HomeMy WebLinkAboutCOM 0577.000 1998-2000 RECEIVED
nme.. ~~~By-- -~-M--°--
County •lrOUnCli
November 23, 1999 ss,o,e
Mr. Jiro A. Sumada
Chief Engineer
Department of Public Works
County of Hawaii
25 Aupuni Street
Hilo, Hawaii 96720
Dear Mr. Shimoda:
Subject: Papaikou Wastewater Treatment Plant
Operation and Maintenance Inspection
Our annual operation and maintenance inspection report of the subject facility is
attached far your use. The facility is given a "Conditional Acceptable" rating
for the following reasons:
1. The chlorine contact tank contained a 6 to 12-inch layer of sludge on the
bottom of the tank. Sludge carryover with the final effluent can occur
during peak flows or when the sludge denitrifies;
2. The chlorine alarm was tested during the inspection and found to be
inoperable; and
3. The headworks ventilation fan was inoperable. For liability and personnel
safety, the ventilation system should be inspected and repaired.
Other deficiencies noted during the inspection are included in the attached
report.
Please submit within 45 days after receipt of this letter a written corrective
action plan addressing the cited deficiencies. The plan should also include a
reasonable time schedule for implementation of your actions.
Should you have any questions, please call Ken Muranaka of our Wastewater Branch
at telephone no. 586-4294.
Sincerely,
'~0. THOMAS E. ARIZUMI, P.E.
Chief, Environmental Management Division Comm. No.
Attachment S E w
F71e No.
c: EPA, Region I% (Attn: Mr. Dan Meer, Iw/report) 1~ TDi QV,/ P ~ ,
County Council Public Worke Chairperson (wlreport)
DOH, Clean Weter Branch (w/report) Ref. Date 'g ,'9~
OPERATION AND MAINTENANCE INSPECTION REPORT
INTRODUCTION
Facility: Papaikou Wastewater Treatment Plant
Date(s) of Inspection: September 14, 1999
Inspector(s): K. Muranaka
Facility Representative(s)/Job Title:
Lyle Hirota - WWTP Superintendent
Andy Narido Sr. - WWTP Supervisor (T/A)
Robert Loeffler - WWTP Operator II
BACKGROUND
1. Current status of deficiencies cited in previous inspection
reports:
No major deficiencies were noted during the 1998 O&M inspection and
the facility was given a general rating of "Acceptable".
2. NPDES Permit Status:
Permit Expiration Date: January 22, 2004
Comments: The current NPDES permit issued on December 22, 1998
became effective on January 22, 1999.
3. Enforcement Action:
The facility is not under any current enforcement action by DOH.
4. Capacity Analysis:
Average flow: 0.105 MGD (For the period 07/98 to 06/99)
Design Flow: 0.350 MGD; Percent of design capacity: 30$
Previous year's comparison:
An increase of 0.018 MGD in plant flows occurred as compared to the
previous year's average flow of 0.087 MGD. The increased flow was
due to the construction of an extension of the Paukaa Collection
System. A total of 105 new sewer connections were reported.
5. influent/Effluent Data Analysis: Based on monthly averages.
a. Influent BODS 160 mg/1 (composite)
b. Effluent BODS 2.3 mg/1 (composite)
c. Influent TSS 173 mg/1 (composite)
d. Effluent TSS 2.7 mg/1 (composite)
e. pH (min) 6.30 (grab)
f. pH (max) 6.90 (grab)
g. Chlorine residual: 0.61 ug/1 (grab)
6. Modifications/Additions - Planned/Present Construction Status:
The 8-inch supernatant sidestream return line was relocated from
the primary influent channel at the headworks to the secondary
backup channel in January 1999. This modification allows
sidestream return flows to be channeled back into the plant
downstream of the influent sampling station.
CURRENT INSPECTION
1. Maintenance: Check either: No. of:
Preventive Maintenance: x Current Backlogged
Corrective Maintenance: x Satisfactory Excessive
Major (or all) items requiring repair/replacement:
None.
2. Reuse:
The facility has a DOH approved effluent irrigation plan:
Yes No x Not applicable
3. NPDES or Chapter 62 violations (effluent limitations, spills,
etc.)
None.
4. Visual quality of effluent on date of inspection (inspectors
judgment):
The effluent was noted to be clear on the date of the inspection.
5. Facility~s Present Deficiencies:
a. The headworks ventilation system was inoperable. operations
personnel keep the doors and window louvers open during the
day for ventilation purposes. For safety and liability
O&M Report Form (12/93) 2
considerations, the ventilation system should be made
operable;
b. The fire extinguisher in the Control Building was noted to be
completely discharged. Monthly visual inspections of the
pressure gage for all fire extinguishers in the plant should
be performed in addition to the annual testing and inspection
by Hilo Fire Extinguishers Co.;
c. During the inspection, the chlorine alarm was tested with
powdered chlorine (pittchlor) and found to be inoperable.
Operators normally perform monthly PM of the unit by
activating the test switch or by unplugging the power cord to
the unit. This tests the alarm bell but not the probe. For
personnel safety, regular testing with a pittchlor or chlorine
solution and proper cleaning of the electrodes must be
incorporated. A written standard method for cleaning the
electrodes should be provided for all treatment facilities
countywide; and
d. A 6 to 12-inch thick sludge layer was found on the bottom of
the Chlorine Contact Tank during the inspection. Sludge
carryover with the final effluent can occur when the sludge
denitrifies and/or during peak flows. The tank needs to be
vacuumed on a more frequent basis. In addition, the sludge
blanket should be checked at least weekly.
SUMMARY
i. General Rating:
ACCEPTABLE X CONDITIONAL ACCEPTANCE UNACCEPTABLE
Explanation: The facility was being operated and maintained
satisfactorily with the exception of the above
deficiencies.
2. General Comments/Recommendations:
The following items are recommended for plant improvement:
a. The aeration tanks have not been rotated since plant startup.
It is recommended that Aeration Tank ,}1 be drained, cleaned,
inspected, and repaired as necessary. The mixed liquor from
Aeration Tank #2 should be pumped into Aeration Tank ;1 for
startup. Tank #`2 should then be taken down, inspected and
repaired as necessary. Residual lime that settles on the
bottom of Tank #2 can be collected, washed, and reused;
0&M Report Form (12/93) 3
b. The 1995 O&M inspection report noted that the standby aeration
tank was to be used as a flow equalization basin. Storm flows
in excess of 0.6 MGD would be routed to the standby aeration
tank via a slotted gate. Storage is currently unavailable
with Aeration Tank #1 being full of rainwater as noted in item
#2a above. The slotted gate was moved to the discharge
channel. It is recommended that the gate be relocated back to
the influent channel; and
c. Heavy algal growth was noted on the effluent weir of Final
Clarifier #2. The algae growth should be cleaned
periodically.
O&M Report Form (12/93) 4