PART II
THE PROPOSED
CAPITAL BUDGET AND SIX-YEAR
CAPITAL IMPROVEMENTS PROGRAM
FY 2023 - 2024
March 01 , 2023
TABLE OF CONTENTS
Part II
THE PROPOSED CAPITAL BUDGET
AND SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FY 2023 - 2024
MAYOR'S TRANSMITTAL LETTER
CAPITAL BUDGET ORDINANCE
TABLE 1. LIST OF PROJECTS AND PROPOSED FUNDING SOURCES
CAPITAL IMPROVEMENTS PROGRAM BY DEPARTMENTS
Civil Defense 9
Department of Environmental Management 14
Department of Parks and Recreation 35
Department of Public Works 44
Fire Department 54
Mass Transit Agency 57
Office of Housing and Community Development 67
O% oAF y4
051
0 - \kit`; Lee E.Lord
* ff4 x Managing Director
Mitchell D.Roth w
Mayor SA r�DF Np Deputy
Robert H.Command
tg g
Guttfv
Offirr of filo Atavor
25 Aupuni Street,Suite 2603 • Hilo,Hawai`i 96720 • (808)961-8211 • Fax(808)961-6553
KONA: 74-5044 Ane Keohokalole Hwy.,Bldg C • Kailua-Kona,Hawai`i 96740
(808)323-4444 • Fax(808)323-4440 -j'or)
RYn ....
March 1. 2023
l.J"
Honorable Members of the County Council
County of Hawaii ,v -
25 Aupuni Street • N.0
Hilo, HI 96720
Aloha Council Members:
Transmitted herewith is the Capital Budget for FY 2023-2024 submitted for your review and
approval and the Capital Program for the next six years from FY 2023-2024 to 2028-2029. The
Capital Budget includes 44 projects requiring a total appropriation of$345.48 million.
Funding Sources
Capital projects are typically funded by debt (bonds, State Revolving Fund loans), revenue
sources (fuel tax, other special revenues), state grants, federal grants or loans, and other
financing options (fair share contributions or special financing districts). The Capital Budget
presented herein includes capital projects of which about$291.04 million are intended to
be funded in whole or part by bonds, $18.87 million to be funded by Federal Grants, $34.65
million to be funded by the State Revolving Loan Fund or State CIP, and $920 thousand to'
be funded by GET (see Table 1).
Debt Service
Every year, we strive to present a budget that is fiscally constrained (in terms of prudent
debt service planning) and selective based on rational criteria. The Government Finance
Officers Association, a professional organization of government officials, recommends a
prudent debt service limit to be 15 (fifteen) percent of general expenditures.
The lower the interest rate and the greater the revenues, the more can be borrowed while
staying within the prudent debt service limits. The proposed operating budget for this
coming fiscal year includes debt service for short term bond anticipation notes, which are
used to reduce carrying cost and ensure that cash will be available for projects as needed.
As budgeted, the resulting total debt service is estimated at 7.4 percent of the general
expenditures. If all debt that has been authorized by the County Council was issued, the
debt service percentage would be 13.2 percent of the general expenditures.
•
Comm. No. �
Ref.To: Read() it/
County or Hawaii is an Equal Opprntunity Provider and Employer _ 1 ?U2
Ref. note MAR R
Honorable Members of the County Council
March 1, 2023
Page 2
What is a Capital Improvement Project?
A project is eligible for funding from the capital budget if it is a major nonrecurring
expenditure, such as:
1. Land acquisition;
2. Infrastructure improvement other than buildings that add value to the land or
improves utility (roads, drainage, sewer lines, parking, landscape or similar
construction);
3. New buildings or structures or additions to buildings, including related equipment
and appurtenances which are integral to the new structure;
4. Nonrecurring rehabilitation, remodeling or expansion of infrastructure and buildings;
5. Planning,feasibility, engineering, or design studies related to capital improvement
projects;
6. Information and communications technology infrastructure.
Project Data/Financial Impact Statements
Proposed capital projects are organized in sections by County agencies. The first
document in each section is a Summary of Department Requests for FY 2023-2024.
Following the Summary are the individual Project Data/Financial Impact Statements, which
include information about the lead County agency, location, project description, Council
benefit districts, project consistency with long range plans, impact on operating budget,
sustainability focus, project readiness, etc.
Fair Share Contributions
A Fair Share Annual Report as of June 30, 2022, will be submitted to the County Council by
March 1, 2023. This document provides information on the total fair share contributions,
appropriations, and funds available for capital improvements.The Capital Budget
presented herein does not include any capital projects to be funded by Fair Share
Contributions.
We ask for your favorable consideration of this Capital Budget and Program.
Wit •loha,
,s6 /ge
Mitchell D. Roth
Mayor, County of Hawaii
.....
COUNTY OF HAWAII STATE OF HAWAI I
4TE OF•N►•d
BILL NO. 31
ORDINANCE NO. DRAFT 1
AN ORDINANCE RELATING TO PUBLIC IMPROVEMENTS AND FINANCING THEREOF FOR THE FISCAL
YEAR JULY 1, 2023 TO JUNE 30, 2024.
BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAII:
SECTION 1. The following amounts to be received from the sale of general obligation
bonds,and other sources are hereby appropriated to the projects and for the purposes
designated in Section 2.
CAPITAL PROJECTS FUND
Funding Source Amount
State Revolving Loan Fund $34,650,000
Federal Funds $18,867,000
General Obligation Bonds, Capital Projects $291,041,000
Fund Balance
General Excise Tax $920,000
Total $345,478,000
SECTION 2. The monies to be provided from the sources specified in Section 1 shall be
appropriated for the purposes and in the amounts as follows:
[The remainder of this page is intentionally left blank]
4
APPROPRIATIONS
FY NO. PROJECTS (in thousands)
FEDERAL GRANTS RECEIVABLE
202306 DEM - Kealakehe Wastewater Treatment Plant R-1 Upgrade 1,250
202323 DPW- Bridge Inspection and Repair 160
202325 DPW- Pavement Preservation 8,000
202327 DPW-Title 23 Project- Kahakai Boulevard Shoulder Improvements 8
202330 MTA- Bus Stop ADA Compliance 1,613
202331 MTA- Islandwide Bus Shelters 540
202332 MTA- Kailua-Kona Maintenance Facility 2,736
202333 ,MTA-Zero Emissions Infrastructure 2,200
202334 MTA- Hub and Spokes Construction 2,360
Subtotal 18,867
STATE REVOLVING LOAN FUND
202305 DEM - Hilo WWTP Upgrades 30,000
202306 DEM - Kealakehe Wastewater Treatment Plant R-1 Upgrade 3,750
202334 MTA- Hub and Spokes Construction 900
Subtotal 34,650
GENERAL OBLIGATION BONDS, CAPITAL PROJECTS
FUND BALANCE
202301 CD-South Point Building Replacement 100
202302 CD- Kulani Cone Building Replacement 200
202303 CD- Land Mobile Radio (LMR) Upgrade 2,000
202304 DEM - Pahala Wastewater System (reappr. 5698.41) 1,000
202305 DEM - Hilo WWTP Upgrades 125,000
202306 DEM - Kealakehe Wastewater Treatment Plant R-1 Upgrade 1,000
202307 DEM - Hale Halawai SPS Renovation & Force Main Replacement 4,000
202308 DEM - Repair/Replacement of Wastewater Facilities 10,000
202309 DEM - Kalanianaole Collector Sewer Phase II 600
202310 DEM - Pua Sewage Pump Station Renovation 32,000
202311 DEM -Ainako Aina Nani Collector Sewer 250
202312 DEM -Ainako Interceptor Sewer Phase 2 200
202313 DEM - Rural Transfer Station Repairs and Enhancements 2,000
202314 DPR- Repairs/Improvements to Facilities 10,000
202315 DPR-ADA Compliance 15,000
202316 DPR- Hilo Skate Park 5,000
202317 DPR- Laupahoehoe Boat Ramp Improvements 9,000
202318 DPR-Afook-Chinen Civic Auditorium Upgrades 7,500
202319 DPR- Kikala-Keokea New Park Development (Reapp.) 1,500
202320 DPR- Kahalu'u Beach Park Improvements 5,000
202321 DPW- Facilities Improvements 11,600
202322 DPW-Waika'alulu Bridge#44-8 (Kalopa) (Reappr) 1,500
202323 DPW- Bridge Inspection and Repair 40
202324 DPW- Drainage Improvement Projects, Islandwide 3,000
202325_DPW- Pavement Preservation 2,000
202326 DPW- Pu'ainako Street Rehab. (Kanoelehua Ave. to Railroad Ave.) (Reappr) 300
202328 DPW- Railroad Avenue Rehabilitation (Reappr) 300
202329 FIRE- NFPA 1851 Compliant PPE Extractor Installation 1,000
5
202332 MTA- Kailua-Kona Maintenance Facility 860
202333 MTA-Zero Emissions Infrastructure 551
202334 MTA- Hub and Spokes Construction 1,790
202337 MTA- Park and Ride Lots 250
202338 OHCD- Facilities Repairs/Maintenance and Renovation 1,500
202339 OHCD- Kamakoa Nui Mini Loop Road, Infrastructure and Housing 18,000
202340 OHCD- O'okala Affordable Housing Subdivision Road 4,000
202341 OHCD - Kukuiola Emergency and Permanent Supportive Housing 10,000
202342 OHCD - Haihai Affordable Housing Project 1,000
202343 OHCD-Ainako Affordable Housing Project 1,000
202344 OHCD-Ainaola Affordable Housing Project 1,000
Subtotal 291,041
GENERAL EXCISE TAX
202330 MTA- Bus Stop ADA Compliance 450
202331 MTA- Islandwide Bus Shelters 300
202335 MTA- Expansion of Hilo Maintenance Facility 125
202336 MTA- Bus Stop Signage 45
Subtotal 920
Grand Total 345,478
SECTION 3. The Director of Finance shall open appropriate accounts for each project,
makemonies available, and expend funds for the projects listed herein.
SECTION 4. The appropriation and authorization in Section 2 includes land purchase, plans,
sitepreparation, equipment purchase, improvements to land, and construction.
SECTION 5. The Mayor shall initiate authorized projects taking into consideration the
factors ofpublic need, general financial condition of the general fund, highway fund, sewer fund,
parking meter fund, bikeway fund, beautification fund, vehicle disposal fund, solid waste fund,
golf course fund, geothermal relocation revolving fund, housing fund, and fair share
contributions as well as the County's general economic conditions.
SECTION 6. Severability. If any provision of this ordinance or the application thereof is
held invalid, such invalidity shall not affect other provisions or applications of the ordinance
which can be given effect without the invalid provision or application, and to this end, the
provisions of this ordinance are declared to be severable.
SECTION 7. As required by Section 10-6(a) of the Hawaii County Charter, the estimated
cost ofeach capital improvement pending or proposed to be undertaken,the estimated operating
cost, and the pending or proposed method of financing are set forth in the attached Project Data
and/or Financial Impact Statement sheets.
6
SECTION 8. This ordinance shall take effect on July 1, 2023.
INTRODUCED BY:
COUNCIL M BER, CO'. NTY OF HAWAII
Hilo, Hawaii
Date of Introduction:
Date of 1st Reading:
Date of 2nd
Reading:
Effective Date:
REFERENCE: Comm. 136
7
TABLE 1.UST OF PROJECTS AND PROPOSED FUNDING SOURCES
CAPITAL BUDGET FY 2023-2024
2023-24 FY FUNDING FUNDING FORECAST BY FISCAL YEAR
In thousands) On thousands) TOTAL
CAPITAL LOCATION COUNCIL 2022-23Prior Funds ESTIMATED
PROJECT (COUNdI BENEFIT FUNDING COUNTYAllotted ,,,,,,,,,,,,,,,,,,,„'.....„_:.'. PROJECT
..............................
AGENCY PRIORITY FY NO. PROJECT ELIGIBILITY DISTRICT) DISTRICT SOURCE G.O.BONO STATE _ FEDERAL PRIVATE CBA,Other', (not lapsed) .I : 2024.25 2025-26 2026-27 2027-28 2028.29 Beyond 6 years EMT
CD 1 202301 CD-South Point Building Replacement Info./Comm.,Infr.Imp.,New Bldg.,Non.Rehab. 6 All Bond 100 200 (t}:' 300
CO 2 202302 CD•Kulani Cone Building Replacement Info./Comm.,Info Imp.,New Bldg.,Non.Rehab. 3 All Bond 200 _ ,,i(£,: 100 300
CD 3 202303 CD-Land Mobile Radio(LMR)Upgrade Info./Comm.,Infr.Imp.,New Bldg.,Non.Rehab. 4-6 4-6 Bond 2,000 iiniffiliit000l 2,000
DEM 1 202304 DEM•Pahala Wastewater System(reaper.5698.41) Infr.Imp.,Land Acq.,New Bldg.,Planning 6 6 Bond 1,000 8,651 ( O0 9,651
DEM 2 202305 OEM-Hilo WWTP Upgrades Infr.Imp.,New Bldg.,Non.Rehab. 3 1-3 Bond,SRF 125,000 30,000 13,400,. „ii r
W .i4%.9ii O 168,400
DEM 3 202306 DEM•Kealakehe Wastewater Treatment Plant R-1 Upgrade Infr.Imp.,Land Acq.,New Bldg.,Planning 8 7-8 Bond,SRF,Fed 1,000 3,750 1,250 13,705 i00r' 20,000_ 10000 10,000 59,705
DEM 4 202307 DEM-Hale Halawai SPS Renovation&Force Main Replacement Info Imp.,New Bldg.,Non.Rehab. 8 7-8 Bond 4,000 500 4,500
DEM 5 202308 DEM•Repair/Replacement of Wastewater Facilities Infr.Imp.,New Bldg.,Non.Rehab. 1-3,7,8 1-3,7,8 Bond 10,000 4,955flOW 10,000 10,000 10,000 10000 10000 64,955
OEM 6 202309 DEM-KalaManaole Collector Sewer Phase II Infr.Imp.,Non,Rehab.,Planning 3 3 Bond 600 .;.;: Q, 12,000 12,600
DEM 7 202310 DEM-Pua Sewage Pump Station Renovation Infr.Imp.,New Bldg.,Non.Rehab. 3 1.3 Bond 32,000 2,873 1 34,873
DEM 9 202311 DEM-Alnako Aina Nani Collector Sewer Infr.Imp.,Non.Rehab.,Planning 2 2 Bond 250
:::::::::::: :::'::<:-:•40::': 8,000 8,250
DEM 10 202312 DEM-Ainako Interceptor Sewer Phase 2 Inft.Imp.,Non.Rehab.,Planning 2 2 Bond 200 MC 7,000 7,200
DEM 11 202313 DEM-Rural Transfer Station Repairs and Enhancements Non.Rehab.,Planning All All Bond 2,000 9,974 2F[I 2,000 2,000 2,000 2,000 2,000 21,974
OPR 1 202314 OPR-Repairs/Improvements to Facilities Infr.Imp.,New Bldg.,Non.Rehab. All All Bond 10,000 )0 J04-1 10,000 10,000 10,000 10,000 10,000 60,000
............d...........
DPR 2 202315 OPR•ADA Compliance loft.Imp.,New Bldg.,Non.Rehab. All All Bond 15,000 15;000€ 15,000
DPR 3 202316 DPR•Hilo Skate Park Mfr.Imp.,New Bldg. 2 1-5 Bond 5,000 5,004'7 5,000
DPR 4 202317 OPR-Laup8hoehoe Boat Ramp Improvements Intr.Imp.,Planning I 1 1 Bond 9,000 9OQ0`; 9,000
DPR 5 202318 DPR-Afook-Cblnen Civic Auditorium Upgrades Infr.Imp.,Non.Rehab. 3 1-5 Bond 7,500 r 7,5flgt:'.. 7,500
DPR 6 202319 DPR-Kikala-KSakea New Park Development(Reapp.) loft.Imp.,New Bldg.,Planning 5 5 Bond 1,500 1500;. 1,500
DPR 7 202320 DPP-Kahalu•u Beach Park Improvements Inft Imp.,New Bldg.,Planning 7 7 Bond 5,000 5404'.; 10,000 15,000
DPW 1 202321 DPW-Fadlities Improvements Infr.Imp.,Planning,Land Acq.,New Bldg. All All Bond 11,600 Miffliiiiiniglfk 11,600 11,600 11,600 11,600 11,600 25,000 94,600
DPW 2 202322 DPW-Waika'alulu Bridge 844.8(Kalopa)(Reappr) Infr.Imp. 1 1 Bond 1,5006 500... 1,500
DPW 3 202323 DPW-Bridge Inspection and Repair Infr.Imp. All All Bond,Fed 40 160 44f01. 200 200 600
DPW 4 202324 DPW-Drainage Improvement Projects,Islandwide Infr.Imp.,Land Acq.,Non.Rehab. All All Bond 3,000 3,004: 3,000 6,000
DPW 5 202325 DPW-Pavement Preservation Infr.Imp. All All Bond,Fed 2,000 8,000 '.;:iMSAcimocK 10,000
DPW 6 202326 DPW-PO'ainaka Street Rehab.(Kanoelehua Ave.to Railroad Ave.)(Reaper) Ink Imp. 3 3 Bond 300 3OS1;. 1,500 1,800
DPW 7 202327 DPW-Title 23 Project-Kahakai Boulevard Shoulder Improvements ink Imp. All All Fed 8 z ; ' 8
DPW 8 202328 DPW•Railroad Avenue Rehabilitation(Reappr) Infr.Imp. 3 3 Bond 300 1,000 5,000 6,300
FIRE 1 202329 FIRE-NEPA 1851 Compliant PPE Extractor Installation Planning All All Bond 1,000 10.001 3,060 4,060
MTA 1 202330 MTA•Bus Stop ADA Compliance Infr.Imp.,Land Acq.,New Bldg.,Planning All All Fed,GET 1,613 450 725 :> H950[i 1,220 50 50 50 4,158
MTA 2 202331 MTA-Islandwide Bus Shelters Ink Imp.,Land Acq.,New Bldg.,Planning All All Fed,GET 540 300 300I'd#0' 300 300 300 300 300 300 2,940
MTA 3 202332 MTA•Kalua-Kona Maintenance Fealty Mfr.Imp.,Land Acq.,New Bldg.,Planning 6.7 6-9 Bond,Fed 860 2,736 3,596 „14 ,;.i.3" I„.i6{ 20,000 27,192
MTA 4 202333 MTA-Zero Emissions Infrastructure loft.Imp.,New Bldg. All All Bond,Fed 551 2,200 1,000 a 2„ 5 1,200 1,200 1,200 7,351
MTA 5 202334 MTA-Hub and Spokes Construction Infr.Imp.,Land Acq.,New Bldg.,Planning All All Bond,SCIP,Fed 1,790 900 2,360 3,450 1. „,,,,,,,s'y0Ef_i 6,650 6,650 6,650 6,650 6,650 41,750
MTA 6 202335 MTA-Expansion of Hilo Maintenance Facility Infr.Imp.,Land Acq.,New Bldg.,Planning 3 All GET 125 125 :";335:. 2,500 2,750
MTA 7 202336 MTA-Bus Stop Signage Infr.Imp. All All GET 45 400 d5:; 10 1 1 1 1 1 460
MTA 8 202337 MTA-Park and Ride Lots Infr.Imp.,Land Acq.,New Bldg.,Planning All All Bond 250 250 „ $Li 1,070 1,070 1,070 1,070 - 4,780
OHCD 1 202338 OHCD-Facilities Repairs/Maintenance and Renovation Infr.Imp.,New Bldg.,Planning Various Various Bond 1,500 7,577 „•3 <, 1,500 1,500 1,500 1,500 1,500 16,677
OHCD 2 202339 OHCD-Kamakoa Nul Mini Loop Road,Infrastructure and Housing Info./Comm.,mfr.Imp.,Planning S 5-9 Bond 18,000 76,255 Nt.;:Ega00.ck 10,000 104,255
OHCD 3 202340 OHCO-&Skala Affordable Housing Subdivision Road Ink Imp.,Planning 1 All Bond 4,000 linNIA000 4,000
OHCD 4 202341 OHCD-Kukuida Emergency and Permanent Supportive Housing Infr.Imp,New Bldg.,Planning 8 6-9 Bond 10,000 5,000 ENONAW 16,000 31,000
OHCD 5 202342 OHCD-Haihai Affordable Housing Project Infr.Imp.,Planning 3 1-4 Bond 1,000 ifigillqiNtlatt 15,000 16,000
OHCD 6 202343 OHCD-Ainako Affordable Housing Project loft.Imp,Planning 2 1-5 Bond 1,000 ,900' 16,000 17,000
011CD 7 202344 OHCD-Ainaola Affordable Housing Project Infr.Imp.,Planning 2 1-5 Bond 1,000 <40901 20,000 21,000
TOTAL 291,041 34,650 18,867 - 920 153,036 4$s 195,710 67,571 61,371 43,371 42,051 25,301 933,889
•Community Benefit Assessments:Fair Share,Park Dedication,Etc.Other:GET,Fuel Tax and other non-bond sources
8
CIVIL DEFENSE
TALMADGE MAGNO,
ADMINISTRATOR
9
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Civil Defense Agency FISCAL YEAR 2023-2024
2023-24 FY FUNDING FUNDING FORECAST BY FISCAL YEAR TOTAL
(in thousands) (in thousands)
County Prior ESTIMATED
G.O. CBA, Funds Beyond 6 PROJECT
PRIORITY PROJECT Bond State Federal Private* Other** Allotted 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 years COST
1 CD-South Point Building Replacement 100 200 100 300
2 CD-Kulani Cone Building Replacement 200 200 100 300
3 CD-Land Mobile Radio Upgrade 2,000 2,000 2,000
4
5
6 -
7
8 -
9 -
10 -
TOTAL 2,300 - - - - 200 2,300 100 - - - - - 2,600
Created By: Talmadge Magna * Private:Foundation Grants
Date: 12/21/2022 ** Community Benefit Assessments:Fair Share,Park Dedication,Etc.Other:GET,Fuel Tax and other non-bond sources
10
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Civil Defense 2.DATE: 12/21/2022
3. PROJECT NAME: CD-South Point Building Replacement 4.SUBMITTER: Talmadge Magno
5. COUNCIL BENEFIT DISTRICT(S): All 6.TMK/CDP PLANNING AREA: (3)9-3-001-006
7. LOCATION(COUNCIL DISTRICT): 6 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition E, Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,✓one:
that apply: Ii Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ! Information/communication tech. O High ❑ Med. ❑ Low
11. PROJECT/PROGRAM Purchase and install a replacement building at South Point that houses current radio system equipment. Recommend a composite building that is better suited to withstand the harsh
DESCRIPTION: evnviromental conditions in this location. Estimates shown here is the cost to install the strucuture at the Land Mobile Radio Site.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,/if Yes: 17 Eliminates a documented hazard. facility/infrastructure/building,✓if Yes: E
B. Service improvements,Vail that apply: C Access to El Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:O Needed to continue current level of services.
E. Operational efficiency and leveraging Results in net decrease in operating cost and maintains services. IF. Fosters inter-departmental collaboration
"Select from drop down menu"
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. /if Yes: E
Additional info:The Land Mobile Radio(LMR)components require a climate controlled environment that is protected from the elements. The current structure does not adequately provide this environment.
13. LONG RANGE PLANS/ C Dept.Priority Details:Maintaining the LMR System is an essential task. ` Comm.Value Details:
COMMUNITY VALUES,check [ General Plan Details:Coordinates the County's disaster preparedness and response program. - Admin Priority Details:
at least one and all that apply,P P Y. ❑ CDP Details: Multi Hazard Details:
provide details: E Other Plans Details:Statewide Communications Interoperability Plan(SCIP) Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:E DESCRIBE:
15.LEGAL MANDATE?✓if Yes: 17 Chapter 7 of Hawaii County Code requires Civil Defense to maintain the Land Mobile Radio system to provide first responder communications.
16.SUSTAINABILITY FOCUS,✓all that apply: ... Promotes energy and resource conservation ❑ Reduces hazard risk HE Preserves/protects our natural/cultural env.
Provide additional information as appropriate: - Cost benefit analysis Promotes economic vitality C Strengthens and sustains our community
Additional info:Maintenance of the LMR system is an essential task identified in Chapter 7,Disaster and Emergency Management,of the County Code.
17.PROJECT READINESS,✓all E Project currently underway jC Previously Appropriated I.•.. Staff available to manage project E External funds/resources ready to proceed
that apply: C Identified operating budget needs 7 Can realistically encumber funds List phases already completed:None
Additional info:
8. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 200 $200
Construction 100 $100
TOTAL: $200 $100 $300
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I
Cty G.O.Bond 200 100 $300,
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $200 $100 $300
11
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
'1. DEPARTMENT AND DIVISION: Civil Defense 2. ' 12/21/2022
3. PROJECT NAME: CD-Kulani Cone Building Replacement4.SUBMITTER: • Magno
5. COUNCIL BENEFIT DISTRICT(S): All •
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTALa $200,000
9. PROJECT ELIGIBILITY,V all E Land acquisition I! Infrastructure improvement _Ii New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation E Planning,feasibility,eng.,or design study 1. Information/communication tech. O High ❑ Med. ❑ Low
11. PROJECT/PROGRAM Purchase and install a replacement building at Kulani Cone LMR site that houses current radio system equipment. Recommend a composite building that is better suited to withstand the
DESCRIPTION: I harsh evnviromental conditions in this location. Estimate shown is the cost to install the strucuture at the Land Mobile Radio Site.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: a Eliminates a documented hazard. facility/infrastructure/building,"if Yes: r
B. Service improvements,/all that apply: C Access to O Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:2 Needed to continue current level of services.
E. Operational efficiency and leveraging Results in net decrease in operating cost and maintains services. 1F. Fosters inter-departmental collaboration ,*Select from drop down menu**
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. ✓if Yes: C
Additional info:The Land Mobile Radio(LMR)components require a climate controlled environment that is protected from the elements. The current structure does not adequately provide this environment.
'13. LONG RANGE PLANS/ Dept.Priority Details:Maintaining the LMR System is an essential task. ❑ Comm.Value Details:
COMMUNITY VALUES,check 7 General Plan Details:Coordinates the County's disaster preparedness and response program. _ Admin Priority Details:
at least one and all that apply, ❑ CDP Details: ❑ MultiHazard Details:
provide details: ? Other PlansDetails:Statewide Communications Interoperability Plan(SCIP) Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes_C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C (Chapter 7 of Hawaii County Code requires Civil Defense to maintain the Land Mobile Radio system to provide first responder communications.
16.SUSTAINABILITY FOCUS,/all that apply: r Promotes energy and resource conservation ❑ Reduces hazard risk ,❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: :— Cost benefit analysis E Promotes economic vitality 17 Strengthens and sustains our community
Additional info:Maintenance of the LMR system is an essential task identified in Chapter 7,Disaster and Emergency Marla ement,of the County Code.
17.PROJECT READINESS,Vail C Project currently underway C Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs ci Can realistically encumber funds List phases already completed:None
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 200 $200
Construction 100 , $100
TOTAL: $200 $100 $300
19. 0&M COSTS (x$1000):
IP I ji
. .. ... , i
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 200 100 $300
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $200 $100 $300
12
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Civil Defense 2.DATE: 12/21/2022
3. PROJECT NAME: CD-Land Mobile Radio(LMR)U —�
Upgrade 4.SUBMITTER: Talmadge Magno
5. COUNCIL BENEFIT DISTRICT(5): 4,5,6 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): 4,5,6 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
9. PROJECT ELIGIBILITY,V all C Land acquisition IE Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation IC Planning,feasibility,eng.,or design study 7 Information/communication tech. ❑ High Med. ` Low
11. PROJECT/PROGRAM Rehabilitate three existing land mobile radio(LMR)towers(Kulani Cone,New Kau Police Station,and Naalehu Pasture). These towers have not received routine maintenance and as a
DESCRIPTION: result have prematurely aged. This project will renovate the existing towers to extent their useful life to prevent a catastrophic failure of the LMR system.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Project will restore full operations to asset.
A. Addresses public health/safety,✓if Yes: Eliminates a documented hazard. facility/infrastructure/building,✓if Yes: 12.
B. Service improvements,Vall that apply: C Access to 0 Quality of 0 Quantity of D. New facility/infr./bldg., ✓if Yes:0 Needed to continue current level of services.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration N/A
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. /if Yes: C
Additional info:Ensures first responder communication which enables Police and Fire response in the affected districts.
13. LONG RANGE PLANS/ 'ir. Dept.Priority Details:Maintaining the LMR System is an essential task. = Comm.Value Details:
COMMUNITY VALUES,check F. General Plan Details:Coordinates the County's disaster preparedness and response program. _ Admin Priority Details:
at least one and all that apply, ❑ CDP Details: Multi Hazard Details:
provide details: P Other Plans Details:Statewide Communications Interoperability Plan(SLIP) Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:I DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C Chapter 7 of Hawaii County Code requires Civil Defense to maintain the Land Mobile Radio system to provide first responder communications.
16.SUSTAINABILITY FOCUS,Vali that apply: I Promotes energy and resource conservation I Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: Cost benefit analysis Promotes economic vitality C Strengthens and sustains our community
Additional info:Maintenance of the LMR system is an essential task identified in Chapter 7,Disaster and Emergency Management,of the County Code.
17.PROJECT READINESS,/all C Project currently underway C Previously Appropriated C Staff available to manage project I External funds/resources ready to proceed
that apply: I± Identified operating budget needs 0 Can realistically encumber funds List phases already completed:None
Additional info:funds previously allocated in Ordinance 20-44 with account number 110.299.5299.86.115
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction 2,000 $2,000
TOTAL: $2,000 I I $2,000
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): €
Cty G.O.Bond 2,000 $2,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc) _
-Other Cty Fund-(describe)
TOTAL:I $2,000 I $2,000
13
DEPARTMENT OF
ENVIRONMENTAL
MANAGEMENT
RAMZI MANSOUR,
DIRECTOR
•
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Environmental Management FISCAL YEAR 2023-2024
2023-24 FY FUNDING FUNDING FORECAST BY FISCAL YEAR TOTAL
(in thousands) (in thousands) ESTIMATED
County Prior
Beyond 6 PROJECT
G.O. CBA, Funds
PRIORITY PROJECT - Bond State Federal Private* Other** Allotted 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 years COST
1 DEM-Pahala Wastewater System(reappr.5698.41) 1,000 8,651 1,000 9,651
2 DEM-Hilo WWWTP Upgrades 125,000 30,000 13,400 155,000 168,400
3 DEM-Kea lakehe Wastwater Treatment Plant R-1 Upgrade 1,000 3,750 1,250 13,705 6,000 20,000 10,000 10,000 59,705
4 DEM-Hale Halawai SPS Renovation&Force Main Replacement 4,000 500 4,000 4,500
5 DEM-Repair/Replacement of Wastewater Facilities 10,000 4,955 10,000 10,000 10,000 10,000 10,000 10,000 64,955
6 DEM-Kalanianaole Collector Sewer Phase II 600 • 600 12,000 12,600
7 DEM-Pua SPS Renovation 32,000 2,873 32,000 34,873
8 DEM-Ainako Aina Nani Collector Sewer 250 - 250 8,000 8,250
9 DEM-Ainako Interceptor Sewer Phase 2 200 200 7,000 7,200
10 DEM-Rural Transfer Station Repairs and Enhancements 2,000 9,974 2,000 2,000 2,000 2,000 2,000 2,000 21,974
11 DEM-Pua Sewage Pump Station Force Main Installation&Rehabilitation(move to 11) 3,931 15,000 18,931
12 DEM-Kulaimano WWTP Upgrade 15,000 12,000 10,000 37,000
13 DEM-Papaikou WWTP Upgrade 10,000 10,000 20,000
14 DEM-Wailuku Force Main and Gravity Sewer Replacement 16,000 - 16,000
15 DEM-Naalehu Wastewater System 1,664 60,000 61,664
16 DEM-Keopu FM Replacement/SPS Renovation and Relocation 2,000 2,000
17 DEM-Paukaa SPS New Force Main 800 8,000 8,800
18 DEM-Wailoa SPS Renovation&Dual Force Mains 2,000 18,000 20,000
19 DEM-Kea lakehe SPS Renovation and Force Main Replacement 15,000 15,000
20 DEM-Puueo Gravity Sewer Replacement 800 8,000 8,800
21 DEM-Improvements to East Hawaii Sort Station 3,000 1,000 1,000 5,000
22 DEM-North Kona SPS,FM,Hina Lani Gravity Sewer,West Hawaii Business Park Gravity Sewer - 729 15,000 15,729
23 DEM-Kaumana Gardens Collector Sewer 6,000 6,000
24 DEM-Replacement of Waimea Baseyard Building 200 400 2,000 2,600
25 DEM-Onekahakaha SPS Renovation and Dual Force Mains 12,000 12,000
26 DEM-Kolea SPS Renovation and Dual Force Mains 10,000 10,000
27 DEM-Lanihau SPS Upgrade 3,000 3,000
28 DEM-Replacement of Kona Baseyard Building 600 2,000 2,600
29 DEM-Leachate Mitigation System Hilo T5 2,000 2,000
30 DEM-Leachate Mitigation System East Hawaii 10,000 10,000
31 DEM-Landfill Gas Collection and Control System,WHSL 4,000 100 1,500 6,000 11,600
32 DEM-Hilo Scrap Metal Site Remediation 16,000 16,000
33 DEM-Replacement of Kailua Disposal Area 600 1,000 2,000 3,600
34 DEM-Replacement of Hilo Disposal Area 600 1,000 3,000 4,600
35 DEM-Leachate Mitigation System West Hawaii 5,000 5,000
I
TOTAL ii 176,050 33,750 1,250 - - 64,382 211,050 204,800 89,000 80,100 35,700 14,000 11,000 710,032
Created By: Robin Bauman * Private:Foundation Grants
Date: 1/6/2023 **Community Benefit Assessments:Fair Share,Pork Dedication,Etc.Other:GET,Fuel Tax and other non-bond sources
15
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
11. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/30/2022
3. PROJECT NAME: DEM-Pahala Wastewater System(reappr.5698.41) _4.SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 6 6.TMK/CDP PLANNING AREA: 9-5/Ka'u
7. LOCATION(COUNCIL DISTRICT): 6 118.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000
9. PROJECT ELIGIBILITY,V all IC Land acquisition E Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: NonrecurringiI rehabilitation E Planning,feasibility,eng.,or design study C Information/communication tech. ❑ High ❑ Med. ❑ Low
11. PROJECT/PROGRAM New treatment and disposal facilities to replace C.Brewer plantation LCC sewer system.Includes planning,design,and construction for the closure of two(2)Large Capacity Cesspools
DESCRIPTION: (LCCS). The LCCs are currently owned and operated by the County of Hawaii. Currently necessitated by Administrative Order on Consent(AOC).
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: Eliminates a documented hazard. facility/infrastructure/building,✓if Yes: E
B. Service improvements,Vall that apply: ❑ Access to O Quality of ❑ Quantity of D. New facility/infr./bldg., 'if Yes:E Fills gap in current services.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A _ ✓if Yes:C
Additional info:
13. LONG RANGE PLANS/ 7 Dept.Priority Details:Compliance with AOC(EPA Docket No.SDWA-UIC-AOC-09-20217-0002). E Comm.Value Details:
COMMUNITY VALUES,check C General Plan Details: C Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard
provide details: C Other Plans Details:
Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:❑ DESCRIBE:Federal EPA grant requires 45%match
15.LEGAL MANDATE?v if Yes: DESCRIBE:Allows compliance with EPA mandate for closure of their Large Capacity Cesspools in accordance with Administrative Order on Consent(AOC)document.
16.SUSTAINABILITY FOCUS,Vall that apply: C Promotes energy and resource conservation E Reduces hazard risk O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis r Promotes economic vitality E Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all E Project currently underway E Previously Appropriated E Staff available to manage project E External funds/resources ready to proceed
that apply: C Identified operating budget needs r- Can realistically encumber funds List phases already completed:Planning/Design in progress while working with EPA.
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition 285 $285
Design/Survey 6,524 1,000 $7,524
Construction 1,842 $1,842
TOTAL: $8,651 $1,000 7----I $9,651
119. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I I I I 1 I
Cty G.O.Bond 2,620 1,000 $3,620
State Revolving Fund 4,189 $4,189
State CIP
Federal 1,842 $1,842
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
L TOTAL: $8,651 $1,000 - $9,651
16
Pahala Wastewater System
♦ Town of Pahala&
' ' `�
i,,,, • Pahala Wastewater System
•'• �. tit
•
4. •T• T ,e •� f" ,,
i
r
a•
A ytt .
I"
• L ,,f a ri
4.
i ' '• it .rk � _ •
.'1, • , ' / •
\-;iih.
„,,,,,e , .. ,.... . , :.34/7 ./-
ire '
l
.44
1 It
/
FY 23 - 24 1:9,028
4Other Roads 6" ® Naalehu-Pahala Sewer Manholes o 0.1 0.2 oi4 mi
Major Roads 4" R Naalehu-Pahala LCCs 0 0.15 0.3 0.6 km
Naalehu-Pahala Sewer Lines 3" « Naalehu-Pahala Cleanouts a OpenStreetMap(and)contributors,CC-BY-SA,Doug Goehnng-
Hawaii County
8"
17
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/30/2022
3. PROJECT NAME: DEM-Hilo WWTP Upgrades 4.SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6.TMK/CDP PLANNING AREA: (3)2/South Hilo
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $125,000,000
9. PROJECT ELIGIBILITY,✓ all 1 Land acquisition I- Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,Vone:
that apply: Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study 7 Information/communication tech. i= High Med. P Low
11. PROJECT/PROGRAM !Upgrades on the Hilo WWTP will include replacing screens,grit removal,and odor control equipment. Replacement of septage receiving station,renovation of primary clarifiers,
DESCRIPTION: upgrades/replacement of secondary process,replacing solids treatment process and sludge dewatering facility. Electrical and instrumentation/control upgrades.Repairs needed due to
,corrosion damage. HWWTP was built in 1990 and after 30 years of operation facility is nearing the end of it's useful life. Upgrades will restore HWWTP's 5.0 mgd capacity.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Project will restore full operations to asset.
A. Addresses public health/safety,✓if Yes: C Eliminates a documented hazard. facility/infrastructure/building,Vif Yes: Ii
B. Service improvements,/all that apply: 0 Access to 0 Quality of 0 Quantity of D. New facility/infr./bldg., /if Yes:E Needed to continue current level of services.
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:C
Additional info:
13. LONG RANGE PLANS/ P Dept.Priority Details:Only WWTP for the Hilo area Comm.Value Details:
COMMUNITY VALUES,check C General Plan Details: Admin Priority Details:
at least one and all that apply, C CDP Details: i Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan ,
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓ifYes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: P DESCRIBE:Allows compliance with EPA/DOH NPDES Permit condition.
16.SUSTAINABILITY FOCUS,Vall that apply: Promotes energy and resource conservation 0 Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: — Cost benefit analysis I✓ Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all E Project currently underway E Previously Appropriated E Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs 1- Can realistically encumber funds List phases already completed:Partial Planning and Design
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 13,400 _ $13,400
Construction 155,000 $155,000
TOTAL: $13,400 $155,000 $168,400
19. 0&M COSTS (x$1000): I I
20. FUNDING SOURCE(x$1000): I I I I
Cty G.O.Bond 13,400 125,000 $138,400
State Revolving Fund 30,000 _ $30,000
State CIP
Federal _
Private(Grants) _
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $13,400 $155,000 $168,400
18
Hilo WWTP Upgrades
FY 23-24 CIP Project
Replacement of headworks and anaerobic
sludge digestion facilies in their entirety.
Rehabilitation of existing primary
sedimentation tanks, rehabilitation of existing
secondary treatment facilities, and
construction of new solids handling facility.
Improvements to instrumentation and
electrical systems plant-wide to improve
operational efficiency.
19
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
11. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division - 2.DATE: 12/30/2022
3. PROJECT NAME: DEM-Kealakehe Wastewater Treatment Plant R-1 Upgrade 4.SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6.TMK/CDP PLANNING AREA: (3)7-4-008:002,(3)7-5-056,083/North
7. LOCATION(COUNCIL DISTRICT): 8 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000
9. PROJECT ELIGIBILITY,v all C Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,Vone:
that apply: I- Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study C Information/communication tech. C High Med. - Low
11. PROJECT/PROGRAM Upgrade to Kealakehe Wastewater Treatment Plant to produce and distribute R-1 quality effluent. This would reduce potable water demand for irrigation in North Kona. Project is
DESCRIPTION: intended to treat the effluent to R-1 quality and make it available for irrigation to users at nearby areas. Additional benefits include R-1 effluent disposal at the nearby existing percolation
,basin. Project includes installing sand filters and improving disinfection system as well as constructing headworks upgrades and installing north&south reuse pipelines in phases.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,Vif Yes: Eliminates a documented hazard. facility/infrastructure/building,Vif Yes: C
B. Service improvements,/all that apply: ❑ Access to O Quality of C Quantity of D. New facility/infr./bldg., /if Yes:C Fills gap in current services.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:C
Additional info:
13. LONG RANGE PLANS/ C Dept.Priority Details:Stewards of the enviornment&support DEM's effluent reuse program .- Comm.Value Details:
COMMUNITY VALUES,check C General Plan Details: C Admin Priority Details:
at least one and all that apply,
C CDP Details: C Multi Hoard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?Vif Yes:C DESCRIBE:US Bureau of Reclamation grant,if awarded,will require a recipient match of 75%or more.
15.LEGAL MANDATE?v if Yes: r DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: C Promotes energy and resource conservation O Reduces hazard risk I L Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis C Promotes economic vitality Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vail C Project currently underway C Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs Can realistically encumber funds List phases already completed:Partial planning and design
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition _
Design/Survey 13,705 1,000 _ _ $14,705
Construction 5,000 20,000 10,000 10,000 $45,000
TOTAL: $13,705 $6,000 $20,000 $10,000 $10,000 $59,705
19. 0&M COSTS (x$1000): ____I
20. FUNDING SOURCE(x$1000): I I I
Cty G.O.Bond 1,000 _ $1,000
State Revolving Fund 11,160 3,750 15,000 7,500 7,500 $44,910
State CIP
Federal 2,545 1,250 5,000 2,500 2,500 $13,795
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $13,705 $6,000 $20,000 $10,000 $10,000 $59,705
20
Kealakehe Wastewater Treatment Plant R-1 Upgrades
4
r 4
.>,00 - •
•
rC__Kea'akehe WWTP
• I.
•
Kealakehe
WWTP R-1
Upgrades
,
a
a
,
1
M`
FY 23-24 1:4,514
Other Roads """"`Outfall,County of Hawaii(WWD) ---Force,Private Military County of Hawaii(not WWD) 0 0.05 0.1 0.2 ml
Major Roads Siphon,County of Hawaii(WWD) ---Force,County of Hawaii(not WWD) Private ' Military 0 0.07 0.15 0.3 km
Mains -Treatment.County of Hawaii(WWD)---Force,State State ` Private
Active Old Sewer System,County of Hawaii(WWD) Gravity,Private Laterals Unknown • State Source.Esn,OigitalGlobe,GeoEye,Earthstar Geographics,CNESI
-Gravity,Dedication Pending -Dedication PendingAirbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User
Gravity,County of Hawaii(not WWD) Chimney • Unknown Community,Doug Goehring-Hawaii County
-Gravity,County of Hawaii(WWD) Gravity,State County of Hawaii(WWD) Dedication Pending Manholes
Force,County of Hawaii(WWD) County of Hawaii(not WWD) ` County of Hawaii(WWD) • County of Hawaii(WWD).Drop
21
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
11. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: - 12/30/2022
3. PROJECT NAME: DEM-Hale Halawai SPS Renovation&Force Main Replacement 4.SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6.TMK/CDP PLANNING AREA: 3-7-5/Kona
7. LOCATION(COUNCIL DISTRICT): 8 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition E Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study C Information/communication tech. C High I Med. - Low
11. PROJECT/PROGRAM Renovation of Hale Halawai sewage pump station and replacement of force main,originally constructed in 1962,which is necessary due to age and condition of assets.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Project will restore full operations to asset.
A. Addresses public health/safety,Vif Yes: C Eliminates a documented hazard. facility/infrastructure/building,,(if Yes: C
B. Service improvements,✓all that apply: ❑ Access to [ Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:C Needed to continue current level of services.
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A _ ✓if Yes:C
Additional info:
13. LONG RANGE PLANS/ 7 Dept.Priority Details:Hale Halawai SPS and FM conveys WW from Kona to Kealakehe WWTP Comm.Value Details:Hole Halawai SPS and FM conveys WW from Kona to Kealakehe WWTP
COMMUNITY VALUES,check C General Plan Details: C Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:County is anticipating enforcement action by EPA/DOH for replacement of all cast iron froce mains.
14.CTY.MATCHING FUNDS REQ'D? if Yes: >>>DESCRIBE:
15.LEGAL MANDATE?v if Yes: r DESCRIBE:
16.SUSTAINABILITY FOCUS,/all that apply: Il 7 Promotes energy and resource conservation '2 Reduces hazard risk G Preserves/protects our natural/cultural env.
Provide additional information as appropriate: - Cost benefit analysis E Promotes economic vitality �E Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,hall E Project currently underway IE Previously Appropriated _C Staff available to manage project JC External funds/resources ready to proceed
that apply: C Identified operating budget needs E Can realistically encumber funds List phases already completed:Partial planning and design
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 500 $500
Construction 4,000 $4,000
TOTAL $500 $4,000 I $4,500
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I
Cty G.O.Bond 500 4,000 $4,500
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $500 $4,000 $4,500
22
I 1
Po z Existing FM
CD
Discharge
7 _ \ Manhole
ao \
)
g m Connect to New 12"
Existing FM FM
CD ,
-‹ IF DJ
?�
' .
17
2"
—
N O t \ Hualalai Rd
20
, 7
71
ONew FM
. O Existing 12" Discharge e
COD FM w
Manhole A-.
3 Existing Hale
Halawai SPS
DJ
CD __L
"0-o –
A)
CCD — \
3
CD
m Legend: F- J
1 -{ 1 - ' Feet
New Forcemain Scale: 1"=100'
Existing Forcemain
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/30/2022
3. PROJECT NAME: DEM-Repair/Replacement of Wastewater Facilities 4.SUBMITTER: Dora Beck,P.E. _
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,7,8 6.TMK/CDP PLANNING AREA: 3-Various
7. LOCATION(COUNCIL DISTRICT): 1,2,3,7,8 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $10,000,000
9. PROJECT ELIGIBILITY,v all C Land acquisition 'C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,✓one:
that apply: C Nonrecurring rehabilitation E Planning,feasibility,eng.,or design study C Information/communication tech. O High El Med. ❑ Low
11. PROJECT/PROGRAM Major repairs and/or replacement of wastewater facilities at various locations to ensure compliance with regulations under HAR 11-62,Wastewater Systems;HAR 11-54,State Water
DESCRIPTION: Quality Standards;HAR 11-55,State Water Pollution Control;and the US Environmental Protection Agency.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Project will restore full operations to asset.
A. Addresses public health/safety,/if Yes: C Eliminates a documented hazard. facility/infrastructure/building,✓if Yes: C
B. Service improvements,✓all that apply: ❑ Access to 17 Quality of ❑ Quantity of D. New facility/ink/bldg., /if Yes:C N/A
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A ✓if Yes:C
Additional info:
13. LONG RANGE PLANS/ [7 Dept.Priority Details:Aging WW facilities need to be repaired or replaced to ensure continued open 7 Comm.Value Details:
COMMUNITY VALUES,check C General Plan Details: C Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:, DESCRIBE: __I
15.LEGAL MANDATE?v if Yes: I DESCRIBE:
16.SUSTAINABILITY FOCUS,Vail that apply: G Promotes energy and resource conservation 0 Reduces hazard risk O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis 17 Promotes economic vitality C Strengthens and sustains our community '
Additional info:
17.PROJECT READINESS,✓all C Project currently underway C Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 1,729 1,000 1,000 1,000 1,000 1,000 1,000 $7,729
Construction 3,226 9,000 9,000 9,000 9,000 9,000 9,000 $57,226
TOTAL: $4,955, $10,000 $10,000 I $10,000 $10,000 $10,0001 $10,000 $64,955
19. 0&M COSTS (x$1000): I
20. FUNDING SOURCE(x$1000): I I I I 1
Cty G.O.Bond 4,955 10,000 10,000 10,000 10,000 i. 10,000 10,000 $64,955
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc) _
Other Cty Fund-(describe)
TOTAL: $4,955 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $64,955
24
County of Hawai'i - DEM -Wastewater Division
Repair/Replacement of Wastewater Facilities
—
1 iirtiv,
1 .,...
F4 74,
fo.k_
.--
...... .......
..,
,_.... .._
.___.
...„ 0,
,.....,,..
47.4-
OecerrOof 29,2c2o 11¶55.58s
'4"; caupon 0 126 26 60n.
" "..Maim RoadS 0 20 40
Towns
...eft Ow...MM.LIMO.rte.(.....;, @rm.C....•
own...*
25
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/30/2022 -
3. PROJECT NAME: DEM-Kalanianaole Collector Sewer Phase II .SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 3 6.TMK/CDP PLANNING AREA: 2-1/South Hilo
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $600,000
9. PROJECT ELIGIBILITY,✓all E Land acquisition C Infrastructure improvement E New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,✓one:
that apply: f+ Nonrecurring rehabilitation E Planning,feasibility,eng.,or design study C Information/communication tech. High Med. Low
11. PROJECT/PROGRAM Install sewer for approximately 200 additional residents.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,✓if Yes: C facility/infrastructure/building,Vif Yes: C
B. Service improvements,Vail that apply: El Access to 0 Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:C Fills gap in current services.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A ✓if Yes:C
Additional info:
13. LONG RANGE PLANS/ + Dept.Priority 'Details:To allow for cesspool conversions to comply with DOH Comm.Value Details:Reduce amount of cesspools
COMMUNITY VALUES,check C General Plan Details: C Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?'if Yes:E DESCRIBE:
15.LEGAL MANDATE? if Yes: r [DESCRIBE:Complies with the initial grant conditions for the construction of Hilo Wastewater Treatment Facility.
16.SUSTAINABILITY FOCUS,Vail that apply: 7 Promotes energy and resource conservation I] Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis C Promotes economic vitality ]C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vall C Project currently underway E Previously Appropriated C Staff available to manage project IC External funds/resources ready to proceed
that apply: C Identified operating budget needs C Can realistically encumber funds List phases already completed:
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 600 $600
Construction 12,000 $12,000
TOTAL: $600 $12,000 I $12,600
19. O&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 600 12,000 $12,600
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $600 $12,000 $12,600
26
County of Hawaii - DEM - Wastewater Division
r---.
II ''''' ‘ ..j ---'.- .•.
e/---,)---- = v - ` _t
/ .
iI
La ��-
....--\, IL 4.........
......
, . .4 mit -. s.T ,# _.' ...--
Ai _
\ \\.
\ J i
J
Kalanianaole Collector Sewer Phase II
"......„ FY 23-24 CIP Project
19,O
a,? i:.rm — areh d Mallettxu, -.... u Puma Lugs",d err.� n • Cour*di Krill NNYCJI %r+or ]' 02 0.4 m
P.m.* '' Facf.C=1111,d.Ire*i •"""Or+.lt.Erie • 6.1,,,,di Wars!rens 4040, • GbY W 4A hand MJIIIQL 01t0I 1 • e' • , 1
0 0.10 0 O.fiAm
- qt...1.2. — OMI.tern*A tired fil*K.n —Foxes.MMi • Wart • r x.t'.*d Hirsh(404.13f f>e�7rr
—Yru'craw .._ ewer.Caro of Moodie 1 WNG —F ref.Orme d Norse mei HINAo . II waa
• Carp d Puri(A1M[!1.wx.rlx.,9e» fir.IEPE eyrre folk uB01i:JEW Oerur.l-twain,
4,..a" -- Nominee.Comet el Fore M/Mlie—Fates Sale • 31r N a.*d moral tieMOD1.III Sono br.e7rt 9 e
— Ibis U!6lisU"Sltbr.CtaM}ti&Wu/'WWII ww.< thjec,is*". I r eriinr.r• • Ow*ed Mol(*NO Rea
— loam*Cledeaoe.F+^aYq • Nara..Pawnee • Clan*d Frac HMO I.hwwraw
27
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/30/2022
3. PROJECT NAME: DEM-Pua Sewage Pump Station Renovation 4.SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6.TMK/CDP PLANNING AREA: 2-1-0.11:004,010/S.Hilo
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $32,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition IC Infrastructure improvement C New bldg.,structure,or addition 110. PROJECT URGENCY/NEED,Vone:
r
that apply: Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study I C Information/communication tech. E High Med. = Low
11. PROJECT/PROGRAM Renovation of the Pua Sewage Pump Station to include replacement of all pumps and controls,flow measurement instruments,upgrade/replacement of mechanical&electrical systems
DESCRIPTION: to comply with current electrical/fire/NIOSH code requirements and to make facility easier to control. Renovation to include installation of surge tank to eliminate existing hydraulic surge
in the force main and rehabilitation of deteriorated concrete wetwell and influent chamber.Renovation will also connect proposed future redundant forcemain the pump station for use.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Project will restore full operations to asset.
A. Addresses public health/safety,/if Yes: P Eliminates a documented hazard. facility/infrastructure/building,Vif Yes: C
B. Service improvements,Vail that apply: ❑ Access to El Quality of C Quantity of D. New facility/infr./bldg., /if Yes:E Needed to continue current level of services.
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration N/A
opportunities: Reduces cost by less than 20%by bundling with adjacent projects. ✓if Yes:C
Additional info: If bundled with Pua Sewer Force Main Replacement,there is cost savings in planning work and construction.
13. LONG RANGE PLANS/ !, Dept.Priority Details: Pua SPS conveys all wastewater from Hilo to the HWWTP for treatment 7 Comm.Value Details:The Pua SPS conveys all wastewater from Hilo to the HWWTP for treatment
COMMUNITY VALUES,check C General Pion Details: C Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes: DESCRIBE:
15.LEGAL MANDATE?v if Yes: l 'DESCRIBE:Failure of the Pua SPS would result in a 3 million gallon/day spill to State Waters.
16.SUSTAINABILITY FOCUS,✓all that apply: 7 Promotes energy and resource conservation C Reduces hazard risk O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: r Cost benefit analysis P Promotes economic vitality E Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vali C Project currently underway C Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs C Can realistically encumber funds List phases already completed:Partial planning and construction
Additional info:Failure of the Pua SPS and/or Force Main would result in a 3 Million gal/day spill to State Waters which does not preserve the beneficial use of our shoreline,coastal waters for residents or tourists.
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 Th—FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 2,873 $2,873
Construction 32,000 $32,000
TOTAL: $2,873 $32,000 I $34,873
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I I
Cty G.O.Bond 2,873 32,000 _ $34,873
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $2,873 $32,000 $34,873
28
Pua Sewage Pump Station Renovation
maw A
I Z
01
Pua Sewage Pump Station `, •
' f 2\
Ata• Ilk
•. J
\\\Ik.
1.
' % IN, ...
i „
„„ . „
• ,
" ,,..
iitl, . . . .
..... . , to - \
,. 0, .
N , • c3
Elv
\ el, I-
.. . - 4-..fi4
FY 23-24 1:1,128
Other Roads *-'.....Outfall,County of Hawaii(WWD) W
D) --"*Force,Private Military • County of Hawaii(not WD) 0 0.01 0.03 0.05 mi
I til J 1 / ii
'"'"11.4a)or Roads Siphon,County of Hawaii(WWD) ''' Force.County of Hawaii(not WWD) ---"Private • Military 0 0.02 0.04 0.08 km
Mains -Treatment,County of Hawaii(WWD)'''-'-"'Forme,State State • Private
Active Old Sewer System,County of Hawaii(W WD) Gravity,Private Laterals '---Unknown • State ®OpenStreetMap(and)contributors,CC-BY-SA, Doug Goehring-
Gravity,Dedication Pending Dedication Pending Chimney • Hawaii County
Gravity,County of Hawaii(not W WD) Unknown
•----Gravity,County of Hawaii(WWD) -Gravity.State County of Hawaii(WWD) • Dedication Pending Manholes
'-'--Force,County of Hawaii(WWD) County of Hawaii(not WWD) • County of Hawaii(WWD) • County of Hawaii(WWD),Drop
29
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/30/2022
3. PROJECT NAME: DEM-Ainako Aina Nani Collector Sewer 4.SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 2 6.TMK/CDP PLANNING AREA: 2-3/Hilo
7. LOCATION(COUNCIL DISTRICT): 2 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $250,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition 0 Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,,/one:
that apply: [ Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study r Information/communication tech. O High _J Med. J Low
11. PROJECT/PROGRAM Install Sewer to service approximately 150 residents
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,Vif Yes: C N/A facility/infrastructure/building,Vif Yes: C
B. Service improvements,Vail that apply: O Access to 0 Quality of 0 Quantity of D. New facility/infr./bldg., Vif Yes:C Fills gap in current services.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:C
Additional info: _
13. LONG RANGE PLANS/ 7 Dept.Priority Details:To allow for cesspool conversions to comply with DOH 7 Comm.Value Details:Reduce the amount of cesspools
COMMUNITY VALUES,check C General Plan Details: C Admin Priority Details:
at least one and all that apply,PP Y, C CDP Details: C Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?Vif Yes:C DESCRIBE:
15.LEGAL MANDATE?v if Yes: (t I DESCRIBE:Complies with the initial grant conditions for the construction of Hilo Wastewater Treatment Facility.
16.SUSTAINABILITY FOCUS,✓all that apply: Promotes energy and resource conservation 9 Reduces hazard risk 2 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: — Cost benefit analysis ❑ Promotes economic vitality E Strengthens and sustains our community
Additional info: _
17.PROJECT READINESS,Vali C Project currently underway C Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs r Can realistically encumber funds List phases already completed:
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$3000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 250 $250
Construction 8,000 $8,000
TOTAL: $250 $8,000 I $8,250
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I I I I
Cty G.O.Bond 250 $250
State Revolving Fund 8,000 $8,000
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $250 $8,000 $8,250
30
Ainako Aina Nani Collector Sewer
FY 23-24 CIP Project
- ', ,_:- 1,• - - */: 4° *4" ll'It' e
., y� a
..eik -r goil ° ik -'411111::_ifibi!‘4*A;16- * .".4r.: 4 ' - .7" 4:0 .-7111.11- _ i ,.
• .
4 . a. , ., .., _ 44
tit&0.6, 4 Ot ili:
. Ml rte „ 'E
�' . .. f
k r
,' i' s..-
le
i cc < - re
'�, afrgl 1
•;. 6_ Or. ..
, y
A
0 itet. ' %, r.
44 41. M
Ilfr#
�► � t
lip
*44, ,4 it ,
31
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/30/2022
3. PROJECT NAME: DEM-Ainako Interceptor Sewer Phase 2 4.SUBMITTER: Dora Beck,P.E.
5. COUNCIL BENEFIT DISTRICT(S): 2 6.TMK/CDP PLANNING AREA: 2-3/Hilo
7. LOCATION(COUNCIL DISTRICT): 2 L8.TOTAL COUNTY FUNDS NEEDED THIS FY: $200,000
9. PROJECT ELIGIBILITY,/all l Land acquisition 0 Infrastructure improvement E New bldg.,structure,or addition 110. PROJECT URGENCY/NEED,✓one:
that apply: Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study E Information/communication tech. El High Med. Low
11. PROJECT/PROGRAM Install Sewer to service approximately 100 residents
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,✓if Yes: N/A facility/infrastructure/building,✓if Yes: C
B. Service improvements,/all that apply: 9 Access to 0 Quality of a Quantity of D. New facility/infr./bldg., ✓if Yes:C Fills gap in current services.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:E
Additional info:
13. LONG RANGE PLANS/ ^ Dept.Priority Details:To allow for cesspool conversions to comply with DOH . comm.Value Details:Reduce the amount of cesspools
COMMUNITY VALUES,check C General Plan Details: — Admin Priority Details:
at least one and all that apply, C CDP Details: -- Multi Hazard Details:
provide details: C Other Plans Details: I Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?v if Yes: 0 DESCRIBE:Complies with the initial grant conditions for the construction of Hilo Wastewater Treatment Facility.
16.SUSTAINABILITY FOCUS,✓all that apply: Promotes energy and resource conservation 1❑ Reduces hazard risk _ LI Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis - Promotes economic vitality �C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all f Project currently underway Previously Appropriated IC Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 200 _ S200
Construction 7,000 $7,000
TOTAL: $200 $7,000 $7,200
19. 0&M COSTS (x$1000): -
_
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 200 $200
State Revolving Fund 7,000 $7,000
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $200 $7,000 $7,200
32
Ainako Interceptor Sewer Phase 2
FY 23-24 CIP Project
P: '• a'r • d r is �* 0 H �,�
. 4171*` , "`' t "'. I U' t * „� , a M' , I.
^r 3' S,
fi'
3. • �� 1 '* a h.
�''to i t i til ?{� . L. .� 4` �$ ''''..1,
Irs
•
is,
S - 0 ,M " . " *. 'p+�
s
1 o.Avc Alnak,Ara k, 4 • l �._' Iop II
I •
46 `,1tR� °`n, 't.
N.
A R`~
33
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Department of Environmental Management Solid Waste Division --12.2.DATE: 12/30/2022
3. PROJECT NAME: _DEM-Rural Transfer Station Repairs and Enhancements 4.SUBMITTER: Michael Rivera _ __
5. COUNCIL BENEFIT DISTRICT(S): All 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition E Infrastructure improvementC New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,Vone:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study I C Information/communication tech. L High ❑ Med. - Low
11. PROJECT/PROGRAM This project is to complete much needed repairs,updates and enhancements to existing rural transfer stations.Current transfer stations require chute upgrades,facility enhancements,
DESCRIPTION: paint,signage updates and road upgrades. By completing the updates operational efficiency,traffic flow and community enhancement will increase.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of 'Necessary repair/maintenance/replacement.
A. Addresses public health/safety,"if Yes: C Reduces risk of a documented hazard. facility/infrastructure/building,Vif Yes: C
B. Service improvements,"all that apply: O Access to O Quality of F' Quantity of D. New facility/infr./bldg., "if Yes:C N/A
E. Operational efficiency and leveraging No change in operating costs. �F. Fosters inter-departmental collaboration N/A
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. ✓if Yes:E
Additional info:
13. LONG RANGE PLANS/ r Dept.Priority Details: Improves overall services to the public ---lp Comm.Value Details: Improves access to disposal and recycling
COMMUNITY VALUES,check C General Plan Details: C Admin Priority Details:
at least one and all that apply,
C CDP Details: C Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: I DESCRIBE:
16.SUSTAINABILITY FOCUS,"all that apply: C Promotes energy and resource conservation t=1 Reduces hazard risk 2 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis C Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,"all C Project currently underway C Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs E Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 934 $934
Construction 9,040 2,000 2,000 2,000 2,000 2,000 2,000 $21,040
TOTAL: $9,974 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 I $21,974
19. 0&M COSTS (x$1000): _
20. FUNDING SOURCE(x$1000): I I I
Cty G.O.Bond 9,974 2,000 2,000 2,000 2,000 2,000 _ 2,000 $21,974
State Revolving Fund
State CIP
Federal _
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $9,974 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $21,974
34
DEPARTMENT OF PARKS
AND RECREATION
MAURICE MESSINA,
DIRECTOR
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: FISCAL YEAR 2023-2024
• 2023-24 FY FUNDING FUNDING FORECAST BY FISCAL YEAR •TOTAL
(in thousands) (in thousands)
County Prior I ESTIMATED
G.O. CBA, Funds I Beyond 6 PROJECT
PRIORITY PROJECT Bond State Federal Private* Other** Allotted 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 years COST
1 DPR-Repairs/Improvements to Facilities 10,000 10,000 10,000 10,000 10,000 10,000 10,000 60,000
2 DPR-ADA Compliance 15,000 15,000 15,000
3 DPR-Hilo Skate Park 5,000 5,000
5,000
4 DPR-Laupahoehoe Boat Ramp Improvements 9,000 9,000 - 9,000
5 DPR-Afook-Chinen Civic Auditorium Upgrades 7,500 - 7,500 7,500
6 DPR-Kikala-Keakea New Park Development - 1,500 1,500 1,500
7 DPR-Kahalu'u Beach Park Improvements 5,000 5,000 10,000 15,000
8 -
9 -
10 - -
TOTAL 53,000 - - - - - 53,000 20,000 10,000 1%000 10,000 10,000 - 113,000
Created By: James Komota * Private:Foundation Grants
Date: 2/3/2023 **Community Benefit Assessments:Fair Share,Park Dedication,Etc.Other:GET,Fuel Tax and other non-bond sources
36
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Parks and Recreation _2.DATE: 2/3/2023
3. PROJECT NAME: DPR-Repairs/Improvements to Facilities 4.SUBMITTER: James Komata,Park Planner
5. COUNCIL BENEFIT DISTRICT(S): All 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): Island-wide 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $10,000,000
9. PROJECT ELIGIBILITY,✓all E Land acquisition I_ Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,'Ione:
that apply: [7 Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study C Information/communication tech. ❑ High ❑ Med. C Low
11. PROJECT/PROGRAM The repair,renovation,upgrade,addition,modification,alteration,improvement,demolition,landscaping,development,etc.of park sites,facilities,amenities,infrastructure,utilities,
DESCRIPTION: components,etc.necessary to facilitate and support safe use thereof and to address the needs of department staff,programs,activities,communities,recreational groups,etc.to fully or
best utilize the department's inventory of land and recreational developments to support the needs of the public.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement per maintenance
A. Addresses public health/safety,lit Yes: 7 Eliminates a documented hazard. facility/infrastructure/building,Vif Yes: C plan/schedule.
B. Service improvements,✓all that apply: El Access to El Quality of El Quantity of D. New facility/intr./bldg., ✓if Yes:C Fills gap in current services.
E. Operational efficiency and leveraging Results in net decrease in operating cost and maintains services. F. Fosters inter-departmental collaboration
"Select from drop down menu"
opportunities: Reduces cost by less than 20%by bundling with adjacent projects. /if Yes:C
Additional info:
13. LONG RANGE PLANS/ '... Dept.Priority Details:Dept.'s highest priority following ADA compliance projects 7 Comm.Value Details:Park users and community groups have advocated for repairs to facilities
COMMUNITY VALUES,check 7 General Plan Details:Reference 12.2(a)and 12.3(b),amongst others l+Admin Priority Details:Mayor recognizes need to address deteriorating conditions at facilities island-wide
at least one and all that apply, ;7 CDP Details:all approved/draft CDPs recognize deteriorating facilities'conditions C Multi Hazard Details:
provide details: mm Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C !DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: 7 Promotes energy and resource conservation CI Reduces hazard risk O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: p Cost benefit analysis 7 Promotes economic vitality E Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all 7 Project currently underway 7 Previously Appropriated 7. Staff available to manage project C External funds/resources ready to proceed
that apply: [ Identified operating budget needs 17 Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
- - -
Planning
Land Acquisition
Design/Survey 1,000 1,000 1,000 1,000 1,000 1,000 ongoing $6,000
Construction 9,000 9,000 9,000 9,000 9,000 9,000 ongoing $54,000
TOTAL: $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $60,000
19. O&M COSTS (x$1000):
f p 1
20. FUNDING SOURCE(x$1000):
^
Cty G.O.Bond 10,000 10,000 10,000 10,000 10,000 10,000 ongoing $60,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $60,000
37
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Parks and Recreation 2.DATE: 2/3/2023
3. PROJECT NAME: DPR-ADA Compliance 4.SUBMITTER: James Komata,Park Planner
5. COUNCIL BENEFIT DISTRICT(S): Island-wide 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): Island-wide 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $15,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition E Infrastructure improvement E New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study Information/communication tech. CI High Med. L Low
11. PROJECT/PROGRAM Elimination of architectural barriers and the provision of accessibility imporovements at various recreational sites,faclities,amenities,etc.as set for the in the County of Hawai'i's Self
DESCRIPTION: Evalutaion and Transition Plan,as dtermined in conjunction with on-going priorities and needs identified with the federal court and as required to ensure compliance with the Americans
with Disabilities Act and simlar accessibility regulations and obligations of the County. Includes associated work require to ensure longevity and safety of the assets.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement per maintenance
A. Addresses public health/safety,✓if Yes: E Community concerns exists around conditions. facility/infrastructure/building, if Yes: C Plan/schedule.
B. Service improvements,Vali that apply: 3 Access to O Quality of 3 Quantity of D. New facility/infr./bldg., ✓if Yes:E0 Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration
**Select Select from drop down menu
rlopportunities: Reduces cost by 20%or more by bundling with adjacent projects. /if Yes:C
Additional info:
13. LONG RANGE PLANS/ Dept.Priority Details:Compliance w/federal laws and court orders i. Comm.Value Details:Park users and community groups have advocated for repairs to facilities
COMMUNITY VALUES,check :r. General Plan Details:Reference 12.2(a),12.3(b),and 12.3(h),amongst others E Admin Priority Details:Mayor recognizes need to address deteriorating conditions at facilities island-wide
at least one and all that apply, CDP Details:all approved/draft COPs recognize ADA compliance as a priority C Multi Hazard Details:
provide details: Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: E DESCRIBE:ADA Act(1990),Title 28 CFR35.150;COH's Consent Decree U.S.D.C.Civil No.97-011O2SPK-June 4,1998 inluding ongoing court proceedings
16. ✓ D :� r
FOCUS, all that apply: ,% Promotes energy and resource conservation Reduces hazard risk Preserves/protects our natural/cultural env.
Provide additional information as appropriate: :7 Cost benefit analysis 17Promotes economic vitality IE Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,stall E.F. Project currently underway E Previously Appropriated IE Staff available to manage project C External funds/resources ready to proceed
that apply: E Identified operating budget needs E Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 1,000 $1,000
Construction 14,000 $14,000
TOTAL: $15,000 J $15,000
19. 0&M COSTS (x$1000): , a,-., �. ..
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 15,000 1 515,000
State Revolving Fund
State CIP
Federal
Private(Grants) __
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) _
TOTAL: $15,000 I I $15,000
38
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Parks and Recreation 2.DATE: 2/3/2023
3. PROJECT NAME: DPR-Hilo Skate Park 4.SUBMITTER: James Komata,Park Planner
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4,5 6.TMK/CDP PLANNING AREA: (3)2-2-033:013&014
7. LOCATION(COUNCIL DISTRICT): 2 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $5,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition E Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study Information/communication tech. 0 High Ji Med. ❑ Low
11. PROJECT/PROGRAM Development of a new public skate park in Hilo
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,Vif Yes: i+ Community concerns exists around conditions. facility/infrastructure/building,Vif Yes: C
B. Service improvements,✓aII that apply: 0 Access to 0 Quality of 0 Quantity of D. New facility/infr./bldg., /if Yes:C Fills gap in current services.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration
**Select from drop down menu,,
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. Yif Yes:C
Additional info:
13. LONG RANGE PLANS/ .% Dept.Priority Details:Dept.Acknowledges need for safe skating facility in Hilo P Comm.Value Details:Skating community and volunteers in support,council member in support
COMMUNITY VALUES,check 1. General Plan Details:Provides additional recreation diversity and optimizes use of County lands E Admin Priority Details:Mayoral directive to pursue
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:
15.LEGAL MANDATE?Vif Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,✓aII that apply: Promotes energy and resource conservation 0 Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: :C Cost benefit analysis P Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all C Project currently underway f✓. Previously Appropriated C Staff available to manage project E Extemalfunds/resources ready to proceed
that apply: Ii Identified operating budget needs C Can realistically encumber funds List phases already completed:Master plan and environmental
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition _
Design/Survey _ 500 $500
Construction 4,500 $4,500
TOTAL: $5,000 $5,000
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 5,000 $5,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL:I $5,000 $5,000
39
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Parks and Recreation 2.DATE: 2/3/2023
3. PROJECT NAME: DPR-Laupahoehoe Boat Ramp Improvements _4.SUBMITTER: James Komata,Park Planner _
5. COUNCIL BENEFIT DISTRICT(S): 1 6.TMK/CDP PLANNING AREA: (3)3-6-002:024/North Hilo
7. LOCATION(COUNCIL DISTRICT): 1 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $9,000,000
9. PROJECT ELIGIBILITY,✓all E Land acquisition E Infrastructure improvement E New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation E Planning,feasibility,eng.,or design study Information/communication tech. O High l Med. E Low
11. PROJECT/PROGRAM Provides for reconstruction/modification of the boat ramp,approach,abutments,etc.To replace the existing deteriorated and unsafe boat ramp.
DESCRIPTION:
_
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,Vif Yes: E N/A facility/infrastructure/building,/if Yes: E
B. Service improvements,/all that apply: ,Q Access to O Quality of ❑ Quantity of 0. New facility/infr./bldg., /if Yes:E Fills gap in current services.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration
**Select from drop down menu**
opportunities: Has no reduction of construction costs. /if Yes:E
Additional info:
13. LONG RANGE PLANS/ Dept.Priority Details:Consistent with dept's vision,mission and goals f✓Comm.Value Details:Enhances quality of life for boaters and fisherman
COMMUNITY VALUES,check :J General Plan Details: E Admin Priority Details:Mayor supports the community in pursuiring this project
at least one and all that apply, :` cop Details: 1.-Multi Hazard Details:
provide details: Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE? If Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: 7 Promotes energy and resource conservation O Reduces hazard risk 'O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: 7 Cost benefit analysis .1 Promotes economic vitality IE Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all E Project currently underway 1.E Previously Appropriated 7 Staff available to manage project E External funds/resources ready to proceed
that apply: C Identified operating budget needs 17 Can realistically encumber funds List phases already completed:Final design
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 250 $250
Construction 8,750 $8,750
TOTAL: $9,000 I I $9,000
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): _1 lE . . . .. . ..
. .
Cty G.O.Bond 9,000 $9,000
State Revolving Fund
State CIP
Federal
Private(Grants) _
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) _
TOTAL: $9,000 $9,000
40
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Parks and Recreation 2.DATE: 2/3/2023
3. PROJECT NAME: DPR-Afook-Chinen Civic Auditorium Upgrades 4.SUBMITTER: James Komata,Park Planner
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4&5 6.TMK/CDP PLANNING AREA: (3)2-2-033:001/Hilo
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $7,500,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition I% Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study Information/communication tech. 0 High ❑ Med. ❑ Low
11. PROJECT/PROGRAM 'Upgrades to existing multi-use facility necessary to address failing state of building components and to ensure intergrity,safety and usability of the facility for large variety of uses into the
DESCRIPTION: future.Includes replacement of main floor's ceiling andlighting system
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: J N/A facility/infrastructure/building,'if Yes: C
B. Service improvements,/all that apply: 9 Access to El Quality of ❑ Quantity of D. New facility/infr./bldg., /if Yes:C N/A
E. Operational efficiency and leveraging Results in net decrease in operating cost and maintains services. /F. Fosters inter-departmental collaboration
**Select from drop down menu**
opportunities: Has no reduction of construction costs. /if Yes:C
Additional info:
113. LONG RANGE PLANS/ 0 Dept.Priority Details:Consistent with dept's vision,mission and goals l✓Comm.Value Details:Desired and valued by the community
COMMUNITY VALUES,check JJ General Plan Details:Provide a variety of recreational opportunities for the residents and visitors C Admin Priority Details:Facility is necessary to support large recreational and community functions
at least one and all that apply, :,.r CDP Details:Maintenance of existing facility C Multi Hazard Details:
provide details: ` Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS, all that apply: 17 Promotes energy and resource conservation O Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ! Cost benefit analysis .Y Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vali C Project currently underway E Previously Appropriated ;% Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs 17 Can realistically encumber funds List phases already completed:n/a
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 750 $750
Construction 6,750 $6,750
TOTAL: $7,500 $7,500
19. O&M COSTS (x$1000): $7 $7 $7 $7 $7 $35
20. FUNDING SOURCE(x$1000): •
Cty G.O.Bond 7,500 $7,500
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $7,500 I $7,500
41
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Parks and Recreation 2.DATE: 2/3/2023
3. PROJECT NAME: DPR-Kikala-Keokea New Park Development(Reapp.) 4.SUBMITTER: James Komata,Park Planner
5. COUNCIL BENEFIT DISTRICT(S): 5 _ 6.TMK/CDP PLANNING AREA: (3)1-2-043:068/Puna
7. LOCATION(COUNCIL DISTRICT): 5 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,500,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition E Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,✓one:
that apply: E Nonrecurrin rg ehabilitation Ii Planning,feasibility,eng.,or design study 7 Information/communication tech. E High ❑ Med. ❑ Low
11. PROJECT/PROGRAM Development of a new public park in the Kalapana area intended to support the desire and efforts of the residents in the surrounding areas for gathering and other park-related functions.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of **Select from drop down menu**
A. Addresses public health/safety,✓if Yes: .J Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: C
B. Service improvements,✓all that apply: O Access to El Quality of Ei Quantity of D. New facility/infr./bldg., ✓if Yes:I FFills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration
**Select from drop down menu**
opportunities: Has no reduction of construction costs. /if Yes:C
Additional info:
13. LONG RANGE PLANS/ 7. Dept.Priority Details:Consistent with dept's vision,mission and goals 17. Comm.Value Details:Desired and valued by the community
COMMUNITY VALUES,check 7 General Plan Details:Provide a variety of recreational opportunities for the residents and visitors C Admin Priority Details:
at least one and all that apply, CDP Details:Expanding parks and recreational facilities as population grows E Multi Hazard Details:
provide details: ET Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,Vali that apply: ,J Promotes energy and resource conservation ❑ Reduces hazard risk O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ;❑ Cost benefit analysis 7 Promotes economic vitality E. Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all C Project currently underway C Previously Appropriated HE Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs Can realistically encumber funds List phases already completed:n/a
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 150 _ $150
Land Acquisition
Design/Survey 200 _ $200
Construction 1,150 $1,150
TOTAL: $1,500 I I $1,500
19. 0&M COSTS (x$1000): $7 $7 $7 $7 $7 $35
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 1,500 $1,500
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $1,500 $1,500
42
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Parks and Recreation '2.DATE: 2/3/2023
3. PROJECT NAME: DPR-Kahalu'u Beach Park Improvements 4.SUBMITTER: James Komata,Park Planner
5. COUNCIL BENEFIT DISTRICT(S): 7 6.TMK/CDP PLANNING AREA: 7-8-014:001
7. LOCATION(COUNCIL DISTRICT): 7 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $5,000,000
9. PROJECT ELIGIBILITY,V all C Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,Ione:
that apply: IF Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ft Information/communication tech. ❑ High 2 Med. ❑ Low
'11. PROJECT/PROGRAM Master planning and design of Kahalu'u Beach Park to address degradation of services,encroaching high surf and preservation of coastal recreation access for the public.
DESCRIPTION:
I
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement per maintenance
A. Addresses public health/safety,✓if Yes: L Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: E Plan/schedule.
B. Service improvements,Vali that apply: 1: Access to g Quality of O Quantity of D. New facility/infr./bldg., ✓if Yes:C Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration
**Select from drop down menu**
opportunities: Has no reduction of construction costs. ✓if Yes:C
Additional info:
13. LONG RANGE PLANS/ Dept.Priority Details: 7 Comm.Value Details:
COMMUNITY VALUES,check :f General Plan Details:
C Admin Priority Details:
at least one and all that apply, :, COP Details:.
C Multi Hazard Details:
provide details: ,r Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?/if Yes: 1- DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: 7 Promotes energy and resource conservation 0 Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: 7 Cost benefit analysis P. Promotes economic vitality E Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all E. Project currently underway E Previously Appropriated E Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs E Can realistically encumber funds List phases already completed:preliminary engineering investigations
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 250 $250
Land Acquisition
Design/Survey 750 $750
Construction 4,000 10,000 $14,000
TOTAL: $5,000 $10,000 I $15,000
19. 0&M COSTS (x$1000): I
20. FUNDING SOURCE(x$1000): •
CtyG.O.Bond 5,000 10,000 $15,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $5,000 $10,000 I $15,000
43
DEPARTMENT OF PUBLIC
WORKS
STEVE PAUSE,
DIRECTOR
SUMMARY OF DEPARTMENT REQUESTS
' SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: PUBLIC WORKS FISCAL YEAR 2023-2024
2023-24 FY FUNDING FUNDING FORECAST BY FISCAL YEAR TOTAL
(in thousands) (in thousands)
County Prior ESTIMATED
G.O. CBA, Funds Beyond 6 PROJECT
PRIORITY PROJECT Bond State Federal Private* Other** Allotted 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 years COST
1 DPW-Facilities Improvements 11,600 11,600 11,600 11,600 11,600 11,600 11,600 25,000 94,600
2 DPW-Waika'a lulu Bridge 644-8(Reappr) 1,500 1,500 1,500
3 DPW-Bridge Inspection and Repair 40 160 200 - 200 _ - 200 - 600
4 DPW-Drainage Improvement Projects,Islandwide 3,000 3,000 3,000 6,000
$ DPW-Pavement Preservation 2,000 8,000 10,000 10,000
6 DPW-PD'ainakd Street Rehab.(Kanoelehua to Railroad)(Reappr) 300 300 1,500 1,800
7 DPW-Title 23 Project-Kahakai Boulevard Shoulder Improvements 8 8 8
8 DPW-Railroad Avenue Rehabilitation(Reappr) 300 •
300 1,000 5,000 6,300
TOTAL 18,740 - 8,168 - - - 26,908 17,100 16,800 11,600 11,800 11,600 25,000 120,808
Created By: Stephen M.Pause,P.E. * Private:Foundation Grants
Date: 1/26/2023 **Community Benefit Assessments:Fair Share,Park Dedication,Etc.Other:GET,Fuel Tax and other non-bond sources
45
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
11. DEPARTMENT AND DIVISION: Public Works/Building - 2.DATE: 12/15/2022
3. PROJECT NAME: DPW-Facilities Improvements 4.SUBMITTER: Julann Sonomura
5. COUNCIL BENEFIT DISTRICT(S): All _ 6.TMK/CDP PLANNING AREA: Any
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $11,600,000
9. PROJECT ELIGIBILITY,/all E Land acquisition E Infrastructure improvement LE New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation E Planning,feasibility,eng.,or design study I: Information/communication tech. ❑ High Med. . Low
11. PROJECT/PROGRAM This project is for the facilities improvements including additions,energy efficiency,ADA compliance,hazard mitigation,hardening,maintenance,renovation,repairs,etc.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
✓iVif Addresses public health/safety, ,f Yes: Eliminates a documented hazard. facility/infrastructure/building, if Yes: C
B. Service improvements,✓all that apply: ❑ Access to Q Quality of O Quantity of D. New facility/intr./bldg., /if Yes:E Needed to continue current level of services.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration **Select from drop down menu**
opportunities: Reduces cost by less than 20%by bundling with adjacent projects. ,/if Yes:E
Additional info:
13. LONG RANGE PLANS/ .% Dept.Priority Details: Department Priority(Asset Management) Comm.Value Details:
COMMUNITY VALUES,check E General Plan Details: Admin Priority Details:
at least one and all that apply, •
CDP Details: C Multi Hazard Details:
provide details: E Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?/if Yes: E I DESCRIBE:
16.SUSTAINABILITY FOCUS,/all that apply: 7 Promotes energy and resource conservation O Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ` Cost benefit analysis IT Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all C Project currently underway IE Previously Appropriated C Staff available to manage project IC External funds/resources ready to proceed
that apply: C Identified operating budget needs II- Can realistically encumber funds 'List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning ___
Land Acquisition 597 500 $1,097
Design/Survey 4,675 2,500 2,500 2,500 2,500 2,500 2,000 $19,175
Construction 6,328 8,600 9,100 9,100 9,100 9,100 23,000 $74,328
I TOTAL: $11,600 $11,600 $11,600 $11,600 $11,600 $11,600 $25,000 $94,600
19. O&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000):
CtyG.O.Bond 11,600 11,600 11,600 k 11,600 11,600 11,600) 25,000 $94,600
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $11,600 $11,600 $11,600 $11,600 $11,600 $11,600 $25,000 $94,600
46
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Public Works/Engineering 2.DATE: 12/14/2022
3. PROJECT NAME: DPW-Waika'alulu Bridge#44-8(Kalopa)(Reaapr) 4.SUBMITTER: Keone Thompson
5. COUNCIL BENEFIT DISTRICT(S): 1 6.TMK/CDP PLANNING AREA: 4-4-2:006/Hamakua
7. LOCATION(COUNCIL DISTRICT): 1 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,500,000
9. PROJECT ELIGIBILITY,/all C Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ❑ Information/communication tech. 0 High ❑ Med. IT Low
11. PROJECT/PROGRAM This project is for bridge repair and maintenance.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: E. Eliminates a documented hazard. facility/infrastructure/building,/if Yes: C
B. Service improvements,/all that apply: I7 Access to 17 Quality of ❑ Quantity of D. New facility/infr./bldg., /if Yes:C **select from drop down menu**
E. Operational efficiency and leveraging Results in net decrease in operating cost and maintains services. F. Fosters inter-departmental collaboration
**Select from drop down menu**
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. /if Yes:C
Additional info:
13. LONG RANGE PLANS/ 7 Dept.Priority Details:Improve Bridge safety. r.Comm.Value Details:Enhances quality of life for residents.
COMMUNITY VALUES,check - GeneralPlan Details: Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C 'DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: 7 Promotes energy and resource conservation O Reduces hazard risk 17 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: 7 Cost benefit analysis E. Promotes economic vitality C✓ Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all C Project currently underway C Previously Appropriated C Staff available to manage project ,C External funds/resources ready to proceed
that apply: C Identified operating budget needs r: Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction 1,500 $1,500
TOTAL: 51,500 $1,500
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000):
CtyG.O.Bond 1,500 $1,500
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $1,500 $1,500
47
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Public Works/Engineering 2.DATE: _ 1/26/2023
3. PROJECT NAME: DPW-Bridge Inspection and Repair 4.SUBMITTER: Keone Thompson
5. COUNCIL BENEFIT DISTRICT(S): All 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $40,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition Ii Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ❑ Information/communication tech. L High 7-Med. Low
11. PROJECT/PROGRAM FHWA/DOT mandated inspection of County-maintained bridges that are registered on the National Bridge inventory.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: E Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: I-
B. Service improvements,/all that apply: 0 Access to El Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:C "Select from drop down menu"
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration
"Select from drop down menu**
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. /if Yes:C
Additional info:
13. LONG RANGE PLANS/ 7 Dept.Priority Details:Assessment and repairs required by state and federal programs Comm.Value Details:Enhances quality of life for residents.
COMMUNITY VALUES,check 7 General Plan Details:Transportation and economic impact. s Admin Priority Details:
at least one and all that apply, :,r CDP Details:Community safety. 0 Multi Hazard Details:
provide details: ;C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:01 DESCRIBE:80%Federal 20%County.
15.LEGAL MANDATE? if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: E Promotes energy and resource conservation O Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis E Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vali C Project currently underway C Previously Appropriated C Staff available to manage project IG External funds/resources ready to proceed
that apply: C Identified operating budget needs r Can realistically encumber funds List phases already completed:
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 200_ 200 200 $600
Land Acquisition
Design/Survey
Construction
TOTAL: $200 $200 $200 $600
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): „ ...
Cty G.O.Bond 40 40 40 $120
State Revolving Fund
State CIP
Federal 160 160 160 $480
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $200 $200 $200 I I $600
48
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Public Works/Engineering 2.DATE: 1/2.6/2023
3. PROJECT NAME: DPW-Drainage Improvement Projects,Islandwide 4.SUBMITTER: Keone Thompson _
5. COUNCIL BENEFIT DISTRICT(S): All _ 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $3,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisitionI(Infrastructure improvement E New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation E Planning,feasibility,eng.,or design study ❑ Information/communication tech. C High iii Med. if Low
11. PROJECT/PROGRAM 'Inspection,repair,and construction of drainage improvement projects,islandwide.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,Vif Yes: .i Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: C
B. Service improvements,Vail that apply: ❑ Access to O Quality of ❑ Quantity of D. New facility/infr./bldg., /if Yes:C **Select from drop down menu"
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration **Select from drop down menu"
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. ✓if Yes:C
Additional info:
13. LONG RANGE PLANS/ Dept.Priority Details:Improve flooding safety concerns. - Comm.Value Details:Community safety driven.
COMMUNITY VALUES,check i General Plan Details:Addresses flooding and other natural Hazards. 2.Admin Priority Details:
at least one and all that apply, c7 CDP Details:Community safety. C Multi Hazard Details:
provide details: Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?1 i Yes: 1- DESCRIBE:
16.SUSTAINABILITY FOCUS,Vall that apply: E Promotes energy and resource conservation O Reduces hazard risk Preserves/protects our natural/cultural env.
Provide additional information as appropriate: W nefit analysis EPromotes economic vitality [7:
Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all C Project currently underway
beC Previously Appropriated Staff available to manage project 1E External funds/resources ready to proceed
that apply: C Identified operating budget needs [+ Can realistically encumber funds List phases already completed:
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction 3,000 3,000 $6,000
TOTAL: $3,000 $3,000 I $6,000
19. 0&M COSTS (x$1000): 1— I F' ,
_..
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 3,000 3,000 $6,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
L______ TOTAL: $3,000 $3,000 $6,000
49
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Public Works/Engineering 2.DATE: 1/26/2023
3. PROJECT NAME: DPW-Pavement Preservation 4.SUBMITTER: Keone Thompson
5. COUNCIL BENEFIT DISTRICT(S): All 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition I% Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ❑ Information/communication tech. ❑ High El Med. ❑ Low
11. PROJECT/PROGRAM Perform various methods of bridge and pavement preservation to increase the service life of our roads and bridges.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: E. Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: C
B. Service improvements,/all that apply: O Access to O Quality of 0 Quantity of D. New facility/infr./bldg., ✓if Yes:C **Select from drop down menu"
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration ==Select from drop down menu**
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. ✓if Yes:C
Additional info:
13. LONG RANGE PLANS/ i7 Dept.Priority Details:Improve roadway safety. 77 Comm.Value Details:Enhances quality of life for residents.
COMMUNITY VALUES,check r General Plan Details: C Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: C other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:80%Federal 20%County
15.LEGAL MANDATE?/if Yes: C 'DESCRIBE:
16.SUSTAINABILITY FOCUS,/all that apply: C Promotes energy and resource conservation 0 Reduces hazard risk O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ;❑ Cost benefit analysis rz Promotes economic vitality IC Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vali C Project currently underway C Previously Appropriated C Staff available to manage project C. External funds/resources ready to proceed
that apply: C Identified operating budget needs C Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction 10,000 $10,000
TOTAL: $10,000 $10,000
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 2,000 $2,000
State Revolving Fund
State CIP _
Federal 8,000 _ $8,000
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $10,000 $10,000
50
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Public Works/Engineering 2.DATE: 12/14/2022
3. PROJECT NAME: DPW-Pu'ainako Street Rehab.(Kanoelehua Ave.to Railroad Ave.)(Reappr) 4.SUBMITTER: Keone Thompson
5. COUNCIL BENEFIT DISTRICT(S): 3 6.TMK/CDP PLANNING AREA: 2-2-40,47/Hilo
7. LOCATION(COUNCIL DISTRICT): 3 • 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $300,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition E Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study Cl Information/communication tech. i High 7 Med. Low
11. PROJECT/PROGRAM The project will pave/resurface the existing roadway.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,/if Yes: C Community concerns exists around conditions. facility/infrastructure/building,/if Yes: C
B. Service improvements,✓all that apply: O Access to El Quality of ❑ Quantity of D. New facility/infr./bldg., if Yes:C "Select from drop down menu"
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration
**Select from drop down menu"
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. /if Yes:C
Additional info:
13. LONG RANGE PLANS/ 7 Dept.Priority Details:Improve roadway safety. +Comm.Value Details:Enhances quality of life for residents.
COMMUNITY VALUES,check
General Plan Details: Admin Priority Details:
at least one and all that apply, C cop Details:
C Multi Hazard Details:
provide details: C Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,/all that apply: r, Promotes energy and resource conservation 0 Reduces hazard risk O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all C Project currently underway l+_ Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs 7 Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 300 $300
Construction 1,500 $1,500
TOTAL: $300 $1,500 $1,800
19. 0&M COSTS (x$1000): L
20. FUNDING SOURCE(x$1000):
.
Cty G.O.Bond 300 1,500 $1,800
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $300 $1,500 $1,800
51
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Public Works/Engineering 2.DATE: 12/14/2022
3. PROJECT NAME: DPW-Title 23 Project-Kahakai Boulevard Shoulder Improvements 4.SUBMITTER: Keone Thompson
5. COUNCIL BENEFIT DISTRICT(S): All 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY:
9. PROJECT ELIGIBILITY,V all C Land acquisitionIf Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ❑ Information/communication tech. ❑ High ❑ Med. P Low
11. PROJECT/PROGRAM Engineering and design of infrastructure improvements of eligible Title 23 projects(included on the Statewide Transportation Improvement Program(STIP)).
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: IT Eliminates a documented hazard. facility/infrastructure/building,Vif Yes: E
B. Service improvements,Vail that apply: O Access to [7 Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:C **Select from drop down menu**
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration ..Seledfromdropdownmenu**
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. ✓if Yes:E
Additional info:
13. LONG RANGE PLANS/ 2 Dept.Priority Details:Improve roadway safety. a Comm.Value Details:Enhances quality of life for residents.
COMMUNITY VALUES,check General Plan Details: Admin Priority Details:
at least one and all that apply, C CDP Details: C Multi Hazard Details:
provide details: Other Plans Details: Mitigation Plan
Additional info:
114.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
115.LEGAL MANDATE?✓if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,Vail that apply: C Promotes energy and resource conservation 2 Reduces hazard risk C Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vali C Project currently underway E Previously Appropriated E Staff available to manage project --1C External funds/resources ready to proceed
that apply: C Identified operating budget needs 1 Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 8 $8
Construction
TOTAL: $8 $8
19. O&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): F .1 I_
Cty G.O.Bond
State Revolving Fund
State CIP
Federal 8 $8
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $8 $8
52
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Public Works/Engineering 2.DATE: 12/14/2022
3. PROJECT NAME: DPW-Railroad Avenue Rehabilitation(Reappr) 4.SUBMITTER: Keone Thompson
5. COUNCIL BENEFIT DISTRICT(S): 3 6.TMK/CDP PLANNING AREA: 2-2-040,047,048,051,058/Hilo
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $300,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,lone:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ❑ Information/communication tech. ❑ High O Med. ❑ Low
11. PROJECT/PROGRAM The project will pave/resurface the existing roadway.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,Vif Yes: ,J Community concerns exists around conditions. facility/infrastructure/building,Vif Yes: C
B. Service improvements,Vali that apply: O Access to CI Quality of ❑ Quantity of D. New facility/infr./bldg., Vif Yes:❑ **Select from drop down menu**
E. Operational efficiency and leveragingResults in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration **Select from drop down menu**
opportunities: No opportunity,not adjacent to project to capitalize on cost saving. Vif Yes:C
Additional info:
13. LONG RANGE PLANS/ Dept.Priority Details:Improve roadway safety. comm.value Details:Enhances quality of life for residents.
COMMUNITY VALUES,check — General Plan Details: `-admin Priority Details:
at least one and all that apply,
CDP Details: C Multi Hazard Details:
provide details: E Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:❑ DESCRIBE:
15.LEGAL MANDATE?Vif Yes: C I DESCRIBE:
16.SUSTAINABILITY FOCUS,ball that apply: ` Promotes energy and resource conservation O Reduces hazard risk 'O Preserves/protects our natural/cultural env.
Provide additional information as appropriate: Cost benefit analysis E Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all C Project currently underway C Previously Appropriated C Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs Li Can realistically encumber funds List phases already completed:
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 300 1,000 $1,300
Construction 5,000 $5,000
TOTAL: $1,000 $5,000 $6,300
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 300 1,000 5,000 $6,300
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $300 $1,000 $5,000 $6,300
53
FIRE DEPARTMENT
KAZOO TODD,
FIRE CHIEF
54
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: FIRE FISCAL YEAR 2023-2024 •
2023-24 FY FUNDING FUNDING FORECAST BY FISCAL YEAR TOTAL
(in thousands) (in thousands)
County Prior ESTIMATED
G.O. CBA, Funds Beyond 6 PROJECT
PRIORITY PROJECT Bond State Federal Private* Other** Allotted 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 years COST
1 FIRE-NFPA 1851 Compliant PPE Extractor Installation 1,000 1,000 3,060 4,060 .
2 -
3 • -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
TOTAL 1,000 - - - - - 1,000 3,060 - - - - - 4,060 -
Created By: IAN CHADWICK&NIKOL LONOKAPU * Private:Foundation Grants
Date: 1/13/2023 **Community Benefit Assessments:Fair Share,Park Dedication,Etc.Other:GET,Fuel Tax and other non-bond sources
55
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: FIRE DEPT 2.DATE: 1/6/2023
3. PROJECT NAME: FIRE-NFPA 1851 Compliant PPE Extractor Installation 4.SUBMITTER: KAZUO TODD
5. COUNCIL BENEFIT DISTRICT(S): ALL 6.TMK/CDP PLANNING AREA: TBD
7. LOCATION(COUNCIL DISTRICT): ALL 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,lone:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study _ Information/communication tech. O High ❑ Med. ❑ Low
11. PROJECT/PROGRAM This project will ensure that we are thoroughly cleaning our firefighter turnout gear providing increased safety of our first responders,mitigating increasing firefighter cancer rates and
DESCRIPTION: exposure,and becoming compliant with the NFPA 1851 guidelines for turnout gear cleaning. Improvements will be made to our facilities to accommodate the 21 extractors that were
funded by a federal grant.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,✓if Yes: :. Reduces risk of a documented hazard. facility/infrastructure/building,✓if Yes: I-
B. Service improvements,Vail that apply: 2 Access to ❑ Quality of O Quantity of D. New facility/infr./bldg., ✓if Yes:C Fills gap in current services.
E. Operational efficiency and leveraging Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration
"Select from drop down menu**
opportunities: Has no reduction of construction costs. ✓if Yes:E
Additional info:
13. LONG RANGE PLANS/ 17 Dept.Priority Details: employees E Comm.Value Details:
COMMUNITY VALUES,check 7 General Plan
E Admin Priority Details:
at least one and all that apply, E CDP Details: E Multi Hazard Details:
provide details: ❑ Other Plans Details:
Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:C DESCRIBE:
15.LEGAL MANDATE?✓if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: = Promotes energy and resource conservation O Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis C Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vail E Project currently underway C Previously Appropriated Staff available to manage project C External funds/resources ready to proceed
that apply: C Identified operating budget needs C Can realistically encumber funds List phases already completed:Secured funds for extractors
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 50 $50
Land Acquisition
Design/Survey 700 $700
Construction 250 3,060 $3,310
TOTAL: $1,000 $3,060 $4,060
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): 1
Cty G.O.Bond 1,000 3,060 $4,060
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $1,000 $3,060 $4,060
56
MASS TRANSIT AGENCY
JOHN ANDOH,
ADMINISTRATOR
57
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Mass Transit Agency FISCAL YEAR 2023-2024
2023-24 FY FUNDING FUNDING FORECAST BY FISCAL YEAR TOTAL
(in thousands) (in thousands)
County Prior ESTIMATED
• G.O. CBA, Funds Beyond 6 PROJECT
PRIORITY PROJECT Bond State Federal Private* Other** Allotted 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 years COST
1 MTA-Bus Stop ADA Compliance - 1,613 - 450 725 2,063 1,220 50 50 50 - - 4,158
2 MTA-Islandwide Bus Shelters 540 300 300 840 300 300 300 300 300 300 2,940
3 MTA-Kailua-Kona Maintenance Facility 860 2,736 3,596 3,596 20,000 27,192
4 MTA-Zero Emissions Infrastructures 551 2,200 1,000 2,751 1,200 1,200 1,200 - - - 7,351
5 MTA-Hub and Spoke Construction 1,790 900 2,360 3,450 5,050 6,650 6,650 6,650 6,650 6,650 - 41,750
6 MTA-Hilo Maintenance Facility Expansion 125 125 • 125 2,500 2,750
7 MTA-Bus Stop Signage 45 400 45 10 1 1 1 1 1 460
8 MTA-Park and Ride Lots 250 - 250 250 1,070 1,070 1,070 1,070 - - 4,780
9 -
10 - •
TOTAL 3,451 900 9,449 - 920 9,846 14,720 32,950 9,271 9,271 8,071 6,951 301 91,381
Created By: John Andoh * Private:Foundation Grants
Date:. 1/2/2023 **Community Benefit Assessments:Fair Share,Park Dedication,Etc.Other:GET,Fuel Tax and other non-band sources
l
•
•
58
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support 12.DATE: 1/3/2023
3. PROJECT NAME: MTA-Bus Stop ADA Compliance 4.SUBMITTER: John Andoh
5. COUNCIL BENEFIT DISTRICT(S): All _ 6.TMKICDP PLANNING AREA: Various _ _
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $450,000
9. PROJECT ELIGIBILITY,/all C Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study C Information/communication tech. O High Med. 11 Low
11. PROJECT/PROGRAM Design and constuct ADA pads for passengers to board buses at safe locations along State and County right-of-way.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Project will restore full operations to asset.
A. Addresses public health/safety,✓ifYes: :1 Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: i✓
B. Service improvements,/all that apply: ID Access to 0 Quality of 2 Quantity of D. New facility/infr./bldg., 'lit Yes:E Needed to continue current level of services.
No change in operating costs. F. Fosters inter-departmental collaboration
E. Operational efficiency and leveraging
opportunities: Reduces cost by 20%or more by bundling with adjacent projects. /if Yes:E DPW
Additional info: Required by the Department of Justice by August 2023.
13. LONG RANGE PLANS/ t2 Dept.Priority Details:Provides a safe place for passengers to ride Hele-On C Comm.Value Details:Provides an opportunity for the communities to board buses in safe places
COMMUNITY VALUES,check r General Plan Details:included in the transit portion of the General Plan IT.Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan
at least one and all that apply, ii CDP Details:Included in the seven CDPs C Multi Hazard Details:
provide details: Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
15.LEGAL MANDATE?Vif Yes: r DESCRIBE:Settlement Agreement with the Department of Justice
16.SUSTAINABILITY FOCUS,✓all that apply: E Promotes energy and resource conservation ! Reduces hazard risk '❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: Cost benefit analysis 7 Promotes economic vitality (= Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all l Project currently underway C Previously Appropriated 7 Staff available to manage project :% External funds/resources ready to proceed
that apply: C Identified operating budget needs 17. Can realistically encumber funds List phases already completed: Manning
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FFY 27-28 FY 28-29 Years TOTAL:
Planning 100 5 _ 5 5 5 5 $125
Land Acquisition _ 75 10 _ 10 10 10 10 $125
Design/Survey 150 580 250 5 5 5 $995
Construction 400 1,468 955 30 30 30 $2,913
TOTAL: $725 $2,063 $1,220 $50I $50 I $50 $4,158
19. O&M COSTS (x$1000): $5 I $10 $15 $20 $25 1 $30 I $35 $40 $180
20. FUNDING SOURCE(x$1000): I
Cty G.O.Bond
State Revolving Fund
State CIP _
Federal 100 1,613 . 1,000 30 $2,743
•Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) GET 625 450 220 20 50 50 $1,415
TOTAL: $725 $2,063 $1,220 $50 $50 $50 $4,158
59
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support 2.DATE: 1/3/2023
3. PROJECT NAME: MTA-Islandwide Bus Shelters _ 4.SUBMITTER: John Andoh
5. COUNCIL BENEFIT DISTRICT(S): All _ 6.TMK/CDP PLANNING AREA: Various _
7. LOCATION(COUNCIL DISTRICT): All 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $300,000
9. PROJECT ELIGIBILITY,✓all C Land acquisition C Infrastructure improvement E New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study 7 Information/communication tech. El High D Med. - Low
11. PROJECT/PROGRAM Construct bus shelters island-wide,as well as replace damaged shelters or relocate bus shelters from areas that are no longer served by Hele-On.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Necessary repair/maintenance/replacement.
A. Addresses public health/safety,/if Yes: :.7. Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: C
B. Service improvements,Vali that apply: El Access to El Quality of El Quantity of D. New facility/ink/bldg., /if Yes:C Needed to continue current level of services.
Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration
E. Operational efficiency and leveraging
/if Yes:C DPW
opportunities: Reduces cost by 20%or more by bundling with adjacent projects.
Additional info:
13. LONG RANGE PLANS/ 7 Dept.Priority Details:Provides a safe place for passengers to ride Hele-On C+ Comm.Value Details:Provides an opportunity for the communities to board buses in safe places
COMMUNITY VALUES,check 7 General Plan Details:included in the transit portion of the General Plan El Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan
at least one and all that apply, :,J CDP Details:Included in the seven COPS E Multi Hazard Details:
provide details: Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
15.LEGAL MANDATE?✓if Yes: 1- I DESCRIBE:
16.SUSTAINABILITY FOCUS,/all that apply: 7 Promotes energy and resource conservation 7 Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate:
._ Cost benefit analysis 7 Promotes economic vitality I' Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all El Project currently underway 7 Previously Appropriated Dl Staff available to manage project 17 External funds/resources ready to proceed
that apply: C Identified operating budget needs 7 Can realistically encumber funds List phases already completed:Planning
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 10 10 10 10 10 10 10 10 $80
Land Acquisition 130 130 _ 130 _ 130 130 130 130 130 $1,040
Design/Survey 10 10 10 _ 10 10 10 10 10 $80
Construction 150 690 150 150 150 150 150 150 $1,740
TOTAL: $300 $840 $300 I $300 $300 $300 $300 $300 $2,940
19. 0&M COSTS (x$1000): $150 I $978 $1,008 $2001 $225 $250 $300 $325 $3,436
20. FUNDING SOURCE(x$1000): 1 t ........... .... .. I .. ( I i
Cty G.O.Bond
State Revolving Fund
State CIP
Federal 540 $540
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) GET 300 300 300 300 300 300 300 300 $2,400
TOTAL: $300 $840 $300 $300 $300 $300 $300 $300 $2,940
60
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support 2.DATE: 1/3/2023
3. PROJECT NAME: _ MTA-Kailua-Kona Maintenance Facility _ _4.SUBMITTER: John Andoh
5. COUNCIL BENEFIT DISTRICT(S): 6,7,8 or 9 6.TMK/CDP PLANNING AREA: Kona
7. LOCATION(COUNCIL DISTRICT): 6,7 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $860,000
9. PROJECT ELIGIBILITY,✓all IC Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 1.0. PROJECT URGENCY/NEED,Vone:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study J Information/communication tech. LO High ❑ Med. ❑ Low
11. PROJECT/PROGRAM To perform planning,design,engineering,land acquisition,construction of a new base yard in Kailua-Kona to support transit operations in West and North Hawaii County.
DESCRIPTION:
—
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,/if Yes: C No health,safety or environmental conditions exist. facility/infrastructure/building,✓if Yes: C
B. Service improvements,/all that apply: O Access to 17 Quality of 0 Quantity of D. New facility/infr./bldg., ✓if Yes:C Needed to continue current level of services.
Results in net decrease in operating cost and improves services. F. Fosters inter-departmental collaboration
E. Operational efficiency and leveraging
opportunities: Reduces cost by 20%or more by bundling with adjacent projects. ✓if Yes:C DPW
Additional info:
13. LONG RANGE PLANS/ 'Details:Allows for the County to provide maintenance and administrative services in Details:Ensures a reliable fleet as buses can be maintained timely when they fail in West&
I+ Dept.Priority West&North Hawaii CountyC Comm.Value North Hawaii County
VALUES,check
at least one and all that apply, 117 General Plan Details:included in the transit portion of the General Plan r Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan
provide details: CCDP Details: C Multi Hazard Details:
[2' Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan ,Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?Vif Yes:C DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
15.LEGAL MANDATE?✓if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: 7 Promotes energy and resource conservation ❑ Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis 67 Promotes economic vitality C Strengthens and sustains our community
Additional info:
—
17.PROJECT READINESS,Vail C Project currently underway [1 Previously Appropriated C Staff available to manage project 7 External funds/resources ready to proceed
that apply: C Identified operating budget needs C±. Can realistically encumber funds List phases already completed:None
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 546 546 $1,092
Land Acquisition 1,500 1,500 $3,000
Design/Survey 1,550 1,550 $3,100
Construction 20,000 $20,000
TOTAL: $3,596 $3,596 I $20,000 1 I $27,192
19. 0&M COSTS (x$1000): I I $445 $450 $475 $500 $525 I $2,395
1 20. FUNDING SOURCE(x$1000): 1 1 I II
Cty G.O.Bond 860 860 4,000 55,720
,State Revolving Fund
State CIP
Federal 2,736 2,736 16,000_ $21,472
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) GET
TOTAL: $3,596 $3,596 $20,000 I $27,192
61
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support 2.DATE: 1/3/2023 _
3. PROJECT NAME: MTA-Zero Emissions Infrastructure 4.SUBMITTER: John Andoh
h
5. COUNCIL BENEFIT DISTRICT(S): ALL 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): ALL 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $551,000
9. PROJECT ELIGIBILITY,/all E Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study 1E Information/communication tech. L High . Med. P Low
11. PROJECT/PROGRAM Construct battery electric charging and hydrogen stations in Hilo,Mo'oheau Bus Terminal,Ka'u,Haw'i,Waikoloa,Waimea,Pahoa,Kailua-Kona to support the Mass Transit Agency's zero
DESCRIPTION: emission vehicles fleet through a public-private partnership
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,Vif Yes: C Reduces risk of documented hazard. facility/infrastructure/building,✓if Yes: E
B. Service improvements,Vall that apply: 0 Access to El Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:C Needed to continue current level of services.
Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration
E. Operational efficiency and leveraging
opportunities: Reduces cost by 20%or more by bundling with adjacent projects. ✓if Yes:C DPW
Additional info:
13. LONG RANGE PLANS/ ( Dept.Priority Details:Implements the transiton to zero emission buses IZ Comm.Value Details:Improve air quality,reduces noise through transition to zero emission buses
COMMUNITY VALUES,check r: General Plan Details:included in the transit portion of the General Plan C Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan,2017
resolution
at least one and all that apply,
provide details: C cop Details: C Multi Hazard Details:
C Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan Mitigation Plan
Additional info: It is the desire to partner with a private vendor to deliver this project.
14.CTY.MATCHING FUNDS REQ'D?ii(if Yes:C (DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
115.LEGAL MANDATE?Vif Yes: P (DESCRIBE:
16.SUSTAINABILITY FOCUS,/all that apply: 0 Promotes energy and resource conservation I Reduces hazard risk P Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis 0. Promotes economic vitality 7 Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,Vall E. Project currently underway 7 Previously Appropriated P Staff available to manage project 17 External funds/resources ready to proceed
that apply: C Identified operating budget needs ET Can realistically encumber funds List phases already completed:None
Additional info: It is anticipated that costs would be paid for in the operating budget based on charges made per month.
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 200 235 250 _ $685
Land Acquisition 51 100 100 100 $351
•
Design/Survey 200 304 250 $754
Construction 600 2,161 600 1,100 1,100 $5,561
TOTAL: $1,000 $2,7511 $1,200 $1,200 $1,200 1 $7,351
19. O&M COSTS (x$1000): $100 $200 $250 $300 $350 $400 $450 $2,050
120. FUNDING SOURCE(x$1000): ''
Cty G.O.Bond 500' 551 $1,051
State Revolving Fund
State CIP
Federal 500 2,200 500 500 500 $4,200
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) GET 700 700 700 $2,100
TOTAL: $1,000 $2,751 $1,200 1 $1,200 $1,200 1 I $7,351
62
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
11. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support - 2.DATE: 1/3/2023
3. PROJECT NAME: MTA-Hub and Spokes Construction _ _ _ _ 4.SUBMITTER: John Andoh
5. COUNCIL BENEFIT DISTRICT(S): ALL 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): ALL 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,790,000
9. PROJECT ELIGIBILITY,/all C Land acquisition C Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation Ii Planning,feasibility,eng.,or design study 7 Information/communication tech. ❑ High Med. ❑ Low
11. PROJECT/PROGRAM Construct transit hubs in Pahoa,Kailua-Kona as first priorities and then in Kea'au,Waimea,Waikola,Ocean View,Honoka'a,Prince Kuhio Plaza as second priorities. Rehabiliation of
DESCRIPTION: Mo'oheau Bus Terminal as a first priority. Transit hubs would include bus bays,shelters,benches,trash cans,bike racks,parking,building with community room/restroom,electric vehicle
charging and secure bus parking.
12. PROJECT JUSTIFICATION&OUTCOME(5),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,✓if Yes: E N/A facility/infrastructure/building,/it Yes: E
B. Service improvements,Vali that apply: O Access to O Quality of ❑ Quantity of D. New facility/infr./bldg., ✓if Yes:C Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging Results in net increase in operating cost but improves services. F. Fosters inter-departmental collaboration
✓if Yes:CL Planning
opportunities: Reduces cost by 20%or more by bundling with adjacent projects.
Additional info:
13. LONG RANGE PLANS/ IT. Dept.Priority Details:Provides a safe place for passengers to ride Hele-On ES Comm.Value Details:Provides an opportunity for the communities to board buses in safe places
COMMUNITY VALUES,check [ General Plan Details:included in the transit portion of the General Plan C%Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan
at least one and all that apply, �
ES CDP Details:Included in the Puna and Kona CDPs [Multi Hazard Details:
provide details: -
C Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
15.LEGAL MANDATE?✓if Yes: ❑ j DESCRIBE:
-
16.SUSTAINABILITY FOCUS,/all that apply: : Promotes energy and resource conservation Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis Promotes economic vitality C Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,✓all E Project currently underway P. Previously Appropriated 7 Staff available to manage project 7 External funds/resources ready to proceed
that apply: C Identified operating budget needs 7. Can realistically encumber funds List phases already completed: None
Additional info:
18. EXPENDITURE PHASING(X$1000): 7 Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 500 1,100 150 150 150 150 150 $2,350
Land Acquisition 1,000 1,000 1,000_ 1,000 _ 1,000 1,000 1,000 $7,000
Design/Survey 450 750 500 500 500 500 500 $3,700
Construction i 1,500 2,200 5,000 5,000 5,000 5,000 5,000 $28,700
TOTAL: $3,450 $5,050 $6,650 $6,6501 $6,650 $6,6501 $6,650 1 $41,750
19. O&M COSTS (x$1000): $15 $20 525y� $30 $30 $120
20. FUNDING SOURCE(x$1000): 1 1
Cty G.O.Bond 3,000 1,790 6,650 6,650 6,650 6,650 6,650 $38,040
State Revolving Fund
State CIP 450 900 $1,350
Federal 2,360 $2,360
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) GET
TOTAL: $3,450 $5,0501 $6,6501 $6,650 $6,650 $6,650 $6,650 $41,750
63
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support 2.DATE: 1/3/2023
3. PROJECT NAME: MTA-Expansion of Hilo Maintenance Facility _ .SUBMITTER: John Andoh
5. COUNCIL BENEFIT DISTRICT(S): ALL _ 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $125,000
9. PROJECT ELIGIBILITY,v all I+ Land acquisition E Infrastructure improvement E New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: E Nonrecurring rehabilitation f Planning,feasibility,eng.,or design study Information/communication tech. ❑ High Med. — Low
11. PROJECT/PROGRAM To perform design,land acquisition,construction of expansion of the Hilo Maintenance Facility due to being undersized for the current operations.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,/if Yes: E N/A facility/infrastructure/building,Vif Yes: E
B. Service improvements,/all that apply: El Access to 17 Quality of ❑ Quantity of D. New facility/infr./bldg., Vif Yes:C Needed to continue current level of services.
Results in net increase in operating cost but improves services. IF. Fosters inter-departmental collaboration
E. Operational efficiency and leveraging - -
✓ifYes:t2 DPW
opportunities: No opportunity,not adjacent to project to capitalize on cost saving.
Additional info:
13. LONG RANGE PLANS/ Details:Allows for the County to provide maintenance and administrative services in ❑ Details:Ensures a reliable fleet as buses can be maintained timely when they fail in East and
Dept.Priority Comm.Value
East and South Hawai'i County South Hawaii County
COMMUNITY VALUES,check
at least one and all that apply, 7 General Plan Details:included in the transit portion of the General Plan EF Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan
provide details: IT CDP Details: E Multi Hazard Details:
E Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan Mitigation Plan
Additional info:
14.CIY.MATCHING FUNDS REQ'D?/if Yes:C I DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
115.LEGAL MANDATE?Vif Yes: C (DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: ` Promotes energy and resource conservation Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: E Cost benefit analysis F. Promotes economic vitality 7 Strengthens and sustains our community
Additional info: If
17.PROJECT READINESS,/all 17. Project currently underway 7 Previously Appropriated 7 Staff available to manage project P External funds/resources ready to proceed
that apply: C Identified operating budget needs Can realistically encumber funds List phases already completed:None
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 50 _ 50 $100
Land Acquisition
Design/Survey 75 75 $150
Construction 2,500 $2,500
1 TOTAL:! $125 $125 l $2,500 f I I $2,750
19. 0&M COSTS (x$1000):
L0. FUNDING SOURCE(x$1000):
Cty G.O.Bond
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) GET 125 125 2,500 $2,750
TOTAL: $125 $1251 $2,500 I $2,750
64
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support 2.DATE: 1/3/2023
3. PROJECT NAME: MTA-Bus Stop Signage _ 4.SUBMITTER: John Andoh
5. COUNCIL BENEFIT DISTRICT(S): ALL 6.TMK/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): ALL 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $45,000
9. PROJECT ELIGIBILITY,V all C Land acquisition E Infrastructure improvement C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,lone:
that apply: E Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study Information/communication tech. [ High ❑ Med. ❑ Low _
11. PROJECT/PROGRAM Purchase 500 bus stop signs and decals for installation at each bus stop located throughout Hawai'i Island.
DESCRIPTION:
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,✓if Yes: Reduces risk of a documented hazard. facility/infrastructure/building,✓if Yes: C
B. Service improvements,/all that apply: O Access to 0 Quality of O Quantity of D. New facility/infr./bldg., ✓if Yes:C N/A
No change in operating costs. F. Fosters inter-departmental collaboration
E. Operational efficiency and leveraging —
✓if Yes:C DPW
opportunities: Reduces cost by 20%or more by bundling with adjacent projects.
Additional info:
13. LONG RANGE PLANS/ E Dept.Priority Details:Provides identifcation of where to board Hele-On buses E comm.Value Details:Provides an opportunity for the communities to know where to board buses
COMMUNITY VALUES,check E General Plan Details:included in the transit portion of the General Plan E Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan
at least one and all that apply, C CDP Details: E Multi Hazard Details:
provide details:
E Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan Mitigation Plan
Additional info: Project must be done by August 2023.
14.CTY.MATCHING FUNDS REQ'D?/if Yes:C DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
15.LEGAL MANDATE?/if Yes: C I DESCRIBE:Settlement Agreement with Department of Justice
16.SUSTAINABILITY FOCUS,Vall that apply: L- Promotes energy and resource conservation LI Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis 7 Promotes economic vitality E Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all r Project currently underway E Previously Appropriated C Staff available to manage project 7 External funds/resources ready to proceed
that apply: C Identified operating budget needs 7 Can realistically encumber funds List phases already completed: Design
Additional info:
Prior Funds Allotted This FY 23-24' Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 50 $50
Land Acquisition
Design/Survey
Construction 350 45 10 1 1 1 1 1 $410
TOTAL: $400 I $45 I $10 $1 I $1 I $1 I $1 $1 1 $460
19. O&M COSTS (x$1000): I I
r FUNDING SOURCErrr
Cty G.O.Bond
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund 400 45 10 1 1 1 1 1 $460
TOTAL: $400 $45 I $10 [ $1 $1 I $1 $1 $1 $460
65
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Mass Transit Agency,Administrative Support 2.DATE: 1/3/2023
3. PROJECT NAME: MTA-Park and Ride Lots _ ®4.SUBMITTER: John Andoh
5. COUNCIL BENEFIT DISTRICT(S): ALL 6.TMK/CDP PLANNING AREA: Various _
7. LOCATION(COUNCIL DISTRICT): ALL 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $250,000
9. PROJECT ELIGIBILITY,✓ all C Land acquisition E Infrastructure improvement E New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,"one:
that apply: C Nonrecurring rehabilitation C Planning,feasibility,eng.,or design study ,E Information/communication tech. ❑ High ❑ Med. - Low
11. PROJECT/PROGRAM 'Build park and ride lots at transit hubs and at key locations on the island where people can park their vehicles and ride commuter buses to destinations around the island. Potential
DESCRIPTION: locations are in Ocean View,Waimea,Hilo,Kailua-Kona and Honoka'a.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,✓if Yes: C Reduces risk of a documented hazard. facility/infrastructure/building,✓if Yes: C
B. Service improvements,/all that apply: O Access to 17 Quality of 2 Quantity of D. New facility/infr./bldg., /if Yes:E Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration
opportunities: Reduces cost by 20%or more by bundling with adjacent projects. ✓ifYes:E DPW
Additional info:
13. LONG RANGE PLANS/ [ Details:Provides on opportunity for potential riders to drive to ride Hele-On express [ Details:Provides an opportunity for potential riders to drive to ride Hele-On express and
Dept.Priority
COMMUNITY VALUES,check and intercommunity routes comm.Value intercommunity routes
at least one and a that aPp yE General Plan Details:included in the transit portion of the General Plan E Admin Priority Details:Addressess implementing the recommendations of the Transit Master Plan
,
provide details: E CDP Details:Included in the Puna and Kona CDP _C.Multi Hazard Details:
E Other Plans Details:Included in the Multi-Modal Transit and Transportation Master Plan Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D? Elf Yes:C DESCRIBE:The Mass Transit Agency will pursue FTA funds and when successful,20%local match will be requirement using GET
115.LEGAL MANDATE?✓if Yes: C DESCRIBE:
16.SUSTAINABILITY FOCUS,✓all that apply: 7 Promotes energy and resource conservation C Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: C Cost benefit analysis 7 Promotes economic vitality E Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all E Project currently underway 7 Previously Appropriated r Staff available to manage project 17 External funds/resources ready to proceed
that apply: E Identified operating budget needs 17 Can realistically encumber funds List phases already completed:None
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 150 150 _ _ $300
Land Acquisition 300 300 300 300 $1,200
Design/Survey 100 100 70 70 70 70 $480
Construction 700 700 700 700 $2,800
TOTAL: $250 $2501 $1,0701 $1,070 1 $1,070 $1,070 I $4,780
19. 0&M COSTS (x$1000): 1 $25 $27 $29 $31 $33 I $35 $37 $217
_
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 250 ' 250 1,070 1,070 1,070 1,070 $4,780
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc) _
Other Cty Fund-(describe) GET
TOTAL: $250 $250 I $1,070 $1,070 $1,070 $1,070 $4,780
66
OFFICE OF HOUSING AND
COMMUNITY DEVELOPMENT
SUSAN KUNZ,
HOUSING ADMINISTRATOR
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Office of Housing and Community Development FISCAL YEAR 2023-2024
2023-24 FY FUNDING � FUNDING FORECAST BY FISCAL YEAR TOTAL
(in thousands) (in thousands) ESTIMATED
•
Prior
County G.O. CBA, Funds Beyond 6 PROJECT
PRIORITY PROJECT Bond State Federal Private* Other** Allotted 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 years COST
1 OHCD-Facilities Repairs/Maintenance and Renovation 1,500 7,677 1,500 1,500 1,500 1,500 1,500 1,500 16,677
2 OHCD-Kamakoa Nui Mini Loop Road,Infrastructure and Housing 10,000 8,000 76,255 18,000 10,000 104,255
3 OHCD-O'okala Affordable Housing Subdivision Road 4,000 4,000 4,000
4 OHCD-Kukuiola Emergency and Permanent Supportive Housing 10,000 5,000 10,000 16,000 31,000
5 OHCD-Haihai Affordable Housing Project 1,000 1,000 15,000 16,000
6 OHCD-Ainako Affordable Housing Project 1,000 1,000 16,000 17,000
7 OHCD-Ainaola Affordable Housing Project 1,000 1,000 20,000 21,000
8 -
9 -
10 -
I
TOTAL 28,500 - - - 8,000 89,932 50,500 63,500 1,500 1,500 1,500 1,500 - 209,932
Created By: * Private:Foundation Grants
Date: **Community Benefit Assessments:Fair Share,Park Dedication,Etc.Other:GET,Fuel Tax and other non-bond sources
68
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Office of Housing&Community Development 2.DATE: 12/27/2022
3. PROJECT NAME: OHCD-Facilities Repairs/Maintenance and Renovation 4.SUBMITTER: Susan K.Kunz
5. COUNCIL BENEFIT DISTRICT(S): Various 6.TMI(/CDP PLANNING AREA: Various
7. LOCATION(COUNCIL DISTRICT): Various 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,500,000
9. PROJECT ELIGIBILITY,✓all ❑ Land acquisition O Infrastructure improvement O New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: 0 Nonrecurring rehabilitation T❑ Planning,feasibility,Eng.,or design study I 0 Information/communication tech. 0 High ❑ Med. ❑ Low
11. PROJECT/PROGRAM OHCD maintains several facilities throughout the island.Three of the facilities are more than 20 years old.The existing buildings are in need of constant renovations/repairs&
DESCRIPTION: maintenance.Repairs and maintenance&renovations of the projects are medium to large scale.Repairs and maintenance are needed to ensure continued project viability.Some of the
repairs we have scheduled include includes resurfacing roads,ADA compliance,and building interior unit renovations including energy efficiency fixtures and appliances.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of Project will restore full operations to asset.
A. Addresses public health/safety,/if Yes: Li Reduces risk of a documented hazard. facility/infrastructure/building,V if Yes: O
B. Service improvements,/all that apply: 0 Access to 0 Quality of Cl Quantity of D. New facility/intr./bldg., /if Yes:❑ N/A
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:❑
Additional info:
13. LONG RANGE PLANS/ LI Dept.Priority Details:maintains and extends the life of OHCD facilities/projects ❑Comm.Value Details:
COMMUNITY VALUES,check O General Plan Details:Section 9,Housing El Admin Priority Details:preservation of affordable housing and homeless facilities,and increasing units
at least one and all that apply, ❑ CDP Details: 0 Multi Hazard Details:
provide details: 0 Other Plans Details: Mitigation Plan
Additional info:Reduce expenditures on operational budget to address aging facilities before it becomes a bigger problem.Eliminate temporary and piece meal fixes.
14.CTY.MATCHING FUNDS REQ'D?✓if Yes: Ll DESCRIBE:
115.LEGAL MANDATE?✓if Yes: El I DESCRIBE:ADA accessibility as required(where applicable)
16.SUSTAINABILITY FOCUS,/all that apply: O Promotes energy and resource conservationReduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis ❑ Promotes economic vitality O Strengthens and sustains our community
Additional info:
17.PROJECT READINESS,/all Project currently underway ❑ Previously Appropriated p Staff available to manage project 0 External funds/resources ready to proceed
that apply: ❑ Identified operating budget needs 0Can realistically encumber funds List phases already completed:various physical needs assessments on OHCD projects
Additional info:Reduce expenditures on operational budget to address aging facilities before it becomes a bigger problem.Eliminate temporary and piece meal fixes.
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey 400 _ $400
Construction 7,677 1,100 1,500 1,500 1,500 1,500 1,500 $16,277
TOTAL: $7,677 $1,500 $1,500 $1,500 $1,500 I $1,500 I $1,500 $16,677
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000):
Cty G.O.Bond 7,677 1,500 1,500 1,500 1,500 1,500 1,500 r $16,677
State Revolving Fund
State CIP "
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $7,677 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $16,677
69
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
• Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Office of Housing&Community Development _ 2.DATE: 12/27/2022
3. PROJECT NAME: OHCD- Kamakoa Nui Mini Loop Road,Infrastructure and Housing 4.SUBMITTER: Susan K.Kunz
5. COUNCIL BENEFIT DISTRICT(S): 5,6,7,8,9 6.TMK/CDP PLANNING AREA:
7. LOCATION(COUNCIL DISTRICT): 8 8.TOTAL COUNTY FUNDS NEEDED THIS Pt: $18,000,000
9. PROJECT ELIGIBILITY,✓all 0 Land acquisition O Infrastructure improvement 0 New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: 0 Nonrecurring rehabilitation O Planning,feasibility,eng.,or design study IEI Information/communication tech. O High 0 Med. 0 Low
11. PROJECT/PROGRAM OHCD will construct the next phase of infrastructure for the County owned Kamakoa Nui Subdivision which will open development for approximately 668 units of both single family and
DESCRIPTION: multifamily units in Waikoloa,South Kohala. A request for proposal will be issued for these parcels once the infrastructure in constructed with CIP FY 24-25 funds for this subdivision.This
subdivision is required to meet the affordable housing demand in this area.This includes any and all related costs.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,/if Yes: [2] Community concerns exists around conditions. facility/infrastructure/building,/if Yes: 0
B. Service improvements,/all that apply: El Access to O Quality of 0 Quantity of D. New facility/infr./bldg., /if Yes:O Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:❑
Additional Info.OHCD has completed a revised master plan in 2022,and is in the process of executing an engineering and design contract of roads and infrastructure for the next phase.
13. LONG RANGE PLANS/ [J Dept.Priority Details:Creating affordable housing opportunities is the Department's mission ❑Comm.Value Details:
COMMUNITY VALUES,check O General Plan Details:Section 9,Housing O Admin Priority Details:Development of affordable housing is this Administration's priority.
at least one and all that apply, O CDP Details:Identify and facilitate use of suitable public lands;expand affordable housing 0 Multi Hazard Details:
provide details: ❑ Other Plans Details: Mitigation Plan
Additional info:
14.CTY.MATCHING FUNDS REQ'D?/if Yes:❑ DESCRIBE:
15.LEGAL MANDATE?✓if Yes: O DESCRIBE: General Plan and all CDP
16.SUSTAINABILITY FOCUS,/all that apply: 0 Promotes energy and resource conservation O Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis O Promotes economic vitality O Strengthens and sustains our community
Additional info:Housed individuals and families reduces homelessness and allows for improved health and safety,while promoting economic improvements within a household,and strengthening our communities.
17.PROJECT READINESS,/all 0 Project currently underway 0 Previously Appropriated O Staff available to manage project 0 External funds/resources ready to proceed
that apply: 0 Identified operating budget needs O Can realistically encumber funds List phases already completed:various physical needs assessments on OHCD projects
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition _ _
Design/Survey 1,000 _ _ $1,000
Construction 76,255 18,000 9,000 $103,255
TOTAL: $76,255 $18,000 $10,000 I $104,255
119. 0&M COSTS (x$1000):
110. FUNDING SOURCE(x$1000):
CtyG.O.Bond 12,317 10,000 10,000 $32,317
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-kamakoa revolving fund 63,938 8,000 $71,938
TOTAL: $76,255 $18,000 $10,000 I 1 $104,255
70
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Office of Housing&Community Development 2.DATE: 12/27/2022
3. PROJECT NAME: OHCD-O'okala Affordable Housing Subdivision Road 4.SUBMITTER: Susan K.Kunz
5. COUNCIL BENEFIT DISTRICT(S): All 6.TMK/CDP PLANNING AREA: (3)3-9-001:034
7. LOCATION(COUNCIL DISTRICT): 1 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000
9. PROJECT ELIGIBILITY,V all 0 Land acquisition p Infrastructure improvement ❑ New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: ❑ Nonrecurring rehabilitation III Planning,feasibility,eng.,or design study El Information/communication tech. O High ❑ Med. ❑ Low
11. PROJECT/PROGRAM OHCD has completed a feasibility study for the development of this 9 acre County owned property as an affordable housing site in O'Okala,North Hilo. A consultant has been hired to
DESCRIPTION: design the subdivision road and infrastructure.Engineering and Design work is currently underway.This project will install roads and infrastructure for the O'okala Affordable Housing
Project.The installation of a road and infrastructure for this subdivision will allow for the development about 30 homes by OHCD and non-profit self-help affordable housing developers.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,:/if Yes: 2 No health,safety or environmental conditions exist. facility/infrastructure/building,/if Yes: 0
B. Service improvements,/all that apply: ❑ Access to O Quality of 0 Quantity of D. New facility/infr./bldg., Vif Yes:L] Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:LI
Additional info:
13. LONG RANGE PLANS/ i) Dept.Priority Details:Creating affordable housing opportunities is the Department's mission ❑Comm.Value Details:
COMMUNITY VALUES,check p General Plan Details:Section 9,Housing p Admin Priority Details:Development of affordable housing is this Administration's priority.
at least one and all that apply, 17 CDP Details:Identify and facilitate use of suitable public lands for affordable housing 0 Multi Hazard Details:
provide details:
D Other Plans Details: Mitigation Plan
Additional info:OHCD has identified this County owned parcel as suitable a suitable location to build an affordable housing subdivision in this Council district.
14.CTY.MATCHING FUNDS REQ'D? if Yes:❑ DESCRIBE:
15.LEGAL MANDATE?/if Yes: kI !DESCRIBE: General Plan and all CDP
16.SUSTAINABILITY FOCUS,Vail that apply: ❑ Promotes energy and resource conservation ❑ Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis O Promotes economic vitality El Strengthens and sustains our community
Additional info:Housed individuals and families reduces homelessness and allows for improved health and safety,whilepromoting economic improvements within a household,and strengthening our communities.
17.PROJECT READINESS,✓all O Project currently underway 0 Previously Appropriated p Staff available to manage project 0 External funds/resources ready to proceed
that apply: ❑ Identified operating budget needs 0 Can realistically encumber funds list phases already completed:various physical needs assessments on OHCD projects
Additional info:OHCD has completed a feasibility study for building affordable housing at this site,and has hired a consultant to engineer the roads and infrastructure.
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction 4,000 $4,000
TOTAL: $4,000 $4,000
19. 0&M COSTS (x$1000):
20rUNDING SOURCE(x$1000): 1
Cty G.O.Bond 4,000 $4,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $4,000 1 I I $4,000
71
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Office of Housing&Community Development 2.DATE: 12/27/2022
3. PROJECT NAME: OHCD-Kukuiola Emergency and Permanent Supportive Housing 4.SUBMITTER: Susan K.Kunz
5. COUNCIL BENEFIT DISTRICT(S): 6,7,8,9 6.TMK/CDP PLANNING AREA: (3)7-4-020:004
7. LOCATION(COUNCIL DISTRICT): 8 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $10,000,000
9. PROJECT ELIGIBILITY,✓all 0 Land acquisition _121 Infrastructure improvement _C New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,'Ione:
that apply: 0 Nonrecurring rehabilitation 0 Planning,feasibility,eng.,or design study ❑ Information/communication tech. O High 0 Med. 0 Low
11. PROJECT/PROGRAM The Kukuiola project will continue it's development of 19.1 acres consisting of the following components:an emergency shelter and permanent housing for homeless individuals&couples
DESCRIPTION: without children including safe overnight parking,an assessment center,health and social services,and community pavilion/kitchen.Federal funds are available to cover up to 16 units of
the 48 unitsplanned.This request covers the remaining units.This includes any and all eligible costs to complete the project.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,✓if Yes: 2 Community concerns exists around conditions. facility/infrastructure/building, if Yes: 0
B. Service improvements,✓all that apply: O Access to O Quality of O Quantity of D. New facility/infr./bldg., ✓if Yes:L l Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:0
Additional info:HHFDC was awarded$4M grant to pay for the design and construction of the cul-de-sac from Kealakehe Parkway.A federal appropriation as been awarded to the County for 510,000,000 to cover the initial construction costs of the emergency shelter,safe parking,assessment center,health
nd social services and the community oavilion/kitchen.
13. LONG RANGE PLANS/ kl Dept.Priority Details:Houses homeless individuals with wrap-around support services ❑Comm.Value Details:
COMMUNITY VALUES,check 0 General Plan Details:Section 9,Housing O Admin Priority Details:Development of affordable housing is this Administration's priority.
at least one and all that apply, 0 CDp Details: 0 Multi Hazard Details:
provide details:
0 Other Plans Details: Mitigation Plan
Additional info:OHCD has identified candidate parcels for affordable housing and will continue to identify additional parcels with this funding.
14.CTY.MATCHING FUNDS REQ'D?✓if Yes:❑ DESCRIBE:
15.LEGAL MANDATE?/if Yes: O DESCRIBE: ADA accessibility as required
16.SUSTAINABILITY FOCUS,Vali that apply: [1l Promotes energy and resource conservation O Reduces hazard risk 0 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis ❑ Promotes economic vitality 0 Strengthens and sustains our community
Additional info:Housed individuals and families reduces homelessness and allows for improved health and safety,while promoting economic improvements within a household,and strengthening our communities.
17.PROJECT READINESS,/all O Project currently underway ❑ Previously Appropriated O staff available to manage project ❑ External funds/resources ready to proceed
that apply: ❑ Identified operating budget needs 0 Can realistically encumber funds List phases already completed:various physical needs assessments on OHCD projects
Additional info:Reduce expenditures on operational budget to address aging facilities before it becomes a bigger problem.Eliminate temporary and piece meal fixes.
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 1,000 $1,000
Land Acquisition
Design/Survey 1,000 1,000 $2,000
Construction 5,000 8,000 15,000 $28,000
TOTAL: $5,000 $10,000 i $16,000 $31,000
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I
Cty G.O.Bond 5,000 10,000 16,000 _ $31,000
State Revolving Fund 4,000 $4,000
State CIP
Federal 10,000 $10,000
Private(Grants) 1,000 $1,000
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe) _
TOTAL: $10,000 $20,000 $16,000 i $46,000
72
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Office of Housing&Community Development 2.DATE: 12/27/2022
3. PROJECT NAME: OHCD-Haihai Affordable Housing Project 4.SUBMITTER: Susan K.Kunz
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4 6.TMK/CDP PLANNING AREA: (3)-2-4-051:111,094, 107,108
7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000
9. PROJECT ELIGIBILITY,V all ❑ Land acquisition 9 Infrastructure improvement ❑ New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,,/one:
that apply: 0 Nonrecurring rehabilitation 0 Planning,feasibility,eng.,or design study 0 Information/communication tech. 0 High ❑ Med. ❑ Low
11. PROJECT/PROGRAM OHCD will complete the planning and design work for an affordable housing subdivision on this 34.13 acre parcel located in Waiakea,South Hilo.These parcels have been Executive
DESCRIPTION: Ordered to the County via EO-4686 on November 15,2022.The project will include an EA,and planning and design program to prepare the parcel for an affordable housing subdivision to
be completed by OHCD and affordable housing development partners.This includes any and all related costs.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,'lit Yes: LI Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: 0
B. Service improvements,/all that apply: O Access to 0 Quality of 0 Quantity of D. New facility/intr./bldg., ✓if Yes:9 Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration N/A
opportunities: N/A lit Yes:
Additional Info.OHCD has completed initial due diligence surveys for biological,flora,fauna,and archeological conditions.
13. LONG RANGE PLANS/ (A Dept.Priority Details:Creating affordable housing opportunities is the Department's mission ❑Comm.Value Details:
COMMUNITY VALUES,check ❑Q General Plan Details:Section 9,Housing 9 Admin Priority Details:Development of affordable housing is this Administration's priority.
at least one and all that apply, O CDP Details:identify and facilitate use of suitable public lands;expand affordable housing ❑Mufti Hazard Details:
provide details:
0 Other Plans Details: Mitigation Plan
Additional info:OHCD has identified candidate parcels for affordable housing and will continue to identify additional parcel's with this funding.
14.CTY.MATCHING FUNDS REQ'D?/if Yesfi DESCRIBE:
15.LEGAL MANDATE?v"if Yes: 1--,1 IDESCRIBE: General Plan and all CDP
16.SUSTAINABILITY FOCUS,✓all that apply: ❑ Promotes energy and resource conservation 0 Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis 0 Promotes economic vitality 0 Strengthens and sustains our community
Additional info:Housed individuals and families reduces homelessness and allows for improved health and safety,while promoting economic improvements within a household,and strengthening our communities.
17.PROJECT READINESS,Vail El Project currently underway ❑ Previously Appropriated O Staff available to manage project ❑ External funds/resources ready to proceed
that apply: ❑ Identified operating budget needs O Can realistically encumber funds List phases already completed:various physical needs assessments on OHCD projects
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000): `JI (not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 500 _ $500
Land Acquisition
Design/Survey 500 $500
Construction 15,000 $15,000
TOTAL: $1,000 $15,000 1 1 I $16,000
19. 0&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I 1
Cty G.O.Bond 1,000 15,000 $16,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $1,000 $15,000 $16,000
73
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Office of Housing&Community Development 2.DATE: _ 12/27/2022
3. PROJECT NAME: OHCD-Ainako Affordable Housing Project 4.SUBMITTER: Susan K.Kunz
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4,5, 6.TMK/CDP PLANNING AREA: 3-2-3-030-004
7. LOCATION(COUNCIL DISTRICT): 2 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000
9. PROJECT ELIGIBILITY,✓all ❑ Land acquisition O Infrastructure improvement _❑ New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,lone:
that apply: ❑ Nonrecurring rehabilitation 0 Planning,feasibility,eng.,or design study ❑ Information/communication tech. El High ❑ Med. ❑ Low
11. PROJECT/PROGRAM OHCD will complete the planning and design work for an affordable housing subdivision on this 60.59 acre parcel located in Waiakea,South Hilo.The project will include an EA,and
DESCRIPTION: planning and design program to prepare the parcels for an affordable housing subdivision to be completed by OHCD and affordable housing development partners.FY 24-25 will request
funds to build the infrastructure and roads for this subdivision.This includes any and all related costs.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,✓if Yes: C] Community concerns exists around conditions. facility/infrastructure/building,/if Yes: ❑
B. Service improvements,/all that apply: El Access to 0 Quality of 0 Quantity of D. New facility/infr./bldg., /if Yes:g Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging No change in operating costs. F. Fosters inter-departmental collaboration N/A
opportunities: N/A /if Yes:❑
Additional info:
13. LONG RANGE PLANS/ [)1 Dept.Priority Details:Creating affordable housing opportunities is the Department's mission ❑Comm.Value Details:
COMMUNITY VALUES,check O General Plan Details:Section 9,Housing Cl Admin Priority Details:Development of affordable housing is this Administration's priority.
at least one and all that apply, p CDP Details:Identify and facilitate use of suitable public lands;expand affordable housing 0 Multi Hazard Details:
provide details: ❑ Other Plans Details:
Mitigation Plan
Additional info:OHCD identified this parcel for affordable housing,and has completed a feasibility study indicating positive conditions for an affordable housing development.
14.CTY.MATCHING FUNDS REQ'D?/if Yesfl DESCRIBE:
15.LEGAL MANDATE?✓if Yes: O DESCRIBE: General Plan and all CDP
16.SUSTAINABILITY FOCUS,/all that apply: ❑ Promotes energy and resource conservation 0 Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis O Promotes economic vitality El Strengthens and sustains our community _
Additional info:Housed individuals and families reduces homelessness and allows for improved health and safety,while promoting economic improvements within a household,and strengthening our communities.
17.PROJECT READINESS,✓all 0 Project currently underway 0 Previously Appropriated 0 Staff available to manage project ❑ External funds/resources ready to proceed
that apply: El Identified operating budget needs 0 Can realistically encumber funds List phases already completed:various physical needs assessments on OHCD projects
Additional info:
18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 23-24 Beyond 6
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 500 $500
Land Acquisition
Design/Survey 500 $500
Construction 16,000 $16,000
TOTAL: $1,000 $16,000 f $17,000
19. 0&M COSTS (x$1000): p
20. FUNDING SOURCE(x$1000):
1 I
Cty G.O.Bond 1,000 16,000 _ _ 517,000
State Revolving Fund
State CIP
Federal
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
Other Cty Fund-(describe)
TOTAL: $1,000 $16,000 $17,000
74
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2023-2024
1. DEPARTMENT AND DIVISION: Office of Housing&Community Development 2.DATE: 12/27/2022
3. PROJECT NAME: OHCD-Ainaola Affordable Housing Project 4.SUBMITTER: Susan K.Kunz
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4,5 _ 6.TMK/CDP PLANNING AREA: (3)2-4-005:001&2-4-005:012
7. LOCATION(COUNCIL DISTRICT): 2 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000
9. PROJECT ELIGIBILITY,✓all ❑ Land acquisition O Infrastructure improvement ❑ New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,/one:
that apply: 0 Nonrecurring rehabilitation O Planning,feasibility,eng.,or design study ❑ Information/communication tech. C7 High ❑ Med. ❑ Low
11. PROJECT/PROGRAM OHCD will complete the planning and design work for an affordable housing subdivision on this 71.26 acre parcel located in Waiakea,South Hilo.The project will include an EA and
DESCRIPTION: planning and design program to prepare the parcels for an affordable housing subdivision to be completed by OHCD and affordable housing development partners.FY 24-25 will request
funds to build the infrastructure and roads for this subdivision.This includes any and all related costs.
12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: C. Repair/maintenance/replacement of N/A
A. Addresses public health/safety,/if Yes: La Community concerns exists around conditions. facility/infrastructure/building,✓if Yes: ❑
B. Service improvements,"all that apply: 17 Access to 0 Quality of 0 Quantity of D. New facility/infr./bldg., ✓if Yes:LJ Fills gap in current services for underserved area/demographic.
E. Operational efficiency and leveraging No change in operating costs. PF. Fosters inter-departmental collaboration N/A
opportunities: N/A ,/if Yes:0
Additional Info.OHCD has contracted a consultant to complete conceptual planning and due diligence studies.
13. LONG RANGE PLANS/ El Dept.Priority Details:Creating affordable housing opportunities is the Department's mission ❑Comm.Value Details:
COMMUNITY VALUES,check O General Plan Details:Section 9,Housing CI Admin Priority Details:Development of affordable housing is this Administration's priority.
at least one and all that apply, p CDP Details:Identify and facilitate use of suitable public lands;expand affordable housing 0 Multi Hazard Details:
provide details: 0 Other Plans Details:
Mitigation Plan
Additional info:OHCD identified this parcel for affordable housing in the Hilo region.
14.CTY.MATCHING FUNDS REQ'D?✓if YesI DESCRIBE:
15.LEGAL MANDATE?✓if Yes: 2 DESCRIBE: General Plan and all CDP
16.SUSTAINABILITY FOCUS,✓all that apply: ❑ Promotes energy and resource conservation O Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis O Promotes economic vitality El Strengthens and sustains our community
Additional info:Housed individuals and families reduces homelessness and allows for improved health and safety,while promoting economic improvements within a household,and strengthening our communities.
17.PROJECT READINESS,Jail 0 Project currently underway 0 Previously Appropriated p Staff available to manage project 0 External funds/resources ready to proceed
that apply: ❑ Identified operating budget needs O Can realistically encumber funds List phases already completed:various physical needs assessments on OHCD projects
Additional info:
Prior Funds Allotted This FY 23-24 Beyond 6
18. EXPENDITURE PHASING(X$1000):
(not lapsed) Request FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Years TOTAL:
Planning 500 $500
,Land Acquisition
Design/Survey 500 $500
Construction 20,000 $20,000
TOTAL: $1,000 $20,000 $21,000
19. O&M COSTS (x$1000):
20. FUNDING SOURCE(x$1000): I I
Cty G.O.Bond 1,000 20.000 $21,000
State Revolving Fund
State CIP
Federal •
Private(Grants)
CBA(Fair Share,Park Dedication,etc)
•
Other Cty Fund-(describe) _
TOTAL: $1,000 $20,000 $21,000
75