Loading...
HomeMy WebLinkAboutCOM 0577.001 1998-2000 / 4 ;tM<Y Of M7k i - 14;;; it Stephen K Yamashiro ~~'i Mayor ~ • _ . Jiro A. Sumada '~r~y • Y ~ _ ~ - ~ Dryuty Chief Engineer % of Mi '~9 DEC 2? P~1 1?_ 48 Cn>~urttg of ~ttfnr>ii ~ . . DEPARTMENT OF PUBLIC'~Ri I{8 ~ _ ; ;,;~,,r,,;i 25 Aupuni Street. Room 202 • Hilo, Hawaii 96720.4252 (808)961-8321 • Fax (808)961-8630 December 23, 1999 Memo 99LH-129 Thomas E. Arizumi, P.E. Chief, Environmental Management Division State Department of Health P.O. Box 3378 Honolulu, Hawaii 96801 Subject: Papaikou Wastewater Treatment Plant Operation and Maintenance Inspection - EMD/WB 991015 The County of Hawaii Wastewater Division has received the annual Operation and Maintenance Inspection Report for the Papaikou Wastewater Treatment Plant and provides the following corrective action plan to address the deficiencies cited in the report. Deficiencies: 1. The Chlorine Contact Tank contained a 6 to 12 inch layer of sludge on the bottom of the tank. The sludge layer in the Chlorine Contact Tank was removed. Monitoring of the sludge layer in the Chlorine Contact Tank is normally performed on a regular basis but has now been added to the Operator's monthly Preventive Maintenance Checklist as a weekly check. 2. The Chlorine Alarm was inoperable. The Wastewater Division has purchased a new Chlorine Alarm system for the facility. However, the new equipment was received in a damaged condition and has been returned to the factory for replacement. Operators currently utilize a portable Chlorine Gas detector at the facility for monitoring of Chlorine Gas. The new Chlorine Alarm will be installed upon receipt and monthly testing of the new Chlorine Alarm system will be added to the Operator's monthly Preventive Maintenance Checklist. Expected completion date is January 31, 2000. Comm. No. ~ ~ ~ Fl'le No. 5 E W Ref. Tol PW~C Ref. Date ~ 1 0 2006 Memo 99LH-129 Papaikou WWfP 1999 O&M Inspection Page 2 of 2 3. The headworks ventilation fan was inoperable. The Wastewater Division has received a replacement fan and is currently in the process of installing the replacement fan. Modification of the assembly is required since a larger fan is being installed to provide additional ventilation. Estimated completion date is January 15, 2000. 4. The fire extinguisher in the Control Building was noted to be completely discharged. The fire extinguisher has been replaced with a fully charged fire extinguisher. Inspection of fire extinguishers is performed on a monthly basis and is part of the Preventive Maintenance checklist. Previous inspection of the fire extinguisher prior to the O&M Inspection was performed on September 10, 1999. The fire extinguisher was found to be in satisfactory condition at that time. Recommendations: 1. Aeration Tanks have not been rotated since Plant Start-up. The Aeration Tanks will be rotated. Estimated completion date for bringing Aeration Tank No. 1 on line is March 31, 2000. 2. Use of Standby Aeration Tank as flow equalization basin. The slotted gate has been moved to the influent channel and Aeration Tank No. 1 will be pumped down to provide additional storage capacity. Pumping down of Aeration Tank No. 1 is expected to be completed by January 31, 2000. 3. Heavy algae growth on effluent weir of Final Clarifier No. 2. The algae growth has been removed. Should there be any comments or questions on the above please contact Peter Boucher, Wastewater Division Chief at 808-961-8338 or correspondence can be sent via facsimile to 808-961-8644. Sincerely, v~ J Jir A. Su ada De ty C ief Engineer cc: Wastewater Division County Council Public Works Chairperson