Loading...
HomeMy WebLinkAboutCOM 0136.021 2022-2024 Fc, From: George Wilson Sent: Monday, April 10, 2023 1:17 PM To: Roth, Mitch D; Mansour, Ramzi; Command, Robert H; Council Testimony,,-'Sako,' Deanna Cc: Mary Ellen Smith; Ellen Wilson;Julie Creighton CO Subject: Kahalulu Line Item UJ There are 69 cesspools and 14 septic tanks along Alii Drive and more mauka in thg"-, Kahalu'u area. There are no sewer lines for 1-mile in Ali'i Drive from Kahalu'u Beach (at Makolea St.) to Queen Kalama. Sewage pollutes the ocean when it seeps through the porous volcanic/sand at high tides. Septic tanks are not the answer, the leach lines put urine and polluting household chemicals directly into the soil. Septic tanks can fill up at king tides or tsunamis and overflow. The best way to protect the bay is to get the 1-mile of sewer line "shovel-ready" so that the County can apply for funding. This means funding the Environmental Impact Statement or Environmental Assessment and engineering studies to figure the project cost. This must be done this year to get the project "shovel ready". We have one of least polluted ocean ecosystems in the world that provides employment and income for many not to mention the immense benefit to natural beauty, marine life, and the environment from protecting and preserving this rare and slowly vanishing resource. After it is lost, we cannot repair it without much greater financial sacrifice than fixing it now. Sincerely, George and Ellen Wilson 77-212 Mahiehie St., Kaillua Kona 96740 Cornin. N,,. Ref. To:- VAT Ref. Doti