOTIFICATION OF GRANT AWARD
COMPLIANCE WITH ORDINANCE NO. 21-38, SECTION 7(1)
Name of Grant Program: Hazard Mitigation Grant Program (HMGP)
Grantor: State Department of Defense,
Hawaii Emergency Management Agency
County Grantee Department or Agency: Hawaii County Police Department
Grant No. (IF KNOWN): DR-4366-12-082
Amount of Grant: $162,190.50
Amount of County Match: $54,063.50
County Revenue & Expenditure Account Numbers: 010.201.5216.74:3310.27
Grant Period (Commencement &Completion): October 29, 2021 to September 23, 2022
Purpose of Grant: To fund for construction of drainage improvements at
Public Safety Building
Is final report required by grantor? R Yes ❑ No
Notification attached: R Yes ❑ No, because
Comm. No. L
Ref. To:
"Hawai'i County is an Equal Opportunity Provider and Employer" Rea. Date FEB ® 7 ^
MEMORANDUM OF AGREEMENT
BETWEEN C(Upy
HAWAII EMERGENCY MANAGEMENT AGENCY
DEPARTMENT OF DEFENSE
STATE OF HAWAII
and the
THE COUNTY OF HAWAII
This MEMORANDUM OF AGREEMENT(MOA) is effective 10/26/2021 and entered by
and between the Department of Defense, State of Hawaii, on behalf of its Hawai'i Emergency
Management Agency, hereinafter referred to as "STATE,"and the County of Hawaii hereinafter
referred to as "SUBRECIPIENT."
1. The purpose of this MOA is to support the project objective and activities related to the
mitigation project entitled "Public Safety Building Flood Mitigation—Phase 1,
HMGP-4366-12-08R".The funds provided by this MOA will be used by SUBRECIPIENT
to pay for a study to eliminate flooding at the Hilo Police Station. This project ensures
the development and implementation of a long-term disaster recovery planned program,
with a focus on hazard mitigation. This project is in support of State and County
commitments toward long-term strategies to reduce the risks of natural hazards and will
reduce future losses. The scope of work is outlined in the Federal Emergency
Management Agency(FEMA) approved project application.
2. Period of Performance.This MOA covers the effective date and ends September 23,
2022.
3. Modifications.Any extensions,changes or alterations to the MOA shall be agreed to by
both parties in writing before being undertaken and the same shall be evidenced by
written amendment to this MOA.
4. Project Budget.The STATE, through the federal share,shall provide a maximum
amount of$162,190.50 for this project. The non-federal share of$54,063.50 shall be
provided by the SUBRECIPIENT in the form of in-kind contributions and/or cash match,
which represent 25 percent of total project cost of$216,254.00. The SUBRECIPIENT
shall maintain accountability of in-kind activities that contribute to the 25 percent
non-federal share.All work and costs shall be associated with the categories of activities
cited in the award documentation, dated July 12, 2021, and provided to you under
separate cover.
5. Subcontracts_ If the SUBRECIPIENT subcontracts any or all of the work required under
this Agreement,the SUBRECIPIENT agrees to include in the subcontract that the
subcontractor is bound by the same terms and conditions of the Agreement with the
SUBRECIPIENT.A copy of the executed subcontract must be forwarded to the STATE
within ten (10)days of the execution of said contract. Contractual agreement shall in no
way relieve the SUBRECIPIENT of its responsibilities to ensure that all funds issued
pursuant tb this grant be administered in accordance with all state and federal
re
quire'tnentst The SUBRECIPIENT may not subcontract any work required by the
A10 any external individual or entity who participated in the development of the
application for the mitigation project covered by this Agreement.
. This Agreement is entered into and awarded under FEMA-4366-DR-Hi.The
SUBRECIPIENT certifies compliance with FEMA Hazard Mitigation Assistance Guidance
2015 and all other applicable rules and regulations regarding hazard mitigation grants
and any terms and conditions that are part of FEMA and other federal statutes,
regulations, guidelines, and any other provisions of law that are applicable to this award.
7. Method of Payment. Payments shall be made on a reimbursable basis. If other payment
arrangements for costs incurred as a result of this MOA are desired, agreement must be
reached after consultation between STATE and SUBRECIPIENT.
8. Quarterly Reports. The SUBRECIPIENT is required to submit to the STATE a quarterly
financial and performance report. Report dates are March 30,June 30, September 30,
and December 30 of each year. The first report is due on September 30, 2021.
9. Termination. Either party to this MOA shall have the privilege,with or without cause, to
terminate this MOA at any time upon written notice given thirty(30) days in advance of
such termination. Upon termination, the total amount to be paid to the SUBRECIPIENT
shall be determined on the basis of the total work completed-up to the date of such
termination.
IN WITNESS THEREOF, the parties have executed this MEMORANDUM OF AGREEMENT on
the day, month, and year mentioned above.
THE COUNTY OF HAWAII APPROVED—AS TO FORM AND LEGALITY:
Y
MITCHELL D. ROTH DAT OFFIC E PORATION C UN L DATE
MAYOR, COUNTY OF HAWAI'l COUN FHA 1
APPROVAL RECOMMENDED
2021
PAUL K. FERREIRA DATE
CHIEF OF POLICE
HAWAI'l EMERGENCY MANAGEMENT AGENCY
DEPARTMENT OF DEFENSE
STATE OF HAWAI'l APPROVED AS TO FORM:
By a- Oct 29,2021 S Y Oct 29,2021
LUKE P. MEYERS,ADMINISTRATOR DATE DEPUTY ATTORNEY GENERAL DATE
Michael Vincent
'q
U- a
L
O C-
o ; ' o ',-4
o
� � V
� = �C O U
q O Q,
G
��a
U.&Department of Homeland Security
RAgion 9
I I I I Broadway,Suite 1200
Oakland,California%On
]FEMA
July 12,2021
Luke P.Meyers
Administrator
Alternate Governor's Authorized Representative
Hawaii State Emergency Management Agency
3949 Diamond Head Road
Honolulu,1196816-4495
Reference. Application Approval,HMGP DR4366-12-08R
County of Hawaii
Public Safety Building Flood Mitigation—Phase I
FIPS Code:001-OOFDB,Supplement 9
Dear Mr.Meyers:
We approve and issue Hazard Mitigation Grant Program(HMGP)funds for the County of Hawaii
(sub-recipient),HMGP DR-4366-12-08R Public Safety Building Flood Mitigation-Phase 1.
The total project cost for Phase I is$216,254.As shown in the enclosed Obligation Report-
Supplement 9,we are obligating$162,190.50 for the75 percent Federal share,the 25 percent non-
Federal share is$54,063.50.These funds are available in SmartLink for immediate and eligible
disbursement.The following is a summary of the approved funding.
Prolect Phase: Federal Share: Non Federal Share: Total Project Cost:
Phase One, $162,190.50 $54,063.50 $216,254.
Su cement 9 1
This HMGP project approval and obligation of funds are subject to the following conditions:
1. Scope of Work(SOW)—Phase I will involve the development of designs and plans from an
architect/engineer for construction of drainage improvements to mitigate flooding impacts to
the County of Hawaii Public Safety Building.The building is located at
349 Kapiolani Street,in Hilo,Hawaii 96720.(-155.085352, 19.715439).
The following Phase I activities and deliverables are expected:
www.fenia.gov
I
I
s
Luke P.Meyen
July 7,2021
Page 2 of 3
Phase I A Estimated Timellne
Task I—Development and secs !once of MOA I month
Task 2—Planning and preliminary Designs 2 months
Task 3—Plans,Specifications,and Estimates 3 months
PS+IitE
Task 4—prelimin Desi 65%com lets 3 months
Task 5—Final Desi 95% 6 months
Please provide the above-referenced deliverables one completed to the assigned FEMA Hazard
Mitigation Assistance )Specialist for review and inclusion within the official grant file.
2. Phase One Completion Date—The work schedule included with the application indicates that
Phase 1 will take 15 months to complete;therefore,the Phase 1 completion date is September 23,
2022. All Phase I project deliverables must be submitted to the assigned FEMA HMA Specialist
by the Phase One completion date.Please inform the sub-recipient that work completed after this
date is not eligible for federal funding,and that federal funds may be de-obligated for work
completed outside the completion date when there is no approved time extension.
3. Phase Two Approval—Please inform the sub-recipient that Phase Two approval is contingent on
programmatic review and Environmental and Historical Preservation(EHP)approval.Phase Two
activities may not commence until written approval has been received.Any Phase Two activities
completed prior to approval may be de-obligated. In addition,if Phase Two is unapproved,
federal funds may be de-obligated for previously completed Phase One activities.
4. Record of Environmental Consideration(REC)-Phase 1 (Design)of this project has been
determined to be Categorically Excluded from the need to prepare either an Environmental
Impact Statement or Environmental Assessment in accordance with FEMA Instruction 108-1-1
and FEMA Directive 108-1-1 as authorized by DHS Instruction Manual 023-01-001-01,
Revision 1.Categorical Exclusion a4(information gathering,data analysis and processing,
information dissemination,review,interpretation,and development of documents)has been
applied Particular attention should be given to the project conditions before and during project
implementation.Failure to comply with these conditions may jeopardize federal assistance
including funding.Please reference the enclosed REC for further information.
i
5. Standard Conditions-This project approval is subject to the enclosed Standard Mitigation
Grant Program(HMGP)Conditions, amended August 2018.Please note that federal funds may
be de-obligated for work that does not comply with these conditions.
Ifyou have any questions,please contact Jeanne Johnston,Hazard Mitigation Assistance
Specialist,by email Jeanne.Johnstonter�dhs.fema. or phone(808)349-3297.
Sincerely,
KATHRYN 1 LI PIECKI uPi as 'n �by txe
daft 2021.07.1212:3937-07*0a
Kathryn Lipiecki
Director,Mitigation Division
FEMA Region 9
Luke P.Meyers
July 7,2021
Page 3 of 3
Enclosures(4):
Obligation Report-Supplement 9
Project Management Report
Record of Environmental Considerations MEC)
Standard Mitigation Grant(HMGP)Conditions
cc: Them Woznick,State Hazard Mitigation Officer,State of Hawaii
Colby Stanton,Director of Readiness,FEMA Region 9,Pacific Area Office
Robert McCord,Chief,Hazard Mitigation Assistance Branch,FEMA Region 9
i
03MIrA21 FEDERAL EMERGENCY Y HM -0 2 j
9:07 HAZARD MMGA710H GRANTS PROGRAM
Obligation Report wl Signatures
Disaster FEMA Amendment State Action Supplements!
No Project No No Application 10 No No state R
eciplent
4386 S-R 0 12 1 9 Hl Statewide
Subreciplent HAWAII COUNTY POLICE DEPT Pr4ect Tido:CoHI c Safety Building.Flood Miligation
Subreciplent FIPS Code:001-WFDB
Tata!Amaunt Total Amount Total Amount Total Amount AvailaMe
PreviouslyAllocated PrieviouslyObligated Pending Obligation for Now Obligation
$162.190.50 $162,190.60 $0.00 $0.00
ement
ProjectAmount SUbrea Ami Total Obllgalion IFMIS Date IFMIS Status FY
$162,190.5 �l $0.5 1` $162180.5 0 021 Accept 2021
Camm2m
Date: 03/2912021 User Id: SSCOTr39
Commenx Approved funding for HMGP 438&12-8R,Havwall County Police Department,Public Safety Building,Flood M1140on for$162.190.51
Autlrortratlon
Preparer Nanw. STEVEN SCOTT Preparation Date: 0=9t2021
HMO Authodzadon Name: KAREN MOdICA HMO Authorization Date:0313012021
KATHRYN J LIPIECK! t IE0QQ dlsytrATHnrNJ
ua
Date:2o21.07.1212A0:1a-OrW
Authorizing Official Signature Authorizing Official Title Authorization Date
Authorizing Official Signature Authorizing Official Title Authorization Dade
Page 1 of 1
OWIrA'021 FEDERAL EMERGENCY MANAGEMENT AGENCY HMGP-AP-01
9:05 AM HAZARD MITIGATION GRANT PROGRAM
Project ManagWIM Report
Disaster FEW Amendment Apo(D state Recipient
Number Project Number Number
4366 S-R 0 12 HI Statuvw1do
Subrectplent: HAWAII COUNTY POLICE DEPT
FIPS Code* 001-00FOS Project Title:CoHl-PD.Public Safety WIding,Flood Mitiriatton
Amendmard Status:Approved Approval Status: Approved
Project Title: CoH1-PD,Public Safety Building.Flood Mitigation
Radplent: Stole" Subredplant: HAWAII COUNTY POLICE DEPT
Recipient County Name: Hawaii Subreciplent County Name: Havali
Recipient County Code: I Subreciplent County Code: I
Recipient Place Nam: Havall(Cour" SUbleCIPlant P1800 Name: Hawall(County)
Recipient Place Code: 0 Subreelplent Place Code: NMI
Project Closeout Date: 001000000
Wg&Schodula fftfts
Amend. Description EM Frame Ova Date Revised Date QMdation Date
a Task I-Accepter=of Grant 11 month 00==1110 011=111341)(10 OMMUN
0 Task 2-MOA Sehmen CoHl and HIEMA 3 Months 00111=00 00100=0 0000=111110
0 Task 3-Design and Planning 9 months 0=1111111300 0010=00 OWING=
0 Task 4-Scliclisdon of Bids 10 Months cowwal) COAMOW =00110110
0 Task 5-Avail Contrad 11 Months 00=10000 own(loo 00000/0006
0 Task 6-Construotton 29 Months 000061=0 001=000 0011)(110000
0 Task 7-Acceptance of Work 32 Months 001000=0 0010010000 =011=00
0 Task 8-Financial Reconciliation 34 Months 001001=0 0010011111100 01111111=00
0 Task 9-Closeout 36 Months camilmo ciamamcco 0000000000
Awagnted Ammuft
Total Approved Federal Total Approved Non-Federal Total Approved
Not Eligible Share Percent Federal Sham Amount Share Percent Non-Fed Share Amount
i - * -- --"--
—.7 -,-iik- -
6 ISEW MMU
Allocations
Allocation IFMIS IFMIS Submission ESFDFSC ESIDFSC PrejAllocAmount Subreciplent Total
Number Status Oate Date FY Support Req Amend Nr Fed Share Management Cost AllocAmount
10 A =2812021 0302012021 2021 3398122 2
TOW '180..r
Pblinallong
Action IFMIS IFMIS Submission SFS SFS Supp) Project Obligated subrecipient Total ObUWW
Nr Status Dole Date Fy Support Amend Nr Amt-Fed Share Management Cog Amount
I A 0300201 031302021 2)21 3473749 0 9 $162.190.60 $0-0•: 5162.190.60
Tow
Page 1 of 1
21FEDERALEMERGENCYREC`01
22:37:42
RECORD OF ENVIRONMENTAL CONSIDERATION( C)
Project HMGP 12.08(Phase 1-Design)
Tata Safely Bddktlrng Flood Mi (Phan 1- )
NEPA DETERMINATION
N : No Date:
EA Public Notice - EA Fond Levels CATEX
E38 Notice of Word EIS ROD Dabs:
Comment The County of Hewell Police Department prop to harden the Pubic Safety Complex(328 Kapiotard
Street,HEto,Hawaii)and upgrecici the electrical system to address ongohyp flooding Issues wkhln the
facility.Phase 1 Is to cornpleha arcttflectund&engineering designs.The resulting designs will be
implemented In the second,construction phase,am!reviewed as Phase 2 of this proposed project.This
review covers Phase 1 acritvifles only with no ground dleboberice or other physical project construction
acdvifses.
Phase 1 )of this project has been determined to be Categadcally Excluded from the need to
prepare either an Environmental Impact Statement or Environmental Assessment In accordance with
FEMA Instruction 108-1-1 and FEMA Directive 108-1-1 as authortmd by DHS instruction Marmal 023.
01.001-01,Revision i.Categorical Exclusion a4{t tmetlon gathering,date analysis and processing.
tubmiation dissemination.review,Interpretation,and development of documents)has boon applied.
Particular attention shadd be given to the project conditions before and during project Implementation.
Failure to comply with these conditions may jeopardize federal assistance Including houfhug.-dcohen3-
03MM02122:3s;24 OUT
CATEX CATEGORIES
Carex Comm code Description "acted
a4 (a4)Information gathering,data anstysls and processing,information Yes
dissexntnaton,review,tnterpretaton.and development of documents. if any of
these activities result In proposals for further action.those proposals mist be
covered by an appropriate CATEX. Examples Irnciude but are not limited to:(a)
Docanent mailing,publication and disaibaton.training and intarmaton
Programs.historical and cultural dertonaUaticns,and ptibtiC affatis actions.(b)
Shalles,reports.proposals,ene4sm literature reviews;computer modeling;
and mon-Intrusive intelligence gathering activtilm.
EXTRAORDINARY
Extraordinary Circumstance Code Description selected 7
No Extraordinary Circumstances were selected
ENVIRONMENTAL LAW 1 EXECUTIVE ORDER
Envtrommerrta!Lawl
Executive Order Status Description Comment
Cteen Air Act(CAA) Completed Project will not result In permanent air
emissions-Review concluded
Coastal Barrier Resources Act Completed Project is not on or connected to CERA Unit
(CORA) or otrerwise protected area-Review
concluded
NOTE:All tires are OUT using a 244rourr clock. Page 1 of 4
03108=11 FEDERAL EMERGENCYMANAGEMENT 1
22:37.42
RECORD OF ENVIRONMENTAL CONSID (REC)
Project HMGP 4366.12-08 1- )
TWO-Public Safety Building Ft od 09gallon Munie 1- }
Environmental 1
Executive Order status Description Comment
Clean avatar Act(CWA) Completed Project would not affect any water of the U.S.
-Review concluded
C013W Tone Management Aa Compteted Project Is located In a coastal zone area
(Cuwa) andfor affects the coastal am
Completed State adm!rdstaft agency does not require
consistency review-Review conctuded
Executive Order 11988- Completed located in ftoodpWn or effects on F1 In review will be required during Phase
Floodplatne floodplatniflood levels 2 once project designs hove been developed.
doohan3-031°8=122:1326 GUT
Completed No adverse effect on floodplain and not
adversely sheeted by the floodplain-Review
concluded
Executive Order 11990- Complotetd No effects on wetlands and project outside
Wett ends wetlands-Review concluded
Executive Order 12898- Completed Low Income or minority population In or roar
EnWonmerdat.hnstfog for Low project area
income and tMirrortly Populations
Completed No disproportionately high and adverse
impact on low Income or mhtofty population-
Revlew concluded
Endangered Species Act(ESA) Cwntplated Listed species and/or designated critical The proposed action Is to provide funding to the
haMt present In areas affected directly or subrecipimtt for Phase 1 design development
tndbectly by the federal action funds.without any proposed physical
dns4abanoe.Thaw actions would result in no
Impacts to endangered species.ESA review wig
need to be completed prior to tmplanu ling any
subsequent phases of the project.The proposed
scope of work for design developrnent wig not
destroy or adversely modify suitable habitat and
will rot affect any other listed or proposed
species.it Is therefore determined the puffnosed
action world have No Effect on fisted species
and consultation with the Services under Section
i of the Endangered Species Act Is not required.
-dodton3-03108=1 2224W GVr
Comptated No effect to species or designated cralcai
habitat(See comments forNstttic ors)-
Review concluded
NOTE:A I times are GMT using a 24-hour clock Page 2 of 4
I
I
21FEDERALEMERGENCYE C-01
z2:a7:42
CORD OF ENVIRONMENTAL CONSIDERATION(REC)
Prefect HMS 4366-12-08(Phase I-Design)
IWO Public Safety Building Flood Mitigation(Phm 1-Deign)
EnvtnmnmnW
Execudw Order stable Description ant
3
Famdand Protection Policy Act Completed Project does not affect designated pdfm or
(FPPA) unique concluded
i
Fish and Wildlife Coomilmation Completed Project does not affect,control.or rnaft a
Act(FWCA) waterway/body of water-Review concluded
Bird Treaty Act( A) Completed Project located within a flyway zone
Completed Project does;W he"potential to take
migratory birds-Rehdew concluded
Magnuson-Steams Fishery Completed Project not located In ar niter Essential Fish
Conservation and Management Habitat-Review concluded
Act(MSA)
National Historic Preservation Act Completed AppAcabde exam Programmatic The Umdestsldng complies with Stlpufatton IA7.1
(NHPA) Agreement Activity meets Programmatic (assistsrhoe provided for placating,studies.
Allowance(eater date and#In comments)- design and argineerirg coals that Involve no
Review oonctuded commiUr ant of resources cover Over,slafftng and
associated dunding)of the Programmatic
Agreement among FEMA,the Hawaii State
Historic Preservatlo n Otftoer(SHPO).&a Office
of Hawallan Affalm.and the HawaSan
EmergenncyMerspnvW Agency of the
Hawaltan Department of Defense executed on
July 11.2016..Thus.tha UndertaMrg does not
require SHPO review.and FEMA has no further
Section 106 ra ponsibill ies In accordsm with
36 CFR§800.3(aXll) No ground disturbance Is
proposed.-dcohen3-03f08120212Z22.07 GMT
Wilt and Somdc Rivata Act Completed Project Is not along and does not affect WAd
MSR) and Soatfc River-Review concluded
CONDITIONS
Sbmdwd Conditions:
Any change to the approved scope of work wtii require re-evaluation for compliance with NEPA and other Laws and Executive Orders.
This review does not address an federal.stats and local requirements.Acceptance of federal funding requires recipient to comply with all
federal.state and focal laws.Failure to obtain ail appropriate federal.state and focal emtrar mardell perndffi and clearances mey
jeopardize federal funding.
NOTE:A0 times are GMT ushg a 24-hour clock Page 3 of 4
L EMERGENCY MANAGEMENTGEC REG01
22:97:42
RECORD OF ENVIRONMENTAL CONSIDERATION(REC)
Project HMGP 4366-12-M 1-D )
Title:Public Seiety Bui ft Flood Mftlgdm(Phase 1• )
If Wound dswftq acowdes w=&on ommmmum appacm wUi mordtor Wound disturbance artd H my pcterdW ardoft0cal
resources ora dscavered,wW Wunedistely owatructlon in that area and the Stale and
NOTE:AD duras are GMT using a 244=w clock. Page 4 of 4
3
s
Standard tiation Grant Program (HMGP) Conditions
FEMA Region LX,August,2418
The following list applies to Recipients and Subrecipients accepting HMGP funds from the Federal
Emergency Management Agency(FEMA)of the Department of Homeland Security(DHS):
1. Applicable Federal,State,and Local Laws and Regulations. The RecipientISubrecipient must
comply with all applicable Federal,State,and Local laws and regulations,regardless of whether they
are on this list or other project documents.DHS financial assistance Recipients and Subrecipients are
required to follow the provisions of the State HMGP Administrative Plan,applicable Hazard i
Mitigation Assistance Uniform Guidance,and Uniform Administrative Requirements,Cost
Principles,and Audit Requirements for Federal Awards located in Title 2 of the Code of Federal
Regulations(CFR)Part 200,adopted by DHS in 2 CFR 3002.
2. Financial Management Systems. The Recipient and Subrecipient must maintain financial
management systems to account for and track funds,as referenced in 2 CFR 200302.
. Match or Cost Share. Non-federal match or cost share must comply with 2 GFR 200.306,the scope
of work(SOW),and any agreements among the Subrecipient,the Recipient,and FEMA.
7
4. Budget Changes. Unanticipated adjustments are permitted within the approved total cost.However,
if costs exceed the federal share,the Subrecipient must notify the Governor's Authorized
Representative(GAR)of overruns before implementation.The GAR shall submit a written request
for approval to FEMA Region IX.The subaward must continue to meet HMGP requirements,
including cost effectiveness and cost share.Refer to 2 CFR 200.308 for additional information.
5. Real Property and Land. The acquisition,use,and disposition must comply with 2 CFR 200311.
6. Equipment. The acquisition,use,and disposition must comply with 2 CFR 200.313.
7. Supplies.Upon project completion,FEMA must be compensated for unused supplies,exceeding
$5,000(fair market value),and not needed for other federal programs.Refer to 2 CFR 200.314.
8. Procurement. Procurement procedures must be in conformance with 2 CFR 200.318-320.
9. Monitoring and Reporting Program Performance.The Recipient and Subrecipient must submit
quarterly progress reports,as referenced in the 2 CFR 200.328 and State HMGP Administrative Plan.
10. Records Retention. In accordance with 2 CFR 200333,financiall programmatic records related to
expenditures must be maintained at least 3 years after the date of Recipient's final expenditure report.
11. Enforcement and Termination. If the Recipient or Subrecipient fails to comply with the award or
subaward terms,whether stated in a Federal statute or regulation,the State HMGP Administrative
Plan,subpplication,a notice of award,an assurance,or elsewhere,FEMA may take one or more of
the actions outlined in 2 CFR 200.338,including termination or partial termination of the award or
subaward outlined in 2 CFR 200.339.
12. Allowable Costs. Funds are to be used for allowable casts in compliance with 2 CFR 200.403,the
approved SOW,and any agreements among the Subrecipient,Recipient,and FEMA.
1
13. Non-Federal Audit. The Recipient and Subrocipient are responsible for obtaining audits in
accordance with the Single Audit Act of 1984,in compliance with 2 CFR 200.501.
14. Debarred and Suspended Parties. Recipients and Subrecipients are subject to the non-procurement
debarment and suspension regulations implementing Executive Orders 12549 and 12689,and 2 CFR
ISO.These regulations restrict federal financial assistance awards,subawards,and contracts with
parties that are debarred,suspended,or otherwise excluded from or ineligible for participation in the
federal assistance program or activities.
15. Equipment Rates. Rates claimed for use of Subrecipient-owned equipment in excess of the FEMA-
approved rates must be approved under State guidelines issued by the State Comptroller's Office or
must be certified by the Recipient to include only those costs attributable to equipment usage less any
fixed overhead and/or profit.
16. Duplication of Funding between Public Assistance(PA)and HMGP. Funding for PA Section 406
and HMGP Section 404 are permitted on the same facility/location,but the activities identified under
each program must be distinct with separately accounted funds.At closeout,FEMA may adjust the
funding to ensure the Subrecipient was reimbursed for eligible work from only one fimding source.
17. Historic Properties and Cultural Resources. In compliance with 2 CFR 800,if a potential historic
property or cultural resource is discovered during construction,the Subrecipient must cease work in
the area and take all reasonable measures to avoid or minimize harm to the discovered
property/resource.During construction,the Subrecipient will monitor ground disturbance activity,
and if any potential archeological resources are discovered,will immediately cease work in that area,
and notify the Recipient and FEMA.Construction in the area may resume with FEMA's written
approval after FEMA's consultation,if applicable,with the State Historic Preservation Officer
(SHPO).
IS. NEPA and Changes to the Scope of Work(SOW). To comply with the National Environmental
Policy Act(NEPA),and other Laws and Executive Orders,any change to the approved SOW shall be
re-evaluated before implementation.Construction associated with a SOW change,prior to FEMA
approval,may be ineligible for funding.Acceptance of federal funding requires environmental
permits and clearances in compliance with all appropriate federal,state and local laws,and failure to
comply may jeopardize funding.
Within their authority,the Recipient and Subrecipient must use of all practicable means,consistent
with other essential policies,to create and maintain productive harmony for people and nature,and
fulfill the social,economic,and other needs of present and future generations of Americans.
M91i8aMm1td%tAV5.HMA Grants Managmm%02.HMOMMOP Smadod C=d1dow%Mndard HMGP Canditiom August 2019.doex
2