Loading...
HomeMy WebLinkAboutRES 542 Draft 01 2022-2024 COUNTY OF HAWAI'I :•:,��SO H STATE OF HAWAI'I .. .''':41/.6-1-ri.ii-i. RESOLUTION NO. 542 24 A RESOLUTION OF DETERMINATION TO PROCEED TO CREATE AND DEFINE A WATER SYSTEM IMPROVEMENT DISTRICT FOR IKI PLACE, KOHANAIKI HOMESTEADS. WHEREAS, on October 5, 2016,the Council of the County of Hawai`i (the "Council") adopted Resolution No. 634-16,to Initiate an Improvement District to Facilitate Construction of Permanent Improvements to Iki Place, Kohanaiki Homesteads (the "Subdivision") in North Kona, including Improvement of a Water Distribution System (the "Improvement District") to County Standards, in accordance with Chapter 12 of the Hawai`i County Code 1983 (2005 Edition, as amended) relating to Improvements by Assessments; and WHEREAS, Resolution No. 634-16, a copy of which is attached hereto and incorporated herein as Exhibit"A", directed the Manager-Chief Engineer of the Department of Water Supply (the "Manager")to prepare and submit a report on the proposed Improvement District in accordance with Section 12-10(a) of the Hawai`i County Code (2005 Edition, as amended); and WHEREAS, on June 21, 2023,the Council adopted Resolution No. 164-23, a copy of which is attached hereto and incorporated herein as Exhibit"B",to Propose the Establishment of a Water System Improvement District for Iki Place, Kohanaiki Homesteads, and thereby approved and adopted the findings, conclusions, and recommendations specified within its exhibits identified therein as: 1. Exhibit A, containing the Iki Place Water Improvement District—Manager-Chief Engineer's Report(the"Manager's Report"), dated March 10, 2017, transmitted via Communication No. 187, and prepared by the Manager with respect to the proposed water system improvement district for the Kohanaiki Homesteads; and 2. Exhibit B, containing a Preliminary Engineering Report for the Iki Place Water System Improvements (the "Preliminary Engineering Report"), dated July 26, 2022, and prepared by Foresight Engineering & Design, LLC; and 3. Exhibit C, containing a Letter of Conditions from the United States Department of Agriculture (the "USDA Letter of Conditions"), dated August 25, 2022, and received by the Department of Water Supply ("DWS"); and WHEREAS, in adopting Resolution No. 164-23,the Council concurred with the conclusion of the Preliminary Engineering Report that"the establishment of the Improvement District will provide significant benefits to the health, safety, and welfare of the residents of the Subdivision," and found that, in accordance with Section 12-10(i) of the Hawai`i County Code 1983 (2016 Edition, as amended) (the "Code"), the creation of the proposed Improvement District and the construction, acquisition, and installation of a water system for the Improvement District was in the public interest; and WHEREAS, the involvement of the Department of Public Works is not required because the proposed improvement is a water system within a private subdivision and the subdivision roads are privately owned; and WHEREAS,pursuant to Section 12-10(c) of the Code, Resolution No. 164-23 provided for a public hearing on the proposed improvements,to be held within sixty (60) days after its adoption; and WHEREAS, said Public Hearing was scheduled for August 15, 2023, at 5:00 p.m. in the Council Chambers at the West Hawai`i Civic Center in Kailua-Kona, Hawai`i, and in accordance with the requirements of public notice set forth in Section 12-10(e) of the Code, the County Clerk issued a Notice of Public Hearing, a copy of which is attached hereto and incorporated herein as Exhibit"C", and which was: 1. Mailed by regular mail to each of the eighteen (18) owners of assessment units, comprising Tax Map Key Nos. 7-3-019:002 through 020, excluding 011, which is the road lot, on July 24, 2023; 2. Published in the West Hawai`i Today, a newspaper of general circulation in the County, on July 29,August 5, August 8, and August 11, 2023,with notarized affidavits of publication having been received from West Hawai`i Today and duly filed; and 3. Posted on July 31, 2023, at four(4) locations in Kailua-Kona, Hawai`i as follows: Matsuyama Food Mart at 73-4354 Mamalahoa Highway, Suite B; Matsuyama Market at 73-4040 Hulikoa Drive; Kona Police Station at 74-611 Hale Maka`i Place; and Kealakehe Solid Waste Recycling and Transfer Station at 74-598 Hale Maka`i Place, as evidenced by the County Clerk's Affidavit of Publication, Posting, and Mailings, a copy of which is attached hereto and incorporated herein as Exhibit"D"; and WHEREAS,the Notice of Public Hearing stated, among other things, that copies of Resolution No. 164-23,which included all associated reports and data, were available for public inspection during regular business hours at the Office of the County Clerk, 25 Aupuni Street, Room 1402, Hilo, and at the Kona Council District Offices, 74-5044 Ane Keohokalole Highway, Building A, Kailua-Kona, and that Resolution No. 164-23 may also be viewed via the County's website at https://records.hawaiicounty.gov/weblink/0/doc/1056516/Pagel.aspx; and WHEREAS, in accordance with section 12-10(e)(3) of the Code,the copy of the Notice of Public Hearing was mailed to each of the eighteen(18) of assessment units within the Improvement District and explicitly advised all said owners that a"protest against making all or part of the proposed improvements, or against the methods by which such assessments are to be made, or the inclusion of certain costs therein... must be submitted in writing, in accordance with Section 12-12 of the Hawaii County Code,to be considered by the Council," and further directed that such written protests or objections be mailed to the County Clerk prior to the Public Hearing and postmarked no later than August 15, 2023, or hand delivered to the Hilo or Kona Office, or hand delivered at the time of the Public Hearing scheduled on August 15, 2023; and 2 WHEREAS, the Public Hearing commenced as scheduled and all persons in attendance were invited to offer verbal testimony relating to the Improvement District and to submit written testimony to the Office of the County Clerk for purposes of recordation and further consideration by the Council; and WHEREAS,to answer questions relating to the Improvement District proposed in Resolution No. 164-23,the following were present: Deanna Sako, Director of Finance; Ryan Quitoriano, Civil Engineer, DWS; Jon Henricks, County Clerk; Chris Nakano, Treasurer; and Palani Greenwell, Civil Engineer, Foresight Engineering & Design, LLC; and WHEREAS, testimony for the proposed Improvement District was heard by the Council at the Public Hearing on August 15, 2023, the minutes of which proceedings are attached hereto and incorporated herein as Exhibit"E"; and WHEREAS,the County Clerk advised the Council that all testifiers were in support of the proposed improvement district and that there were no written protests or requests for modifications, as attested to in the County Clerk's Affidavit of Public Hearing and Protest Procedures, a copy of which is attached hereto and incorporated herein as Exhibit"F"; and WHEREAS, as no written protests were received from the eighteen(18) owners of the assessment units, and pursuant to Sections 12-17 and 12-18 of the Code,the Council may proceed to determine that the proposed improvement shall be made as hereinafter proposed; now, therefore, BE IT RESOLVED BY THE COUNCIL OF THE COUNTY OF HAWAI`I that: 1. Certain Determinations and Findings. In accordance with the provisions of Sections 12-17 and 12-18 of the Code,the Council hereby determines to proceed with the improvements proposed in Resolution No. 164-23, as described in the Manager's Report and further specified in the Preliminary Engineering Report and the USDA Letter of Conditions, which are attached to Resolution No. 164-23 as Exhibits A, B, and C,respectively. The Council finds that the establishment of the proposed Improvement District will be in the public interest and will provide significant benefits to the health, safety, and welfare of the residents of the Subdivision, to wit: a. The installation of underground waterlines, constructed and installed in accordance with DWS standards, which will eliminate the need for private catchment systems, alleviate potential leakage problems associated with long overland pipes currently serving a portion of the Subdivision, and provide residents with a reliable water supply and regular water pressure; and b. The installation of fire hydrants in the Subdivision,which will afford a greater measure of public safety and homeowner security in the Subdivision and may result in lower fire insurance premiums for owners within the Subdivision. 2. Creation, Definition and Establishment of the Extent of the Improvement District. The Council hereby creates, defines, and establishes a Water System Improvement District, which shall be known as "Improvement District No. 21 —Iki Place Water System 3 Improvements," consisting of all "assessment units" (as such term is defined below) located within the Subdivision, comprising Tax Map Key Nos. 7-3-019:002 through 020, excluding 011, which is the road lot, and including 037,which is a County road and not part of the Subdivision. The owners of assessment units within the Improvement District are identified in the "Proposed Assessment Roll" contained within the Manager's Report. The Council acknowledges that changes in property ownership and the recordation of ownership of assessment units by the Department of Finance Real Property Tax Division may be subject to change and/or revision prior to the passage of a bond ordinance to finance the Improvement District, at which time, a final Assessment Roll of owners of assessment units within the Improvement District shall be compiled by DWS. 3. Kind, Extent and General Details of the Proposed Improvements. The improvements shall consist of a public water system(the "Water System") consistent with applicable DWS standards, which shall be owned, operated, and maintained by DWS. The construction and installation of the Water System shall include the removal of all existing meters and laterals servicing residents of the Improvement District, and the installation of meters for each currently existing assessment unit within the Improvement District. 4. No Acquisition of Land Required; Required Easements or Other Use and Occupancy Agreements. The construction and installation of the Water System for the Improvement District will not require the acquisition of land. However, an easement over the privately-owned subdivision roads will be required for maintenance and operation of the Water System. In addition, an easement or other agreement to use and occupy an area within the existing roadway right-of-way will also be required for a portion of the Water System. 5. Part or Proportion of the Cost of the Improvements to be Borne by the County. The total costs of the design, construction, and installation of the Water System, (collectively, the "Project Costs"), is estimated to be $1,100,000,which is anticipated to be financed by: a. A grant from the United States Department of Agriculture, Rural Development ("Rural Development") in the amount of$825,000 to be applied against the Project Costs; and b. A 35-year loan from Rural Development to the County in the amount of$275,000 which loan shall be evidenced by a bond of the County (the "Improvement District Bond") and repaid out of the proceeds of assessments to be assessed to the owners of assessment units within the Improvement District; and The County shall bear the customary operating costs of loan management by its Department of Finance Treasury Division for the 35-year duration of the Improvement District Bond. These costs will be partially offset by charging a collection fee as specified in Chapter 12 of the Code. A prepayment penalty for early payoffs and out-of-pocket transaction costs associated with property transfers will also be assessed. 6. Description of the Assessment Unit and Method of Assessment. a. For purposes of the Improvement District, "Assessment unit" shall mean a duly subdivided parcel of land or condominium unit bearing a unique tax map key number. 4 b. Each assessment unit existing as of the date that assessments begin to accrue on assessment units within the Improvement District (the "Commencement Date") shall be subject to an assessment calculated by dividing the Net Project Costs (as defined below) by the number of assessment units within the Improvement District as of the Commencement Date. As used in this Resolution, "Net Project Costs"means the Project Costs, less any grants which reduce the actual costs of the Water System to the County. By way of example, assuming the Project Costs to be $1,100,000 and further assuming a Rural Development grant of$825,000 to be applied against the Project Costs,the Net Project Costs would be $275,000. The Council finds that, assuming Net Project Costs of$275,000,the anticipated assessment per assessment unit($275,000 divided by 18) will be $15,278. c. As provided in Section 12-33 of the Code, assessments may be paid in full to the Director of Finance within 30 days after the date of the last publication of the ordinance fixing the assessments. Unless paid in full, assessments will be payable in monthly installments sufficient to meet the principal and interest requirements on the Improvement District Bond. Owners of assessment units will be permitted to prepay their assessments in full,plus a 3%premium on the amount to be prepaid (unless waived by the Director of Finance) and interest at the rate on the Improvement Bond until it can be redeemed or prepaid with the assessment prepayment. 7. Material to be Used. The materials to be used in the construction and installation of the special improvements are set forth in the Preliminary Engineering Report, and include, without limitation, the following: i. Approximately 1,150 linear feet of 8-inch ductile iron waterline ii. Two fire hydrants iii. Two Type "A"laterals iv. Eight Type "C" laterals v. Removal of existing service laterals vi. Pavement restoration 8. Prior Findings Regarding Required Documents, Data and Detailed Plans and Specifications. As set forth in Resolution No. 164-23,the Council found that the Manager's Report,together with the Preliminary Engineering Report, contained sufficient documentation, data and detailed plans and specifications to satisfy the requirements of Sections 12-18, 12-19, 12-20, and 12-28 of the Code. Accordingly, the Council hereby finds and determines that such requirements have been satisfied, and hereby directs DWS to initiate obtaining bids. 9. Reimbursement of Project Expenditures. The County expects that the County or DWS may pay certain capital expenditures for the Water System Improvements prior to the issuance of the Improvement District Bond, and reasonably expects to reimburse such expenditures from the proceeds of such Improvement District Bond. The County hereby declares its official intent to use proceeds of the Improvement District Bond to reimburse itself or DWS for such capital expenditures. This Resolution is adopted in part for the purpose of establishing compliance with Section 1.150-2 of Title 26, Code of Federal Regulations. 5 10. Effective Date. This Resolution shall take effect immediately upon adoption thereof. BE IT FINALLY RESOLVED that the County Clerk shall make this copies of this resolution available for public inspection at the Office of the County Clerk no later than fifteen (15) days after its effective date and shall transmit copies of this resolution to the Honorable Mitchell D. Roth, Mayor of the County of Hawai`i; the Honorable Elizabeth A. Strance, Corporation Counsel; Diane Nakagawa, Director of Finance; Keith K. Okamoto, Manager-Chief Engineer of the Department of Water Supply; Lisa Miura, Administrator, Real Property Tax Division, Department of Finance; Stephen K. Lopez, Chairman of the Water Board; Chris J. Kanazawa, Hawaii and Western Pacific State Director for Rural Development, U.S. Department of Agriculture; and Brian T. Hirai, Bond Counsel, McCorriston Miller Mukai MacKinnon LLP. Dated at Kona , Hawai`i,this 19th day of June , 2024. INTRODUCED BY: COUNCIL MEMBER, COUNTY OF HAWAII COUNTY COUNCIL ROLL CALL VOTE County of Hawai`i AYES NOES ABS EX Hilo, Hawai`i EVANS X GALIMBA X I hereby certify that the foregoing RESOLUTION was by INABA X the vote indicated to the right hereof adopted by the COUNCIL of the KAGIWADA X County of Hawaii on June 19, 2024 KANEALI`I-KLEINFELDER X KIERKIEWICZ X ATTEST: KIMBALL X LEE LOY X VILLEGAS X 8 0 1 0 Reference: C-911/Waived LAAC TY CLERK AIRPERSON&P SIDING OFFICER RESOLUTION NO. 5 4 2 24 6 COUNTY OF HAWAI`I " R_• STATE OF HAWAI`I .. RESOLUTION NO. 634 16 EXHIEITA A RESOLUTION RELATING TO A COUNCIL INITIATED IMPROVEMENT DISTRICT TO FACILITATE CONSTRUCTION OF PERMANENT IMPROVEMENTS TO IKI PLACE AT KOHANAIKI HOMESTEADS,KOHANAIKI,NORTH KONA, HAWAI`I,INCLUDING IMPROVEMENT OF THE WATER DISTRIBUTION SYSTEM TO COUNTY STANDARDS,IN ACCORDANCE WITH CHAPTER 12 OF THE HAWAI`I COUNTY CODE 1983 (2005 EDITION,AS AMENDED) RELATING TO IMPROVEMENTS BY ASSESSMENTS. WHEREAS, it has been brought to the attention of the Council that the water distribution system to Iki Place at Kohanaiki Homesteads, Kohanaiki,North Kona, Hawai`i, is not constructed to County standards; and WHEREAS, property owners at Iki Place, Kohanaiki Homesteads,have privately installed individual plastic water pipelines that begin at the intersection of Hawai`i Belt Road, run west along Hale Pule Road to the Iki Place intersection, and continue south along Iki Place to each home in order to receive County water, as shown in the attached Exhibit A; and WHEREAS, a single length of pipeline installed by Iki Place property owners from its beginning point at Hawai`i Belt Road and ending at the southern-most lot of Iki Place exceeds 3,000 linear feet; and WHEREAS,the plastic water pipelines have been installed by property owners since approximately 1984,and age and exposure to the natural elements of wind, sun, and rain have caused the pipelines to deteriorate at an alarming rate,thereby demanding constant costly repairs; and WHEREAS, 15 of the 18 property owners at Iki Place have expressed support for their Council representative to proceed with the initiation of a water improvement district project via resolution,and the remaining three property owners have not responded; and WHEREAS, to initiate the establishment of a water system improvement district, the Council must first request the Manager-Chief Engineer of the Department of Water Supply to prepare and submit to the Council a report containing information outlined in Chapter 12, Article 2, Section 12-10(a), Hawai`i County Code 1983 (2005 Edition, as amended); now, therefore, BE IT RESOLVED BY THE COUNCIL OF THE COUNTY OF HAWAII that it hereby initiates an improvement district for Iki Place at Kohanaiki Homesteads, Kohanaiki, North Kona,Hawai`i,to facilitate improvements of the water distribution system to County standards. BE IT FURTHER RESOLVED that pursuant to Chapter 12, Article 2, Section 12-10(a), Hawai`i County Code 1983 (2005 Edition, as amended),the Manager-Chief Engineer of the Department of Water Supply is hereby directed to prepare and submit to the Council a report containing the following: (1) Preliminary data concerning the special improvement proposed to be opened, constructed, or improved; (2) The general character and extent of any improvement to be proposed; (3) The proposed assessment unit and method of assessment; (4) Whether any new land will be necessary to be acquired, and the estimated cost thereof and the proportion of the cost which should be borne by the County; (5) The materials recommended to meet the conditions of the improvement; (6) The boundaries of the proposed improvement district and any subdistricts or zones therein as to which different portions of the cost of improvements should be charged; (7) The estimated cost of the improvement,the portions of the cost to be borne by the County, and the portions of the cost to be assessed against the assessment units specially benefited with the maximum unit of assessment to be made against each assessment unit to be assessed; and (8) All necessary plans and other data, details, and specifications for the improvements and any other matters or details intended to apply thereto. 2 BE IT FINALLY RESOLVED that the County Clerk shall forward a copy of this resolution to the Honorable Mayor William P. Kenoi and Department of Water Supply Manager- Chief Engineer Keith Okamoto. Dated at Hilo , Hawai`i, this 5th day of October , 2016 • INTRODUCED BY: 4e, kCOUNCIL MEMBER, TY OF HAWAI`I COUNTY COUNCIL ROLL CALL VOTE County of Hawai`i AYES NOES ABS EX Hilo, Hawai`i CHUNG X DAVID X I hereby certify that the foregoing RESOLUTION was by EOFF X the vote indicated to the right hereof adopted by the COUNCIL of the ILAGAN X County of Hawai`i on October 5, 2016 KANUHA X ONISHI X ATTEST: PALEKA X POINDEXTER X ri n WILLE X ( t„ ) >\(/1.1% 6 0 3 0,___ l Reference: C-1035/FC-75 l, / COUNTY CLERK CHAIRPERSON & PRESIDING OFFICER RESOLUTION NO. 634 16 3 ql 3,; 11 II f NPR _'1 iW i. ,: �� 1 0 1O11 1 f 1 ,.wr' y";,'.::-,J.:,,:•,:l.,4.,k t - £ w J - Z '�4 mom, 0 xa"# � ', E.. w . .61 i Pi- ili:•,-,,\YI'il::::,,•::: 'sue ;7 !:;.,::.„ . ,:.„ .. . .. ,..•:.,. _ , , , at ,, ''4La _ .. .. _ a '. " ci g lii ill : 7 I . .. w a + ik: a lill•F.l.l'..l:l= £ . ,_ ,.- :fie Y 4 ° 1.1 Pi i a it EXHIBIT . 1 1 i - COUNTY OF HAWAI`I +_ �" �• STATE OF HAWAI'I EXHIBIT B RESOLUTION NO. 164 23 A RESOLUTION PROPOSING THE ESTABLISHMENT OF A WATER SYSTEM IMPROVEMENT DISTRICT FOR IKE PLACE,KOHANAIKI HOMESTEADS. WHEREAS, it has been brought to the attention of the Council of the County of Hawai`i (the"Council")that the water distribution system for Iid Place,Kohanaiki Homesteads(the "Subdivision"), located at Kohanaiki,North Kona,Hawaii,is not built to County standards; and WHEREAS, on October 5, 2016,pursuant to Section 12-10(a),Hawaii County Code, the Council adopted Resolution No. 634-16, directing the Manager-Chief Engineer of the Department of Water Supply"DWS",to prepare and submit the Manager's Report on the proposed establishment of a water system improvement district, known as the"lid Place Water System Improvements"and the costs of design and installation of a public water delivery system for the Improvement District; and WHEREAS, Communication No. 187, as issued by the Manager-Chief Engineer, submitted for the Council's consideration the Manager's Report dated March 10, 2017, a copy of which is attached hereto and incorporated herein as Exhibit A; and WHEREAS,DWS initiated an application to the United States Department of Agriculture(the"USDA") for grant and loan funding by the USDA Rural Utilities Service ("RUS"); and WHEREAS,DWS caused to be prepared a Preliminary Engineering Report for the Iki Place Water System Improvements dated July 26,2022, and prepared by Foresight Engineering &Design,LLC., a copy of which is attached hereto and incorporated herein as Exhibit B; and WHEREAS,a Letter of Conditions from the USDA Department of Agriculture dated August 25,2022,was received by DWS, a copy of which is attached hereto and incorporated herein as Exhibit C; and WHEREAS,the Letter of Conditions states that the Iki Place Water System Improvements will provide significant benefits to the health, safety, and welfare of the residents of the Subdivision and that the estimated construction, acquisition, and installation costs of the Improvement District(collectively,the"Project Costs") are $1,100,000; and WHEREAS,the Letter of Conditions includes verification that DWS's application for up to $825,000 of RUS grant funds and$275,000 of RUS loan funds for the Improvement District is being considered by the USDA, subject to the conditions specified therein; and WHEREAS,the total amount of RUS grant and loan funds, is sufficient to pay the estimated cost of the proposed Improvement District(as further discussed herein) and, in view of the potential benefits of such funding,DWS is proceeding with the actions necessary to satisfy the conditions specified in the USDA Letter of Conditions in order to obtain a firm commitment of the RUS grant and loan funds for the Improvement District; and WHEREAS,public meetings were held with respect to initiation of the proposed Improvement District at Council Chambers on September 20, 2016 and October 5, 2016, which meetings were attended by residents of the Subdivision; and WHEREAS,upon consideration of the community interest expressed for the proposed Iid Place Water System Improvements,the findings,conclusions, and recommendations set forth in the Preliminary Engineering Report and the potential benefits of the available RUS grant and loan funds,the Council has determined to proceed with further actions regarding the potential establishment and funding of the lid Place Water System Improvements;now,therefore, BE IT RESOLVED BY THE COUNCIL OF THE COUNTY OF HAWAII that pursuant to Section 12-10, Subsection(c)of the Hawai`i County Code,it proposes the making of the improvement described herein based on the following: 1. Certain Findings and Determinations. The Council hereby ratifies and confirms Resolution No. 634-16,and approves and adopts the fmdings, conclusions, and recommendations specified in the Preliminary Engineering Report dated July 26,2022. Without limiting the generality of the foregoing,the Council concurs with the findings and conclusions specified in the Preliminary Engineering Report to the effect that the establishment of the Improvement District will provide significant benefits to the health, safety, and welfare of the residents of the Subdivision, including: a. The installation of underground waterlines, constructed and installed in accordance with DWS standards, will eliminate the need for private catchment systems, • alleviate potential leakage problems associated with long overland pipes currently serving a portion of the Subdivision, and provide residents with a reliable water supply and regular water pressure; and b. The installation of fire hydrants will afford a greater measure of public safety and homeowner security in the Subdivision,and may potentially result in lower fire insurance premiums for owners within the Subdivision. In consideration of the foregoing,the Council further finds, in accordance with Section 12-10(i), Hawai`i County Code,that the creation of the Improvement District encompassing the -Subdivision, and the construction, acquisition, and installation of a water system for the Improvement District, all as contemplated in this Resolution,is in the public interest. • 2. Proposal to Establish Improvement District. The Council proposes the creation of the Improvement District,which shall encompass the Subdivision, and the construction, acquisition, and installation of a water system for the Improvement District, upon the terms and conditions set forth in the Manager's Report, including the following terms and conditions: a. Special Improvements to be Opened, Constructed, or Improved. The special improvements shall be for the design, construction, acquisition, and installation of a public water system for the Improvement District consistent with applicable DWS standards,which shall be owned, operated,and maintained by DWS. The special improvements shall include the removal of all existing meters and laterals within the Improvement District, and the installation of meters for each currently existing assessment unit within the Improvement District. b. No Acquisition of Land Required; Required Easements. The construction and installation of the water system for the Improvement District will not require the acquisition of land. However, an easement over the privately-owned subdivision roads will be required for maintenance and operation of the water system. In addition, an easement or other agreement to use and occupy an area within the existing roadway right- of-way will also be required for a portion of the water system. c. Material to be Used. The materials to be used in the construction and installation of the special improvements are set forth in the Preliminary Engineering Report, and include,without limitation,the following: i. Approximately 1,150 linear feet of 8 inch ductile iron waterline ii. Two fire hydrants iii. Two Type"A"laterals iv. Eight Type"C"laterals v. Removal of existing service laterals vi. Pavement restoration d. Proposed Assessment Unit; Method of Assessment; Minimum Number of Installments. i. Assessment Unit. "Assessment unit"for purposes of the Improvement District shall mean a duly subdivided parcel of land or condominium unit bearing a unique tax map key number. ii. Method of Assessment. (1) As used in this Resolution, "Net Project Costs"means the Project Costs,less any amounts which reduce the actual costs of the special improvements to the County.By way of example, assuming the Project Costs to be$1,100,000 as set forth in the Manager's Report, and further assuming an RUS grant of$825,000 to be applied against the Project Costs,the Net Project Costs would be$275,000. 3 (2) Each assessment unit existing as of the date that assessments begin to accrue on assessment units within the Improvement District(the"Commencement Date") shall be subject to an assessment calculated by dividing the Net Project Costs by the number of assessment units within the Improvement District as of the Commencement Date. iii. Minimum Number of Assessments. The minimum number of assessments shall be five (5) annual, or sixty(60)monthly installments of principal. e. Maximum Term. The maximum term of the bonds to be issued to represent unpaid installments (the"Bonds") shall be as the Director of Finance shall determine in the Director of Finance's reasonable judgment; however, such term shall not exceed thirty-five years (35)years following the date of issuance thereof. f. Maximum Rate of Interest. The rate of interest to be borne by the Bonds shall be as the Director of Finance shall determine in the Director of Finance's reasonable discretion;provided,however,that such interest shall not exceed three and twenty-five one hundredths percent(3.25%). g. Maximum Premium. The premium to be paid on the advance payment of installments or the call and redemption of any Bond prior to its maturity shall be as the Director of Finance shall determine in the Director of Finance's reasonable judgment; provided,however,that such premium shall not exceed three percent(3%). h. Maximum Amount of Reserve Fund. The Director of Finance may establish a reserve fund for the Bonds;provided,however,that the amount of such reserve fund shall not exceed the maximum annual debt service requirements on the Bonds. i. General Boundaries of Improvement District. The Improvement District shall be comprised of all assessment units located within the Subdivision, comprised of TMKs 7-3-019-002 through 020, excluding 7-3-19-11 which is the road lot, and includes 7-3-19-37,which is not part of the Subdivision. j. Maximum Estimated Units of Assessment. The current estimated maximum number of assessment units within the Improvement District is eighteen(18). Assuming Net Project Costs of$275,000,the anticipated assessment per assessment unit will be$15,278. 3. Assessed Tax Valuation. The Real Property Tax Division of the Department of Finance has confirmed that the current assessed tax valuation of the assessment units is $2,471,200 in total 2022-23 land value and$4,546,600 in 2022-23 building value,which is at least twice the estimated Net Project Costs of the water system for the proposed Improvement District. Accordingly,the proposed Improvement District meets the qualifying criteria specified in Section 12-10(h),Hawai`i County Code. 4 4. Facilities Connection Charge. Owners of assessment units who are not presently customers of DWS shall pay the applicable facilities connection charge upon connection to the completed special improvements. This charge will not apply to owners who already have service from DWS or have made prior payments of the charge to DWS. 5. Future Increase in Assessment Units. In accordance with the provisions of Section 12-30(c),Hawai`i County Code,in the event of an increase in the number of assessment units in the Improvement District resulting from subdivision, annexation, conversion to condominium property regime or otherwise,the Department of Finance shall reallocate the outstanding assessments within the Improvement District among the assessment units subject to such outstanding assessments,including the resulting new assessment units. 6. Provisions Regarding Combination Hearings. a. The Council determines that the public hearings relating to the special improvements and the establishment of the Improvement District provided for under Sections 12-10 and 12-27 of the Hawai`i County Code shall be combined, as permitted under Section 12-28 of the Hawai`i County Code. b. The Council fmds that although Section 12-28 of the Hawai`i County Code contemplates that the Council, in its resolution proposing to make the improvements shall direct the Manager-Chief Engineer to prepare documents and data as provided in Sections 12-18, 12-19, and 12-27 of the Hawai`i County Code, and further contemplates that the Council shall request the Manager-Chief Engineer to furnish final detail plans and specifications for the proposed improvements as provided in Section 12-20 of the Hawai`i County Code,the Manager's Report already contains such documents, data,and detailed plans and specifications. c. The Council further finds that the Manager's Report,together with the Preliminary Engineering Report dated July 26,2022, as prepared by Foresight Engineering&Design,LLC provide sufficient and comprehensive documentation relating to the plans and specifications for adequate and appropriate conduits,pipes, service laterals,fire hydrants and other appurtenances necessary for the water supply and distribution of the proposed special improvements. d. In light of the fmdings set forth in Paragraphs 6.b and 6.c above,the Council determines that, as provided by Section 12-28 of the Hawai`i County Code: i. The direction by the Council to the Manager-Chief Engineer for the preparation of the documents and data as provided in Sections 12-18, 12-19, and 12-27 of the Hawai`i County Code, and the request by the Council that the Manager-Chief Engineer furnish detailed plans and specifications for the proposed special improvements as provided in Section 12-20 of the Hawai`i County Code,shall be deemed to have been made; and 5 ii. The delivery of the Manager's Report shall be deemed to have complied with such directions and fulfilled such requests. e. The Council hereby preliminarily approves the aforementioned documents, data, and detail plans and specifications. f. A public hearing on the proposed improvements shall be held not more than sixty (60) days after the adoption of this resolution and not less than fifteen(15) days after the first publication thereof in at least one newspaper of general circulation in the County of Hawai`i. Copies of the notice shall also be posted at a public place in the district in which the proposed Improvement District is located at least ten(10)days prior to the public hearing. The County Clerk shall assure that affidavits of publication and posting of the notice shall be filed with the Council on or before the date of the hearing. BE IT FINALLY RESOLVED that the Clerk of the County of Hawai`i shall transmit copies of this resolution to the Honorable Mayor Mitchell D. Roth; Finance Director Deanna Sako; Corporation Counsel Elizabeth Strance;Real Property Tax Division Tax Administrator Lisa Miura;Department of Water Supply Manager-Chief Engineer Keith Okamoto; Water Board Chair Dwayne Mukai;Hawaii State Director Chris Kanazawa,USDA Rural Development; Bond Counsel Brian T. Hirai,McCorriston Miller Mukai MacKinnon LLP; and County Clerk Jon Henricks. Dated at Kona ,Hawai`i,this 21st day of June ,20 23 • - INTRODUCED BY: COUNCIL MEMBER, COUNTY OF HAWAI`I COUNTY COUNCIL ROLL CALL VOTE County of Hawaii AYES NOES ABS EX Hilo,Hawai`i EVANS X GALIMBA X I hereby certify that the foregoing RESOLUTION was by INABA X the vote indicated to the right hereof adopted by the COUNCIL of the KAGIWADA X County of Hawaii on June 21, 2023 KANEALI`I-KLEINFELDER X KIERKIEWICZ X ATTEST: KIMBALL X LEE LOY X VILLEGAS X 7 • 0 2 0 Crr�!����"""' Reference: C-271PEC -53 TY CLERK HAIRPERSON&PRESIDING OFFICER RESOLUTION NO. 164 23 6 • 4">• wA7£RSG4� `',, DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWA1`I '�?:.> 345 KEKOANAO'A STREET, SUITE 20 • HILO, HAWAI'I 96720 TELEPHONE (808) 961-8050 • FAX (808) 951 •8657 COONTY CLERK March 14. 2017 COUNTY OF HAWAI'I RECEIVED��} Time Z :t`b r' 3N, Date MAR 1 4 Lill/ Honorable Valerie'I'. Poindexter, Chairperson, and Members of the Hawa i County Council 25 Aupuni Street Hilo, l-lawai'i 96720 Dear Honorable Chair Poindexter and Council Members: • Subject: Iki Street Water Improvement District Manager-Chief Engineer's Report Kohanaiki,North Kona,Hawaii Attached for your review and action is the Manager-Chief Engineer's Report detailing aproject for the installation of a water system for the properties along lki Place, as requested by Hawai`i County Council Resolution No. 634-16. • • 'I'hc attached report represents collaborative efforts on the part of the Department of Water Supply and the Department of Finance. Please do not hesitate to call-me at 961-8050 if you have any questions or ill may be of further assistance. Sincerely yours, Keith K. Okamoto. P. Manager-Chief Engineer RQ:dmj Att. Manager-Chief Engineer's Report for Iki Place Water System Improvement District, Kohanaiki,North Kona. Hawaii - copy - (w•lent.) I lonorable Harry Kim, Mayor • (w/enc.) Water Board,County of'1[awai'i 7 eomm: No. • R�•. e5. b3I-k (aovkk-tb iefrn) Ref. To:, re-- Ref. Date MAR 2 2 2017 . Water, Our!Most(Precious Wesource. , . 7<a WaiJ4 'i(dne. . . The Department of Water Supply Is an Equal Opportunity provider and employer. EXHIBIT A IKI PLACE WATER IMPROVEMENT DISTRICT Manager-Chief Engineer's Report Department of Water Supply—County of Hawaii March 10,2017 This report was prepared for Hawaii County Council Resolution No. 634-16.pursuant to Hawaii County Code, Chapter 12,Article 2,Subsection I2-10(at Department of Water Supply-County of Hawaii MANAGER-CHIEF ENGINEER'S REPORT Iki Place Water Improvement District Kohanaiki, North Kona, Hawai`i March 10, 2017 t isnRti iu 1. Introduction 3 A. Location 4 B. Purpose and Need 4 2. Character and Extent of Proposed Improvements 4 3. Proposed Method of Assessment 5 4. Land and Easements to be Acquired 5 5. Recommended Materials 5 6. Improvement District Boundaries 5 7. Estimated Cost of the Improvement 6 8. Necessary Plans, Data, and Detail 6 EXHIBITS Exhibit A. Location Map Exhibit B. Proposed Improvement District Boundaries Exhibit C. Preliminary Design of Iki Place Water Improvements Exhibit D. Proposed Assessment Roll for Iki Place Water Improvement Exhibit E. Detailed Project Cost Estimate 1. Introduction This report has been prepared in response to Hawaii County Council Resolution No. 634-16, Draft 1,adopted October 5,2016("Resolution"). The Resolution directed the Manager-Chief Engineer of the Department of Water Supply("DWS")to prepare and submit to the Council a report containing the information required by Hawai`i County Code Chapter 12,Article 2, Subsection 12-10(a)as follows: (1) Preliminary data concerning the special improvement proposed to be opened, constructed, or improved; (2) The general character and extent of-any improvement to he proposed; (3) The proposed assessment unit and method of assessment; (4) Whether any new land will he necessary 10 be acquired, and the estimated cost thereof and the proportion of the cost which should be borne by the County; (5) The materials recommended to meet the conditions of the improvement; (6) The boundaries of the proposed improvement district and any s►►bdistricts or zones therein as to which different portions of the cost of improvements should he charged; (7) The estimated cost of the improvement, the portions of the cost to be borne by the County,and the portions of the cost to be assessed against the assessment units specially benefited with the maximum unit of assessment to he made against each assessment unit to be assessed;and (8)All necessary plans and other data, details, and specifications for the improvements and any other matters or details intended to apply thereto, The proposed improvement district,initiated by the Hawai`i County Council, is for the design and installation of a water system for Iki Place, located at Kohanaiki,North Kona("Project")that will meet current State of Hawaii,Water System Standards,2002 as amended, for the County of Hawaii ("DWS Standards"). The DWS will own,operate,and maintain the system. The proposed improvements consist exclusively of a water system including the incidental restoration of roadways,meeting the definition of a"water system improvement district" under Hawaii County Code(HCC)Chapter 12,Article 1,Subsection 12-1. Animmintionm I. '\I,i\1I \'I ( w Is1.1�I 1'1'I1 (;1)t \I\ c)I 11 ';\ ;i 1 A. Location Iki Place is located west of Mamalahoa Highway and south of Hualalai Vista Subdivision, within the ahupua'a of Kohanaiki, North Kona District, island and County of Hawaii ("Project Area")(see Exhibit A). The subdivision was approved in 1962 and currently consists of 18 lots ranging from 7,632 sq. ft.to 10,089 sq. ft. The current county zoning over the entire subdivision including the roadway is A-3a(Agriculture, 3 acre lot size minimum). There are 15 lots with an existing dwelling and an active account for water service. The subdivision was created prior to the enactment of the County Subdivision Code requiring water system improvements. Therefore,each lot obtained water service from the DWS water system from meters located at the intersection of Mamalahoa Highway and Hale Pule Road (also known as"Church of God Road"),approximately 700 1.f.mauka from Iki Place. B. Purpose and Need Each of the 15 lots within the Project Area has an existing service from the existing DWS water system on Mamalahoa Highway above the subdivision through its own individual water meter. These lots rely on customer water lines that traverse along Hale Pule Road and along Iki Place. As these meters do not front the lots,they are considered"Out of Bounds" where the customer is responsible for maintaining their water line fronting and/or traversing neighboring properties. Furthermore,there are currently no fire hydrants located along Iki Place. 2. Character and Extent of Proposed Improvements As the lots are"non-conforming"to the existing county zoning,the requirements of the water improvements will be based on use and land area size,which is similar to county RS-7.5 zoning (Residential Single,7,500 s.f. minimum lot size). The Project will be installed entirely within the existing private roadway,Iki Place and along portion of Aniani Street. The proposed water system improvements would service 18 lots within the Project Area(see Exhibit B). An easement will be required over the private roadway for maintenance and operation of the water system improvements, which will need to be dedicated to the Water Board of the County of Hawaii. In order to meet current DWS Standards for the RS-7,5 zoning,installation shall include(See Exhibit C): a. water mains capable of delivering water at adequate pressure and volume under peak-flow and fire-flow conditions;minimum diameter of mains shall be 8-inches from an existing 8-inch waterline within Aniani Street extending approximately 1,125 lineal feet along Aniani Street to the northern boundary of the southernmost lot(TMK 7-3-019:010) b. service laterals that will accommodate 5/8-inch sized meters to each lot, c. existing service laterals must be cut and plugged at the main,and \‘ l'I'I.l ..c c}I '.I 1 ! U !11.1! I d. fire hydrants spaced no more than 600 feet apart and within 300 feet of the driveway or access for each lot. • The waterline will be installed in trenches to a depth of approximately 3-ft. The roadway within Ild Place will be restored to the existing pavement width while the roadway within Aniani Street will be restored over an entire lane(i.e.,not limited to a patch over the trench). The property owners will be responsible for the improvements on their private property to connect or re-connect their plumbing to the new service. 3. Proposed Method of Assessment The"assessment unit"as defined by HCC Chapter 12 is a subdivided parcel or condominium unit with a unique tax key number. Each assessment unit within this improvement district will he subject to a special assessment. There arc 18 single-family lots and no condominium units. The unit cost per assessment unit will be determined by equally dividing the total project costs by the 18 assessment units. Each assessment unit will require one(1) unit of water, which is equivalent to an average use of 400 gallons per day. Currently.there are three (3) vacant lots that do not have water service, which would also be required to pay the prevailing Facilities Charge,aside from the special assessment. This charge however,will be the responsibility of the owner/applicant at the time water service is requested for and is not factored in to the assessment unit. The current cost for the Facilities Charge is $1,190.00 for each of the three(3)vacant lots. 4. Land and Easements to be Acquired Iki Place is an existing private road,and therefore,an easement covering the entire roadway lot will he required as all of the proposed improvements appear to be able to occur within the Iki Place lot. • 5. Recommended Materials The recommended materials for the water system improvements shall meet the requirements of the DWS Standards. Also, all backfill and asphalt pavement materials shall meet the requirements of the Department of Public Works,County of Hawai`i. The roadway will be restored to the existing pavement width(i.e.,nut limited to a patch over the trench). The property owners will be responsible for the improvements on their private property to connect their plumbing to the new service. 6. Improvement District Boundaries The Improvement District boundaries were determined by boundaries of the subdivision that created the 18 lots. All of the lots in the proposed Improvement District boundaries will receive a direct benefit of having their own individual DWS meter front their lot,eliminating the need to maintain private customer lines within Hale Pole Road as well as along Iki Place,fronting other ' I !t! %.! (� .. i�: !: }� i�t'�.� (•ttit \i.l Iit. !: la \ ! ! • . • • ' . • . • . .... . .. - . . • • . ..tb:OP.q..00;9... .Fir a hydroowi 4:It:instal led.wi thin-.110:•:Plaaa.ibettefil tting•cti• 118-assessedlots.(50 • 4'..)i.hibit,p).-. • . . . . . •- • . 7... .. Estimated ::P•Oti-.0.f::th.,:improvernpni. • • -Tbd total projdateia--401h4thittilkiiring/prelimittpry studies, daimitritation,and fintiNilfg.-is estimated as fo.110Wit ,• •••.•,' :z..:•!e,:,:,ig,lizaFISFIK•tigetekinkeit:4.7M:Figt„Tviii*.,,,,e;islaigv, .• - - •' :. •••ig ZA,41.:=',4•AL-44-.4,01,6,. .mitattf.,.N.Td•I&WIriVit,ILIkif.diitif.,.Sivatt= . • .•• . • ;::i,446.iiiiiifilfigiiiiiiillii046'''1.* :• • . • ?;$.145501f W : - .. . . . • .'$t7.26Q.U. . • . ' -4t..:if:.•24106.i.',. . . ... ,_ ....„ ...., ., ._.. . . .. . •: ...•• - ::. .01thg•ft,attOrgion• .$156 *95. • . ..... •. .. :••Siiiiii4fal : . .. . .. :$4.4.3..,.. . .. . . . . - .. • . . T.c:0606004.(6':213.%). - .. tattbp-. . . . 104144oho9n4*. ::..:,.,:,... ...„. .. -$:§At..7§5, __, ----,, .m?-4, ., wrwigivow:... • .P.P1.43-w w .44g011474m.,-, • . .. . .,..;.P1047117)100Pealiett!nl6e; t40 yINAlgt! •: . -:V.:$0i,090 ' . ,. • . . :;-EpviromOitatgeopq ,.$..30;000.. • • • • • . • 0i0P0'..iii.10.Formation • .$4 .,09.9.•• • . . . • • . 1.:0114:40C:4COrAt410100:.c'fOg)...... . - ':$!2310.0.-, • . . • • - '•• ."-, via*....,..:....-,,-__vit,A0..itvi.:".:,',.•:' 1414404.tz.‘--iteiki*ItiV...titait. i• • . . . • , .:i,kbgrk.i.t,•'4.......A. ,iv,r,-N,:;:.,.k.,.,..-:.::;i.s,-:,:!zse,,,..,....,a,,,,....,..4,,,,,,_.,.,,..,,,,,.. ..„_ 1 • * . . - . iif ..kiikidilifiaif lii44406Of itio-..6Otistrootiiiiiik Exhibitlif: E. - ...• •. .. .,. ., . • - - . . '.0,..;i: ' 4040..000..P1Oin%;•1114tai, and Detail • . . . . • •• - - .._. • • . —.Kit.iteaiitfy:preliminary plans and(Oar.4attt,-0444atails:flf.lhp-hiltifovatitatits-attd-rtitty;.titi*. . • • • - . apattets'bF.'d8titits iritdnifdd.t4:4`filq.therafoira Oritoi:ta440,1haa?ihihits••.ligtiditatoOittia.ailfiatt404 • • • *t•p':thii‘3,:•tapp_rt.- 'The infcifttfittibliin4his food-and Lhe 4.400.-an in such Nit and contain such ... • -. .. • • 14.forgi.40011:os is reasonably necessary•ito-infOriti ttia:pwnp,p..of•ossa§striant,..0,tift4.,11nd other •••• . . t•t. . •. .. . . ;iiitootqlip00.p$;ptlaasti Aattaitittly of the nature.iitid ii-04.4:ofthe...piOmecliwat.pr System. .- . • tre.0001**.to..bo onAtiloteaauctin.kaIi6d in Iiii'.1.4i0aitlant-:-.biAtlet. •• • . • . . .. I. tibibit...A. Location Map . . . • • • . . 2.-1;.. -Evxliib'it.B....kitiptigdd Itiiptiive.r460 P.1,4#00)potidatip.s • • • 3,: ..00iNt.C.:..:.proilinigary.:04igo,(&Ikfiqk'd*10000.6f0*TiO, . 4:-.. -.E40415.Popoge4 Msothwnt0011Yot•lkt PrAde:Viitdr'i0Vidii0*.Ot • . • . . • $. ,:,•!'..4-iiiiit.::t;Ddtailed•PitijOdt.C64 .0).1100- . . •. . . . . .. . . .. • . , . :.,.. •• c.';!, . . . : . . " - • .•-: . .1..;!'71.. ...:.;•:-If::::1?t'::::..!'r.•:::-::.1-.....-:'''. 4111*- . . . • • ...!::..,:.••.-;,,z. .:•-,..,...,..f.-:,),:..,••••,•• ...,."- ..- : -,. . . • Xeith: . P. Okamoto. .. E . '', • . . : 'N1046iT*P.P.410607.,:09grtmoot oe.Watot•Suppl$, . . . . . . .-,:....,•-:-..,:' ,.;;I!!!1::::', ...;;,-.-;,,,,,, ,:',,,,,ii, -,,,.,.-..,•,-,,-,,,...2-,---,-- --,---r.,,,,.::: ,,,,,,,,,,,,,,,,, ,,,,,..fi.,,,,,,,;-,,,..-.-:,:z.-,1::i.,:.:--,;-: -.,,,z,:-,,;•,,,, „:: 4..-.±-.:...,.:3:-L..„,•,....t.;:::::--. . .. , :.. . , .,.,. .. .. ... „ , ... ._. , . . -.. . :IA4MitNT6FAVATFilii SUPPLY,C(iIti NTY.(0.AAAV A11 . .l.'i • .• . . . • • • . . . . • • - •. . . • . 11 t'l Ibithind8,sir . * 1\ • '..,PU.,TH KOHALA ' F.- ..., .. fildi...,..imsr Ne: , 0 , .. . ..,...3., HAMAKUA V . • A RTH KONA KWOUt..0 ST NOkT.111 41LO , . ... . 1 *.•... • • ‘PROjpGritioAtiOiC 1 • AKINA Pl.. , - - :•.- " '' t.. SOUTH KONA . _ HAIM)8T .1.ji- 1 \_. r , 0 KAu . :.*.:.-----„,iii. 1,.. :0 i.z:c: z lu , '13 C• , 'Ct 1 .ri ' 1 FIANPS' cc I 1 I . . \ Ai(AMAi.8:r - 1. . . i '1P .1 fr"1:likiby • .* ro . *S- .- • . •• (‘,.,.. DfQ,,_,,_.2._ 7:r.sr. oppkCH Of GOD RI° ! • • • titINA 0 ST• • .z.; • \.:..: - ( • 7;: i t . 0 i: T. a. • '7 . : . "?' 1 . • co . . •-=-% . 73 • (0 ST tr o < • '''' . PROJECT LOCATION ; r i '_. %. Po z. m ..X • T.Z-.)- .0 •P ' (/) Lli • 7$ . .. , Trt, . ., A s' - " • ''''1 . ; ..., HANOI -F. .A: .'g.. tt AU PL T<. C •S • KA'''\:•.••• 5, -.7A • "3:.. V • ' ›...., . "73 /C4//c4 p )2t •-ci in 0-9 'elf 1-7.1 13A .° ...) .X141131,t•A - -4; • "ii> • P, . ikiPtato:lib.proverti6iiC01014.6ti.! s. ... .):. fi . r ' . . , . 1 r- st. • •-p- t LOCATION. MAP 0 . 0.125 0.25 • O.§Miles 1 1 t I 1 1 I (---- • ‘ epale: 1 .74.1000.• • hilaech4OI:7, . __ . _ _____ _•_ • . , .:. .. \ \ • :I: \ . )!. I ,. k I - - . . .1? I/ „, '13 \• •' "0 . •.,o i 'V I > A . . I ,..Y.j, > I i AI t X i 73 1 74 . • rn t rn . 1 rn ,S3 •. . - m , m ,. r. r•-, ., r-, • r'. .... i t 8 1 •• , ... 1 • r'• • • ••• . . ,,-• • .., ,., 19 ^t.1 k 0.1 i :g , •,.., - '. • i i .... i 1 ' QHURCH ' PArktti.•999 i • OF GOD. .........„,„......,......_,,,...., --:.- „...............- .........:::::•vt.....•,......:••!::.::•,t,:t•::-::-•!:%1 11:.....itii7?‹,...4': ,:-....1"i:ii..;•• • 1 t:•:,:P.4,,,„..,...::.::::::•::'..1 =,:•::t1.1Yttlelzz‘::4-t.; . • • ',Ri.;;4.:':,.W9i:::::::•::,1 ...1..-:„.2.::...•....._0 ••••!...:.• • . 1 itt.:;:::::ti:-:,t.'t--•"tt 00, .::: i:..,.....:•.:'.:1.:‘,.:t4:-.; :.:: • 1.::,....-......!.::•::.•••••. i 4...•::*.,••••,,i..;;:-'''''.,, ..,.....;,..,,,-,,,....... ..,+•4 1:::::....i,..-:%.:11.:; :q,:' • i'':".•••:•:;•:::**.:', ,ii::.: . .i ''''''',,,...,...4,, :.•',.....:, .t:t4....T.:;1:4-.7..;,,,t::::::;:i Pl.t.4;,•,.....:::::,".".,• • . . . . . , 4,,,....., ,•.:y.t.....;'....•••3 1•Z.,:l.,!',!'t.e:t...:V:%;:-..^'' ,:':`1.*::;::.,.::.',f.•44,4. . . • 1 1,.,..:::::!.:,,S.,,,;;.7.1:".,1....., :.•'.P....:.i,:tj.,;:::,,',. .1.•'•Z:. . . . t:::•:',.:f.!,..!....$;.'.:.;.4•1".":.::..f.:",:i.::::I ..,.. ::...;.•:,;:':f:..::.:,..;'.::;:::::::'.'r.:' •e,y•••:•:•• • W::::•22'4-.,....::::::;::-:i*•.:.:.:I L:1•r•i-•:;-;::'.7:..,.:: 9... . i::;t •it•-:,...,........",,.... :4.1., . .:::-•-•t,....,..,;,:::•tt•-t :m• 1 ,,,...#4,,,-t...,..•.......:•••••1 t•••,+.....:•!::••••,....,..::::. rt',-....4:4:::;::.;:,:44;::::: • ,•.f..:;..t.i.t...::•...:•-•••••t,-; :p •. .,,,,....,..,,t,,..... ..•..,:•:.,,, t,•••.....,4-r:;-2,.,:...-...,,,,.. ,, , • i ::::::1•:::,:,,:'1,-,::.::::::'::: -.::::.':',",, ;::::-::',,,!: • ,a '.4.•,....• ,....:,`••••,...,.. 1.:::::::::::;1:';:l'l V.'..f::.::::; f;',''•:;„WAigil,..6.iii' ',i. ....• .. 1 . • . . ..:.,..„.:„:.,„-....•,:,. . • :,,,,,;,,,,,,,,....,t.:!1.::-...-. ,,...I.,::,...-.............t.t..............: . I. . .:..,f I.:::::''•,'•.4-..::''"r” 4:7.:',•.,,,,Ail:•.-•-•-,..-....,... . . :,„,,,„.„.::.:::::,',..,,,,,..;;.:: .*...,..:"..;...,41.••,.....1::-::::•1• ;:-...tty.,..:.;.-.,Z:t.f.:,:•:;,:,4•: • ' ;-;,...,,,,.; ;;,.:•.,.:,.....;.::••••.• ., t:,::t,..••.",--.w c, •••••••...• A...,-,•,:...t.••••,•,..*:.•:::•,i 1 •'••••',•.,...,:**,••-...,..., :;•......,•::^:.:-i 4,...::.;;*v. •ii.:.:1..!•.:':':;''.....c,,,...::.:';•.• .,“., ...••• ,.. • I ..:,...:•.:.:::;;;;;,... ;.:It::;:• •• [ • ,::.;::...:::sf..;.,,,,0::::,..!•77,.,.;:..,.:;.....:::::::,....:1;: t-!,,,,:,>:..:-.•:•;•V.1,•••.'..:::, ' • ):;::::::.;;;:'4'.:"ti;(4:1"•:: ,'-''''-'-'t tt-008\ic:1::,..1 ';:3%•,-4'.••:t IsOS. .,••• • , .,....„._ , . • ,;:,;:„...:::::,,,._,,,,,,i,:•„-,:,,::::::.,,:•••,1 ,...,,,..,!...,,,,,.':::''''.'"•::"''•.4.::•"‘"* ...:::.q' ,-....-.,..,,...... ,...z1.:::,:.:::•:.f,. .:...:::1:':,.. • . ..,,., . , • . .. ... . ... *,- 1 . 1i ..•• 1 .•".., ',. • • 0aral-. ' :•4'`'..:::."..'.'..:,,'",.;.i..'`P:•.,-..-..:•f A,.....,,'.',R.:..,i•',%:.•C•..I.zE"•:..;'':',•..:L:',:•'4>•.:',•.:,--:...0.,:•..:,,•.:.0....•.•::.''6..... .:r ., . .:..•:1'..:;•,.t•-:.•1'••.:•t:1;:.tt FZt,,t :f..•.:•:;:%t..',:::::•t:'S:'`,•':,V:,':,:t..:.:.:..'..•:..;::.k:)•0.:•,'..'4..•:1••1..:•'51.•::.-::•`,-:::t7•00 m !1;j:.:;;..••. % :: ••,.4 ::;,t$•:'•::i,'•:-:':7,',e''.'•1%,..,...'.....,.:'..:.:.-:',...'..-.,.:na i .':••A"-:.,'.,1•y::';':"",:•:': . • • .• tri • '''-: .-"''*--"'•••'',:•:,:::••:=:, •'.:•:::'::::•,f44":::.4:r.;;::;7•::".: . . " i . .•4• • , ::ji:•:. ft nliiiU•if...?',7:11•;"114i."11 .%.1.,1:15'.i.i?liii;i:-:..i . .• 1 . :,:..fi:.!,,.7.c.:-::•:::.,,...,7 .4 ' 1:r. . . • . f. .4.,PARCEL.:007;;.!:1 m ,....,,..,,,,,,.....,•;•..,,tt• r.;;,•;,.....-..,::, •,.„, tt,..,.........,,,,-,-.•.:::: • tt...:••••••tt-f.....•.7.:1,•:',...... . • .i. . • 1 ,,....,„...,„.4............•,.,...i 6:......,...:,:v.t.„.:-.Hlota: : ....... . .,.....t t• t ....::,..c• r....:rio.?...i-t:': • • • . • •• , .11:1 4:4::f•...:::•.;:t7•.::`:::::f. t...t.:SV 4::::::.,:tt:,..t,:'• i • ..,:!::::,,S,.....::.::::-:.....1 e.;',f,t4:41,%;1:',..,;.::,;11;: . . : ,'.....•i 1 FVX1.:::';•.....i:.::%1 1:::;.:;.t.,...:':14.1;,.":4,%".: . • 1 . • . ':':,:;i'.:.:l'. ,..,:-:::•".:::!`;.:;r::•:1 . . . . .. . . ::::rr•--",• •,:'"'''''''•-: > • - • • - . ',..,.,,,..,,•.-",........r.,,r1 . - W • CT . • • ii • tn. v.. • . . - • • • ii:,•13.00...: :-il.,3...??)..V8;:,:..t.:1 • • : . ........t4:,::;:•,.'',1` ;:i •.r.:.,, . • • -;::.•::::,:::':::::•:.;11.;:fa:•:f ...i-:;:N:11.',:::.:.-.;:1:;•:. ,c4, : ,.et• . . •••••.,.,,,,:::.:.:i1:::... •::::P•-•,...;.-,;::it;:."..t4 •••,....:•:-.........::::::,1 ;•::•••••,-....::::‘-,. . • ,ll'i. t,.:-...2.i.:3'i;',..!,i3'54.,;:a . •--....,•.....4,:,•;,::• . . :, . ::::•:.:Itt„z:::'0.:::::: • ._,.. • T;ii-• . ,,,,,.:::::.:','")).:-.::.::*:1 ilii::.:,:-•f.0:;::,:, , ;1:1..';:l....1 . . . ..- .......,,..%;::::,:...:::::::: . :14, •;: . - ::;;;;:p.,:e..,:..:::::•!1. 1,4' x- • :,,,,,::,,,..-4.,:::.:::::.f, :::t ,„•?...:w..,.:::::::.:,,..., ,•...........,,....•.„.., ... , . • ,,...,,,,,:-•=4..::!;, ;:::•::.!,..:::.,&;;I::,z::: . al-t-•-z..: :;.::%::::-.••••••:::::4 • . • ... •13,,a), : .. .. .,... . . • .s• :...a,-,:.... „..,„ „..,..„,'14.""Pri.....' ii.siV„, . ?••44. `...,.•.... ''' ,. 1 • UI,.I Et.)!, ,-,!.... ••., ,.:.,.::.z .....:'*-^f,0...,.,- 1-:;::..t::41:'"•`-0-,' < rn•-1,Xt.73;', . •-•,,,......:-.Z::717:::!::i: .....,....,:,,,, ,.:. • .Xi K , ..----; 4 4 'Zi< • • .:;:•.:1'''' ''Z'4..'..""'? "..—"-...., :•,—,... . : . .• ..- Ca.z :. > . "'A.:4: r: ' , •• - .;.P.'.!'.o'....-,•...•,......,„,,.. C1:1;1:::;.•;•::::•.;::.z! :::::;;•••.-.::::.;-:::::.-, • 9 i....0ti. r .,...., :,_,, gl• • . . . .21 . ..: •• • :•:•rx..; =, • PARC.EL: li2 -*PARCEL-'05 ------‘.•--,•••••-•- : ..0.' i. • • ,..,....., ' . si .. • • • • • . . • . • . • . . . . • . • • . • • , • . • • • •_ . • ... - . . , . •- . . • • -• • ' a . : , et5tKtiy.:..i td 1, - :• - iv .. t!ttAjht.;.:.0 1-,8 11 : PARCEL:0 ‘•.:1''•‘l• - ;1;i. .AIt:..4.,11 j1. • PARCEL '; Legend_ • • .....•• . ., • . . : ••... • • • .1 .. k 1 1-4I,4. -.1 . -77-eA4169.**clineFAkdELiOg PARCELI999- 7. . •• i . •• ...• . . ' .. ''''''----'-- ‘ "i'11414/7 . j. .,&, T . - • i tiI:- -..4P.t1-"?f e:7..,'7, •-1i,.1----.-------.,...._/s•-.•,•--''-,...;........,.r.,-------,--'',....-...../'.'.''•',.:.,.„,,...,,.,..--"-.•..-..'.....-...‘.,',.-..,',.-.-.,,,,.....-„.-4'..;''',4'„_.„•-4••!.!.!>.,.-`...'•'.•.'''...•.:....'.4•..,/„;,• ...•4). - • '•I'*._..l''1t'I t.''s1 ... .. /•l - • Oektiitttil15101 ve t 4 • sj6Ile4 hydrant. •;: - .,,,.„„„ -r7 I o f J . ,. . , .• .•::.,' . • - .•-•'- •J f-tiARCEL".:-02:5,-.".....-"." ---.,-,:,,I . -• -8188.4,1":- ... 1 ; i : ' t ur I us 1..d• i I, 1).• ::,..-., I . ;:'.”.. ICITSTCY8E.ttkyEb• 2. i pal i o •i..,(3. ; it... f , ./.., ..-...r • ; i. io 1,.(Er• i,e- I--t i 1 1.1 'id'. i . 1 1,„ --- • ,,.. ,... , 1.i - 1 .-, \ • , ...... p.ROPCiSEb,*AT:EgILi.N..IF .. ,, \ ' 0 PlkOPOSED:::FIRE.HYDRANT ., 1 ) t.j 5: f i -•, 1 .;if 024 • • ; j I / I,, 1 i PARCEL:027 r„....„2:-..------4 PARCEL.,..1;26. t 1 t•,t-,,,, I \ 7.7:, -..77----` ----- -2 ---,..• A \., , + ," i 1 0.6.• , .1 i . .; Z t' • ,... -. • , • 0 1 .`o,§.., 1 • , ., i • . • 3. I , <, / .I - 1 1 .. 40 7 I, `. i ' I I 1 .111- .1 :iv. 4 ,4(..3.. , -1,., ',,,..,-4.,i,,,,P7,-.,.,.„, ; . . PARCEL 421- ' 1 . • • •/ 1•• .. i 9-L ''''''.4.,,, • • . .'.1 . I ; i•i •i ,...i p : • . " • . , I PARQEL,A30 i I airti,'11. :-,,, .•/ ..0! ',..,,, i •,--m..:(0,. : , 1 I 7 1 • OAACELZ:htt-$. -4._.------------F .,s, ' . , f, r- S, PARCEL ., 1 i ! f I t, j,. --,..,„... 1 l'N‘• , 4, i I , 4 0 , ; • , .. ‘i• . 4.- '4 . . s's.'-•„ ---7NAteeS, -..,,,, i I 1 f I f •PAR• ',...., ,Cp.o.,,,/ ",''.,..„ . CEL:.123 -,i- *I?: i ------„1... • /,•-•-•-q. • t f i ( , , g, ; • 1 . -g I; , pAR-." . , 1. ... . ..... . ., ,...• . ,,, . . . . , • • ; 1 ,t/P,,-..,..‘ CEL.:...0•3-3 t 17.4.4:,;‘...:f.fr•f;:t.,/..;;•:]!,,,a'-',f.:i:'::::;:::,..4-:,"ki.47..t.t•:,:,.f...T.‘...4;"'4.4t•gl.t....--.-.;-....;-•'.- ' - • i ,. nk,:isit i .P2. 3.1 ..,.,..1..::::,,y:::,!..:z..:41v,:z.,.,41.:;,;..,74.r,..::::,,,„:„;,!:::;:,,,4..,„:,,I...:,%-:.h :!...:41:.:..2.1.::::',,•44 t,./.',-,..,...-A-•'--, '•••••• i .,-,, • fl/N4.1:•.k'• ! i .0- 1. c ,g::::.T./:,/.,,,,,•:1.1.•;:li..,-.?-4:f::::.,z,..!,:,;/,:1*tt::,./,/1;:r.::::: ..,..:-'4",:!.:,:.s.,--1.t1': .:"'..:4"::!;7*/;: -....4%.:";:: :, ; 1 .44, i .IS. 1 • •M: 1,. - •. ,-,--..,... --, ;Ps! ./r-.-.,,..... . I -..& 1 "r .A.'1 • .,• -,---:....;•''',4:•^•,',4: ```' '''"'.:'..':'4'0'W:••..".•41:'''`.1....,1:».:::,:;•:',..1:::4••::••...!..4'.%,:.,•••:' ••••'4.?.:'''''-t." ' ' '''' 6. \ 1.-------•.1•,,,z:..T.:..7.-?..11z.t. :tw..,..:ts.e....,,,,.--------..,. 7":14,....44:.....-_:.!:44-;Z:114:14/Ki pt.:::-:•:-.-.1...;.?,•.--,,,:. -•••:.:,,....•:-,, .f Ve° it t ..tt...• e,e,t, ' -' i t.t., ..--,...-t,r;'-.7.117:.:.::;:',',',..t,;:.:•:i.r:;.:Pr."7":•-•:"rt'7.17.--t- - ........, -. :. . . - . t. 4);:l'i • I C..t- 1 ,ss.gk ',it.t. "`",'.271,:a. rt-:•%:.1'.,',,'::•::.:::!;P:::.tf.;.:..:;•:•::''4.4::.7.Z:Y',...,,:::'.1 ."-:-IT::: .:1""':'4".',414-1,--,..4......,L, t te 1 ,, . #0,.,,a,... . ... ,...,:.:::::...1..:: :.z:.:;:,:::,..7:: t.I.: ,1:::.::,::::::::...!.::,:;;;;;.:•.:Cf;4":1%!:':: .:'''.::::::1:4:.' ..:':':t.:: .r.."-: ;-.1 .....V;'-itil: PMQEL.:080 s* 12.ir ,e, -1,'''''''';0, -•::',,..''''".-,:. .P:':t 77. .:ct,,,,.--": -1,!!!!!!!!:!!!!!!!!!!:!!!!!!!..;-'';';'!!!,::::'''''..!.:;!::::::!:::'::::',41.,:::',,;:!'",:..::::!:!:::.:'::::.!:::::::::!:,':-.;:::-.::..,:.....-:;:'!::::::.!;:::•:1:1'' :_,.....,...,.. ,,,,,-1 _...„,,,.5,,0 1.j .?_. .v.i.. :::.::,i,:;ii,„;.;:::.:.:iiiii::,::::,:l.i'.5.i,:',..;,.•!::.,3•1;i".,.:::!::;f:•iiI-..•47,•:.z.tr.,;IS.:'..1".;;;-f:"'Zri.:.;::::::: ::•fii••ii•••:;:•:::•fit :. . ----.., PARCEL::Via . , 1- .w it:, I • • ,.... : ., .•1 . ,f,Y • i 1 o• :0 t - • . .1 .... . . ! 4r- ../ ,,,, , Ale- I: ! .CC -••• , • . * -.121" 1 t 1 .--""•.^ -....„.._ • ; fl•I --"'•'"".•,.......,,,,4,... ei. f•cr i .- •' . • , . • • 1 11 ----....,1 if i „....1. it 'IL 01:- , • • PARCEL it.01. I. * - f 1 i k ., . • . . . . i PARCEL:,086. , ., .•-•' - : '• r . - • - 1-1 . „ , - •Z•••• 1 ...- I • - ,o.--.;• i - , , ,,• ., ,7." •I' .' i . • " i . • vp,,, c,0•••• 's 11 ,,,,• ..,/ • , . • • ....--• , ," 4,-• .........------„- ;1,7,- As) . -I . :/ e.• . . . • • li • • ANIr. •,..... . . .,---'---- . • .- . • • .. . 1141./P10 ITOP,1001110difp.5XiStritti-B:iTt: KCittPngild;•NOrtti'Kbt.IA • . • - '. - • ' ,..,*'-,....-... i ...... . . ''PAROEL::00.5 • ,' •.•• ,: , ,. . .• . &N1 sT' 1.,---i, , 11- -140,..:, .PARCEL..;031 -. .;'1-. •, - • • . • - -*•'.4. i "a.‘ . . _ ,___. 1 t • • _ .: .. . ... ..,... , . •• • . PROPOSED:WATERSYSTEM., !. - • PARCEL:.118: IT. '1:1 .°Oa- \ 01' .....--,---- I.-. - ••••••••'' ' , 1.1 ,, , 1 IMPROVEMENTS' . , ..-.. .. I : ' :,.., .,. . . . .. _,... . . . . . . • :, . - i I i„ 11, 0• . . . . .., • • ..-.....44;.6.i.„, , -, •0. - 1 s', . • • • . --------- Serdirl*...2017-- •. lki Place Improvement District Proposed Assessment Roll Tax Map Key Owner Situs Address .Mainling Address 73019002 AUREN,DEAN E 73-4518 IKI PLACE 73-4518 1Kl PL KAILUA KONA,HI 96740-8213 73019003 KORONA,JOHN E JR IKI PLACE 511 S ST ASAPH ST ALEXANDRIA,VA 22314-4116 73019004 FITZGERALD,NANCY 73-4526 IKI PLACE 74-5615 LUH1A ST#A1B KAILUA KONA, HI 96740-3622 73019005 WILK,RICHARD R IKI PLACE 3825 5 OAK RIDGE DR BLOOMINGTON, IN 47401-8932 73019006 ANDERSON,LEIF JOHN 73-4532 IKI PLACE 73-4532 IKI PL KAILUA KONA, Hi 96740 73019007 OLD,DAVID W IKI PLACE , PO BOX 5306 KAILUA KONA,HI 96745-5306 73019008 HECHT,DEBORAH A 73-4540 !Kt PLACE 73-4540 IKI PL KAILUA KONA,HI 96740 73019009 SHERMAN,KIMOTHY K 73-4544 IKI PLACE 74-4910 HAO KUNM PLACE, LOT 5 KAILUA KONA,HI 96740 73019010 THERIAULT,GARY IKI PLACE P 0 BOX 5519 KAILUA KONA,HI 96745 73019011 VARIOUS OWNERS SR-ROADWAY 73019012 RUTLEDGE,DANEEN TRUST 73-4547 IKI PLACE 73-4547 HAWAII BELT HWY KAILUA KONA,HI 96740 73019013 BEN,GERALD A 73-4543 IKI PLACE 73-4543 MAMALAHOA HWY KAILUA KONA,HI 96740 73019014 BREHAUT,CHRISTY ELLEN TRST 73-4539 IKI PLACE 75-5695 ALA DR STE D KAILUA KONA,HI 96740-3113 73019015 NANNESTAD,JEFFREY SCOTT 73-4535 IKI PLACE 73-4539 MAMALAHOA HWY KAILUA KONA,HI 96740 73019016 RUMPEL,JOHN DAVID 73-4531 IKI PLACE 73-45311K1 PL KAILUA KONA,HI 96740-8212 • 73019017 SHORTE,KIRK 73-4529 IKI PLACE 73-4529 IKI PL KAILUA KONA,HI 96740-8212 73019018 TAMASHIRO,ERNEST/NAOMI TRST IKI PLACE 4250-C KANAELE RD KAPAA,HI 96746 73019019 CALDWELL,STEPHEN WARREN 73-4521 IKI PLACE 9000 CROW CANYON RD#132 DANVILLE,CA 94506 73019020 WILSON,RICHARD A 73-4517 1K! PLACE PO BOX 2109 KAILUA KONA, HI 96745 - I EXHIBIT D lki Place Improvement District WATER SYSTEM INSTALLATION COST ESTIMATE TMK 7-3-19:011 &037 ITEM QUANTITY UNITS UNIT PRICE AMOUNT A. CONSTRUCTION COST Project Mobilization,and Demobilization. $15,000 Not to exceed$15,000 Lump Sum 8"D.l. Pipe 1,125 I.f. $140 $157,500 8"90° C.I.Bend,M.J. 1 ea. $600 $600 8"x8"C.i.Tee, M.J. 1 ea. $850 $850 8"x6"C.1.Tee, M.J. 3 ea. $800 $2,400 6"x6"C.I.Tee,M.J. 1 ea. $750 $750 8"Gate Valve&Box 1 ea. $2,700 $2,700 6"Gate Valve&Box 2 ea. $2,350 $4.700 8"Solid Body Sleeve 2 ea. $700 $1,400 6"Solid Body Sleeve 2 ea. $600 $1,200 Fire Hydrant Type B 2 ea. $9,000 $18,000 1"Air Relief Valve Unit&Box 1 ea. $3,000 $3,000 1"Type"A Lateral - 2 ea. $4,000 $8,000 1.5"Type"C"Lateral 8 ea. $4,500 $36,000 Cut and Plug Existing Service Laterals 15 ea. $900 $13,500 Connections to existing waterline 1 ea. $7,000 $7,000 Chlorination and Testing Lump Sum $15,000 Pavement Repair: 2-inch min AC(one-lane)Aniani Street 444 sy $80 $35,520 2-inch min AC(12-ft wide road)lki Place 967 sy $125 $120,875 CONSTRUCTION COST _ $443,995 Contingency(20%) • 88,800 TOTAL CONSTRUCTION COST 5532,795 B. OTHER COSTS 80,000 Consultant Fee* Planning/Environmental Report 30,0003 ,000 Legal Fees Miscellaneous Costs' 21,300 TOTAL OTHER COSTS --- $176,300 TOTAL ESTIMATE IMPROVEMENT DISTRICT COST $709,0951 Percentage of total construction cost EXHIBIT E PRELIMINARY ENGINEERING REPORT FOR THE IKI PLACE WATER SYSTEM IMPROVEMENTS Kohanaiki, North Kona Island of Hawaii State of Hawaii • July 26, 2022 • • Prepared For: Prepared By: Department of Water Supply Foresight Engineering&Design,LLC County of Hawaii Palani Greenwell,P.E. 345 Kekuanaoa Street, Suite 20 PO Box 4538 Hilo,Hawaii 96720 Kailua Kona, Hawaii 96745 EXHIBIT B Table of.Contents 1. GENERAL 1 2. PROJECT PLANNING 1 a. Location 1 Figure 2a.1 2 Figure 2a.2 3 b. Environmental Resources Present 3 c. Population Trends 4 d. Community Engagement 4 3. EXISTING FACILITIES 4 a. Location Map 4 Figure 3a.1 5 b. History 6 c. Condition of Facilities 6 d. Financial Status of Existing Facilities 6 e. Water Audits 6 4. NEED FOR THE PROJECT 6 a. Health, Sanitation and Safety 6 b. Aging Infrastructure 6 c. System Operation and Maintenance 6 d. Growth 7 5. ALTERNATIVES CONSIDERED - 7 a. Description 7 b. Design Criteria 8 c. Map 9 Figure 5c.1 10 Figure 5c.2 11 d. Environmental Impacts 11 e. Land Requirements 11 f. Construction Problems(Alternatives 2 &3) 12 g. Sustainability Considerations 12 h. Cost Estimates 13 6. SELECTION OF AN ALTERNATIVE 13 a. Lifecycle Cost Analysis 13 b. Non-Monetary Factors 13 7. PROPOSED PROJECT 14 • a. Preliminary Project Design 14 • b. Project Schedule 14 c. Permit Requirements 15 d. Sustainability Requirements 15 e. Total Project Costs 16 Figure 7e.1 16 f. Annual Operating Budget 16 8. CONCLUSIONS AND RECOMMENDATIONS 17 EXHIBIT A A EXHIBIT B B EXHIBIT C C • • ii 1. GENERAL This preliminary engineering report is in support of the proposed lid Place Water System Improvements (Project) within the lid Place subdivision. The Project is intended to be funded through the United States Department of Agriculture (USDA),Rural Development(RD),Rural Utilities Water and Waste Disposal Loan and Grant Program. This program funds municipal projects such as this with a combination of loan and grant monies. The loan portion of the . funding is repaid to the USDA over a specified period by the applicant-in this case the Hawaii County Department of Water Supply(DWS) -while the grant portion of the funding does not . require repayment. The Hawaii County Council has initiated an Improvement District(ID), which will ensure the repayment of the loaned funds. The Project is to consist of a new water system conforming to current DWS standards and is intended to provide adequate fire protection and reliable and safe potable water service to the residents of the subdivision. • The existing and proposed water system is served by DWS's North Kona Water System. The sources of supply are groundwater wells and a groundwater shaft. Water is pumped from the sources to DWS's 0.3 MG Kalaoa Tank which then feeds the system via gravity. Beginning at the outlet of the tank, an existing 8-inch main runs down an access road and feeds a 12-inch main in Mamalahoa Highway. This main subsequently supplies an 8-inch main in Akamai Street which flows to the 8-inch main in Aniani Street where the proposed point of connection for the new water system lies. A pressure reducing valve station (PRV)located at approximately elevation 1468 in Akamai Street is set to 55 psi and will provide adequate pressure to the proposed water system without requiring changes to the existing water system or installation of additional PRVs. The proposed water system improvements consist of approximately 1,150 linear feet of new 8- inch water main,individual 5/8-inch meters for each lot, and two (2)fire hydrants located in accordance with current DWS standards. The project will also include modifications to the banks of meters located within the Mamalahoa Highway ROW. Work following installation of the water system improvements will include re-paving and striping of the portions of the Aniani Street,Iki Place and Kona Church of God Road ROWsimpacted by water system installation as necessary. Traffic control during all phases of construction will also be required. 2. PROJECT PLANNING a. Location The Iki Place Subdivision is a residential subdivision within the ahupuaa of Kohanaiki in the North Kona District on the Island of Hawaii, State of Hawaii. It is more particularly located on the makai (west) side of the Mamalahoa Highway and is on the western slope of Hualalai. The • subdivision was created in 1961 and currently consists of 18 residential lots ranging in size from 7,632 to 10,089 square feet. The subdivision is accessed via a single thirty(30) foot wide right- of-way(ROW) designated lid Place,which generally runs north-south and is privately owned by the homeowners association. Elevations within the subdivision range from between 1430 feet to 1450 feet. The average slope is approximately 10%running east to west. There are currently no water mains, or hydrants within the subdivision,however DWS is currently providing domestic water service to fifteen(15) of the eighteen(18) lots via 5/8"water meters located along the Mamalahoa Highway. Small diameter PVC &HDPE pipes run makai (west) down the Kona Church of God Road ROW to service homes on these lots. The distance from the meters along Mamalahoa Highway to the most distant homes served is approximately 1,500 feet. There are 1 • three(3)vacant lots within the subdivision which are not served by a water meter but are to be provided with service laterals and meter boxes for future use as part of the project. The State Land Use Designation for the area is Agricultural, and the County General Plan Land Use Pattern Allocation Guide Map(LUPAG Map) designation is Low Density Urban. All lots within the subdivision are zoned A-3a(Agricultural—3 acre minimum),are outside of the Special Management Area, and shown on the following Island and Location Maps. A of, N HAWAII iSLAND UPOLU POINT' KOHALA Ki1wAiHAE " . wain., HAMAKUA IKI RLACE,.SUBOIV1510N MAUNA KEA ` PEPEEKO POINT (PROJECT LOCA31014) " FGL'OBAY' KEAHOLE.'‘ KONA. HILO •POINT .. •RAiI.UA KEdAu KFOKEKUA.. •KAPOHO HONAUNAU vim° PUNA PACIFIC OCEAN xuurtaioA. KALAPANA. KA'U MILOtfI N/AIbf11NU PACIFICOCEAN SOUTHPOINT• a 16 so: MILES- IKI PLACE WATER SYSTEM IMPROVEMENTSPROJECT ISLAND MAP KOHANAIKI,N.KONA.DISTRICT. HAWAII ISLAND Figure 2a.1 2 `l 1 ct • 3 HAMO ST n` ' \I x I Sj, F1 1, c ii ,• t a`-- ''ki c h��t s l { • 7,. 3 1 'r.. f °k , y a t ( 3 ! .i al tw �r 1 r s e -: ' THANES sT 1. z •a 1' ' . F{ i ' s N '' '.a °5 Ai "1 "r' - 5 `, r.'ra Q zt,, . t '''' i G'.'t C :�i' " � , 1 1 .r a s L ,,, X t 7•, a v y ir >t • ? a t • ,s x2 1,�OF GOD RD } t k ' • ' �1,.;j '' \•s x, : .. #x / F {1 j`4URGI tad . ,.l MI i s�;Z s' t[ t s }' 3' '�. � i e i a .{7� L 3 yt f£ ;, i �k;i 1 PLfiGs UBDlY1510N ? ?`' z 1�'s i •; N x t • V i(PROJE OCATION t �:� E 'A E '�^v .3 )� \1 3 i t Z'i 'f° s Q t' 9 i 't a i # ( Q r:,` .. ._"fit '' i&} ,,x •, z - i, a a ; `w� �S s 3 ' t _1 I t. E.- } 7 ' :/. x• G ^' " f .Sit �..., / • S - 3SS 3 ` ��t 1 4 . ,� , 7 a k VS i 3t .}j , 5 *. 1 ,,� I `�'� 3-�., .,�;Y y ,`'€ c'� 1�`m .yam i ,'; I ''oy„'" i • �'• I a 1- • Sty t. .:N ' q i ,, , J, t.Y , i i .I.;., 1„ 'C / ;+ . I � a ' rf E. 1 i 0 1000 2000 FEET IKI PLACEINATER SYSTEM IMPROVEMENTS,PROJECT LOCATION MAP kONANAIKI;'N.KONA DISTR( NAI+UAII ISLAND • Figure 2a.2 b. Environmental Resources Present The average annual rainfall in the project area is approximately 44 inches. A flood insurance rate map (FIRM)panel was not printed for this area. The entire subdivision is located in FEMA. Zone X,areas determined to be outside the 500-year flood plain. There are no wetlands within the project area. According to the Soil Conservation Service's 2013 Soil Survey of Island of Hawaii, State of Hawaii, soils within the subdivision consist of both Puuikaaka and Napuu series soil types. The Puuikaaka series consists of very cobbly highly organic medial silt loam approximately 2 to 6 inches thick underlain by pahoehoe lava bedrock. The Napuu soils consist of extremely cobbly highly organic medial sandy loam of up to 15 inches thick underlain by pahoehoe lava bedrock. There are nine (9)Lava Flow Hazard zones on the Island of Hawaii with Zone 1 being the most hazardous and Zone 9 posing the least danger. The Project is located in Lava Flow Hazard Zone4. The area is designated Zone 4 due to the region's steep slopes and the fact that lava flows could rapidly cover the distance between potential vent sites and the coast. Survey by a professional biologist has determined that there are no rare,threatened or endangered(RTE)plant species present or likely to be affected in the area to be disturbed by the project.No RTE animals were observed during surveys. Impacts to several potentially present • 3 . • • RTE animals that range widely in the Hawaiian Islands will be avoided through adoption of construction-stage mitigation measures that are standard for projects in the State. Coordination by the USDA with the U.S.Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act will formalize the determination of effects to listed species and the mitigation measures to be adopted. c. Population Trends According to the U.S. Census Bureau, Census 2010,the resident population of Kalaoa in the North Kona district was 9,644 within a land area of 39.48 square miles. There is no information available as to the number of residents within the Iki Place subdivision. The resident population of the North Kona District in 2010 was 37,875. The Hawaii County General Plan 2005 projected the resident population of North Kona would increase to 42,275 by the year 2020,however the recent 2020 US Census reported an actual population of 43,313. The population in the Iki Place subdivision is estimated at approximately 45 persons based 3 persons per home. According to the County of Hawaii Real Property Tax site there are 15 residences within the subdivision. The DWS currently provides water to 15 lots. The Project will provide a 5/8"meter to each lot of record or a total of 18 meters. No further growth is expected which would use the proposed water infrastructure. • d. Community Engagement As previously discussed in Section 1 of this report, community members have requested that this project be undertaken as an improvement district with the help of the Hawaii County Council. The improvement district was created successfully in 2016 with the support of the local council representative at the time and considerable support from many of the lot owners who would directly benefit from the project's success. 3. EXISTING FACILITIES a. Location Map Figure 3.a.1 shows the location of the water meters along Mamalahoa Highway which currently serve the Iid Place subdivision. There are 15 lots within the subdivision and 5 lots outside the lid Place subdivision that are currently being served from meters along this section of Mamalahoa Highway, at its intersection with Kona Church of God Road. The project will involve modifying the existing meter clusters and removing unused meter boxes once new meters have been installed to serve the 15 lots within the subdivision. The remaining 5 meters which serve parcels outside of the lid Place Subdivision will remain in place. • • . • . • X ! I . r.., fi•I \ i t 1,f- ---------.:. •• . \ 1 i 1' . ,. \..._. , cs• k vt-E..---------W-a i - i.1 -------------W 9 Ex.PRESSURE REDUONG,yat.yE ---..."----.1„,44-.44, 1 EX. 12,D.I. WATER MAXI ‘ ' (SET TO SS PSI) ....— I • 1 I i 11, 1 i EX.Sr D.1.*ATER MAN, ' '• Is, i i ...„-- . • -e, I / \ ••• • -94,- . I / i ,..--‘- ' .. .,. -:---------. --—--— ---- 2 A \ I 44-EX.5/8--WATER METERS 7 '.(12 TO BE.RELOCATED) '• ,g.... I kg;:te C.3.;HATER 1.. p!..`,0.'..O..1,.Wi!!TER,I.MN ' 1 EX,4,11,ePE.V,I.kTERN-. : \ !.. \ 1 - 5:/e WAOMETER.; \--.----- ---. 6-EX.5/87.11rATER METERS .. (3 TO BE RELOCATED) VIS".( 7.7919.:02/ ' Ai t :CHURCH OF•GOD RD: „.., ''2"'•' . . • f. I R . .. 1 • 6 I . - _7f• (;),14.13m—Kolkozi \ z. . • --- ; . 1 ' 10111.EXI.,51V.METERS' ' - i 1 i. , ,.. 1 , i 1 •.• • . 1 • -. 1____:: 1 FiR-00,re eatiipg,B* .. ..• . ;,.---— . 1 _.__________ w— i . ---- E.--—... . . .., . . • ill wk . I ; g, • : .(3)i-3,2019:cqo ..1 . .. . ---1 i -wk. • IkiK: t 1.16'' (3)Z-2-bo7.:0D5 I (3) "7- 9.'"I I ,_L • 1 ,. % """----1 ( )1- 01.0i030 i i •1 . ' '21:io •.460 1 FEET ___—..--.,-----;---,--*-- % s 4,, EXISTING'WATER MET..ERS IKI PLADEVVATEKSYSTEM IMPROVEMENTS.PROJECT •• ••,.., • • ...,. . ...•ANDI-05HA*II,N.KONA DISTRICT LOTS CURRENTLY BEING SERVED • HAWAII ISLAND: Figure 3a.1 5 , ____ b. History There was no water service available to the Iki Place subdivision when it was developed in the early 1960's. Water for the residences was provided by individual rainwater catchment systems. When the water main within the Mamalahoa Highway was extended mauka of the subdivision, 5/8"meters were installed within the Mamalahoa Highway ROW to serve some of the homes. PVC lateral lines run cross country from the highway to the residences, some of which are up to 2,000 feet from their respective meters. c. Condition of Facilities The existing PVC and HDPE service lines from the meters at the highway run overland to homes via the Kona Church of God Road ROW and then through neighboring properties. These lines are subject to leaks and potential contamination should infiltration occur due to pipe failure. It is often difficult to locate the source of leaks due to the extraordinarily long overland routes of these lines. Furthermore, there are no fire hydrants within the subdivision to provide fire protection to the homes within it. d. Financial Status of Existing Facilities The Department of Water Supply's Financial Statements are attached as Exhibit A. There is no site-specific operation and income data available. e. Water Audits In June 2016,Act 169, Session Laws of Hawaii 2016,was signed into law by the Governor. This Act requires Hawai`i public water utilities to complete and submit validated water audits to the State of Hawai`i,Department of Land and Natural Resources, Commission on Water Resources Management, on an annual basis. The water audits for the North Kona Water System has resulted in a decrease of the Infrastructure Leakage Index over the years since the initial water audit conducted in 2017. 4. NEED FOR THE PROJECT a. Health, Sanitation and Safety The health and safety of the residents of the Iki Place subdivision is jeopardized by the current sub-standard water system. Potential contamination and leakage problems exist due to reasons described previously in Section 3c. County water system standards also call for fire hydrants every 600 feet based on the existing lot sizes and zoning, so that no parcel is further than 300 feet of a hydrant. No parcel within the subdivision currently falls within this distance,leaving the homes within it particularly underserved with regard to fire protection. b. Aging Infrastructure The existing service lines which serve all 15 homes within the Iki Place subdivision are decades old in most cases and prone to breakage due to-degradation and impact. A visual inspection of these lines shows many repaired breaks along their respective lengths from years of use and exposure to the elements. c. System Operation and Maintenance The proposed water system will become part of the North Kona water system which consists of wells and pumping stations. No future extension of the proposed system is anticipated and 6 additional water service to neighboring properties will be available from it. Exhibit B includes the Operating Budget and Projected Cash Flow for the project. d. Growth The proposed water system improvements are intended to provide water service and fire protection to the 15 homes and 3 vacant lots that currently exist within the lid Place Subdivision. All 15 of the existing homes currently have water service via water meters located along Mamalahoa Highway as described in previous sections. These meters will be relocated to front the lots they serve once the new water mains and service laterals are installed within Iki Place. Water laterals for each of the 3 vacant lots will also be installed so that water service may be easily provided to each one in the future upon request by lot owners. No further growth within the subdivision or adjacent lots is anticipated. 5. ALTERNATIVES CONSIDERED Alternatives considered included: 1) Take no action. 2) Construct a private water system funded and maintained by lot owners. 3) Construct a water system to be dedicated to the County of Hawaii within the existing private lid Place ROW. a. Description Alternative 1—No Action: Taking no action,while financially and logistically the easiest alternative available,would not offer any improvement to the current system and force residents to continue relying on a system of water distribution which is prone to leaks and provides no fire protection. Alternative 1 was therefore ruled out as a solution to the problem and not considered further. Alternative 2—Construct a private water system funded and maintained entirely by lot owners: Some subdivisions on Hawaii Island elect to construct their own private water systems where DWS lacks the infrastructure or resources to provide service directly. These private systems must still be designed to the same standards as county-dedicable systems and are subject to approval and inspection by DWS. This alternative would involve installing a water main, service laterals and meters for each lot and two (2)fire hydrants, all of which would flow through-a master water meter tapped into the existing DWS system within Aniani Street. The upfront cost of this alternative is high and residents of the subdivision are currently unable to finance the improvements on their own. Furthermore,private systems require maintenance, administrative work and coordination by the parties which own them. Splitting the cost and burden of owning and operating a system such as this between only 18 owners is not cost-effective or feasible and the risk of defaulting on system maintenance and repairs would be great. Alternative 3 -Extend the existing County Department of Water Supply's system to serve the subdivision: Alternative 3 is nearly identical from an engineering standpoint as Alternative 2 and would provide a system meeting with DWS standards within the Iki Place subdivision and Aniani Street. This would include providing water mains within the existing roads, service laterals to each lot and two (2)fire hydrants, with a direct connection to the existing DWS system and no master water meter. An easement in favor of DWS would also need to be granted over the lid Place ROW for dedication of the water system to DWS. As this system would not be private, it would not be the responsibility of the subdivision's homeowners to monitor or maintain the system and would become part of the County's municipal system in perpetuity, Constructing a county-dedicable water system in a small,rural subdivision such as lid Place also opens up funding avenues through the USDA RUS Loan and Grant Program and fulfils the intent of the improvement district resolution established by residents and the Hawaii County Council. b. Design Criteria Alternatives 2 &3 -The water system required for either Alternative 2 or Alternative 3 would need to be designed in accordance with the County of Hawaii DWS standards found in the Water System Standards, State of Hawaii 2002, as amended. Road repair and traffic control would also be required in accordance with County of Hawaii Department of Public Works standards including Standard Specifications for Public Works Construction, September 1986 as amended. A breakdown of the water system design calculations for Alternatives 2& 3 is shown in the steps below: 1) Determine Design Flow Rate for Proposed System: The water source for either alternative would be DWS's upper level groundwater wells which would feed the proposed system by gravity. The average daily water usage per the Water System Standards is 400 gallons per day per home and the maximum daily usage is 600 gallons per day per home. Peak hour flow is five times the average daily flow. Flows for the 18 lot subdivision are estimated as follows: Average Daily Flow: 400 gpd x 18 lots=7,200 gpd Maximum Daily Demand: 600 gpd x 18 lots= 10,800 gpd or 7.5 gpm over a 24 hour period Peak Hour Demand: 5 x 7,200gpd=36,000 gpd or 25 gpm(round up to 100 gpm) Peak Hour Flow=100 gpm at 40 psi residual pressure Fire Flow= 1,000 gpm Design Flow=Peak Hour Flow Plus Fire Flow=1100 gpm at 20 psi residual pressure Pipelines are to be sized for maximum daily flow plus fire flow with a residual pressure of 20 psi at the critical fire hydrant and peak hour flow with a residual pressure of 40 psi. 2) Determine Static Pressure at critical points within the Proposed System: The Water System Standards require that static pressures in domestic service lines be a minimum of 43 psi (or 100 Ft. of head)and a maximum of 125 psi. Static pressures at critical points in the system were determined as follows: Elevation(Overflow) at Kalaoa Tank: 1,815 Feet Elevation at PRV in Akamai Street: 1,468 Feet Pressure setting of PRV in Akamai Street: 55psi Head(Ft.)to Pressure(psi) Conversion: 2.31 Ft./psi Elevation at point-of-connection in Aniani Street: 1,437 Feet(68 psi static pressure) Lowest Elevation within Iid Place ROW: +/-1,410 Feet(80 psi static pressure) Highest Elevation within lid Place ROW: +/-1,455 Feet(61 psi static pressure) 8 • Elevation of highest proposed hydrant: +/-1,450 Feet(63 psi static pressure) 3) Determine Frictional Losses and Flow Velocity for Design Flow: Using Bernoulli's Equation, frictional or `head' losses may be calculated for a given pipe size, pipe material and flowrate. Determining head losses during peak hour and design flows was • performed as follows: Length of 8-inch pipe from PRV to farthest proposed hydrant: +/-2100 Linear Feet(LF) Peak hour flow head loss for 8-inch DI Pipe at 100 gpm: 0.037 Ft. HEAD/ 100 LF Pipe Design flow head loss for 8-inch DI Pipe at 1100 gpm: 2.15 Ft. HEAD/ 100 LF Pipe Head loss during peak hour flow=0.037 Ft.HEAD/ 100 LF x 2100 LF pipe =0.78 Ft.HEAD = (0.3 psi) Head loss during design flow=2.15 Ft. HEAD/ 100 LF x 2100 LF pipe =45.15 Ft.HEAD =(20 psi) 4) Determine Residual Pressure and Flow Velocities for Peak Hour& Design Flows: Using the data above,flow velocities and estimated residual pressure in the proposed system can be calculated for peak hour flow and design flow conditions: Flow velocity during peak hour flow(100 gpm)=0.83 ft/sec Peak hour flow residual pressure =highest elevation static pressure—head loss =61 psi—0.3 psi(Negligible)=61 psi>40 psi Flow velocity during design flow(1,100 gpm) =7.02 ft/sec Design flow residual pressure =static pressure at highest proposed hydrant—head loss =63 psi—20 psi (Negligible)=43 psi>20 psi Maximum velocity in distribution mains (without fire flow) is less than the maximum allowable velocity of 6 feet per second with a residual pressure of>40 psi. Maximum velocity in distribution mains with fire flow is less than the maximum allowable velocity of 10 feet per second with a residual pressure of more than 20 psi. c. Map Alternative 2—Figure 5c.1 shows the proposed water system design for Alternative 2. The proposed layout includes the installation of approximately 1,150 linear feet of 8-inch ductile iron water main,two (2) fire hydrants, 10 service laterals, 18 water meter boxes and associated appurtenances. This system would be served by a 6-inch fire service meter(master meter) tapped into the existing 8-inch DWS main within Aniani Street. This alternative would also require an easement in favor of the lid Place Owner's Association within the section of the Aniani Street ROW which contained the private water system components. • 9 Ex v+�1cq vv'c.._ M w'2 "•'T' .._'_ 41..' —y,:o ( .. HAWAiI B _ —7 ti_.__. 1 BELT RD. ... 11 .et, 70,*Ma bO - `---tl"@ . nC- (12 TO BC BdA::ATCO) SI^,T, I. ' CM.TYFC"D'tAi'ERAI-. .. (TO:Ru+ux2 4.3 , •#-Ex-ve w•in#t�i gtis g (3)'7-3-OiO:027' ` l i (313.'.BE RPLKXTEP) • l_ .(3)7-3-019,B? 11 I j 1 j (3)7-3-016:0zr • I IY(TtF) .I ' I , IPM1CPRTT BODVDAP / — __ IL _.__ ___, I •' 7-3-017033 I I I I ) 1/. -RvErvl ivc1 racvav Rvurttirt • t` ffi 1 • FRS 2 el vAltk:YNN, • I PRBPQSEO TODRANT -•••— r 7 I1 �..-l_.___�- t •i FO68 UCIrSI^(•9 i PR9k` E n+TFAX 1 3/! R C�3 :ri II at p•DJ.WIER l()JSI'TO P APl .-.a�44,. .- .. ' U 150 I .,,f - -1Ns)f FRE BERf0F iiiiEWI Ti8•irerz8 FEET WATER SCHEMATIC PLAN.. JKI°PLACEWATER SYSTEM IMPROVEMENTS:PROJECT. ,(ALTERHATIVE2) / . ' PI-.I AIKI.N-.IC,OJADIOTRICT HAWAII isikio- Figure 5c.1 Alternative 3—Figure 5c.2 shows the proposed water system design for Alternative 3. The proposed layout includes the installation of approximately 1,150 linear feet of 8-inch ductile iron water main,two (2)fire hydrants, 10 service laterals, 18 water meter boxes and associated appurtenances. This alternative would require an easement in favor of the Hawaii County DWS within the entirety of the Iki Place ROW for system dedication. 10 ET.WATER VALL£ T -12: 4'-A ..42. 2"..12- - - .._I--•-�• °-x(_`__—_'zi-AI..._ a� � HAWAII BEl:7 Rb. i (14=Er•C/H'WATER YEARS - ^"'•-21-k----�_-l_At z (12 TO EE RELOCATED) ` . at;R 1- /8-XEA;' 1t. J 1.i ` ti (3)7-3-G1n-N.a -ice'' ' i 1 : / g. Ij i i (3)7-3Y0)3010 .i 1I iJ i ------------------------ . I I i I _ i — (3)7-3-01?0l0 ) (317-2-TIO030 I i (3)7-3_010:02t, I. i I I • j ; ' PRcvER r Ra AQy(T i H - (' tTT A._F�C ,v:. �1 1 FDCtOMD YTYRANT I. ( 'I '12 i 22 'L •12 '12• 2•CLEAT10aT f .�i11 :' 22 � t0 L-- .! PROMgO'$"LA'NAIEIt YA?1 � •l ,PRSFG$Q MIYFANT. -A i - . I .'Y' - ; .fCfj.S�'YL,,Trtn(1W)i,CRA i . 7 - P,AE� E?O;&',aL,Wt9IM WVN TO F14,( '� EA.0 DA.MAL,4AM i0 RELNN °A T !�7 s-ar.'oot 0 150 300 �Q?� e -cw EQnon im 1 FEET' ..1 PAP . i ( 7). f i 1 WATER.SCHEMATIC PLAN, IKI PLACE WATERSYSTEM IMPROVEMENTS PROJECT (ALTERNATIVE 3) KONANAIKI;N.KONA DISTRICT I-IAWAII.ISLAND Figure 5c.2 d- Environmental Impacts The water system for both Alternatives 2 &3 would be constructed within existing roadways. No environmental impacts to wetlands, floodplains, endangered species,historical or archaeological resources or other important land resources are anticipated. e. Land Requirements The water system for both Alternatives 2 & 3 would be constructed within existing roadway corridors. Alternative 2—Tapping into the existing DWS system with a private master meter,backflow preventer and subsequent 8-inch private water main in Aniani Street,which is county-owned and maintained,would require the county to grant an easement in favor of the Iki Place lot owners for maintenance and repairs to those private water system components. Alternative 3 -The Iki Place ROW is private,therefore the property owners within the subdivision would be required to grant an easement to the Department of Water Supply for construction, operationand maintenance of the water system. 11 ( f Construction Problems (Alternatives 2 &3) I. Site space constraints: The lid Place ROW is narrow at only 30 feet in width and at several points there are steep cut or fill embankments and existing driveways within it which will require careful location of meters to avoid the need for rock walls. The existing pavement is also narrow and crumbling and closure of one lane of traffic will most likely be required where trenching work is to occur. Access to existing driveways will need to be maintained so that residents can get in and out of their properties. It is very likely that the underlying subgrade consists of lava rock which may make trenching difficult. There are also private water service lines running beneath lid Place serving properties below the subdivision which will need to be avoided during construction. II. Hazardous trees: Several large,invasive trees have been identified within the ROW or just outside of it. The roots from these trees likely extend under the pavement of the existing roadway and would be severed during trenching operations. This root damage may be enough to destabilize the trees and cause a safety concern both during construction and on into the future. Tree removal will be recommended as part of the construction work for the project. III. Construction logistics: Staging of materials and equipment will be particularly challenging due to the narrow ROW width and the need to maintain access to all homes along lid Place during construction. A stockpile and storage area outside of the ROW will need to be identified and made available to the contractor performing the installation work. IV. Overhead utility lines& poles: Several utility poles within the ROW are likely to be close to the water main trench and may be destabilized during trenching activities. Temporary bracing or potentially pole replacement may be necessary during • construction. In addition,utility lines suspended from these poles are quite low in several areas and may need to be rerouted or relocated temporarily or permanently to allow excavation equipment and trucks to freely travel and work within the ROW without posing an electrical safety or service risk. V. Offsite drainage: A visual inspection of the lid Place ROW revealed an obvious stormwater runoff issue which occurs at a low point in the roadway,mauka of parcel 004 (see Figure 5c.1). Runoff from upslope collects at this point before crossing the roadway and continuing down into that parcel. Due to high seasonal rainfall,this drainage channel could pose a challenge during construction and a hazard to downstream property owners following project completion. It should be mitigated by installing a permanent drainage inlet and seepage pit to dispose of stormwater from upstream areas by ground infiltration. g. Sustainability Considerations I. Water and energy are closely linked in a water distribution system. Hawaii Island is home to some,of the world's deepest fresh water wells and lifting this ground water to a usable elevation comes with considerable energy cost. Every drop of water which leaks out of the local system is not only wasted water but also wasted energy. Improving the water service to the Ild Place subdivision through either Alternative 2 or 3 will help to alleviate these inefficiencies in the current system. II. Selecting Alternative 3 would result in the installation of wireless water meters by DWS. These meters can be read remotely, leading to faster and more efficient system 12 management and reduced energy usage compared to the current water system. It would also reduce or eliminate the need for physical meter reading by a DWS employee and • service vehicle. h. Cost Estimates Preliminary cost estimates for the project are as follows: Alternative 2: Construction Cost: $880,000.00 Other Costs: $105,000.00 $985,000.00 Alternative 3: Construction Cost: $880,000.00 Other Costs: $219,000.00 $1,099,000.00 Exhibit B includes the estimated annual operations and maintenance costs for both Alternatives 2 &3. Selecting Alternative 2 would place the burden of these operation and maintenance costs entirely on the Iki Place homeowners. 6. SELECTION OF AN ALTERNATIVE - a. Lfeecycle Cost Analysis Repairs and maintenance to the systems required for either Alternative 2 or 3 would essentially be the same,as both systems would require the same components laid out in the same arrangement. However,over the lifecycle of the proposed infrastructure, a county-dedicated system(Alternative 3)has a much lower lifecycle cost than a private system(Alternative 2) due to the simple fact that DWS is better trained and equipped to perform repairs and routine maintenance to underground water systems than the homeowners within the lki Place subdivision Alternative 3 is tttttherefor`e thehpreferre alterria ive from a lifecycle cost analysis ..R ux.Z:.A§.3 ,&.:..,:...,.,m �.,;_..._. 31�v.� .....,..x�„4. Y�£..�,. sl'+Sd.w"�':.,..:.'.. ...��..,X'�"KsY..�' perspective. b. Non-Monetary Factors The only practicable approach to supplying the Iki Place subdivision with a safe and reliable source of water is the construction of water lines, laterals,fire hydrants and appurtenances within existing roadways. Both alternatives 2 &3 accomplish this,however with limited funding by homeowners for a private system and limited resources for maintenance and repairs,Alternative 2 is not feasible. Funding assistance provided by the USDA RUS Loan and Grant Program (Alternative 3)to construct a county-dedicable water system is far more practical and repayment of the loan portion of the funding would be assured by an existing County Council-approved • Improvement District in accordance with Chapter 12, Improvements by Assessments of the Hawaii County Code. The creation of the improvement district also clearly demonstrates that Alternative 3 is preferred by the community. 13 7. PROPOSED PROJECT a. Preliminary Project Design The proposed project consists of water lines,laterals, fire hydrants and associated appurtenances. The system will be designed to the County of Hawaii Department of Water Supply Standards and will be dedicated to the County upon completion. The water system will be constructed within existing roadways. Pavement restoration will be required across an entire lane width (minimum)in the location of the water line trench in Aniani Street and the full width of the travelled way(+/- 14')within Ild Place. The paving improvement will likely increase the volume of stormwater runoff generated within lid Place and it is recommended that a drainage inlet and seepage pit be installed at a low point within the ROW(as previously discussed in Section 5.f.V.)to dispose of this excess runoff and protect properties downstream. The work will generally include but not be limited to: — Hazardous tree removal — Utility pole bracing/replacement as necessary — Installation of a drainage inlet and seepage pit at low point within Iki Place — 1,150 linear feet of 8-inch ductile iron waterline — Two fire hydrants — Eight Type"B" service laterals — Two Type"A"service laterals — Miscellaneous valves and fittings — Demolition of existing service laterals and meter boxes • — Pavement restoration The new water system will be connected to an existing 8-inch waterline located within the Aniani Street ROW and extend a new 8-inch line to the end of l d Place. Water system utility easements will be granted to the Department of Water Supply over Iid Place. b. Project Schedule July 22,2022 -Application,PER and ER to USDA August 5,2022 -USDA RUS Loan/Grant obligation November 2022 -Land and Easement Acquisition January 2023 -Plans and Specifications, and Design Complete March 2023 -Bid Advertisement May 2023 -Bid Opening November 2023 -Notice of Award—Construction Contract January 2024 -Notice to Proceed—Construction June 2024 - Substantial Completion July 2024 -Final Completion I . 14 • c. Permit Requirements Permits for the proposed work will need to be sought from two government agencies;the State Department of Transportation(DOT)for minor work within Mamalahoa Highway, and the Hawaii County Department of Public Works—Engineering Division(DPW) for work within Aniani Street and Kona Church of God Road. The area of ground disturbance necessary to complete installation of the proposed water system is less than one acre and is therefore too small to require a National Pollutant Discharge Elimination System(NPDES) General Permit for Construction Activities. No portion of the project lies within any Special Management Areas (SMAs),therefore an SMA permit will not be required. d. Sustainability Requirements I. Improving the water service to the Iki Place subdivision by installing a county-dedicable water system will help to reduce and eliminate wasted water and the energy required to pump it from the ground to a usable elevation. II. Installation of wireless water meters which can be read remotely will lead to faster and more efficient system management and,reduced energy usage compared to the current water system.These meters would also reduce or eliminate the need for physical meter reading by a DWS employee and service vehicle. • 15 e. Total Project Costs The itemized cost estimate based on the preliminary design is as follows: Project: Iki Place WaterSilatem:lriiprovernants, Location: North Kona;:Hawaii. • Praimii a y Constr'ettibii Cost Estimate • ltem Estimated No: Quantity. . Unit Description• Upit:`Cost Item:Cost Water System 1 1 IS Tree removal•:&:site prep $65;00000 '$65;000:00 2 7 :LS, .Nokiiizatign 8�1jerfnobilizatign. $1380040 $13;804:00 '3 1 LS Site staking•.&;layout '$3;496:00 $8;496.Q0 4 1• .LS' Probe eicisting Utility locations' ,$9;329 00.• $9;329.00 _ :5 1 " LS Saw cut e.'igsfiiig:AC'pavement $3;450:00 -$3,450 00 11150 'LF Trench prebr`eak $105:00 $120;7503Q0 7 '1150 LP: Tteiicti excaVatien and 8=iricli:D`I.:pipe*reach: $305;00 $350,750.00 :8. '9 I Ls'' Tie tnto:,existing.8'=lncfi.:Da.1:Main;(clitand:drop)- • :$5,1.6500 $5;165:00 .2. EA TypeA Service Lateral .:$2;4.45:00 $4;890.00 10 :8: EA Type.;C Senrice`Lateral ::$3;030 00 :$24124(100 11: 20:0 IF 15 'Copper:pipe :$33:64 $6;728:00 12 40 LF 1°`copperpipe. $25:50 ' $1,020.00 13 =2. EA Fire tiydrant$8;305.00 $8;305.00 $16;6.10.00 1:4 1 :EA Air-reiet•valve..$3,41000 :$3;4:10.00 $3;410.00 15 1 EA 2.''aeanout=$3 080;00' ;$3 080:00 .00).00 16 1 LS Remove and'reduce:eifisting meterbanlis.(DWS to•perform) $1.0,000 00 S10;000.00 17 1 LS System;testing&chlonnatiorr :$9;660 00 0660:00 SUBTOTAL FOR:WATER SYSTEM:(PLUS 4.712%HI GE TAX) $082;07.0;93 Repaving and Drainage ImPrd emerits.-,Arian Street&:Ili Place: 18 1 EA• 8'Drain Sump R-40:Cover:' ,$17 020 00 S.17,020;.00 19 14400. SF Cold plane&remove'_ald pavetrienf . :$6;33 ' '$91„152.00 .20 37.00. SF ;Pavement(27•,.Aiiiani Street) :$5.00 ;$22;200:00 ;21 • 10200, SF Pavemotii(:1 1.12,-Iki:Plac'e), .$.4:50 S45,9.00:00 22 1 .LS. Road striping _S5;52000 :$5;520.00 23 1 'LS Repeir concrete driveways. $7;475.00 '$7,47.5.00 SUBTOTAL FQR.REPAVING:&DRAINAGE.iMPRQUEMENTS(PLUS-4.712%Hl GE TAX) $198;18526 Other costs Design Survey&Environmental.Assessment' $148;583_:00 legal Fees $40;00000 Miscellaneous Costs: 00;000:00 SUBTOTAL FOR OTHER'CQSTS $218,563:00 TOTAL PROJECT.ESTINIATED:CQSTI S14098;839.19 Figure 7e.1 f Annual Operating Budget Financial statements for the County of Hawaii Department of Water Supply can be found in Exhibit A. Operations and maintenance cost estimates can be found in Exhibit B. Water rate schedules are found in Exhibit C. Financial assistance for this project is expected to be provided by the(USDA)United States Department of Agriculture Rural Utility Services(RUS) agency. • 16 Loan repayment will be through a Hawaii County Council initiated Improvement District process. S. CONCLUSIONS AND RECOMMENDATIONS The Iki Place Subdivision is currently served by a substandard water system which creates health and safety concerns for the residents. This project will provide safe and reliable water for consumption and fire protection. Any negative impacts will be temporary and short-term during the construction of the system. The residents of the Iki Place have struggled to find a way to construct the much-needed water system improvements for nearly a decade. Funding provided by the USDA loan and grant program will facilitate the construction of this much-needed water system improvement. It is recommended that the County and the Department of Water Supply move forward with the Improvement District requirements and apply to the USDA for the grant and loan. • 17 EXHIBIT A Department of Water Supply Financial Statement A • COUNTY OF HAWAI`I DEPARTMENT OF WATER SUPPLY (A component unit of the County of Hawaii, State of Hawaii) FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION WITH INDEPENDENT AUDITOR'S REPORTS Fiscal Year Ended June 30, 2021 N&K CPAs, Inc. ACC OU NTANTS ICON S U LTANTS 999 BISHOP STREET,SUITE 2200 I HONOLULU,HAWAII 96813 • T(808)524-2255 F(808) 523-2090 I nkcpa.com COUNTY OF HAWAI`I DEPARTMENT OF WATER SUPPLY (A component unit of the County of Hawaii, State of Hawaii) TABLE OF CONTENTS Pa e INDEPENDENT AUDITOR'S REPORT 4-6 MANAGEMENT'S DISCUSSION AND ANALYSIS 7- 11 FINANCIAL STATEMENTS Statement of Net Position 12- 13 Statement of Revenues, Expenses, and Changes in Net Position 14 Statement of Cash Flows 15- 16 Notes to Financial Statements 17 -43 REQUIRED SUPPLEMENTARY INFORMATION OTHER THAN MANAGEMENT'S DISCUSSION AND ANALYSIS Schedule of Proportionate Share of the Net Pension Liability 45 Schedule of Contributions (Pension) 46 Notes to Required Supplementary Information Required by GASB Statement No. 68 47 Schedule of Changes in the Net OPEB Liability and Related Ratios 48 Schedule of Contributions (OPEB) 49 Notes to Required Supplementary Information Required by GASB • Statement No. 75 50 - 51 2 COUNTY OF HAWAII DEPARTMENT OF WATER SUPPLY (A component unit of the County of Hawaii, State of Hawaii) TABLE OF CONTENTS Page INDEPENDENT AUDITOR'S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING AND ON COMPLIANCE AND OTHER MATTERS BASED ON AN AUDIT OF FINANCIAL STATEMENTS PERFORMED IN ACCORDANCE WITH GOVERNMENT AUDITING STANDARDS 52 - 53 SCHEDULE OF FINDINGS AND RESPONSES - 54- 55 CORRECTIVE ACTION PLAN 57 3 999 BISHOP STREET,SUITE 2200 N&K CPAs, Inc. HONOLULU,HAWAII 96813 ACCOUNTANTS]CONSULTANTS T(808) 524-2255 F(808)523-2090 INDEPENDENT AUDITOR'S REPORT To the Water Board County of Hawaii, Department of Water Supply Report on the Financial Statements We have audited the accompanying financial statements of the County of Hawaii, Department of Water Supply (Department), a component unit of the County of Hawaii, State of Hawaii, as of and for the fiscal year ended June 30, 2021, and the related notes to the financial statements, which collectively comprise the Department's basic financial statements as listed in the table of contents. Management's Responsibility for the Financial Statements Management is responsible for the preparation and fair presentation of these financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. Auditor's Responsibility Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our audit in accordance with auditing standards generally accepted in the United States of America and the standards applicable to financial audits contained in Government Auditing Standards, issued by the Comptroller General of the United States. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor's judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity's preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements. 4 N&K CPAs, Inc. ACCOUNTANTS I CONSULTANTS We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Opinion In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of the Department as of June 30, 2021, and the changes in its financial position and its cash flows for the fiscal year then ended in accordance with accounting principles generally accepted in the United States of America. Emphasis of Matter Adjustments to Prior Period Financial Statements As discussed in Note J to the financial statements, certain errors were discovered in relation to classification of capital asset balances as of June 30, 2020. Accordingly, the accompanying financial statements have been restated to correct these errors. Our opinion is not modified with respect to this matter. Other Matters - Required Supplementary Information Accounting principles generally accepted in the United States of America require that the management's discussion and analysis on pages 7 through 11 and the schedules of proportionate share of the net pension liability, contributions (pension), changes in the net OPEB liability and related ratios, and contributions (OPEB) on pages 45 through 51 be presented to supplement the basic financial statements. Such information, although not a part of the basic financial statements, is required by the Governmental Accounting Standards Board who considers it to be an essential part of financial reporting for placing the basic financial statements in an appropriate operational, economic, or historical context. We have applied certain limited procedures to the required supplementary information in accordance with auditing standards generally accepted in the United States • of America, which consisted of inquiries of management about the methods of preparing the information and comparing the information for consistency with management's responses to our inquiries, the basic financial statements, and other knowledge we obtained during our audit of the basic financial statements. We do not express an opinion or provide any assurance on the information because the limited procedures do not provide us with sufficient evidence to express an opinion or provide any assurance. • • N&K CPAs, Inc. ACCOUNTANTS I CONSULTANTS Other Reporting Required by Government Auditing Standards In accordance with Government Auditing Standards, we have also issued our report dated January 21, 2022 on our consideration of the Department's internal control over financial reporting and on our tests of its compliance with certain provisions of laws, regulations, contracts, and grant agreements and other matters. The purpose of that report is solely to describe the scope of our testing of internal control over financial reporting and compliance and the results of that testing, and not to provide an opinion on the effectiveness of the Department's internal control over financial reporting or on compliance. That report is an integral part of an audit performed in accordance with Government Auditing Standards in considering the Department's internal control over financial reporting and compliance. le ear, 2 ,'c. Honolulu, Hawaii January 21, 2022 • ------------- County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) MANAGEMENT'S DISCUSSION AND ANALYSIS Fiscal Year Ended June 30, 2021 • The Department of Water Supply, County of Hawaii(Department) operates as a semiautonomous agency charged with the responsibility of operating and maintaining the County of Hawaii's public water systems. The Department is a utility enterprise and presents its financial statements using the economic resources measurement focus and the accrual basis of accounting.This discussion and analysis is designed to assist the reader in focusing on the significant financial issues and activities and to identify any significant changes in financial position. Readers are encouraged to consider the information presented here in conjunction with the financial statements taken as a whole. Financial Statements The financial statements are designed to provide readers with a broad overview of the Department's finances in a manner similar to a private sector business. The statements of net position present information on all of the Department's assets, deferred outflows of resources, liabilities, and deferred inflows of resources, with the residual amount reported as net position. Over time, increases or decreases in net position may serve as a useful indicator of whether the financial position of the Department is improving or deteriorating. Net position increases when revenues exceed expenses. Increases in assets and deferred outflows of resources, without a corresponding increase in liabilities and deferred inflows of resources, result in increased net position, which indicate an improved financial position. In the case of the Department, assets plus deferred outflows of resources exceeded liabilities plus deferred inflows of resources by $212.1 million, at the close of the most recent fiscal year. This represents a decrease of$3.9 million, or 1.84% less than the previous year. At June 30, 2021, $235.9 million of the Department's net position was invested in capital assets (net of related debt), and ($23.8) million was unrestricted. • The statements of revenues, expenses, and changes in net position present information showing how the Department's net position changed during the fiscal year.All components of the changes in net position are reported as soon as the underlying event occurs, regardless of the timing of related cash flows. Thus, revenues and expenses are reported in the statements for some items that will result in cash flows in future fiscal periods. The statements of cash flows present changes in cash and cash equivalents (short-term investments with original maturities of three months or less from the date of acquisition), resulting from operating, investing, capital and related financing activities, and non-capital financing activities. Notes to Financial Statements The notes to the financial statements provide additional information that is essential to a full understanding of the data provided in the financial statements. Other Information In addition to the financial statements and accompanying notes, this report also presents certain required supplementary information concerning the Department's participation in the Employees' Retirement System of the State of Hawaii (ERS) and the Employer-Union Health Benefits Trust • Fund of the State of Hawaii (EUTF). 7 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) MANAGEMENT'S DISCUSSION AND ANALYSIS (Continued) Fiscal Year Ended June 30, 2021 Condensed Financial Information The following are summaries from the Department's financial statements as of and for the fiscal years ended June 31, 2021 and 2020. STATEMENTS OF NET POSITION 2020 2021 (as restated) Assets Capital assets, net $ 302,506,735 $ 300,269,903 Other assets 48,572,154 52,659,064 Total assets 351,078,889 352,928,967 . Deferred outflows of resources Deferred outflows of resources 10,072,803 10,093,069 Total deferred outflows of resources 10,072,803 10,093,069 Total assets and deferred outflows of resources $ 361,151,692 $ 363,022,036 • Liabilities Long-term debt $ 67,451,426 $ 66,433,693 Other liabilities 76,550,883 76,578,688 Total liabilities 144,002,309 143,012,381 Deferred inflows of resources Deferred inflows of resources 5,029,788 3,911,126 Total deferred inflows of resources 5,029,788 3,911,126 Net position Net investment in capital assets 232,086,655 230,896,241 Unrestricted (19,967,060) (14,797,712) Total net position 212,119,595 216,098,529 Total liabilities, deferred inflows of resources and net position $ 361,151,692 $ 363,022,036 8 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawai'i) MANAGEMENT'S DISCUSSION AND ANALYSIS (Continued) . Fiscal Year Ended June 30, 2021 Condensed Financial Information (Continued) STATEMENTS OF REVENUES, EXPENSES,AND CHANGES IN NET POSITION • 2020 2021 (as restated) Operating revenues-water sales $ 50,502,359 $ 49,052,933 Operating expenses 58,171,860 58,942,515 Operating loss (7,669,501) (9,889,582) Nonoperating revenues 1,271,384 1,475,971 Nonoperating expenses (1,927,397) (1,877,186) • Loss before contributions (8,325,514) (10,290,797) Contributions in aid of construction 4,346,580 3,202,379 Change in net position (3,978,934) (7,088,418) Net position at beginning of fiscal year 216,098,529 223,929,317 Prior period adjustment -- (742,370) Net position at beginning of fiscal year, as restated 216,098,529 223,186,947 Net position end of fiscal year $ 212,119,595 $ 216,098,529 Financial Analysis Capital assets, net increased by $2.2 million, or 0.74%, during the fiscal year ended June 30, 2021 (FY2021), due primarily to an increase in accumulated depreciation of$14.9 million, offset by increases in utility plant in service of $9.5 million and construction work in progress of $6.3 million. Other assets decreased by $4.1 million, or 7.76%, in FY2021, due primarily to decreases in investments of$2.0 million. • Deferred outflows of resources decreased by $0.02 million, or 0.20%, in FY2021, due primarily to a decrease in deferred outflows of resources for OPEB of$0.07 million offset by an increase in deferred outflows of resources for pensions of$0.05 million. Long-term debt increased by $1.0 million, or 1.53%, in FY2021, due primarily to bond and loan repayments of$5.8 million, offset by loan proceeds of$7.2 million, and refunding bond of$4.4 million with new issue of$3.7 million. 9 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) MANAGEMENT'S DISCUSSION AND ANALYSIS (Continued) Fiscal Year Ended June 30, 2021 Financial Analysis (Continued) Other liabilities decreased by $0.03 million, or 0.04% in FY2021, due primarily to collective increases in accrued compensation, customers' deposits, accrued vacation, and net pension liability totaling $3.73 million offset by collective decreases in accounts and construction contracts payable, accrued interest payable, accrued workers' compensation, unearned revenue (non current) and net OPEB liability totaling $3.75 million. Deferred inflows of resources increased by $1.1 million, or 28.60%, in FY2021, due primarily to an increase in deferred inflows of resources related to OPEB of$2.0 million offset by a decrease in deferred inflows of resources related to pensions of$1.0 million. • Net investment in capital assets increased by$1.2 million, or 0.52%, in FY2021, due primarily to an increase in net capital assets of$2.2 million, offset by an increase in long-term debt of$1.2 million. Total net position decreased $3.9 million, or 1.84%, in FY2021, due primarily to the results of operations of($3.9 million). In October 2020, the Water Board approved a 13% rate increase for water consumption and standby charges that became effective January 1, 2021. Total operating revenues increased by $1.4 million, or 2.95% in FY2021, due primarily to an increase in water consumption charges of $1.5 million and standby charges of$1.0 million offset by a decrease in power charges of $1.1 million. Operating expenses decreased by $0.7 million, or 0.91%, in FY2021, due primarily to a decrease in power and pumping of $1.4 million offset by increases in general and administrative and transmission and distribution expenses of$1.0 million. • Nonoperating expenses increased by $0.05 million, or 2.67%, in FY2021, due primarily to a decrease in interest on long-term debt of$0.28 million offset by an increase in losses on disposal of property of$0.30 million. Contributions in aid of construction (CIAC) increased by$1.14 million, or 35.73%, in FY2021,due primarily to an increase in current year dedications of$0.16 million, the addition to CIAC of$1.60 million for Uplands Subd Ph Il offset by decreases in external Federal funding of$0.11 million and CIAC-Facilities Charge of$0.31 million. Capital Assets and Debt Administration As of June 30, 2021, the Department had $302.5 million invested in capital assets, and $67.4 million of long-term debt outstanding. 10 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) MANAGEMENT'S DISCUSSION AND ANALYSIS (Continued) Fiscal Year Ended June 30, 2021 During 2021, major capital asset additions included: • $2.3 million for the Kaieie Mauka Facility Improvements. • $0.1 million for the Kaloko Mauka#1 Booster A&B repair. • $0.9 million for the Hualalai Deepwell Repair. • $0.8 million for the Keauohana Deepwell B Repair. • $0.2 million for the Parker#1 Deepwell Repair. • $0.2 million for the Honokaa Boosters A&B. • $0.3 million for the Kulaimano Well Repair. • $0.4 million for the Olaa Deepwell Repair. • $0.6 million for the Holualoa Deepwell Repair. • $0.4 million for the Lalamilo Deepwell Repair. • $1.0 milllion for the Keahuolu Deepwell Repair. More detailed information about the Department's capital assets is provided in Note D to the financial statements. • At June 30, 2021, the Department had outstanding $18.8 million in County of Hawaii general obligation bonds for public improvements, and $47.0 million in State of Hawai'i revolving fund loans. As of June 30, 2021, the Department, through the County of Hawaii, maintained an "AA" rating from Standard & Poor's, an "Aa2" rating from Moody's and an "AA+"rating from Fitch for general obligation debt. Currently Known Facts, Decisions, or Conditions Effective January 1, 2021, water rates increased 13%from the fiscal year ended June 30, 2020. 11 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) STATEMENT OF NET POSITION June 30, 2021 ASSETS Current assets Cash and cash equivalents $ 17,119,629 Investments 18,000,000 Interest receivable 437,619 Trade receivables, less allowance for doubtful accounts of $1,700,000 8,128,905 Intergovernmental receivables 263,386 Other receivables 245,871 Inventories of materials and supplies 1,438,500 Prepaid expenses and other 50,019 Total current assets 45,683,929 Restricted cash 888,225 Investments 2,000,000 Capital assets Utility plant in service 538,770,419 Less accumulated depreciation (292,046,560) 246,723,859 Land and rights 5,267,919 Preliminary survey and investigation charges 5,515,581 Construction work in progress 44,999,376 Net capital assets 302,506,735 Total assets 351,078,889 DEFERRED OUTFLOWS OF RESOURCES Deferred outflows of resources related to pensions 7,488,980 Deferred outflows of resources related to OPEB 2,583,823 Total deferred outflows of resources 10,072,803 • Total assets and deferred outflows of resources $ 361,151,692 The accompanying notes are an integral part of these financial statements. 12 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) STATEMENT OF NET POSITION (Continued) June 30, 2021 LIABILITIES Current liabilities Accounts and construction contracts payable, including retainages $ 5,900,022 Long-term debt, current portion 6,214,530 Accrued compensation 1,961,911 Accrued interest payable 475,544 Accrued workers' compensation, current portion 97,888 Accrued vacation, current portion 629,515 Customers' deposits, current portion 284,487 Total current liabilities 15,563,897 Accrued workers' compensation, noncurrent portion 282,112 Accrued vacation, noncurrent portion 1,400,153 Customers' deposits, noncurrent portion 15,835,180 Net pension liability 35,290,257 Net OPEB liability 14,393,814 Long-term debt, noncurrent portion 61,236,896 Total liabilities • 144,002,309 DEFERRED INFLOWS OF RESOURCES Deferred inflows of resources related to pensions 1,774,106 Deferred inflows of resources related to OPEB 3,073,292 Unamortized gain on refunding of debt 182,390 Total deferred inflows of resources 5,029,788 NET POSITION Net investment in capital assets 232,086,655 • Unrestricted (19,967,060) Total net position 212,119,595 Total liabilities, deferred inflows of resources and net position $ 361,151,692 The accompanying notes are an integral part of these financial statements. 13 County of Hawaii • • Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) STATEMENT OF REVENUES, EXPENSES, AND CHANGES IN NET POSITION Fiscal Year ended June 30, 2021 OPERATING REVENUES • Water sales $ 50,502,359 OPERATING EXPENSES • Power and pumping 18,416,244 Depreciation 14,934,054 General and administrative 12,007,335 Transmission and distribution 7,470,735 Purification 2,296,296 Maintenance and repairs 1,682,148 Customers' accounting and collecting 1,365,048 Total operating expenses 58,171,860 Operating loss (7,669,501) NONOPERATING REVENUES Interest income 381,448 Other • 889,936 Total nonoperating revenues • 1,271,384 NONOPERATING EXPENSES Interest expense on long-term debt (1,280,834) Loss on disposal of capital assets (412,328) Other (234,235) Total nonoperating expenses _(1,927,397) Loss before contributions (8,325,514) CONTRIBUTIONS IN AID OF CONSTRUCTION 4,346,580 Change in net position (3,978,934) NET POSITION Beginning of fiscal year, as previously reported 217,335,813 Prior period adjustment (1,237,284) Beginning of fiscal year, as restated 216,098,529 Net position at end of fiscal year $ 212,119,595 • The accompanying notes are an integral part of these financial statements. 14 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) STATEMENT OF CASH FLOWS Fiscal Year ended June 30, 2021 CASH FLOWS FROM OPERATING ACTIVITIES Cash received from customers $ 49,503,797 Payments to suppliers for goods and services (22,763,519) Payments to employees for services (17,758,696) Net cash provided by operating activities 8,981,582 CASH FLOWS FROM CAPITAL AND RELATED FINANCING ACTIVITIES Principal paid on long-term debt (5,833,067) Debt proceeds 7,206,603 Interest paid on long-term debt (1,610,328) Acquisition and construction of capital assets (15,224,953) Cash received from contributions in aid of construction and other 1,316,044 Net cash used in capital and related financing activities (14,145,701) CASH FLOWS FROM INVESTING ACTIVITIES Purchase of investments (13,000,000) Proceeds from sale and maturities of investments 15,000,000 • Interest received 620,633 Net cash provided by investing activities 2,620,633 Net decrease in cash and cash equivalents (2;543,486) CASH AND CASH EQUIVALENTS-BEGINNING OF FISCAL YEAR 20,551,340 CASH AND CASH EQUIVALENTS-END OF FISCAL YEAR $ 18,007,854 RECONCILIATION OF CASH AND CASH EQUIVALENTS TO THE STATEMENT OF NET POSITION Unrestricted $ 17,119,629 Restricted 888,225 $ 18,007,854 The accompanying notes are an integral part of these financial statements. • 15 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) STATEMENT OF CASH FLOWS (Continued) Fiscal Year ended June 30, 2021 RECONCILIATION OF OPERATING LOSS TO NET CASH PROVIDED BY OPERATING ACTIVITIES' Operating loss $ (7,669,501) Depreciation 14,934,054 Provision for doubtful accounts 202,367 Change in assets, deferred outflows of resources, liabilities and deferred inflows of resources Trade and other receivables (1,224,963) Inventories of materials and supplies 98,855 Prepaid expenses and other (4,903) Deferred outflows of resources related to pensions • (47,272) Deferred outflows of resources related to OPEB 67,538 Accounts and construction contracts payable, including retainages (133,533) Customers' deposits 24,034 Other accrued liabilities 160,709 Net pension liability 3,261,009 Net OPEB liability (1,685,933) Deferred inflows of resources related to pensions (980,539) Deferred inflows of resources related to OPEB 1,979,660 Net cash provided by operating activities $ 8,981,582 SUPPLEMENTAL DISCLOSURE OF NONCASH CAPITAL . AND RELATED FINANCING ACTIVITIES . Contributions in aid of construction $ 3,263,419 Amortization of unamortized gain on refunding of debt $ 17,004 Amortization of bond premium $ 242,352 • Public improvement bonds were issued to refund debt issued in 2010. The $4,448,051 proceeds were used for the current refunding of $4,403,750 of outstanding public improvement bonds. • The accompanying notes are an integral part of these financial statements. 16 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE A-NATURE OF ACTIVITIES The Department of Water Supply, County of Hawai'i (Department) is administered by the Water Board, which consists of nine members who serve staggered terms of five years in length. Board members are appointed by the Mayor of the County of Hawai'i, State of Hawaii (County) and are confirmed by the County Council, as required by the County Charter. NOTE B-SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (1) Financial Statement Presentation-The Department is a component unit of the County (primary government).The accompanying financial statements present only the financial position and activities of the Department and do not purport to, and do not present the financial position of the County, the changes in its financial position, or, where applicable, its cash flows. (2) Measurement Focus and Basis of Accounting - The Department's financial statements are prepared using the economic resources measurement focus and the accrual basis of accounting. Under this method, revenues are recorded when earned and expenses are recorded at the time liabilities are incurred. (3) Cash and Cash Equivalents - For purposes of the statement of cash flows, the Department considers all highly liquid investments with a maturity of three months or less or money market funds with a weighted average maturity of three months or less when purchased to be cash equivalents. (4) Investments - Investments in time certificates of deposits are carried at cost, which approximates fair value. (5) Trade Receivables-Trade receivables are recorded at the invoiced amount and do not bear interest. The allowance for doubtful accounts is the Department's best estimate of the amount of probable credit losses in the Department's existing trade receivables.The Department determines the allowance based on historical write-off experience. The Department reviews its allowance for doubtful accounts monthly. Past-due balances over 90 days and over a specified amount are reviewed individually for collectability. Account balances are charged off against the allowance after all means of collection have been exhausted and the potential for recovery is considered remote. (6) Inventories of Materials and Supplies - Materials and supplies are stated at cost on an average cost basis. (7) Restricted Assets- Unspent bond proceeds that are restricted for purchases of water system improvements are recorded as restricted assets. 17 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 • NOTE B-SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) (8) Capital Assets- Capital assets in service as of January 1, 1950, date of inception of the Department, were recorded at the cost of the assets acquired by the County for its water system from January 1, 1924 to December 31, 1949, less accumulated depreciation to December 31, 1949, as determined by the Department. Assets purchased prior to 1924 and property acquired by gift or grant prior to 1950 are not included in capital assets. Additions to capital assets since January 1, 1950 are stated at cost and include contributions by governmental agencies, private subdividers, and customers at their cost or estimated cost. The capitalization threshold of assets is $400 with estimated useful lives greater than one year. Construction costs include amounts for contract work, engineering supervision, and other direct costs and overhead costs. Preliminary survey and investigation charges represent expenditures incurred to determine the feasibility of potential water system sites for future development. Maintenance and repairs and minor replacements are charged to operations. Major replacements, renewals, and betterments are capitalized to capital asset accounts. • Depreciation is computed using the straight-line method over the following estimated useful lives: Distribution mains and accessories 40 years Structures and improvements 40 to 50 years Electric and hydraulic pumping equipment 10 years Services 25 years • Transmission mains and accessories, hydrants and purification system 40 years • Meters 10 years Transportation, communication, tools • and office equipment and furniture 5 years Other equipment 5 to 10 years • Other fire protection plant 25 years • Annual depreciation rates are applied to costs of the various classes of depreciable assets on the group basis or, as to transportation equipment, to the cost of individual units of property. Gains or losses resulting from the sale, retirement, or disposal of capital assets in service are charged or credited to operations in the year realized. • 18 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE B-SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) (9) Compensated Absences - Employees earn vacation credits at the rate of one and three-quarter working days for each month of service. Up to 90 days of vacation leave credits can be accumulated per employee. In addition, employees who work overtime can elect to take compensatory time off instead of overtime pay. The time off is earned at the rate of one and a half hours for each hour of overtime worked. Both compensatory time off and vacation credits are converted to pay upon termination of employment. Sick leave•can be taken only in the event of illness and is not convertible to pay upon termination of employment. Accumulated sick leave at June 30, 2021 amounted to approximately $6,300,000. (10) Pensions - For purposes of measuring the net pension liability, deferred outflows of resources and deferred inflows of resources related to pensions, and pension expense, information about the fiduciary net position of the Employees' Retirement System of the State of Hawaii (ERS) and additions to/deductions from the ERS's fiduciary net position have been determined on the same basis as they are reported by the ERS. For this purpose, employer and member contributions are recognized in the period in which the contributions are legally due and benefit payments (including refunds of employee contributions) are recognized when due and payable in accordance with benefit terms. Investments are reported at fair value. (11) Postemployment Benefits Other Than Pensions (OPEB) - For the purposes of measuring the net OPEB liability, deferred outflows of resources and deferred inflows of resources related to OPEB, and OPEB expense, information about the fiduciary net position of the Hawaii Employer-Union Health Benefits Trust Fund (EUTF) and additions to/deductions from EUTF's fiduciary net position have been determined on the same basis as they are reported by EUTF. For this purpose, EUTF recognizes benefit payments when due and payable in accordance with the benefit terms. Investments are . reported at fair value, except for investments in commingled and money market funds, which are reported at net asset value (NAV). The NAV is based on the fair value of the underlying assets held by the respective fund less its liabilities. (12) Net Position - Net position represents the difference between assets and deferred outflows of resources less liabilities and deferred inflows of resources. Net position is classified in the following components: net investment in capital assets and unrestricted net position. Net investment in capital assets consists of capital assets, net of accumulated depreciation, reduced by outstanding debt related to the acquisition or construction of those assets, less unspent bond proceeds. Unrestricted net position consists of all other net position not categorized as net investment in capital assets. When both restricted and unrestricted resources are available for use, generally, it is management's policy to use restricted resources first, then unrestricted resources, as they are needed. 19 • County of Hawaii Department of Water Supply (A component unit of the County of Hawai`ii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 • NOTE B-SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) (13) Operating Revenues and Expenses - Revenues and expenses are distinguished between operating and nonoperating items. Operating revenues generally result from providing services in connection with the Department's principal ongoing operations. The principal operating revenues of the Department are fees charged to customers for providing water services. Operating expenses include the costs associated with providing water services, administrative expenses and depreciation on capital assets. All revenues and expenses not meeting these definitions are reported as nonoperating revenues and expenses. (14) Contributions in Aid of Construction - Contributions in aid of construction represent cash or capital assets received by the Department to aid in the construction of infrastructure assets. It also includes the forgiveness of principal due on state revolving fund loans that were used to finance the costs of infrastructure needed to maintain the • water system. Contributions in aid of construction are recognized when they are accepted by the Water Board and when all applicable eligibility requirements have been met. (15) Deferred Outflows of Resources and Deferred Inflows of Resources - Deferred • outflows of resources represent a consumption of net position that applies to a future period and will not be recognized as an outflow of resources (expense) until that time. Deferred inflows of resources represent an acquisition of net position that applies to a future period and will not be recognized as an inflow of resources (revenue) until that time. (16) Use of Estimates - The preparation of the financial statements in accordance with accounting principles generally accepted in the United States of America requires management to make a number of estimates and assumptions that affect the reported • amounts of assets, deferred outflows of resources, liabilities, deferred inflows of resources and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Significant items subject to such estimates and assumptions include the carrying amount of capital assets, valuation allowances for trade receivables, valuation of noncash contributions in aid of construction, accrued workers' compensation, pensions and postretirement healthcare and life insurance benefits.Actual results could differ from those estimates. 20 County of Hawaii • Department of Water Supply • (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 • NOTE B -SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) • (17) New Accounting Pronouncements-The Governmental Accounting Standards Board (GASB). issued Statement No. 87, Leases. This Statement requires the recognition of certain lease assets and liabilities for leases that previously were classified as operating leases and recognized as inflows of resources or outflows of resources based on the payment provisions of the contract. It establishes a single model for lease accounting based on the foundational principle that leases are financings of the right to use an underlying asset. Under this Statement, a lessee is required to recognize a lease liability and an intangible right-to-use lease asset, and a lessor is required to recognize a lease receivable and a deferred inflow of resources. The requirements of this Statement are effective for reporting periods beginning after June 15, 2021. Management has not yet determined the effect this Statement will have on the Department's financial statements. The GASB issued Statement No. 91, Conduit Debt Obligations. The primary objectives of this Statement are to provide a single method of reporting conduit debt obligations by issuers and eliminate diversity in practice associated with (1) commitments extended by. issuers, (2) arrangements associated with conduit debt obligations, and (3) related note disclosures.This Statement achieves those objectives by clarifying the existing definition of a conduit debt obligation; establishing that a conduit debt obligation is not a liability of the issuer; establishing standards for accounting and financial reporting of additional commitments and voluntary commitments extended by issuers and arrangements associated with conduit debt obligations; and improving required note disclosures. The requirements of this Statement are effective for reporting periods beginning after December 15, 2021. Management has not yet determined the effect this Statement will have on the Department's financial statements. The GASB issued Statement No. 92, Omnibus 2020. This Statement establishes accounting and financial reporting requirements for specific issues related to leases, intra-entity transfers of assets, postemployment benefits, government acquisitions, risk financing and insurance-related activities of public entity risk pools, fair value measurements, and derivative instruments. The requirements in paragraphs 6 and 7 of this Statement are effective for fiscal years beginning after June 15, 2021, while the requirements in paragraphs 8, 9, and 12 of this Statement are effective for reporting periods beginning after June 15, 2021. Management has not yet determined the effect this Statement Will have on the Department's financial statements. • 21 • County of Hawaii - Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE B-SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) The GASB issued Statement No. 94, Public-Private and Public-Public Partnerships and Availability Payment Arrangements.. The primary objective of this Statement is to improve financial reporting by addressing issues related to public-private and public partnership arrangements (PPPs). As used in this Statement, a PPP is an arrangement in which a government (the transferor) contracts with an operator (a governmental or • nongovernmental entity) to provide public services by conveying control of the right to operate or use a nonfinancial asset, such as infrastructure or other capital asset (the underlying PPP asset), for a period of time in an exchange or exchange-like transaction. This Statement also provides guidance for accounting and financial reporting for availability payment arrangements (APAs). As defined in this Statement, an APA is an arrangement in which a government compensates an operator for services that may include designing, constructing, financing, maintaining, or operating an underlying nonfinancial asset for a period of time in an exchange or exchange-like transaction. The requirements of. this Statement are effective for reporting periods beginning after June 15, 2022. Management has not yet determined the effect this Statement will have on the Department's financial statements. The GASB issued Statement No. 96, Subscription-Based Information Technology Arrangements. This Statement provides guidance on the accounting and financial reporting for subscription-based information technology arrangements (SBITA) for government end users.This Statement(1) defines a SBITA; (2)establishes that a SBITA results in a right-to-use subscription asset - an intangible asset - and a corresponding subscription liability; (3) provides the capitalization criteria for outlays other than subscription payments, including implementation costs of a SBITA; and (4) requires note disclosures regarding a SBITA. The requirements of this Statement are effective for reporting periods beginning after June 15, 2022. Management has not yet determined the effect this Statement will have on the Department's financial statements. NOTE C - DEPOSITS AND INVESTMENTS • At June 30, 2021, the carrying amount of deposits (cash, time certificates of deposit, and money market funds) was $38,007,854, with a corresponding bank balance of$38,971,017. These amounts were fully insured or collateralized with securities held by the County's agent in the County's name. 22 County of Hawaii • Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS • June 30, 2021 NOTE C -DEPOSITS AND INVESTMENTS (Continued) The Hawaii Revised Statutes (HRS) authorizes the County Director of Finance to invest Department moneys that are in excess of the amounts necessary for meeting immediate requirements. The primary objective of the County's investment policy is to safeguard the principal. The secondary objective is to meet the liquidity needs of the Department. The third objective is to return an acceptable yield. In accordance with the HRS, the County's investment policy permits investments in obligations of or guaranteed by the U.S.government, obligations of the State of Hawaii, federally insured savings and checking accounts, time certificates of deposit, and repurchase agreements with federally insured financial institutions. Investments in time certificates of deposits totaled $20,000,000 at June 30, 2021. Custodial Credit Risk- Custodial credit risk for deposits is the risk that, in the event of the failure of a depository financial institution, the Department will not be able to recover deposits or will not be able to recover collateral securities that are in possession of an outside party. The Department's policy requires deposits to be maintained at financial institutions that are members of the Federal Deposit Insurance Corporation and for deposits in excess of insured amounts to be collateralized with securities in accordance with the HRS. • Custodial credit risk for investments is the risk that, in the event of the failure of the counterparty (e.g., broker-dealer) to a transaction, the Department will not be able to recover the value of its investment or collateral securities that are in,the possession of another party. The Department's policy provides a list of authorized counterparties as well as minimum requirements that counterparties must demonstrate in order to be utilized by the Department. Interest Rate Risk- Interest rate risk is the risk that changes in interest rates will adversely affect the fair value of an investment. Generally,the longer the maturity of an investment, the greater the sensitivity of its fair value to changes in market interest rates. One of the ways that the Department manages its exposure to interest rate risk is by purchasing a combination of short-term and mid-term investments and by timing cash flows from maturities so that a portion of the portfolio is maturing or nearing maturity evenly over time as necessary to provide the cash flow and liquidity needed for operations. The Department monitors the interest rate risk inherent in its portfolio by measuring the weighted average maturity of its portfolio. Credit Risk and Concentration of Credit Risk- Credit risk is the risk that an issuer of an investment will not fulfill its obligation to the holder of the investment. Concentration of credit risk is the risk of loss attributed to the magnitude of a government's investment in a single issuer. The Department's policy limits investment options to those authorized in the HRS and requires the diversification of assets as to issuer. • • 23 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE D-CAPITAL ASSETS The following summarizes the Department's capital assets at June 30, 2021: • Amount Utility plant in service Structures and improvements $ 201,177,444 Distribution mains and accessories 146,414,763 Electric and hydraulic pumping equipment 73,403,352 Transmission mains and accessories 36,614,323 Services 32,792,603 Purification system 13,384,414 Meters 11,402,561 Hydrants 9,760,517 Transportation equipment • 4,583,687 Communication equipment 3,182,341 Office equipment and furniture 2,752,811 Tools and work equipment 1,640,771 Other equipment 1,641,245 Other fire protection plant 19,587 Total utility plant in service 538,770,419 Less accumulated depreciation (292,046,560) 246,723,859 Land and rights 5,267,919 Preliminary survey and investigation charges 5,515,581 Construction work in progress 44,999,376 Net capital assets $ 302,506,735 The following is a summary of changes in capital assets during the fiscal year ended June 30, 2021: Balance July 1,2020 Retirements/ Balance (restated) Additions Transfers June 30,2021 Utility plant in service $ 529,212,470 $ 10,636,869 $ (1,078,920) $ 538,770,419 Less accumulated depreciation (277,778,573) (14,934,054) 666,067 (292,046,560) 251,433,897 (4,297,185) (412,853) 246,723,859 Land and rights 5,261,319 .6,600 — 5,267,919 Preliminary survey and investigation charges 4,926,822 822,977 (234,218) 5,515,581 Construction work in progress 38,647,865 16,639,120 (10,287,609) 44,999,376 $ 300,269,903 $ 13,171,512 $ (10,934,680) $ 302,506,735 24 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE E-LONG-TERM OBLIGATIONS At June 30, 2021, long-term debt consisted of the following: Amount • Public improvement refunding bonds($13,497,500 issued),2016 Series B, payable to the County, interest at 3%to 5%,due in semiannual installments through 2026 $ 8,830,000 Public improvement refunding bonds($6,353,750 issued),2016 Series E, payable to the County, interest at 2%to 5%,due in semiannual installments through 2029 5,838,750 Public improvement refunding bonds($3,751,250 issued),2020 Series C&D, payable to the County,interest at 5%,due in semiannual installments through 2029 3,405,000 Public improvement refunding bonds($5,752,612•issued),2007 Series C, payable to the County,interest at 4%to 5%,due in semiannual installments through 2021 639,952 Public improvement bonds($147,000 issued),2008 Series A,payable to the County,interest at 4.125%,due in semiannual installments through 2043 117,541 State Revolving Fund loans($73,624,812 loaned)payable to the State of Hawaii,interest up to 1.37%,due in semiannual installments through 2040 46,997,951 Total long-term debt 65,829,194 Add:Unamortized premium 1,622,232 67,451,426 Less: Current portion (6,214,530) Noncurrent portion $ 61,236,896 The public improvement bonds consist of long-term obligations to the County that reflect the Department's proportionate share of general obligation bonds that were issued by the County, in part, for the purpose of improving the public water system. The County's general obligation bonds are an absolute and unconditional general obligation of the County for which its full faith and credit are pledged. The principal and interest payments on the bonds are a first charge on the general fund of the County. The Department's State Revolving Fund Loans are direct,borrowings of the Department for which it pledges either its full faith and credit or gross revenues of the Department. 25 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS "June 30, 2021 NOTE E-LONG-TERM OBLIGATIONS(Continued) The following is a summary of changes in long-term debt during the fiscal year ended June 30, 2021: • Balance Balance Due Within July 1,2020 Additions Decreases June 30,2021 One Year State Revolving Fund Loans $ 42,909,525 $ 7,206,603 $ (3,118,177) $ 46,997,951 $ 3,417,443 Public Improvement Bonds 22,198,633 -- (3,367,390) 18,831,243 2,797,087 Total $ , 65,108,158 $ 7,206,603 $ (6,485,567) $ 65,829,194 $ 6,214,530 At June 30, 2021, future principal and interest payments for long-term debt are scheduled as follows: Public Year Ending State Revolving Fund Loans improvement Bonds Total June 30, Principal Interest Principal Interest Principal Interest 2022 $ 3,417,443 $ 726,119 $ 2,797,087 $ 751,032 $ 6,214,530 $ 1,477,151 2023 .2,933,881 659,020 2,267,275 624,456 5,201,156 1,283,476 2024 2,968,161 607,556 2,384,921 508,185 5,353,082 1,115,741 2025 3,002,936 555,540 2,496,322 393,728 5,499,258 949,268 2026 3,038,178 503,001 2,603,980 288,195 5,642,158 791,196 2027-2031 14,615,768 1,769,103 6,205,000 370,421 20,820,768 2,139,524 2032-2036 12,280,555 752,069 27,539 13,631 12,308,094 765,700 2037-2041 4,741,029 119,132 33,708 7,462 4,774,737 126,594 2042-2046 -- -- 15,411 958 15,411 958 $ 46,997,951 $ 5,691,540 $ 18,831,243 $ 2,958,068 $ 65,829,194 $ 8,649,608 In November 2020, the County issued $15,005,000 in refunding bonds as the 2020 Series C&D general obligation bond issue. The refunding bonds have a true interest cost of 0.86% and were issued to refund $17,615,000 of the total callable bonds outstanding of the 2010 Series B general,obligation bond issue. The bonds refunded bore interest at a rate of 5.0%. The Department has a 25% proportionate share of the 2010 Series B and 2020 Series C&D general obligation bond issues. The par amount of $3,751,250 plus a premium of$719,895 minus $23,094 in underwriting fees, insurance, and other issuance costs resulted in the Department's share of net proceeds of$4,448,051. The Department's total debt service requirements decreased by $585,931 as a result of the refunding, and the net economic gain (difference between the present values on the old and new debt) after taking into account all allocable costs of issuance of the bonds was$511,467. 26 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE E-LONG-TERM OBLIGATIONS (Continued) In prior years, the County defeased certain general obligation bonds by placing the proceeds of new bonds in irrevocable trusts to provide for all future debt service payments on the old bonds. Accordingly, the assets of the irrevocable trust and the liability of the defeased bonds are not included for the Department's proportionate share on the Department's financial statements. As of June 30, 2021, the Department's proportionate share of the outstanding balance of the unpaid defeased bonds amounted to $15,822,500. • NOTE F -OTHER LONG-TERM OBLIGATIONS The following is a summary of other long-term obligations transactions for the fiscal year ended June 30, 2021: Balance Deductions Balance Due Within July 1,2020 Additions and Payments June 30,2021 One Year Accrued workers' compensation $ 660,000 $ -- $ (280,000) $ 380,000 $ 97,888 Accrued vacation 1,809,892 897,318 (677,542) 2,029,668 629,515 Customers'deposits 16,095,633 896,631 (872,597) 16,119,667 284,487 Total $ , 18,565,525 $ 1,793,949 $ (1,830,139) $ 18,529,335 $ 1,011,890 NOTE G - EMPLOYEE BENEFITS Pension Plan Plan Description - Generally, all full-time employees of the State and counties are required • to be members of the ERS, a cost-sharing multiple-employer defined benefit pension plan that administers the State's pension benefits program. Benefits, eligibility, and contribution requirements are governed by HRS Chapter 88 and can be amended through legislation. The ERS issues publicly available annual financial reports that can be obtained at ERS' website: https://ers.ehawaii.gov. Benefits Provided - The ERS Pension Trust is comprised of three pension classes for membership purposes and considered to be a single plan for accounting purposes since all assets of the ERS may legally be used to pay the benefits of any of the ERS members or beneficiaries. The ERS provides retirement, disability and death benefits with three membership classes known as the noncontributory, contributory and hybrid retirement classes. The three classes provide a monthly retirement allowance equal to the benefit multiplier (generally 1.25% or 2%) multiplied by the average final compensation multiplied by years of credited service.Average final compensation for members hired prior to July 1, 2012 is an average of the highest salaries during any three years of credited service, excluding any salary paid in lieu of vacation for members hired January 1, 1971 or later and the average of 27 County of Hawaii • Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii`i) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) the highest salaries during any five years of credited service including any salary paid in lieu of vacation for members hired prior to January 1, 1971. For members hired after June 30, 2012, average final compensation is an average of the highest salaries during any five years of credited service excluding any salary paid in lieu of vacation. Each retiree's original retirement allowance is increased on each July 1 beginning the calendar year after retirement. Retirees first hired as members prior to July 1, 2012 receive a 2.5% increase each year of their original retirement allowance without a ceiling (2.5% of the original retirement allowance the first year, 5.0% the second year, 7.5% the third year, etc.). Retirees first hired as members after June 30, 2012 receive a 1.5% increase each year of their original retirement allowance without a ceiling (1.5% of the original retirement allowance the first year, 3.0% the second year, 4.5% the third year, etc.). The following summarizes the provisions relevant to the largest employee groups of the respective membership class. Retirement benefits for certain groups, such as police officers, .firefighters, some investigators, sewer workers, judges, and elected officials, vary from general employees. Noncontributory Class Retirement Benefits - General employees' retirement benefits are determined as 1.25% of.average final compensation multiplied by the years of credited service. Employees with ten years of credited service are eligible to retire at age 62. Employees with 30 years of credited service are eligible to retire at age 55. Disability Benefits- Members are eligible for service-related disability benefits regardless of length of service and receive a lifetime pension of 35% of their average final compensation. Ten years of credited service is required for ordinary disability. Ordinary disability benefits are determined in the same manner as retirement benefits but are payable immediately, without an actuarial reduction, and at a minimum of 12.5% of average final compensation. Death Benefits - For service-connected deaths, the surviving spouse/reciprocal beneficiary receives a monthly benefit of 30% of the average final compensation until remarriage or re-entry into a new reciprocal beneficiary relationship. Additional benefits are payable to surviving dependent children up to age 18. If there is no spouse/reciprocal . beneficiary or dependent children, no benefit is payable. Ordinary death benefits are available to employees who were active at time of death with at least ten years of credited service. The surviving spouse/reciprocal beneficiary (until remarriage/re-entry into a new reciprocal beneficiary relationship) and dependent children (up to age 18) receive a benefit equal to a percentage of the member's accrued maximum allowance unreduced for age or, if the member was eligible for retirement at the time of death, the surviving spouse/reciprocal beneficiary receives 100% joint and survivor lifetime pension and the dependent children receive a percentage of the member's accrued maximum allowance unreduced for age. 28 • County of Hawaii Department of Water Supply • (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) Contributory Class for Employees Hired prior to July 1, 2012 Retirement Benefits - General employees' retirement benefits are determined as 2% of average final compensation multiplied by the years of credited service. General employees with five years of credited service are eligible to retire at age 55. Police officers and firefighters' retirement benefits are determined using the benefit multiplier of 2.5% for qualified service, up to a maximum of 80% of average final compensation. Police officers and firefighters with five years of credited service are eligible to retire at age 55. Police officers and firefighters with 25 years of credited service are eligible to retire at any age, provided the last five years is service credited in these occupations. Disability Benefits- Members are eligible for service-related disability benefits regardless of length of service and receive a one-time payment of the member's contributions and accrued interest plus a lifetime pension of 50% of their average final compensation. Ten years of credited service is required for ordinary disability. Ordinary disability benefits are determined as 1.75% of average final compensation multiplied by the years of credited service but are payable immediately, without an actuarial reduction, and at a minimum of 30% of average final compensation. Death Benefits - For service-connected deaths, the surviving spouse/reciprocal beneficiary receives a lump sum payment of the member's contributions and accrued interest plus a monthly benefit of 50% of the average final compensation until remarriage or re-entry into a new reciprocal beneficiary relationship. If there is no surviving spouse/reciprocal beneficiary, surviving children (up to age 18) or dependent parents are eligible for the monthly benefit. If there is no spouse/reciprocal beneficiary or dependent children/parents, the ordinary death benefit is payable to the designated beneficiary. Ordinary death benefits are available to employees who were active at time of death with at least one year of service. Ordinary death benefits consist of a lump sum payment of the member's contributions and accrued interest plus a percentage of the salary earned in the 12 months preceding death, or 50%joint and survivor lifetime pension if the member was not eligible for retirement at the time of death but was credited with at least ten years of service and'designated one beneficiary, or 100%joint and survivor lifetime pension if the member was eligible for retirement at the time of death and designated one beneficiary. Contributory Class for Employees Hired After June 30, 2012 Retirement Benefits - General employees' retirement benefits are determined as 1.75% of average final compensation multiplied by the years of credited service. General employees with ten years of credited service are eligible to retire at age 60. 29 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G-EMPLOYEE BENEFITS (Continued) Police officers and firefighters' retirement benefits are determined using the benefit multiplier of 2.25% for qualified service, up to a maximum of 80% of average final compensation. Police officers and firefighters with ten years of credited service are eligible to retire at age 60. Police officers and firefighters with 25 years of credited service are eligible to retire at age 55, provided the last five years is service credited in these occupations. Disability and Death Benefits-Members are eligible for service-related disability benefits regardless of length of service and receive a lifetime pension of 50% of their average final compensation plus refund of contributions and accrued interest. Ten years of credited service is required for ordinary disability. For police officers and firefighters, ordinary disability benefits are 1.75% of average final • compensation for each year of service and are payable immediately, without an actuarial reduction, at a minimum of 30% of average final compensation. Death benefits for contributory members hired after June 30, 2012 are generally the same as those for contributory members hired June 30, 2012 and prior. Hybrid Class for Employees Hired Prior to July 1, 2012 Retirement Benefits - General employees' retirement benefits are determined as 2% of average final compensation multiplied by the years of credited service. General employees with five years of credited service are eligible to retire at age 62. General employees with 30 years of credited service are eligible to retire at age 55. Disability Benefits- Members are eligible for service-related disability benefits regardless of length of service and receive a lifetime pension of 35% of their average final compensation plus refund of their contributions and accrued interest.Ten years.of credited service is required for ordinary disability. Ordinary disability benefits are determined in the same manner as retirement benefits but are payable immediately, without an actuarial reduction, and at a minimum of 25% of average final compensation. . Death Benefits - For service-connected deaths, the surviving spouse/reciprocal beneficiary receives a lump sum payment of the member's contributions and accrued interest plus a monthly benefit of 50% of the average final compensation until remarriage or re-entry into a new reciprocal beneficiary relationship. If there is no surviving spouse/reciprocal beneficiary, surviving dependent children (up to age 18) or dependent parents are eligible for the monthly benefit. If there is no spouse/reciprocal beneficiary or dependent children/parents, the ordinary death benefit is payable to the designated beneficiary. 30 County of Hawaii Department of Water Supply • (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS • June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) Ordinary death benefits are available to employees who were active at time of death with at least five years of service. Ordinary death benefits consist of a lump sum payment of • the member's contributions and accrued interest plus a percentage multiplied by 150%, or 50%joint and survivor lifetime pension if the member was not eligible for retirement at the time of death but was credited with at least ten years of service and designated one beneficiary, or 100% joint and survivor lifetime pension if the member was eligible for retirement at the time of death and designated one beneficiary. Hybrid Class for Employees Hired After June 30, 2012 Retirement Benefits - General employees' retirement benefits are determined as 1.75% of average final compensation multiplied by the years of credited service. General employees with ten years of credited service are eligible to retire at age 65. Employees with 30 years of credited service are eligible to retire at age 60. Disability and Death Benefits-Provisions for disability and death benefits generally remain the same except for ordinary death benefits. Ordinary death benefits are available to employees who were active at time of death with at least ten years of service. Ordinary death benefits consist of a lump sum payment of the member's contributions and accrued interest, plus a percentage multiplied by 50% joint and survivor lifetime pension if the member was not eligible for retirement at the time of death but was credited with at least ten years of service and designated one beneficiary, or 100% joint and survivor lifetime pension if the member was eligible for retirement at the time of death and designated one beneficiary. Contributions - Contributions are governed by HRS Chapter 88 and may be amended through legislation. The employer rate is set by statute based on the recommendations of the ERS actuary resulting from an experience study conducted every five years. Since July 1, 2005, the employer contribution rate is a fixed percentage of compensation, including the normal cost plus amounts required to pay for the unfunded actuarial accrued liabilities. Contributions to the pension plan from the Department were $2,579,631 for the fiscal year ended June 30, 2021. Per Act 17 (SLH 2017), employer contributions from the State and counties increased over • four years beginning July 1, 2017. The rate for police officers and firefighters increases to 31.00% on July 1, 2018; 36.00% on July 1, 2019; and 41.00% on July 1, 2020 and the rate for all other employees' increases to 19.00% on July 1, 2018; 22.00% on July 1, 2019; and 24.00% on July 1, 2020. The employer is required to make all contributions for noncontributory members. Contributory members hired prior to July 1, 2012 are required to contribute 7.8% of their salary, except for police officers and firefighters who are required to contribute 12.2% of their salary. Contributory members hired after June 30,2012 are required to contribute 9.8% of their salary, except for police officers and firefighters who are required to contribute 14.2% of their salary. Hybrid members hired prior to July 1, 2012 are required to contribute 6.0% of their salary. Hybrid members hired after June 30, 2012 are required to contribute 8.0% of their salary. 31 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) • l Pension Liabilities, Pension Expense, and Deferred Outflows of Resources and Deferred Inflows of Resources Related to Pensions-At June 30; 2021, the Department reported a liability of$35,290,257 for its proportionate share of the net pension liability. The net pension liability was measured as of June 30, 2020, and the total pension liability used to calculate the net pension liability was determined by an actuarial valuation as of that date. The Department's proportion of the net pension liability was based on a proportion of the • Department's contributions to the pension plan relative to the contributions of all participating employers. At June 30, 2020, the Department's proportion was 0.23%, a decrease of 0.01% from its proportion measured as of June 30, 2019. The actuarial assumptions used in the June 30, 2020 actuarial valuation are the same as those used in the prior valuation. There were no changes between the measurement date, June 30, 2020, and the reporting date, June 30, 2021 that are expected to have a significant effect on the proportionate share of the net pension liability. For the fiscal years ended June 30, 2021, the Department recognized pension expense of $5,052,444. At June 30, 2021, the Department reported deferred outflows of resources and deferred inflows of resources related to pensions from the following sources: Deferred Deferred Outflows of Inflows of Resources Resources Differences between expected and actual experience $ 394,865 $ -- • Changes in assumptions 993,272 -- Net difference between projected and actual earnings on pension plan investments 1,233,871 -- Changes in proportion and differences between Department contributions and proportionate share of contributions 2,287,341 (1,774,106) Department contributions subsequent to the measurement date 2,579,631 -- Total $ 7,488,980 $ (1,774,106) 32 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 • NOTE G -EMPLOYEE BENEFITS (Continued) At June 30, 2021, the Department reported $2,579,631 of deferred outflows of resources related to pensions resulting from the Department's contributions subsequent to the measurement date, which will be recognized as a reduction of the net pension liability in the fiscal year ended June 30, 2022. Other amounts reported as deferred outflows of resources and deferred inflows of resources related to pensions at June 30, 2021 will be recognized in pension expense as follows: Net Deferred Fiscal Year Ending June 30, Outflows (Inflows) 2022 $ 1,432,140 2023 837,447 2024 449,810 • 2025 384,809 2026 31,037 $ 3,135,243 Actuarial Assumptions- The total pension liability in the June 30, 2020 actuarial valuation was determined using the following actuarial assumptions, applied to all periods included in the measurement: Inflation 2.50% Investment rate of return, including inflation 7.00% Salary increases, including inflation Police and fire employees 5.00% to 7.00% General employees 3.50% to 6.50% Teachers 3.75% to 5.75% Mortality rates used in the actuarial valuation as of June 30,2020 were based on the following: . Active members - Multiples of the Pub-2010 mortality table for active employees based on the occupation of the member. • Healthy retirees-The 2019 Public Retirees of Hawaii mortality table, generational projection using the BB projection table from the year 2019 and with multipliers based on plan and group experience. Disabled retirees - Base Table for healthy retirees' occupation, set forward five years, generational projection using the BB projection table from the year 2019. Minimum mortality rate of 3.5% for males and 2.5% for females. The actuarial assumptions used in the actuarial valuation as of June 30, 2020 were based on the results of an actuarial experience study as of June 30,2018, with most of the assumptions based on the period from July 1, 2013 through June 30, 2018. 33 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii`i, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 0 NOTE G -EMPLOYEE BENEFITS (Continued) The long-term expected rate of return on pension plan investments was determined using a "top down approach" of the Client-Constrained Simulation-based Optimization Model (a statistical technique known as "re-sampling with replacement"that directly keys in on specific plan-level risk factors as stipulated by the ERS Board) in which best-estimate ranges of expected future real rates of return (expected returns, net of pension plan investment expense and inflation) are developed for each major asset class. These ranges are then combined to produce the long-term expected rate of return by weighting the expected future nominal rates of return (real returns + inflation) by the target asset allocation percentage. The target allocation and best estimates of geometric real rates of return for each major asset class as • of June 30, 2020 are summarized in the following table: Long-Term Long-Term Strategic Allocation Target Expected Expected Real (Risk-Based Classes) Allocation Rate of Return Rate of Return* Broad Growth 63.00% 7.90% 5.70% Diversifying Strategies 37.00% 3.70% 1.50% 100.00% *Uses an expected inflation of 2.20% Discount Rate-The discount rate used to measure the net pension liability at June 30, 2021 was 7.00%. The projection of cash flows used to determine the discount rate assumed that employee contributions will be made at the current contribution rate and that contributions from the Department will be made at statutorily required rates, actuarially determined. Based on those assumptions, the pension plan's fiduciary net position was projected to be available to make all projected future benefit payments of current active and inactive employees. Therefore, the long-term expected rate of return on pension plan investments was applied to all periods of projected benefit payments to determine the total pension liability. Sensitivity of the Department's Proportionate Share of the Net Pension Liability to Changes in the Discount Rate - The following presents the Department's proportionate share of the net pension liability as of June 3,0, 2021, calculated using the discount rate of 7.00%, as well as what the Department's proportionate share of the net pension liability would be if it were calculated using a discount rate that is one percentage point lower(6.00%) or one percentage point higher(8.00%)than the current rate: 1%Decrease Discount Rate 1%Increase (6.00%) (7.00%) (8.00%) Department's proportionate share of • the net pension liability $ 45,321,338 $ 35,290,257 $ 27,020,579 34 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) Pension Plan Fiduciary Net Position - Detailed information about the pension plan's fiduciary net position is available in the separately issued ERS financial report. ERS' complete financial statements are available at: https://ers.ehawaii.gov/resources/financials. Payables to the Pension Plan - At June 30, 2021, the amount payable to the ERS was $321,571, which consists of statutorily required employer contributions for the month of June and an accrual for excess pension costs attributed to the fiscal year, as required by the HRS. Postemployment Benefits Other Than Pensions (OPEB) General Information about the OPEB Plan Plan description. Chapter 87A of the Hawaii Revised Statutes (HRS) established the EUTF, an agent multiple-employer defined benefit plan, which provides a single delivery system of health and other benefits for state and county workers, retirees and their eligible dependents. The EUTF issues a stand-alone financial report that is available to the public on its website at https://eutf.hawaii.gov/reports. Benefits provided. Chapter 87A of the HRS grants the authority to establish and amend the benefit terms to the board of trustees of the EUTF. The EUTF currently provides medical, prescription drug, dental, vision, chiropractic, supplemental medical and prescription drug,. and group life insurance benefits for retirees and their dependents. The following table provides a summary of the number of employees covered by the benefits terms as of July 1, 2020: Inactive employees or beneficiaries currently receiving benefits 101 Inactive employees entitled but not yet receiving benefit payments 13 Active employees 160 274 Contributions-The Department's contribution levels are established by Chapter 87A of the HRS. For the fiscal year ended June 30, 2021,the Department was not required to contribute 100% of the annual required contribution (ARC), as determined by an actuary retained by the board of trustees of the EUTF. The ARC represents a level of funding that is sufficient to cover 1) the normal cost, which is the cost of the other postemployment benefits attributable to the current year of service; and 2) an amortization payment,which is a catch-up payment for past service costs to fund the unfunded actuarial accrued liability over the next thirty years. For the fiscal year ended June 30,2021, contributions to the OPEB plan from the Department totaled $1,210,523 which resulted in an average contribution rate of approximately 10.45% of covered-employee payroll. 35 • County of Hawaii • Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) For employees hired before July 1, 1996, the Department pays the entire base monthly contribution for employees retiring with 10 or more years of credited service, and 50% of the base monthly contribution for employees retiring with fewer than 10 years of credited service. A retiree can elect a family plan to cover dependents. The Department's contribution is based on the plan selected by the retiree (single, two-party, or family plans). For employees hired after June.30, 1996, but before July 1, 2001, and who retire with fewer than 10 years of service, the Department makes no contributions. For those retiring with at . least 10 years of service but fewer than 15 years of service, the Department pays 50% of the base monthly contribution. For employees retiring with at least 15 years of service but fewer than 25 years of service, the Department pays 75% of the base monthly contribution. For employees retiring with at least 25 years of service, the Department pays 100% of the base monthly contribution. The Department's contribution is based on the plan selected by the retiree (single, two-party, or family plans). For employees hired on or after July 1, 2001, and who retire with less than 10 years of service, the Department makes no contributions. For those retiring with at least 10 years but fewer than 15 years of service, the Department pays 50% of the base monthly contribution. For those retiring with at least 15 years but fewer than 25 years of service, the Department pays 75% of the base monthly contribution. For those employees retiring with at least 25 years of service, the Department pays 100% of the base monthly contribution. Only single plan coverage is provided for retirees in this category. The Department's contribution is based on the single plan base monthly contribution. Retirees can elect family coverage but must pay • the difference. Net OPEB Liability The Department's 'net OPEB liability as of June 30, 2021 was measured as of July 1, 2020, and the total OPEB liability used to calculate the net OPEB liability was determined by an actuarial valuation as of that date. Actuarial assumptions. The total OPEB liability in the July 1, 2020 actuarial valuation was determined using the following actuarial assumptions, applied to all periods included in the measurement, unless otherwise specified: Actuarial cost method Entry age normal Discount rate 7.00% Inflation 2.50% Salary increases 3.50% to 7.00% including inflation 36 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii`i) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) Demographic assumptions Based on the experience study covering the five year period ending June 30, 2018 as conducted by the ERS Mortality System-specific mortality tables utilizing scale BB to project generational mortality improvement Participation rates 98% healthcare participation assumption for retirees that cover 100% of the base monthly contribution.Healthcare participation rates of 25%, • 65%, and 90% for retirees that receive 0%, 50%, or 75% of the base monthly contribution, respectively. 100% for life insurance and 98% for Medicare Part B Healthcare cost trend rates PPO* Initial rate of 7.50%; declining to a rate of 4.70% after 13 years HMO* Initial rate of 7.50%; declining to a rate of 4.70% after 13 years Part B & base monthly contribution Initial rate of 5.00%, declining to a rate of 4.70% after 10 years Dental Initial rate of 5.00% for first year, followed by 4.00% for all future years Vision Initial rate of 0.00% for first year, followed by 2.50% for all future years Life insurance 0.00% * Blended rates for medical and prescription drug • 37 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) The long-term expected rate of return on OPEB plan investments was determined using a building-block method in which best-estimate ranges of expected future real rates of return (expected returns, net of OPEB plan investment expense and inflation) are developed for each major asset class. These ranges are combined to produce the long-term expected rate of return by weighting the expected future real rates of return by the target asset allocation • percentage and by adding expected inflation. The target allocation and best estimates of arithmetic real rates of return for each major asset class as of July 1, 2020 are summarized in the following table: Long-Term Target Expected Real • Asset Class Allocation Rate of Return Non-U.S. equity 16.00% 7.72% U.S.equity 14.00% 6.23% Private equity 10.00% 9.66% Core real estate 10.00% 5.98% Trend following 8.00% 2.12% U.S.microcap 6.00% 7.85% Global options 6.00% 4.65% Private credit 6.00% 5.50% Long treasuries 6.00% . _ 0.86% Alternative risk premium 5.00% 1.56% TIPS 5.00% 0.11% Reinsurance 5.00% 4.34% Core bonds 3.00% 0.08% 100.00% Discount Rate-The discount rate used to measure the total OPEB liability at June 30, 2021 was 7.00%. The discount rate was based on the expected rate of return on OPEB plan investments of 7.00%. The Department's funding policy is to pay the recommended actuarially determined contribution, which is based on layered, closed amortization periods. Based on those assumptions,the OPEB plan's fiduciary net position was projected to be available to make all projected future benefit payments for current plan members. Therefore, the long-term expected rate of return on OPEB plan investments was applied to all periods of projected benefit payments to determine the total OPEB liability. 38 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G -EMPLOYEE BENEFITS (Continued) Changes in the Net OPEB Liability The following schedules presents the changes in the net OPEB liability for the fiscal year • ending June 30, 2021: Increase(Decrease) Total OPEB Plan Fiduciary Net OPEB Liability Net Position Liability (a) (b) (a)-(b) Balance at June 30,2020 $ 35,611,034 $ 19,531,287 $ 16,079,747 • Changes for the fiscal year: Service cost 773,607 -- 773,607 Interest on the total OPEB liability 2,483,573 — 2,483,573 Difference between expected and actual experience • (2,403,748) -- (2,403,748) Change of assumptions (190,921) -- (190,921) Contributions-employer — 1,977,000 (1,977,000) Net investment income -- 376,721 (376,721) Benefit payments (1,036,438) (1,036,438) -- Administrative expense — (3,013) 3,013 Other -- (2,264) 2,264 Net changes (373,927) 1,312,006 _ (1,685,933) Balance at June 30,2021 $ 35,237,107 $ 20,843,293 $ 14,393,814 The healthcare trend assumption was updated in the July 1, 2020 actuarial valuation to reflect the repeal of the "Cadillac Tax" on high-cost employer health plans, which resulted in a decrease to the total OPEB liability as of June 30, 2021. • Sensitivity of the Net OPEB Liability to Changes in the Discount Rate - The following presents the net OPEB liability of the Department, as well as what the Department's net OPEB liability would be if it were calculated using a discount rate that is one percentage point lower or one percentage point higher than the current discount rate: 1% Decrease Discount Rate 1% Increase (6.00%) (7.00%) (8.00%) Net OPEB Liability $ 19,857,974 $ 14,393,814 $ 10,046,035 39 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 • NOTE G-EMPLOYEE BENEFITS (Continued) Sensitivity of the Net OPEB Liability to Changes in the Healthcare Cost Trend Rates - . The following presents the net OPEB liability of the Department, as well as what the Department's net OPEB liability would be if it were calculated using healthcare cost trend rates that are one percentage point lower or one percentage point higher than the current healthcare cost trend rates: Current Healthcare Cost Trend 1% Decrease Rates 1% Increase Net OPEB Liability $ 9,809,296 $ 14,393,814 $ 20,268,633 OPEB Expense and Deferred Outflows of Resources and Deferred inflows of Resources Related to OPEB For the fiscal year ended June 30, 2021, the Department recognized OPEB expense of $1,571,788. At June 30, 2021, the Department reported deferred outflows of resources and deferred inflows of resources related to OPEB from the following sources: Deferred Deferred Outflows of Inflows of Resources Resources Difference between expected and actual experience $ -- $ (2,910,951) Changes of assumptions 332,234 (162,341) Net difference between projected and actual earnings on OPEB plan investments 1,041,066 Employer contributions subsequent to the measurement date 1,210,523 -- $ 2,583,823 $ (3,073,292) • 40 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE G - EMPLOYEE BENEFITS (Continued) At June 30, 2021, the Department reported $1,210,523 as deferred outflows of resources related to OPEB resulting from Department contributions subsequent to the measurement date,which will be recognized as a reduction of the net OPEB liability in the fiscal year ended June 30, 2022. Other amounts reported as deferred outflows of resources and deferred • inflows of resources at June 30, 2021 will be recognized in OPEB expense as follows: Fiscal Year Net Deferred Ended June 30: Inflows 2022 $ (290,667) 2023 (230,950) 2024 (228,519) 2025 (281,885) 2026 (403,738) • Thereafter (264,233) $ (1,699,992) Deferred Compensation Plan The Department participates in a deferred compensation plan established by the State of Hawaii in accordance with Internal Revenue Code Section 457. The plan is available to all the Department employees, and permits employees to defer a portion of their salary until future years. The deferred compensation is not available to employees until termination, retirement, death, or unforeseeable emergency. All plan assets are held in a trust fund to protect them from claims of general creditors and from diversion to any uses other than paying benefits to participants and beneficiaries. The Department has no responsibility for loss due to the investment or failure of investment of funds and assets in the plans, but does have the duty of due care that would be required of an ordinary prudent investor. NOTE H -COMMITMENTS AND CONTINGENT LIABILITIES Risk Management- The Department is exposed to various risks of loss from torts; theft of, damage to, and destruction of assets; employee injuries and illnesses; and natural disasters. The Department maintains property, auto liability, and general liability insurance policies. The Department remains self-insured for workers' compensation liability. Liabilities are recorded when it is probable that a loss has occurred and the amount of that loss can be reasonably estimated. Claim liabilities are based on the estimated ultimate cost of settling the claims, and include incremental costs for the hiring of special counsel and expert witnesses. Claims liabilities are estimated by a case-by-case review of all claims and the application of historical experience to outstanding claims. 41 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE H -COMMITMENTS AND CONTINGENT LIABILITIES (Continued) Construction Contracts - The Department is obligated under construction contracts for the utility plant and other projects. Such commitments totaled $34,022,885 at June 30, 2021. Litigation - The Department is involved in various legal proceedings arising in the ordinary course of business. The Department provides for losses that, in the opinion of management, are both probable of being incurred and that can be reasonably estimated. In management's opinion, losses, if any,would not materially affect the Department's financial position or results of operations. NOTE 1-RELATED PARTY TRANSACTIONS Long-term Debt-As discussed in Note E, the County has issued general obligation bonds on the Department's behalf for improvements to the water system. The Department is liable to the County for its proportionate share of the debt service requirements. In connection with these general obligation bond issues, long-term debt payable to the County totaled $18,831,243 at June 30, 2021. Accrued interest payable to the County totaled $340,850 at June 30, 2021. Operating Lease- The Department leases office space in its Hilo office to the County. The term of the lease is for ten years, starting on October 1, 2013, with an option to extend for an additional ten years. The County is also obligated to pay for common area maintenance expense. Thereafter and for the duration of the lease term, annual lease rent from the County, including common area maintenance will be approximately $236,000, subject to annual adjustments to the monthly common area maintenance charge. Payments received from the County in connection with this lease totaled approximately $236,000 during the fiscal year ended June 30, 2021. As of June 30, 2021,future minimum lease rental income was as follows: Fiscal Year Ending June 30, Amount 2022 $ 236,000 2023 236,000 2024 59,000 • $ 531,000 42 County of Hawaii Department of Water Supply • (A component unit of the County of Hawaii, State of Hawaii) NOTES TO FINANCIAL STATEMENTS June 30, 2021 NOTE I-RELATED PARTY TRANSACTIONS (Continued) Other-Amounts due to the County totaled approximately$225,000 as of June 30, 2021. The County provides the Department with various administrative services including treasury, legal, audit, and workers' compensation administration. The cost for these services are generally invoiced and reimbursed on an annual basis. NOTE J -PRIOR PERIOD ADJUSTMENT The financial statements for the fiscal year ended June 30, 2020 contained an error related to construction work in progress and preliminary survey and investigation charges that should have been placed in service and classified as utility plant in service as of June 30, 2018. Therefore, an adjustment was made to increase utility plant in service by $13,163,292, • decrease construction work in progress by$11,672,265, and decrease preliminary survey and investigation charges by $1,491,027 for the fiscal year ended June 30, 2020.,The effect for the fiscal year ended June 30, 2020 was an increase in depreciation expense of$494,914 and a decrease in beginning net position of$742,370 in relation to depreciation expense for the fiscal years ended June 30, 2019 and 2018. • NOTE K-NOVEL CORONAVIRUS DISEASE On March 11,2020,the World Health Organization declared the outbreak of novel coronavirus disease(COVID-19)as a pandemic,which has led to an economic downturn on a global scale that has created significant uncertainty, volatility, and disruption across economies and financial markets. The pandemic has also resulted in federal, state, and local governments and private entities mandating various restrictions, including travel and business restrictions, temporary closures of nonessential businesses, and wide-sweeping quarantines and stay-at- home orders. While the disruption caused by COVID-19 is expected to be temporary,there is uncertainty around the duration and severity of the pandemic. The related financial impact on • the Department's financial statements cannot be reasonably determined at this time. 43 REQUIRED SUPPLEMENTARY INFORMATION OTHER THAN MANAGEMENT'S DISCUSSION AND ANALYSIS • • 44 County of Hawaii • Department of Water Supply (A component unit of the County of Hawaii, State of Hawai:`i) SCHEDULE OF PROPORTIONATE SHARE OF THE NET PENSION LIABILITY Last Ten Fiscal Years* Proportionate Plan • Share of the Fiduciary Net Pension Net Position • Proportion Proportionate Liability as a %age Measurement of the Share of the as a%age of the Total Period Net Pension Net Pension Covered of Covered Pension Ended Liability(%) Liability($) Payroll Payroll Liability June 30, 2020 0.23% $ 35,290,257 $ 10,439,473 338.0% 53.18% June 30, 2019 0.23% $ 32,029,248 $ 10,318,136 310.4% 54.87% June 30, 2018 0.25% $ 33,522,053 $ 9,742,400 344.1% 55.48% June 30, 2017 0.22% $ 28,365,453 $ 9,358,187 303.1% 54.80% June 30, 2016 0.22% $ 29,247,607 $ 9,046,930 323.3% 51.28% June 30, 2015 0.22% $ 18,940,065 $ 9,012,196 210.2% 62.42% June 30, 2014 0.26% $ 20,526,993 $ 8,272,307 248.1% 63.92% June 30, 2013 0.21% $ 18,469,400 $ 7,640,477 241.7% 57.96% * This schedule is intended to present information for 10 years, as of the measurement date of the collective net pension liability for each respective fiscal year. Additional years will be built prospectively as information becomes available. • See accompanying notes to required supplementary information. 45 County of Hawaii Department of Water Supply (A component unit of the County of Hewai°i, State of Hawaii) SCHEDULE OF CONTRIBUTIONS (PENSION) Last Ten Fiscal Years Actual Contributions •Department as a%age Fiscal Statutorily Statutorily Contribution of Year Required Required Deficiency Covered Covered Ended Contribution Contributions (Excess) Payroll Payroll June 30, 2021 $ 2,579,631 $ 2,579,631 $ -- $ 11,016,038 ' 23.42% June 30, 2020 $ 2,258,593 $ 2,258,593 $ -- $ 10,439,473 21.64% June 30, 2019 $ 1,950,328 $ 1,950,328 $ -- $ 10,318,136 18.90% June 30, 2018 $ 1,757,461 $ 1,757,461 $ -- $ 9,742,400 18.04% June 30, 2017 $ 1,603,278 $ 1,603,278 $ -- $ 9,358,187 17.13% June 30, 2016 $ 1,553,128 $ 1,553,128 $ -- $ 9,046,930 ' 17.17% June 30, 2015 $ 1,520,994 $ 1,520,994 $ -- $ 9,012,196 16.88% June 30, 2014 $ 1,664,580 $ 1,664,580 $ -- $ 8,272,307 20.12% • June 30, 2013 $ 1,214,933 $ 1,214,933 $ -- $ 7,640,477 15.90% June 30, 2012 $ 1,210,106 $ 1,210,106 $ -- $ 7,849,473 15.42% See accompanying notes to required supplementary information. 46 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO REQUIRED SUPPLEMENTARY INFORMATION REQUIRED BY GASB STATEMENT NO. 68 • Fiscal Year Ended June 30, 2021 NOTE A-CHANGES OF ASSUMPTIONS There were no changes of assumptions or other inputs that significantly affected the measurement of the total pension liability since the measurement period ended June 30,2016. Amounts reported in the schedule of the proportionate share of the net pension liability as of the measurement period ended June 30, 2016 (fiscal year ended June 30, 2017)were significantly impacted by the following changes of actuarial assumptions: o The investment return assumption decreased from 7.65% to 7.00% o Mortality assumptions were modified to assume longer life expectancies as well as to reflect continuous mortality improvement Prior to the measurement period ended June 30, 2016 (fiscal year ended June 30,2017),there were no other factors, including the use of different assumptions that significantly affect trends reported in these schedules. 47 • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) SCHEDULE OF CHANGES IN THE NET OPEB LIABILITY AND RELATED RATIOS Last Ten Fiscal Years* • 2021 2020 2019 2018 Total OPEB liability Service cost $ 773,607 $ 746,672 $ 698,126 $ 687,414 Interest on the total OPEB liability 2,483,573 2,349,959 2,264,524 2,135,490 Difference between expected and actual experience of the total OPEB liability (2,403,748) (314,598) (1,184,347) — Changes of assumptions (190,921) 137,542 432,233 — Benefit payments (1,036,438) (1,012,084) (1,016,548) (953,288) Net change in total OPEB liability (373,927) 1,907,491 1,193,988 1,869,616 Total OPEB liability-Beginning 35,611,034 33,703,543 32,509,555 30,639,939 TotalOPEBliability-Ending $ 35,237,107 $ 35,611,034 $ 33,703,543 $ 32,509,555 Plan fiduciary net position Contributions-employer $ 1,977,000 $ 1,990,000 $ 1,936,548 $ 1,867,788 Net investment income 376,721 764,696 1,111,306 1,245,946 Benefit payments (1,036,438) (1,012,084) (1,016,548) (953,288) Administrative expense (3,013) (5,493) (3,336) (2,782) Other (2,264) 522,371 — 16,370 Net change in plan fiduciary net position 1,312,006 2,259,490 2,027,970 2,174,034 Plan fiduciary net position-Beginning 19,531,287 17,271,797 15,243,827 13,069,793 Plan fiduciary net position-Ending $ 20,843,293 $ 19,531,287 $ 17,271,797 $ 15,243,827 NetOPEBliability $ 14,393,814 $ 16,079,747 $ 16,431,746 $ 17,265,728 Plan fiduciary net position as a percentage of the total OPEB liability 59.15% 54.85% 51.25% 46.89% Covered-employee payroll $ 10,266,331 $ 10,264,425 $ 10,212,595 $ 9,791,132 Net OPEB Liability as a Percentage of Covered-employee Payroll 140.20% 156.66% 160.90% 176.34% • *This schedule is intended to present information for ten years for each respective fiscal year.Additional years will be built prospectively as information becomes available. • See accompanying notes to required supplementary information. 48 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) SCHEDULE OF CONTRIBUTIONS (OPEB) Last Ten Fiscal Years • Contributions Contributions in Relation to as a%age Fiscal Actuarially the Actuarially Contribution Covered- of Covered- Year Determined Determined Deficiency Employee Employee Ended Contribution Contribution (Excess) Payroll Payroll June 30, 2021 $ 2,046,000 $ 1,210,523 $ 835,477 $ 11,587,764 10.45% June 30, 2020 $ 1,977,000 $ 1,977,000 $ -- $ 10,266,331 19.26% June 30, 2019 $ 1,990,000 $ 1,990,000 $ — $ 10,264,425 19.39% June 30, 2018 $ 1,933,000 $ 1,936,548 $ (3,548) $ 10,212,595 18.96% June 30, 2017 $ 1,867,000 $ 1,867,788 $ (788) $ 9,791,132 19.08% June 30, 2016 $ 1,914,000 $ 1,913,204 $ 79.6 $ 9,464,649 20.21% June 30, 2015 $ 1,850,000 $ 1,848,389 $ 1,611 $ 9,426,509 19.61% June 30, 2014 $ 1,899,000 $ 1,900,758 $ (1,758) $ 8,635,402 22.01% June 30, 2013 $ 1,834,000 $ 1,833,733 $ 267 $ 7,966,529 23.02% June 30, 2012 $ 2,400,000 $ 2,401,487 $ (1,487) $ 8,182,968 29.35% See accompanying notes to required supplementary information. 49 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii,State of Hawaii) NOTES TO REQUIRED SUPPLEMENTARY INFORMATION REQUIRED BY GASB STATEMENT NO. 75 Fiscal Year Ended June 30, 2021 NOTE A-SIGNIFICANT METHODS AND ASSUMPTIONS The actuarially determined annual required contributions ("ARC") for the fiscal year ending June 30, 2021 was developed in the July 1, 2018 valuation. The following summarizes the significant methods and assumptions used to determine the actuarially determined contribution for the fiscal year ended June 30, 2021: Actuarial valuation date July 1, 2018 Actuarial cost method Entry Age Normal Amortization method Level percent, closed Equivalent single amortization period 16.9 as of June 30,2021 Asset valuation method 4-year smoothed market Inflation rate 2.50% Investment rate of return 7.00% Payroll growth 3.50% Salary increases 3.50%to 7.00% including inflation Demographic assumptions Based on the experience study covering the five year period ending June 30, 2015 as conducted for the Hawaii Employees' Retirement System (ERS) Mortality • System-specific mortality tables utilizing scale BB to project generational mortality improvement Participation rates 98%healthcare participation assumption for retirees that receive 100% of the Base Monthly Contribution. Healthcare participation rates of 25%, 65%, and 90% for retirees that receive 0%, 50%, or 75%of the base monthly contribution, respectively. 100%for life insurance and 98%for Medicare Part B Healthcare cost trend rates PPO " Initial rate of 10%, declining to a rate of 4.86% after 13 years HMO Initial rate of 10%, declining to a rate of 4.86% • after 13 years Part B Initial rates of 4%and 5%; declining to a rate of 4.7%after 12 years Dental 5%for the first 3 years; then 4%for all future years • Vision 0%for the first 3 years; then 2.5%for all future years Life Insurance 0.00% • 50 • • County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) NOTES TO REQUIRED SUPPLEMENTARY INFORMATION REQUIRED BY GASB STATEMENT NO. 75 • Fiscal Year Ended June 30, 2021 NOTE A-SIGNIFICANT METHODS AND ASSUMPTIONS (Continued) There were no other factors that significantly affected trends in the amounts reported in the schedule of changes in the net OPEB liability and related ratios or the schedule of contributions (OPEB). • • 51 999 BISHOP STREET,SUITE 2200 li N&K CPAs, Inc. HONOLULU,HAWAII 96813 ACCOUNTANTS i CONSULTANTS T(808)524-2255 F(808)523-2090 INDEPENDENT AUDITOR'S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING AND ON COMPLIANCE AND OTHER MATTERS BASED ON AN AUDIT OF FINANCIAL STATEMENTS PERFORMED IN ACCORDANCE WITH GOVERNMENT AUDITING STANDARDS To the Water Board County of Hawaii, Department of Water Supply We have audited, in accordance with auditing standards generally accepted in the United States of America and the standards applicable to financial audits contained in Government Auditing Standards issued by the Comptroller General of the United States, the financial statements of the County of Hawaii, Department of Water Supply (Department),a component unit of the County of Hawaii, State of Hawai'i, as of and for the fiscal year ended June 30, 2021, and the related notes to the financial statements, and have issued our report thereon dated January 21, 2022. Internal Control over Financial Reporting In planning and performing our audit of the financial statements, we considered the Department's internal control over financial reporting (internal control) as a basis for. designing audit procedures that are appropriate in the circumstances for the purpose of expressing our opinion on the financial statements, but not for the purpose of expressing an opinion on the effectiveness of the Department's internal control. Accordingly, we do' not express an opinion on the effectiveness of the Department's internal control. A deficiency in internal control exists when the design or operation of a control does not allow management or employees, in the normal course of performing their assigned functions, to prevent, or detect and correct, misstatements on a timely basis. A material weakness is a deficiency, or a combination of deficiencies, in internal control, such that there is a reasonable possibility that a material misstatement of the entity's financial statements will not be prevented, or detected and corrected, on a timely basis. A significant deficiency is a deficiency, or a combination of deficiencies, in internal control that is less severe than a material weakness yet important enough to merit attention by those charged with governance. • 52 N&K CPAs, Inc. ACCOUNTANTS I CONSULTANTS • Our consideration of internal control was for the limited purpose described in the first paragraph of this section and was not designed to identify all deficiencies in internal control that might be material weaknesses or significant deficiencies and therefore, • material weaknesses or significant deficiencies may exist that have not been identified. We did identify certain deficiencies in internal control, described in the accompanying schedule of findings and responses as items 2021-001 and 2021-002 that we consider to be material weaknesses. Compliance and Other Matters As part of obtaining reasonable assurance about whether the Department's financial ° statements are free from material misstatement, we performed tests of its compliance with certain provisions of laws, regulations, contracts, and grant agreements, noncompliance with which could have a direct and material effect on the financial statements. However, providing an opinion on compliance with those provisions was not an objective of our audit, and accordingly,we do not express such an opinion. The results of our tests disclosed no instances of noncompliance or other matters that are required to be reported under Government Auditing Standards. Department's Response to Findings The Department's response to the findings identified in our audit is described in the accompanying schedule of findings and responses. The Department's response was not subjected to the auditing procedures applied in.the audit of the financial statements and, accordingly, we express no opinion on it. Purpose of this Report The purpose of this report is solely to describe the scope of our testing of internal control and compliance and the results of that testing, and not to provide an opinion on the effectiveness of the entity's internal control or on compliance. This report is an integral part of an audit performed in accordance with Government Auditing Standards in considering the entity's internal control and compliance. Accordingly, this communication is not suitable for any other purpose. Honolulu, Hawaii January 21, 2022 53 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawai`i) SCHEDULE OF FINDINGS AND RESPONSES Fiscal Year Ended June 30, 2021 Ref. No. Description 2021-001 Improve Internal Controls Over Accounting for Constructed Capital Assets Criteria: Once constructed capital assets are completed and placed into operations, they should be depreciated over their estimated useful lives. Condition: During our testing of construction work in progress, we noted the Department.had placed several projects into operations. However, these projects were not accounted for as completed projects and were not being depreciated over their estimated useful lives. Cause: Management transfers constructed capital assets from construction work in progress • to utility plant in service once the project is fully closed and all outstanding items are resolved. However, management does not have a system in place to track whether these projects are placed into operations prior to that. Effect: The following adjustments were necessary: • Increase utility plant in service and decrease construction work in progress by $1,583,953 as of June 30, 2021. • Increase utility plant in service by $13,163,292, decrease construction work in progress by $11,672,265, and decrease preliminary survey and investigation charges by$1,491,027 as of July 1, 2020. • Increase depreciation expense by $247,457, increase accumulated • depreciation by $1,484,741, and decrease beginning net position by $1,237,284 as of and for the fiscal year ended June 30, 2021. Recommendation: Management should monitor construction work in progress to ensure constructed capital assets placed into operations are being accounted for properly. Views of Responsible Officials and Planned Corrective Action: The Department agrees with the finding and recommendation. See Corrective Action Plan. 54 County of Hawaii Department of Water Supply (A component unit of the County of Hawaii, State of Hawaii) SCHEDULE OF FINDINGS AND RESPONSES (Continued) Fiscal Year Ended June 30, 2021 Ref. No. Description 2021-002 Improve Internal Controls Over Accounting for Significant Nonroutine Transactions Criteria: Accounting for nonroutine transactions, including issuance of debt, may require the application of accounting principles that an entity's personnel may not be familiar with. Issuance of debt should be recorded on the closing date. Condition: • During our testing of grant awards, we noted the Department recorded debt related to an intergovernmental grant award not in accordance with GAAP. • Cause: Although a grant award was executed, management presumed that accounting treatment applicable to other grant awards would apply to this specific grant award. Long-term debt was recorded prior to a closing date or debt proceeds received. Effect: • • An adjustment was necessary to decrease intergovernmental receivables and long- term debt by $2,640,961 as of June 30, 2021. • Recommendation: Management should identify significant, nonroutine accounting transactions and ensure that a process is established whereby management-level fiscal personnel are actively involved in both the determination of the proper accounting treatment and the timely review of the transactions posted to the Department's accounting system. Views of Responsible Officials and Planned Corrective Action: The Department agrees with the finding and recommendation. See Corrective Action Plan. 55 CORRECTIVE ACTION PLAN 56 ;kg: DEPARTMENT OF WATER 4uppLy • .COUNTY OF H.AwA141 4A.tEXLi:ANAtiA.PTREE.T.,SU1T 20 H.;La,EfAwAPtstno 000):9-ai-43-657 Iahuary,-11,1612 Mr Ch04..X.,•VunoSWi,f—C.11A,''C..010A rue. . 999 Bishop Street Suite.2200 HorialUltSt R.fi.8.1,3! _. . Dear FII.tta.saki;;. • Subject: gikik CPAs'Independent Auditor's Report,Schedule of Pindings And RettiOnSeS,FiScal Year Elided,June,301.2621 CPAs'Indepefidea Auditors Report or the Department of Water Supply(DWS)has been reviewed krliefindlings included iiiytwr report Will he addressed iaaccordance•vifith..yoUrredoitmendatibris • 2621401 Impeiiiie IritehlettednirOls.Oveeeiteognting foe Cohstrueled.Capitat Assets' Management's ReSpOuSC • D.epthip*nt inre.0.440 itfi.PJ.61110nt tliP,40d4oes,.teeoolixieride000. Mailegeitootmill ieview the:cur.tent. Accounting system Anti`worisflow•forvonstructioAvork.inprogresaaod implement necessary•coordination and improvements to ensure*tidy:Shifting of assets to fixed asset aceottnt(SIones they are placed in service. i2021-402 Improve Internal controls OverAcconnt,ngfor Significant Non-Routine Transactions ntnagPinetteS ReSponse:, - The Department intends to.iolpremetip the 40ditOr'S,r,dooznniendatido to engirt proper acco.untiog.treEttment ,oftton-routine tr,ansactiOns, . 'WO:00661W put'review;find redonimendations. If you have any questions,please!do,not hesitate:to contact at W8)96.14059. sitioor.oy:youtsi . • Keith biceitiote, • Mariaoer-ehietB4lifeet • Kji Waif! no Water, Nt4.1*Otedem$10.0100 • Tippoloitinctogivoteripo* u Opp]OpOspOtypioyiskr.ggimippygt 57 • EXHIBIT B Department of Water Supply Operation&Maintenance Cost Estimate B USDA-RD Position 3 Form Approved Form RD 442-7 OMB No.0575-0015 (Rev.3-02) OPERATING BUDGET Schedule 1 Name Address COUNTY OF HAWAII - DEPT. OF WATER SUPPLY 345 KEKUANAOP_ ST., HILO Applicant Fiscal Year County State(Including ZIP Code) From 07-21 To 06/22 HAWAII HAWAII 96720 20 21 • 20 21 20 22 20 22 First Full Year OPERATING INCOME (1) (2) (3) (4) (5) 1. USER FEES $13,814,953.00 $13,093,544.00 $15,111,774.00 $13,347,762.00 $55,368,033.00 .2. • 3. 4. 5.Miscellaneous 6.Less:Allowances and Deductions ( ) ( )( ) ( ) ( 7.Total Operating Income (Add Lines 1 through 6) $13,814,953.00 $13,093,544.00 $15,111,774.00 $13,347,762.00 $55,368,033.00 OPERATING EXPENSES 8. POWER & PUMPING $4,212,938.00 $5,287,769.00 $6,437,383.00 $7,325,715.00 $23,263,805.00 9. GENERAL ADMINISTRATION $2,241,268.00 $2,382,648.00 $2,437,611.00 $2,432,974.00 $9,494,501.00 10.MAINTENANCE & REPAIRS $384,619.00 $415,280.00 $415,667.00 $448,483.00 $1,664,049.00 11. CUSTOMER ACCOUNTING $275,704.00 $386,617.00 $297,674.00 $305,504.00 $1,265,499.00 12. PURIFICATION $401,168.00 $511,500.00 $415,942.00 $751,884.00 $2,080,494.00 13.TRANSMISSION & DISTRIBU $1,402,267.00 $1,737,743.00 $1,518,668.00 $1,529,026.00 $6,187,704.00 14.OTHER - WOP EXPENSES $54,368.00 $39,146.00 $63,353.00 $51,287.00 $208,154.00 15.Interest(RD) $304,037.00 $338,791.00 $273,952.00 $268,384.00 $1,185,164.00 16.Depreciation $3,750,000.00 $3,750,000.00 $3,750,'000.00 $3,750,000.00 $15,000,000.00 17.Total Operating Expense $13,026,369.00 $14,849,494.00 $15,610,250.00 $16,863,257.00 $60,349,370.00 (Add lines 8 through 16) 18.NET OPERATING INCOME $788,584.00 ($1,755,950.00) ($498,476.00) ($3,515,495.00) ($4,981,337.00) (LOSS) (Line 7 less 17) NONOPERATING INCOME 19. INTEREST $24,530.00 $22,719.00 $62,736.00 $657.00 $110,642.00 20.OTHER $328,938.00 $200,893.00 $214,158.00 $334,141.00 $1,078,130.00 21.Total Nonoperating Income $353,468.00 $223,612.00 $276,894.00 $334,798.00 $1,188,772.00 (Add Lines 19 and 20) 22.NET INCOME(LOSS) (Add Lines 18 and 21)(Transfer to Line A Schedule 2) . $1,142,052.00 ($1,532,338.00) ($221,582.00) ($3,180,697.00) ($3,792,565.00) Budget and Projected Cash Flow Approved by Governing Body Attest: Secretary Date Appropriate Official Date According to the Paperwork Reduction Act of 1995,an agency may not conduct or sponser,and a person is not required to respond to a collection of infonnation unless it displays a valid OMB control number.The valid OMB control number for this information collection is 0575-0015.The time required to complete this information collection is estimated to average 5 hours per response,including the time for reviewing instructions,searching existing data sources,gathering and maintaining the data needed,and completing and reviewing the collection of information. • • Schedule 2 PROJECTED CASH FLOW First 20 21 20 21 20 22 20 22 Full Year A.Line22 from Schedule 1 Income(Loss) $1,142,052 ($1,532,338. ($221,582) ($3,180,697.($3,792,565• Add B.Items in Operations not Requiring Cash: 1.Depreciation(Line 16 Schedule 1) $3,750,000 $3,750,000 $3,750,000 $3,750,000 $15,000,000 2.Others: C.Cash Provided from: 1.Proceeds from RD loan/grant 2.Proceeds from others 3.Increase(Decrease)in Accounts Payable, Accruals and other Current Liabilities 4.Decrease(Increase)in Accounts Receivable, inventories and Other Current Assets(Exclude Cash) 5.Other: 6. D.Total all A,B and C Items $4,892,052 $2,217,662 $3,528,418 $569,303 $11,207,435 E.Less:Cash Expended for: 1.All Construction,Equipment and New Capital Items (Loan and grant Ands) $2,777,453 $2,524,666 $2,126,912 $4,882,548 $12,311,579 2.Replacement and Additions to Existing Property,Plant and Equipment 3.Principal Payment RD Loan 4.PrincipalPaymentOtherLoans $3,328,557 $1,193,531 $1,042,270 $646,787 $6,211,145 5.Other: 6.Total E 1 through 5 $6,106,010 $3,718,197 $3,169,182 $5,529,335 $18,522,724 Add F.Beginning Cash Balances $12,396,188$10,762,627 $8,768,154 $9,805,724 $12,396,188 G.Ending Cash Balances(Total of D minus E 6 plus F) $11,182,230 $9,262,092 $9,127,390 $4,845,692 $5,080,899 Item G Cash Balances Composed of: Construction Account Revenue Account Debt Payment Account O&M Account Reserve Account Funded Depreciation Account • Others: Total-Agrees with Item G $o $o $o $0 $0 EXHIBIT C • Department of Water Supply Rate Schedule C • • ! A. UONkt.MY. TM12!)W.ClIARgES*., 0; AGjIt0ttt•rtA6kt;tjgtltVrgg.,.(irie.il 000 gailto1.0 All.m.Pie4',C9.11ne,Cii541A'JsIlialth p,stib:jop,,t o a monthly• In addition tb.At4ii:d157,..golveltoa,,.5ricI:eteigtC1PC1161.gesa, oilstizni5.-• 01.Andby.:el .as,Polltiwt: i.i.c?P,4?51r8.1.F,q1;:"14PPI=P4',0 Almgc1.44-,P414P....'clOk94:14s'as*.41CYFF,' • Meter . Eff.4tiVO: Eljeefitif Si* ..Efft9tfv,S 'Effective Nth:10'0'1,4321 Iii14_11,::202.2 (iinctlei). 'filnuarv.ip'2021 July L.:2022 lit Block '31,,04.- 1.1_,I4. . ' V:tio: %. i244.3 .;i 25:00 ' fici.illoc`k -zit ..A.49..- 48.:59 :53.21 •F4.?3Y)c4 4!44, 1.58. i_141) 90:40 .98,99. AGRICULTURAL BLOCK THRESHOIDS(gOliapeeitiorith) vi ;141:2$ .15.40 ):s1 :./na: •. td.,.• 2:5P7 • 2.-.83, IVIeter. ize: Block .., .Block Blade. 4,9 'LP.60,1 45'048. 40f4P. gbop 5;001'..- '5:olgrj ->15;p00 v.) 8411 924.36 , :8' lf 34a:90 5147492. In..p*r;t.p::applify,f9ragr;41.,Fg .applicalt.s,sleka.11f4p.Fpli47..vii* 10'-'' 1 943 N.8 24.. . ..,?. - ... ''i .0epAr4m6:1't a744e11;41,Piticq:at46.-IiiiiP11-VolITPqq4ssatisfscr• taty*aof'''@:q.cimtifiliied-bYtlidDepb.L.U.L.6110s IDE engagement in 5tiettil, Iti: 5.;5§,0t10 . ;,•711•2.05... 't-0,,' tack<0.i.*15-...6t:404fi-..T114.:15ii.:'eciA.NiiPi.01-.1.Y4*..s.1-id.tif9t.7,05 1..Pt4rA•1Tki:-0iPtTi-Lt.:9o.0..qr:ank9dvrP ./r74twe4gt.t9oloAvr!=tv.aglfTr;g The Department Sbrthatgis aniinrihibrit14i;arge. siih e event o f•Vitei;tlibit4igizeiri,ifie.dit'ent.7iiite?„.detiride•Id:doinetire.useisiss. disP-1,009K1677P13c113cT-aq.sif tagiclgtal'7.4er.?P --... .ppliC-44. ..2-s1141' I3,.:GMWRAL'TjSE-RATES,(perl000 gallon,$) 1)14;t411fa6;acT'''Ell:6" .".7411irll'sli4111b°1'-'141*!°e"114.'81:14±P-7.4igItt:* . ...... .....,.. Artittn ti)eicitetfiattr sefiike.:is.;p#11tecl..Adictill.ithIYitet.arP•ntiit ..-Tii-Aaclitkiti-Vi:Itarkil*':pcNer:aislt5.;dha.t•enqu'ar-VthAtKes; ppplicalAeSfqz19§Pi.e.,P,011 .Pri3:1Ark49 or other establishments.:engaged g...cangtibpiloii.,414.gt.vrill.;b:e.Applied-...to,:ailtdrixial•ilie.duS- it.Oit,t047.001.1-c4...treafwA.72X.pg660.44:grica-H Wi24pg'icluds. -thildefs:.as fcilkiva7, affC91.* Effective ti. 141.( rkarrlbSt-. ..., .FIRE ......, •.......,. ..... janlgtry.),2021: ..jiili.f,,20.2,i MONTHLY SikAND)3Y Ql.iktiRG. St:h.irocfc, 3: I...beF t , .., Foi each d'cifzie&ibiti ifeautciiiiatiate, r.iiikethkfii,tithii:j4itate'Il.tie :-2.411106iL 2 7 249. .1;.,xPtqq42.4,:t-lwr-P-AFA:10.e,!4--piRly3*.,4.22.;r0;p9,g 1:11(.44.4,:iA,:4atlitt'Prl.to - - :Ydtioa 399. 4.51 epti§tittiliiia4:ftstrit cos atirt. nelkt CIP charg ,.-15a.sect-,6A''.4-f.6 size of. tlie;p:girlepf.lovAssfc-3agnrw:i 4.4‘Block0':',! 5.:F4), $ite,#: Service ',4ffvcilye :Effective 13tobittfuttysiflotti8 04116.4$per month) rich.. ,: .(it)-s TatibakV1.,. "•• • ' .'•• 2021. liilvl,i?•202.2 21'• :1, 2.0.5.4 T; 0,217- .71,1e:tlare§h0T4fOrthe:sge brpc.4-ya-zywith-iji.ze.size,of:the: .57 3955 '411.1 9. . ; Wateg411q1eres-Tollo '4 54:24 59 35, O.!' I:54.417 1424• .Meter. 'kV?' •-?C'4;.P - .2490 §#..- 1st- ','44.., •4-4 'IA Aindheal.431odk. :Block. . .'lilock, .Bioek, 6.%8% '6'406.0 .•1i.04:11,, '16i000 ••••1•,0•0•.1- - -40P00 >'• ;40;000 E... FIliE.:7`.1NE...011:VIRE SEIWICt.IVIETVIIS, ;1",3c,.0 a;,091-„„ ',100,000 i.100;001 - -$130;0011.::,, zA00;00 MONTITLYSTIMIAIV.gt-fAltdEgi4 , ., ......-... tw• 5900 3,001-- :490;009 -499;9 01 - ftigjigoto,> i;Ooo...000 F9;each connec 11.oaRt..esg,-111:13,4' Aii...fir.,le&at2Tne side".•sF..vIdc.t:s;.•there: ‘0.! koii -..po0..,.- ,'.0,0;000 :904,..004 - 4,0004 > ,.0.0090.0 shall.b.a standby alitgajViE;ritibritkill<45dilibiftd ei5iibiitittion,• ,0 5;60-0 i5,101, '.,0,0164d'spp 2090,9,0i,- ..,,900,':969i" > 51p-ljaptto :ppy,,qvcgst;m:14 qt.-.4gy;c11?;43.p..rgos;1:)gsg4-:_ciry;f1*14tvp,s#e.tt.the. 4". 5i000 51091-. .4;700000 ';'4,70C);601 -. 10000000 > 109o0p0 coiftiefitii-14-slciitovis1- 'or 5,pao :.sioin.- io;pocGosio i--35030;o4IL 2-53)poinoo-:.*.25;500;900 sitetcf., . WO-P. 3i1)01z 20;009;0.0.0 :20.;90.A.091 5.MQ.U.O.0!?,.: .C.!1000;900 seiiiriEE .iEffEalie ..Effgcifie 'IP'•.` 5;669 ...;4/..- '4400;ii09 .44:09.0:6g-i.i)..P., .:906.3:1 ilD•OA9#04.0 fiiklie ) Wiefai V"1.,.:2021` 'NW'1,..2022. ••••12 Cf:leiti 'I0(:,i1,., di1-fip(0iyo :1Q1.20061:-•l'06:090•9:..-1590019..,:00 .:3.!?- V.:25g.91, ,.,....., 1,:4011. s'Olkg. . R. 782g5, .,...... OP! •rafo:14 -13.;86'. 40". 135243' t9.19',15' i .. 811.84.0trAl-..m1ALJN-sTAILL41.10N • L..STANDPIPE.•.clIARGE.S . - , .• • • • 'all4R..0 0$1 New customers o8tairtifig.Coi•a:fe'r.ieriiicfrOhiDepirtfiesii3Ok :11-istallg4bn,thalkeIorsery166.16.teral.cCiiilectidirtyltki5.18-irl& WitPr:Supply..ptAn4.4),pf;x0IfiesAk11.::lip,.c.hTgO an initial •FKiie ; -Eaiiiiierit Arid kpiai5bitiaiilif,E6iti5fliestaiidit5e fd:t114. pi:1411°4 thlrhe_sis,..Tliese,,eieTges,e.tees:tblic7sAF(taxe.•iti. Effe.c4Fc. 0f"cikrc 'd.:adiflorl:Ar•D eii(ti§lirriptei;,Itlhabt'IONXiei'cost-ilict'eliferg:el-2 TIiirt,0* l'airirri.,;2Pi1.1. .charges: ...cune.'..gicte 6o8s:kora. ": .:tuld: icte. tviss.kilgit. • '•••• aiunq, . .RiOtf..:01V74.. $300100 i.4000:0: ,Z:3;000.Q0 $ 6000110 Effecuye Effective st,,I.to •Pnirtry.f;..2021 July i.2012 ,46t,ctilitol 12000i0.0 tit:Oboi.00 :17:(.60.00 24-bohbo. 1niont1).016t; 1.1d.teiiii e..01SI)a.101.Y.S:: .V ". :ii',40.,?. 'T.2. 6;44 1)-Foi•Sile'cial.thrlditiOnS-gal.ascdriciei4,-Sicte-rvalkSi, 4" 416:93 4.5658 cor41.pectioAteees,Jarge cut or,fi:lf.areas where,additional 1.../4 349,80 369:10 ,,.., ...--. •:. tirbikiIirequire'di ddchliorial Chat(5siS'iTeteriiiiiTe'dli)ftll'e t" M.65 .:68.1.18 Department. ,...4iAll,,,,2.444..P,Iih.P..1.n*.-1.1,p.,031:1,clixgAligiPid.. itarthel • . 44.eter-siKe, :)Pea 4o rrleterts'secri,iiec3; 5/8". I. t1.30 X, 12..:•37.' ;2475.• 28;25. .3.0193 .,G.. FACILITIES•CHARGES .;.T? 327.72 lid AifidiEia....itsio*imbevgicable.;65-hivtid .service connections ...bgPg4..9.P'f:he.-Tnatillurrt'siP of alg,11-Agt9g)....447P0";.ct.Periv.5e.0.1e. ,Sertice..latetal.eafi:sivisort:?:&by tlid iiiitiib di of Id if .,rIckiellitit'uilitS or ecp.hir4ert.untts:ljl-the d.pvelOp,ment4hichey.er.coklgor..,The ][.... POWER cOsT CLIAR9F-5(ivpr:,1,99044119*) Ii.init:aiSt•iii,deterinitidtidii.g5f the facilities charges shall belkOg5.00 All. **-me,slial.Y.bez•sIkello.The...irpiOsition of gt.,VoNvg•' 'for.0?*;#1411,19Pilrib . 4-131t1g*iii.o;•.g9t3iY4 .4*.1.4:4.Thei:id11- Zpot,j,Ch - in. •additionto.: consumption..standby.:. '• ,......„ 04EA. ,. :§,.. .Y,and04C;gy . .16eichgrge isiraddltiOil.tb.',theiralekigeratiti.§011)4:10meltdr,S . tTF.'044t:0-F.T.ti:eADep*:..tOspri,T,Sh'41.;;Cale*I;e.,*e'r46..hleerl:.' The schedule iof.'facilities cflgrges:j.wes;`,Collows.:. -difietialpbsxreiti5StS and:'d6iist.iiia'ption 6teryltOctlit.oriiiis or Al4tot. Effective : ffeptivo foxtile periOil.SltiCo..thC4i:St.revISidil.to:the'li,o*.er, c:..st... ii•a.v.: ..;.._ ,. . .. . ., ,. Sid,' 1*-4t ,January:,1;. ='.d:iiridiogri,d;14storic,powet cost charges are 0-A20110:Oz. 2021 5/„8" TirSt,Cciruldttion $: 1,1:90L00:1 t."1.01:9!00 Effective Date Power Cost • 444t.IPP4o/.1. Pal:clrl.,. •5 300,00.:. ' ',CIP4"9 '. "'-g.241:1C*0.11.11cc0911. 113,7:1504:0' ;1547Q0 J4.1y.?-.I„ ..04 2.:4$.1: 1M'A .'..$. h..; k:1:Pri.ect.)11.• 27,5.6.010.6. 304'74:0 11?:34": .2'- ..8's.ci'Lcontiectiori. ,41,60d00:: 43.0::06 ;111.4'... 1.3. .:k."2" :keithi'.1'-.2.1 . ..: ..,.. -.0i02 .3" EaCkiaiddiOn, .8.2;5000,0 975111 TbV6iriber 1. 00 ,. . axs.,2.021. • .4',.' rEadr:GotaittiOrx 137t50000. 1,5z; 721:ro 6' Each.:Pcp.tleci;ip. .. AVic/pti;Pg ,X14;7441.00. -..8'-'. .1.E:g.ch:c-pwqcSbil 0;:00b,0' 4.$1$A-.00 'fq" "-, gcli!:00nrmciii:in: 70, 0:oi00. 1.27.N.:,5)27'00 . -. . . . ifz. ..geti...Ciiiiiiedhibri! ii,14600..001 - 'tat 0§.66 K. E10.14.Y.:COC-1.1416ES-(00:1PQ114411b.#.4): , 4w14:4'‘sP a1*:07'14?ict,:tp,'.tly.:#4i4pitipp,pf an•.44?•prsir• B. ,.--MAVOW:$toVIM:--0..NTOWTAIsn.,! ..cmchiteinvdditibi,....t.;,.con§uieipti*,,§tilltid*apOtitei'.: COATZ. 0. $ tedeVhiarges.:A6.1:ite'Slaiifd5e4jiiStecl:iniiii.;414-ni 6.kiler to fund. - ... , . • -. . , - preqec.te7iciesViecttitiith.provo.t.lie_Depalt.trichAl'efiergl :EiPhO-PPY04t464 i:C4:0:-*Y'09'1*CE04 of a40045*'.AJ4 ,pft:•ciplicy;The ctirreo....c4 ,zyrn..aia.fu:. .i.a..,,fpllow4, likailiiit.-thillIk:e.iiit6gaiiciiiiii,415ayiiieritk,.;f6fliet:ge;pediallk, • iy....iiiebbijiiithhtilit.iiiCarlaiiitid46tOlit4tiOlistaii81:%•.pOtver:-.. • tiedeiitretate thtrgy.diti Charge, .. -.on 4.14 energy b IV.6.1axgr:s:. ex,1)id.e:ehel.1..hOlittit•cotto a Tetioil, . :, ,......:. _... Ai4-'$'1,:1•210a *$1105,:. P.41447 r::711An IM.:ci4c-51.gx,:90-.ys:"..1.4o-44),T4*.e.t it regtV.P si1‘,L 40:1.9'441.FP•11TUP.445)P,-P:1•Cr9.97.,ez- FTfsg?3,F4457:R?4:41P,49P.. 0..w-tiKEit . . . . • • • USDA United States Department of Agriculture • August 25, 2022 • Mr. Keith Okamoto,Manager-Chief Engineer _ Department of Water Supply County of Hawai`i 345 Kekuanaoa Street, Suite 20 Hilo,Hawaii 96720 SUBJECT: Letter of Conditions County of Hawai`i Project Name: Iid Place Water System Improvements CFDA NUMBER—10.760 RUS Loan: $275,000 . . RUS Grant: $825,000 • Dear Mr. Okamoto: This letter establishes conditions which must be understood and agreed to by you before further consideration may be given to your application. The loan and grant will be administered on behalf of the Rural Utilities Service(RUS)by the State staff of USDA Rural Development(RD), both of which are referred•to throughout this letter as the Agency.Any changes in project cost, source of funds, scope of project, or any other significant changes in'the project or applicant • must be reported to and concurred with by the Agency by written amendment to this letter. This includes any significant changes in the Applicant's financial condition, operation, organizational structure or executive leadership.Any changes made without Agency concurrence shall be cause ' for discontinuing processing of the application. This letter does not constitute loan and grant approval,nor does it ensure that funds are or will be available for the project.The funding is being processed on the basis of a loan not to exceed $275,000 and a grant not to exceed$825,000 The loan and grant will be considered approved on the date Form RD 1940-1, "Request for Obligation of Funds"is signed by the Agency approval off cial. The applicant will ensure projects are completed in a timely, efficient, and economical manner. You must meet all conditions set forth under Section III—Requirements Prior to Advertising for • Bids within 1 year of this letter. •If you do not meet the conditions of this letter,the Agency reserves the right to withdraw Agency funding. Rural Development 154 Waianuenue Avenue,Rm 311,Hilo,Hawaii 96720 Voice(808)933-8380 Fax 1-855-878-2460 • . USDA is an equal opportunity provider, employer, and lender. If you wish to file a Civil Rights program complaint of discrimination,complete the USDA Program Discrimination Complaint Form(PDF),found online at http://www.ascr.usda.gov/complaint filing_cust.html,or at any USDA office,or call (866)632-9992 to request the form.You may also write a letter' containing all of the information requested in the form.Send your completed complaint form or letter to us by mail at U.S.Department of Agriculture, Director, Office of Adjudication, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410, by fax (202) •690-7442 or email at program.intake@usda.gov. • • EXHIBIT C • • • If you agree to meet the conditions set forth in this letter and desire further consideration be given to your application,please complete and return the following forms within 3 days: • • Form RD 1942-46,"Letter of Intent to Meet Conditions" Form RD 1940-1,."Request for Obligation of Funds" All parties may access information and regulations referenced in this letter at our website located at https://www.rd.usda.gov/programs-services/water-environmental-programs/water-waste- disposal-loan-grant-program. The conditions are as follows: SECTION I-PROJECT SCOPE 1.Project Description—Funds will be used for water system improvements to include all work involved to extend potable water and.fire protection service to the residential lots along Iki Place in Kohanaiki,North Kona on Hawai`i Island. • • Facilities will be designed and constructed in accordance with sound engineering practices and must meet the requirements of Federal, State, and local agencies.The proposed facility design must be based on the Preliminary Engineering Report(PER),prepared by Foresight Engineering &Design,LLC. dated July 26, 2022, as concurred with by the Agency. ' 2.Project Funding—The Agency is offering the following funding for your project: RUS Loan- $275,000 RUS Grant- $ 825,000 TOTAL PROJECT COST- $ 1,100,000 • Any changes in funding sources following obligation of Agency funds must be reported to the "processing official.Prior to loan closing,any increase in non-Agency funding will be applied first as a reduction to Agency grant funds,up to the total amount of the grant, and then as a reduction to Agency loan funds. The applicant must certify that they have exhausted all other funding avenues and have no pending funding considerations from any other sources. Further,the applicant must certify that they do not intend to apply anywhere else for funding for this project. If, after obligation of Agency funds, other funding becomes available,the Agency reserves the right to deobligate any and all funding for this project and to re-underwrite. This may result in the offering of a different funding package to for this project. • • •• Prior to advertisement for construction bids,you must provide evidence of applicant contributions and other funding sources. This evidence should include a copy of the commitment letter. Agency funds will not be used to pre-finance funds committed to the project from other sources. • 3.Project Budget—Funding from all sources has been budgeted for the estimated expenditures as follows: Project Costs: Total Budgeted: Construction $ 881,500 Contingency $ 30,000 Engineering Fees $ 148,500 • Includes: Preliminary Engineering Report $ 16,000 Environmental Report - $ 32,400 Design $ 89,500 Construction Support $ 10,600 • Legal Fees $ 40,000 TOTAL $1,100,000 • Project feasibility and funding will be reassessed if there is a significant change in project costs after bids are received. Obligated loan and/or grant funds not needed to complete the proposed project will be deobligated. Any reduction will be applied to Agency.grant funds first. If actual project costs exceed the project cost estimates, an additional contribution by the Owner may be necessary. An"Amended Letter of Conditions"will be issued for any changes to the total project budget. 4. Project Timeline—To ensure that the project proceeds in a timely manner,key processing milestones have been established in accordance with the PER or other Agency approved documentation. Projects should be completed, and Agency funds fully disbursed within three years of obligation. By agreeing to the terms herein,you agree to comply with the milestones identified below. If,for any reason, one or more of the milestones cannot be met,you Must notify the Agency in writing at least 30 days prior to the referenced date. Should your final completion date become more than three years after obligation the written request will follow the procedures outlined in Section VI of this letter, including the submission of not less than 90 days prior to the benchmark. The correspondence must contain a valid explanation as to why the milestone cannot be met and include a proposed revised project completion schedule. If the Agency agrees to the modification, a written confirmation will be issued.The Agency reserves the right to de-obligate loan and/or grant funds, or take other appropriate action,if the established or amended deadlines are not met. 4 Milestone Date Land&Easement Acquisition November 2022 Plans & Specifications, and Design Complete January 2023 • Initial Advertisement for Bids March 2023 Award Contract(s)/Initiate Construction January 2024 • Substantial Completion June 2024 Final Completion July 2024 • • SECTION II—RATES & TERMS 5.Interest Rates and Loan Terms—The interest rate will be the lower of the rate in effect at the time of loan approval or the.time of loan.closing unless you request otherwise. Should the interest rate be reduced,the payment will be recalculated to the lower amount. The payment due date will be established as the day that the loan closes. Your loan will be scheduled for repayment over a period of 35 years. Payments will be equal annual amortized installments,beginning.one month after closing. For planning purposes,use a 2.00%interest which provides for an annual payment of$11,003.00 The precise payment amount will be based on the interest rate at which the loan is closed and may be different than the one above. • 6. Security—The loan will be secured by a General Obligation bond with first lien position in the amount of$275,000. The bond will'be fully registered as to both principal and interest in the name of the"United States of America,Acting through the United States Department of Agriculture."Bond Counsel will be utilized in preparation of these documents. • The bond and any ordinance or resolution relating thereto must not contain any provision in .conflict with the Agency Loan Resolution,applicable regulations, or associated laws. There must be no defeasance or refinancing clause in conflict with the graduation requirements of 7 U.S.C. 1983. Additional security requirements are contained in RUS Bulletin 1780-27, "Loan Resolution" (Public Bodies)and RUS Bulletin 1780-12, "Water and Waste System Grant Agreement". A draft of all security instruments,including draft bond resolution,must be reviewed and concurred • in by the Agency prior to advertising for bids. Bond/loan resolutions must be duly adopted and executed prior to loan closing. The Grant Agreement will be executed prior to the first disbursement of grant funds. The grantee understands that any property acquired or improved with Federal grant funds may have use•and disposition conditions which apply to the property as provided by 2 CFR part 200 in effect at this time and as may be subsequently modified. The grantee understands that any sale or transfer of property is subject to the interest of the United States Government in the market value in proportion to its participation the project. ' • • 5 • 7.Reserves—Reserves must be properly budgeted and set aside to maintain the financial viability and sustainability.of any operation. Reserves are important to fund unanticipated emergency repairs,to assist with debt service should the need arise, and for the replacement of assets which have a useful life less than the repayment period of the loan. SECTION III—REQUIREMENTS PRIOR TO ADVERTISING FOR BIDS 8. Organization—The Bond Counsel transcripts of proceedings must show that your organization is a duly incorporated public body and has continued legal existence. Your . organization must have the authority to own, construct, operate, and maintain the proposed facility, as well as for borrowing money,pledging security and raising revenues. 9. Suspension and Debarment Screening—Agency staff must conduct screening for suspension and debarment of the entity through the Do Not Pay Portal. 10.Environmental Requirements—At the conclusion of the proposal's environmental review process, specific action(s)were determined necessary to avoid or minimize adverse • environmental impacts. As outlined in the Environmental Report(ER) dated July 2022,the following actions are required for successful completion of the project and must be adhered to during project design,and construction: In the unlikely event that lava tube caves, archaeological resources or human remains are encountered during future development activities within the affected area,work in the immediate area of discovery will be halted arid the State Historic Preservation Division • (SHPD) contacted as outlined in Hawai`i Administrative Rules 13§13-275-12. To minimize potential impacts to Hawaiian hoary bats: • Do not disturb,remove or trim woody plants taller than 15 feet during the bat birthing • and pup rearing season(June 1 through September 15). • • Do not use barbed wire for fencing• To avoid and minimize potential project impacts to seabirds: • Fully shield all permanent outdoor lights so the bulb can only be seen from below bulb height and only use when necessary. Any permanent fixtures would use only energy efficient outdoor lamps with wanner colors (less blue light) and would install lighting only where and when it is needed for safety purposes,with automatic motion sensors for appropriate fixtures • • Avoid nighttime construction altogether during seabird fledging period, September 15 through.December 15. 6 • To avoid and minimize potential project impacts to Blackburn's sphinx moth: , • A biologist familiar with Blackburn's sphinx moth shall survey areas of proposed activities for Blackburn's sphinx moth and its larval host plants prior to work initiation. o Surveys shall be conducted during the wettest portion of the year(November- , , April)if possible,but in any case,within 4-6 weeks prior to construction. o Surveys shall include searches for eggs, larvae, and.signs of larval feeding (chewed stems,frass, or leaf damage). o If moths or the native 'aiea or tree tobacco over 3 feet tall are found during the survey, inform the Agency for coordination with USFWS for additional guidance to avoid take. • If no Blackburn's sphinx moth, `aiea, or tree tobacco are found during surveys, , measures shall be taken to avoid attraction of Blackburn's sphinx moth to the project location and prohibit tree tobacco from entering the site. Ensure there are trained • personnel who will: ' o Remove any tree tobacco less than 3 feet tall. o Monitor the site every 4-6 weeks for new tree tobacco growth before, during and after the proposed ground-disturbing activity. - • To minimize potential impacts to Hawaiian hawks, ensure that if heavy construction to include excavation and large tree or major tree trimming is scheduled to begin during the breeding season for Hawaiian hawks (March 1 to September 30), arrange for a hawk nest search to be conducted by a qualified biologist according to accepted protocol. If hawk nests are present in or near the project site, all land clearing activity will cease until the expiration of the breeding season. • To avoid and minimize potential project impacts to the Hawaiian goose,incorporate the following measures into the project conditions: - • • Do not approach, feed, or disturb the Hawaiian goose • If Hawaiian geese are observed loafing or foraging within the project area during the • breeding season(September through April),have a biologist familiar with Hawaiian • goose nesting behavior survey for nests in and around the project area prior to the resumption of any work. Repeat surveys after any subsequent delay of work of 3 or more days (during which the birds may attempt to nest). • Cease all work immediately and contact the USFWS for further guidance if a nest is discovered within a radius of 150 feet of the proposed project, or a previously undiscovered nest is found within the 150-foot radius after work begins. 7 • • In areas where the Hawaiian goose are known to be present,post and implement reduced speed limits, and inform project personnel and contractors about•the presence of federally listed species on-site. Apply biosecurity protocols including cleaning and inspection of construction equipment for invasive species including fire ants,frogs,rats, and mice during.construction. The project, as proposed,has been evaluated to be consistent with the National Environmental Policy Act. Other Federal, State,tribal, and local laws,regulations and/or permits may apply or be required.If the project or any project element deviates from or is modified from the originally approved project, additional environmental-review may be required. 11.Engineering Services—You have been required to complete an Agreement for Engineering • Services,which should.consist of the Engineers Joint Contract Documents Committee(EJCDC) documents as indicated in RUS Bulletin 1780-26, "Guidance for the Use of EJCDC Documents on Water and Waste Projects with RUS Financial Assistance," or other approved form of agreement.The Agency will provide concurrence prior to advertising for bids and must approve any modifications to this agreement. 12. Contract Documents,Final Plans, and Specifications-All development will be completed by contract in accordance with applicable provisions of RUS Instruction 1780, Subpart C— Planning,Designing,Bidding, Contracting, Constructing and Inspections, (copy available upon request), and in compliance with all statutory requirements. You are responsible to share this with your engineer before pre-design. • a. The plans and specifications and all proposals required by law must be approved by the respective State and local regulatory bodies for water systems. b. In preparing final design and providing service to the planned project area,you and your engineer will comply with all zoning and planning requirements of the appropriate governing bodies where service is to be provided. . c. The Agency will need to concur in the plans and specifications prior to advertising for bids. The Agency may require an updated cost estimate if a significant amount of time has elapsed between the original project cost estimate and advertising for bids. • d. The use of any procurement method other than competitive sealed bids must be requested • in writing and approved by the Agency. e. The contract documents must consist of the EJCDC construction contract documents as indicated in RUS Bulletin 1780-26 or other Agency-approved forms of agreement. f. American Iron and Steel Requirements. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A-Agriculture,Rural Development,Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent • • • statutes mandating domestic preference applies the American Iron and Steel(AIS) requirement to obligations made after May 5,20.17: (1)No Federal funds made available for this fiscal year for the rural water,wastewater, . waste disposal,and solid waste management programs authorized by the Consolidated Farm and Rural Development Act(7 U.S.C. 1926 et seq.) shall be used for a project for the construction, alteration,maintenance, or repair of a public water - or wastewater system unless all of the iron and steel products used in the project are • produced in the United States. • • (2)The term"iron and steel products"means the following products made primarily of iron or steel: lined or unlined pipes and fittings,manhole covers and other municipal castings,hydrants,tanks,flanges,pipe clamps and restraints,valves, structural steel, reinforced precast concrete, and construction materials. (3) The requirement shall not apply in any case or category of cases in which the Secretary of Agriculture (in this section referred to as the".Secretary") or the designee of the Secretary finds that (a)applying the requirement would be inconsistent with the public interest; (b) iron and steel products are not produced in the United Statesin sufficient and reasonably available quantities or of a satisfactory quality; or (c) inclusion of iron and steel products produced in the United States will increase the cost of the overall project by more than 25 percent. (4) Owners are ultimately responsible for compliance with AIS requirements (as defined in RUS Bulletin 1780-35). (a)Sign loan resolutions, grant agreements and letters of intent to meet conditions which include MS language, accepting AISequirements in those documents and in the letter of conditions. (b)Sign agreements for engineering services, executed construction contracts and all other appropriate and necessary documents which include MS language. Change Orders and Partial Payment Estimates:Acknowledge responsibility for compliance with MS requirements by signing change orders(EJCDC C-941) and partial payment estimates (EJCDC C-620). (c) Substantial completion of project: Obtain the certification letters from the • consulting engineer and maintain this documentation for the life of the loan. (d)Special Cases is Where Owner provides their own engineering,the Owner's responsibilities will • include items listed in Section 5 of RUS Bulletin 1780-35. ii. Where Owner performs their own construction,the Owner's responsibilities will include items listed in Section 6 of RUS Bulletin 1780-35. iii. Where Owner directly procures MS products, Owner must utilize EJCDC Procurement Series standard contract documents following RUS Bulletin 1780-26 Exhibit D and obtain manufacturers' certifications and provide copies to Engineer and Contractor. 13.Legal Services—A legal services agreement is required with your attorney and bond counsel, if applicable, for any legal work needed in connection with this project. The agreement should • • stipulate an hourly rate for the work,with a"not to exceed" amount for the services,including reimbursable expenses. RUS Bulletin 1780-7, "Legal Services Agreement," or similar format may be used. The Agency will provide concurrence prior to advertising for bids. Any changes to the fees or services spelled out in the original agreement must be reflected in an amendment to the agreement and have prior Agency concurrence. • • 14.Property Rights -Prior to advertising for bids,you and your legal counsel must furnish satisfactory evidence that you have adequate continuous and valid control over the lands and rights-of-way needed for the project. Acquisitions of necessary land and rigihts must be accomplished in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act. Such control over the lands and rights will be evidenced by the • following: a. Right-of-Way Map—Your engineer will provide a map clearly showing the location of all lands and rights-of-way needed for the project. The map must designate public and • private lands and rights and the appropriate legal ownership thereof. • b. Form RD 442-20,"Right-of-Way Easement"—This form, or similar format,may be used to obtain any necessary easements for the proposed project. c. Form RD 442-21, "Right-of-Way Certificate"—You will provide a certification on this form that all right-of-way requirements have been obtained for the proposed project. d. Form RD 442-22,"Opinion of Counsel Relative to Rights-of-Way"—Your attorney will provide a certification and legal opinion on this form addressing rights-of-way, easements, and title. • The approving official may waive title defects or restrictions, such as utility easements,that do ,not adversely affect the suitability, successful operation, security value, or transferability of the facility. Any such waivers must be provided by the approving official in writing prior to closing or the start'of construction,whichever occurs first. You are responsible for the acquisition of all property rights necessary for the project and for • determining that prices paid are reasonable and fair. The Agency may require an appraisal by an independent appraiser or Agency employee in order to validate the price to be paid. 15..System Policies,Procedures, Contracts,and Agreements—The facility must be operated on a sound business plan which involves adopting policies,procedures, and/or ordinances outlining the conditions of service and use of the proposed system. Mandatory connection policies should be used where enforceable. The policies,procedures, and/or ordinances must contain an effective collection policy for accounts not paid in full within a specified number of days after the date of billing. They should include appropriate late fees, specified timeframes for disconnection of service, and reconnection fees. A draft of these policies,procedures, and/or ordinances must be submitted for Agency review and concurrence, along with the documents below,before closing instructions may be issued unless otherwise stated. a. Contracts for Other Services/Lease Agreement—Drafts of any contracts or other forms of agreements for other services, including audit,management, operation, and • 10 maintenance, or lease agreements covering real property essential to the successful operation of the facility,must be submitted to the Agency for review and concurrence prior to advertising for bids. Fully executed copies of any policies,procedures,ordinances, contracts, or agreements above must be submitted prior to loan closing. • 16.Closing Instructions—The Agency will prepare closing instructions as soon as the requirements of the previous paragraphs are complete, as well as a draft of the security instrument(s). Both your bond and legal counsel must comply with these instructions when closing the Agency loan/grant. 17. System Users—This letter of conditions is based upon your indication at application that there will be at least 15 residential users on the proposed system when construction.is completed. Before the Agency can agree to the project being advertised for construction bids,you must certify that the number of users indicated at application are currently using the system-or signed up to use the system once it is operational. If the actual number of existing and/or proposed users that have signed up for service is less than the number indicated at the time of application,you must provide the Agency with a written plan on how you will obtain the necessary revenue to adequately cash flow the expected operation, maintenance, debt service, and reserve requirements of the proposed project(e.g., increase user rates, sign up an adequate number of other users,reduce project scope, etc.). Similar action is required if there is cause to modify the anticipated flows or volumes presented following approval. 18. Construction Account—A separate construction account is not required for project funds. However,the recipient must be able to separately identify,report and account for all Federal funds,including the receipt, obligation and expenditure of funds,in accordance with 2 CFR 200.305. These funds must be deposited in a bank with Federal Deposit Insurance Corporation (FDIC)insurance coverage. If.the balances at the financial institution where federal funds will be deposited exceeds the FDIC insurance coverage, the excess amount must be collaterally secured up to 100 percent of the highest amount of funds expected to be • deposited in the account at any one time,per the Department of Treasury regulations and requirements. 19. Interim Financing—The Agency's policy is to utilize interim financing for all loans exceeding$500,000.Prepayment penalties.on interim financing are not allowed. Borrowers are required to seek interim financing initially from private or cooperative lenders if funds can be borrowed at reasonable interest rates on an interim basis from those sources for the construction period.The.fact that a commercial lender's rates are higher than current Agency interest rates does not necessarily mean that the commercial rate is not reasonable. • 11 • • 20.Proposed Operating Budget—You must establish and/or maintain a rate schedule that provides adequate income to meet the minimum requirements for operation and maintenance(0 • and M), debt service, and reserves. Prior to advertising for bids,you must submit a proposed annual operating budget to the Agency, as well as your proposed rate schedule. The operating budget should be based on a typical year cash flow after completion of the construction phase and should be signed by the appropriate official of your organisation. Form RD 442-7, "Operating Budget,"or similar format may be utilized for this purpose.It is expected that 0 and M expenses will change over each successive year and user rates will need to be adjusted on a . regular basis. Technical assistance is available at no cost to help you evaluate and complete a rate analysis on your system. This assistance is available free to your organization. If you are interested,please - contact our office for information. 21.Permits—The owner or responsible party will be required to obtain all applicable permits for the project,prior to advertising for bids. The consulting engineer must submit written evidence that all applicable permits required prior to construction have been obtained with submission to the Agency of the final plans, specifications,and bid documents. 22.Risk and Resilience Assessment/Emergency Response Plan (RRAJERP)—The Agency requires all financed water and wastewater systems to have an RRA/ERP in place. New water or wastewater systems must provide a certification that an ERP is complete prior to the start of operation, and a certification that an RRA is complete must be submitted within one year of the start of operation. Borrowers with existing systems must provide a certification that an RRA/ERP has been completed prior to advertising for bids. Technical assistance is available in preparing these documents at no cost to you. Before funds are drawn,you should have in place a cybersecurity plan, a supply chain plan, and a plan to comply with cybersecurity requirements of the National Institute of Science and Technology and the Cybersecurity and Infrastructure Security Administration. These items • should be addressed in the RRA/ERP. The RRA/ERP documents themselves are not submitted to the Agency. The RRA/ERP must address potential impacts from natural disasters and other emergency events. It should include plans to address impacts of flash flooding in areas where severe drought or wildfires occur. The documents should be reviewed and updated every five years at a minimum. 23.Bid Authorization- Once all the conditions outlined in Section III of this letter have been met,the Agency will authorize you to advertise the project for construction bids. Such advertisement must be in accordance with applicable State statutes. SECTION IV-REQUIREMENTS PRIOR TO.START OF CONSTRUCTION • 24.Disbursement of Agency Funds -•Agency funds will be disbursed electronically into the construction account as they are needed. SF 3881, "ACH Vendor/Miscellaneous Payment 12 . Enrollment Form,"must be completed and submitted to the Agency prior to commencement of construction. The order of disbursement is as follows: 1)Applicant contribution,2) other funding sources, 3) interim fmancing or Agency loan funds, and 4)Agency grant funds. Interim financing or Agency loan funds will be expended after all other funding sources unless a written agreement is reached with all other funding sources on how funds are to be disbursed prior the first 'disbursement. Interim financing funds or Agency loan funds must be used prior to the use of Agency grant funds. Agency Grant funds must not be disbursed prior to loan funds except as authorized in 7 CFR 1780.45(d). Grant funds are to be deposited in an interest-bearing account(exception provided below)in accordance with 2 CFR Part 200 and interest in excess of$500 per year remitted to the Agency. The funds should be disbursed by the recipient immediately upon receipt,and there should be little interest accrual on the Federal funds. Recipients shall maintain advances of Federal funds • in interest-bearing accounts,unless: • The recipient receives less than$120,000 in Federal awards per year. • The best reasonably available interest-bearing account would not be expected to earn interest in excess of$500 per year on Federal cash balances. • The depository would require an average or minimum balance so high that it would .not be feasible within the expected Federal and non-Federal cash resources. • A foreign government or banking system prohibits or precludes interest-bearing accounts. 25. Bid Tabulation—Immediately after bid opening,you must provide the Agency with the bid tabulation and your engineer's evaluation of bids and recommendations for contract awards. If the Agency agrees that the construction bids received are acceptable, adequate funds are available to cover the total project costs, and all the requirements of Section III of this letter have been satisfied,the Agency will authorize you to issue the Notice of Award. a. Cost Overruns—If bids are higher than expected, or if unexpected construction problems are encountered,you must utilize all options to reduce cost overruns. Negotiations,redesign,use of bidding alternatives,rebidding or other means will be considered prior to commitment of subsequent funding by the Agency. Any requests for subsequent funding to cover cost overruns will be contingent on the availability of funds. Cost overruns.exceeding 20 percent of the development cost at time of loan or grant approval or where the scope of the original purpose has changed will compete for funds with all other applications on hand as of that date. b. Excess Funds -If bids are lower than anticipated at time of obligation, excess funds must be deobligated prior to start of construction except in the cases addressed in this paragraph. In cases where the original PER for the project included items that were not bid, or were bid as an alternate,the State Office official may modify the project to fully • utilize obligated funds for those items. Amendments to the PER,ER, and Letter of • • 13 • Conditions may be needed for any work not included in the original project scope. In all cases,prior to start of construction, excess funds will be deobligated,with grant funds • being deobligated first. Excess funds do not include contingency funds as described in this letter. 26. Suspension and Debarment Screening'In accordance with 2 CFR Part 180, Subpart C, as a condition of the transaction and the responsibilities to persons at the next lower tier with whom you enter into transactions;you must conduct screening for suspension and debarment of lower • tier recipients (e.g.,vendors, contractors, etc.). 27. Contract Review—Your attorney wi11 certify that the executed contract documents, including performance and payment bonds, if required, are adequate and that the persons executing these documents have been properly authorized to do so in accordance with 7 CFR 1780.61(b). Once your attorney has certified that they are acceptable,the contract documents will be submitted to the Agency for concurrence. Construction cannot commence until the Agency has concurred in the construction contracts. - 28.Final Rights of Way—Your attorney or title company must furnish a separate final title opinion or Title Insurance Policy on all real property related to the facility,now owned and to be acquired for this project, as of the day of loan closing or start of construction,whichever occurs ' first. Form RD 1927-10, "Final Title Opin on"may be used. If any of the right-of-way forms listed previously in this letter contain exceptions that do not adversely affect the suitability, successful operation,security value, or transferability of the facility,the approving official must provide a written waiver prior to the issuance of the Notice • to Proceed. • 29.Insurance and Bonding Requirements -Prior to the start of construction or loan closing, whichever-occurs first,you must acquire and submit to the Agency proof of the types of • • insurance and bond coverage for the borrower shown below. The use of deductibles may be allowed,providing you have the financial resources to.cover potential claims requiring payment of the deductible.The.Agency strongly recommends that you have your engineer, attorney,and ' insurance provider(s).review proposed types and amounts of coverage,including any exclusions and deductible provisions. It is your responsibility and not that of the Agency to assure that • adequate insurance and fidelity bond coverage is maintained. • a. General Liability Insurance—Include vehicular coverage. • b. Workers' Compensation—In accordance with appropriate State laws. c. Guaranty or Fidelity Insurance—Coverage for all persons who have access to funds, including persons working under a contract or management agreement. Coverage may be provided either for all individual positions or persons, or through"blanket"coverage 14 • providing protection for all appropriate employees.Each position is to be insured in an amount equal to the maximum amount of funds expected to be under the control of that position at any one time. The minimum coverage allowed will be an amount equal to the total annual debt service payment on the Agency loans.The coverage may be increased • during construction based on the anticipated monthly advances. d. National Flood Insurance-If the project involves acquisition or construction in a designated special flood area,the community in which the acquisition or construction is situated must be currently participating in the national flood insurance program. Additionally, if the project involves acquisition or constriction in designated special flood or mudslide prone areas, a flood insurance policy must be in place at the time of loan closing. • e. Real Property Insurance—Fire.and extended coverage will normally be maintained on all structures except reservoirs,pipelines and other structures if such structures are not normally insured, and subsurface lift stations except for the value of electrical and • pumping equipment.The Agency will be listed as mortgagee on the policy when the Agency has a lien on the property.Prior to the acceptance of the facility from the contractor(s),you must obtain real property insurance(fire and extended coverage) on all • facilities identified above. The Agency is to be listed as"Other Insured" so as to receive notifications on all insurance, regardless of security.Insurance types described above are required to be continued throughout the life of the loan. See Section VII. 30. Initial Civil Rights Compliance Review—The Agency will conduct an initial civil rights compliance review of the borrower prior to loan closing or start of construction,whichever occurs first,in accordance with 7 CFR 1901, Subpart E. You are expected to comply with the completion of the review,including the furnishing of any documents,records, or other applicable . material. • SECTION V—REQUIREMENTS PRIOR TO CLOSING • 31.Multiple Advance.Multiple advances of Agency funds will be used. Loan closing will occur prior to when the funds are needed. All items detailed in the sections above, as well as the applicable items listed in this section,must be completed prior to closing. • 32.Electronic Payments—Payments will be made through an electronic preauthorized debit system. You will be required to complete Form RD 3550-28, "Authorization Agreement for Preauthorized Payments,"for all new and existing indebtedness to the Agency prior to loan closing. 33. Other Requirements—All requirements contained in the Agency's closing instructions, as well as any requirements of your bond counsel and/or attorney,must be met prior to loan closing. _.15 • . a. System for Award Management. You will be required to maintain a Unique Entity ID (UEI) and maintain an active registration in the System for Award Management(SAM) database. Renewal can be completed online at: http://sam.gov. This registration must be renewed and revalidated every 12 months for as long as there is an active loan, grant, or • guaranteed loan with the Agency. To ensure,the information is current, accurate and complete, and to prevent the SAM account expiration,the review and updates must be performed within 365 days of the activation date, commonly referred to as the expiration date. The registration process may take up to 10 business days. (See 2 CFR.Part 25 and the"Help" section at ' http://sam.gov). b. Litigation. You are required to notify the Agency within 30 days of receiving • notification of being involved in any type of litigation prior to loan closing or start of construction,'whichever occurs first. Additional documentation regarding the situation and litigation may be requested by the Agency. c. Certified Operator. Evidence must be provided that your system has or will have a • certified operator,as defined by applicable State or Federal requirements, available prior to the system becoming operational, or that a suitable supervisory agreement with a certified operator is in effect. SECTION VI—REQUIREMENTS DURING CONSTRUCTION AND POST CONSTRUCTION • 34. Construction Completion Timeframe—Following the benchmarks established in Section I, Item 4,Project Timeline, all projects should be completed,and Agency funds fully disbursed within three years of the date of obligation. If funds are not disbursed within three years of obligation and you have not already done so per Section I,Item 4,you must submit a written request for extension of time to the Agency with adequate justification of the circumstances, including any beyond your control. The request must be submitted at least 90 days prior to the end of the three-year timeframe and include a revised estimated date of completion. The Agency will typically only allow one extension. Subsequent requests for waivers beyond the initial extension or requests that exceed five years from the initial date of obligation will be submitted to the RUS,Water and Environmental Programs for consideration. The Agency retains the right to de-obligate any loan and/or grant monies, or take other appropriate action,related to unliquidated funds that exceed the timeframes above and are not under an active extension. 35.Resident Inspector(s)—Full-time'inspection is required unless you request an exception. Such requests must be made in writing and the Agency must provide written concurrence. Inspection services are to be provided by the consulting engineer unless other arrangements are requested in writing and concurred with by the Agency. A resume of qualifications of any resident inspector(s)will be submitted to the owner and Agency for review and concurrence • • prior to the pre-construction conference. The resident inspector(s)must attend the preconstruction conference. 16 • 36. Preconstruction Conference—A preconstruction conference will be held prior to the issuance of the Notice to Proceed. The consulting engineer will review the planned development with the Agency, owner,resident inspector, attorney, contractor, other fenders, and other interested parties, and will provide minutes of this meeting to the owner and Agency. • • 37.Inspections -The Agency requires a preconstruction conference,pre-final, final, and warranty inspections.. Your engineer will schedule a warranty inspection with the contractor and the Agency before the end of the [one-year] warranty period to address and/or resolve any outstanding warranty.issues. The Agency will conduct an inspection with you of your records management system at the same time and will continue to inspect the facility and your records system every three years for the life of the loan. See Section VII of this letter. 38. Change Orders—A Change Order must be submitted for all modifications to the approved scope of work, including existing contracts. This includes.non-physical modifications such as any time extension requests. Prior written Agency concurrence is required for all Change Orders. 39.Payments—Prior Agency concurrence is required for all invoices and requests for payment before Agency funds will be released. Requests for payment related to a contract or service agreement will be signed by the owner,project engineer, and contractor or service provider prior to Agency concurrence. Invoices not related to a construction contract or service agreement will include the owner's written concurrence. 40.Use of Remaining Funds—As stated above, applicant contribution and connection or tap fees will be the first funds expended in the project. Funds remaining after all costs incident to the basic project have been paid or provided will be handled as follows: a. Funds remaining after the applicant contribution and connection fees may be considered in direct proportion to the amounts of funding obtained from each source. The use of Agency funding will be limited to eligible loan and grant purposes,provided the use will not result in major changes to the original scope of work and the purpose of the loan and • grant remains the same. • b. Any reductions in the Agency funding will be first applied to the grant funds. c. Grant funds not expended for authorized purposes will.be cancelled(de-obligated)within 60 days of final completion of project. Prior to actual cancellation,you,your attorney and engineer will be notified of the Agency's intent to cancel the remaining funds and given appropriate appeal rights. d. Under no circumstances is it appropriate to use remaining funds as contributions to a new project outside the scope of the funded project. 17 e. Loan funds that are not needed will be applied as an extra payment on the Agency • indebtedness unless otherdisposition is required by the bond ordinance,resolution, or State statute. - • 41.Technical,Managerial and Financial Capacity-It is required that members of the Board of Directors, City Council members,trustees, commissioners and other governing members possess the necessary technical,managerial, and financial capacity skills to consistently comply with pertinent Federal,and State laws and requirements. It is recommended members receive training within one year of appointment or election to the governing board, and a refresher training for all governing members on a routine basis. The content and amount of training should be tailored to the needs of the individual and the utility system. Technical assistance providers • are available to provide this training for your organization, often at no cost. Contact the Agency for additional information. 42.Reporting Requirements Related to Expenditure of Funds--An annual audit under 2 CFR 200 is required if you expend$750,000 or more in Federal financial assistance per fiscal year. The total Federal funds expended from all sources shall be used to determine Federal financial assistance expended. Expenditures of interim financing are considered Federal expenditures. • All audits are to be performed in accordance with 2 CFR Part 200, as adopted by USDA through 2 CFR Part 400. Further guidance on preparing an acceptable audit can be obtained from the Agency. The audit must be prepared by an independent licensed Certified Public Accountant, or a State or Federal auditor if allowed by State law andmust be submitted within 9 months of your fiscal year end. Both the audit and accompanying management report must be submitted for review. If an audit is required,you must enter into a written agreement with the auditor and submit a copy of that agreement to the Agency prior to the advertisement of construction bids. The audit agreement may include terms and conditions that the borrower and auditor deem appropriate; however,the agreement should-include the type of audit to be completed,the time frame in which the audit will be completed, and how irregularities will be reported. SECTION VII—SERVICING REQUIREMENTS DURING THE TERM OF THE LOAN 43.Prepayment and Extra Payments-Prepayments of scheduled installments, or any portion thereof,may be made at any time at the option of borrower,with no penalty. Security instruments,including bonding documents,must contain the following language regarding extra payments;unless prohibited by State statute: Prepayments of scheduled installments, or any portion thereof may be made at any time at the option of borrower. Refunds, extra payments and loan proceeds obtained from outside sources for the purpose of paying down the Agency debt,'shall, after payment of interest, be applied to the installments last to become due under this note and shall hot 18 affect the obligation of borrower to pay-the remaining installments as scheduled in'your security instruments. 44.Annual Financial Reporting/Audit Requirements—You are required to submit an annual financial report at the end of each fiscal-year. The annual report will be certified by the appropriate organization official, and will consist of financial information, a current rate schedule, and listing of board members with,their terms. Financial statements must be prepared on an accrual basis of accounting in accordance with generally accepted accounting principles (GAAP). The annual report will include separate reporting for each water and waste disposal facility, and itemized cash accounts by type(debt service, short-lived assets, etc.)under each facility. All records,books and-supporting material are to be retained for three years after the issuance of the annual report. Technical assistance is available, at no cost,with preparing financial reports. The type of financial information that must be submitted is specified below: • a. Audits—An audit under the Single Audit Act is required if you expend$750,000 or more in Federal financial assistance per fiscal year. The total Federal funds expended from all sources shall be used to determine Federal,financial assistance expended. Expenditures • of interim financing are considered Federal expenditures. See Section VI for additional information regarding audits. • b. Financial Statements—If you expend less than$750,000 in Federal financial assistance per fiscal year,you may submit financial statements in lieu of an audit which include, at a minimum, a balance sheet and an income and expense statement. You may use Form RD 442-2, "Statement of Budget,Income and Equity," and 442-3, "Balance Sheet," or similar format to provide the financial information. The financial statements must be signed by the appropriate borrower official and submitted within 60 days of your fiscal year end. , • •45.Annual Budget and Projected Cash Flow-Thirty days prior to the beginning of each fiscal year,you will be required to submit an annual budget and projected cash flow to this office. The budget must be signed by the appropriate borrower official. Form RD 442-2,"Statement of • Budget,Income and Equity,"or similar format may be ued. . Technical assistance is available at no cost to help you evaluate and complete a rate analysis on your system, as well as completing the annual budget. 46. Graduation-By accepting this loan,you are also agreeing to refinance(graduate)the unpaid loan balance in whole, or in part,upon request of the Government. If at any time the Agency determines you can obtain a loan for such purposes from responsible cooperative or private-sources at reasonable rates and terms,you will be requested to refinane. Your ability to refinance will be assessed every other year for those loans that are five years old or older. • • 19 • 47. Security/Operational Inspections—The Agency will inspect the facility and conduct a review of your operations and records management system and conflict of interest policy every three years for the life of the loan.. You must participate in these inspections and provide the , required information. 48.System for Award Management. You will be required to maintain a Unique Entity ID (UEI) and maintain an active registration in the System for.Award Management(SAM) database. Further information can be found at paragraph 33 of this letter. 49.Risk and Resiliency Assessment/Emergency Response Plan(RRA/ERP)—The RRA/ERP is further outlined under Section III of this letter. You will be required to submit a certification to the servicing office every five years that the RRA/ERP is current and covers all sites related to the facility. The-RRA/ERP documents themselves are not submitted to the Agency. The RRA/ERP must address potential impacts from natural disasters and other emergency events. It should include plans to address impacts of flash flooding in areas where severe drought or wildfires occur. Technical assistance is available in preparing these documents at no cost to you. 50. Insurance.—'Insurance requirements are further outlined in Section IV of this letter. You will be required to maintain insurance on the facility and employees as previously described in this letter for the life of the loan. 51.Statutory and National Policy Requirements—As a recipient of Federal funding,you are required to comply with U.S. statutory and public policy requirements,including but not limited to: • a. Section 504 of the Rehabilitation Act of 1973—Under Section 504 of the Rehabilitation Act of 1973, as amended(29 U.S.C. 794),no handicapped individual in the United States shall, solely by reason of their handicap,be excluded from participation in,be denied the benefits of,or be subjected to discrimination under any program or activity receiving Agency financial assistance. • b. Civil Rights Act of 1964—All borrowers are subject to, and facilities must be operated in accordance with,Title VI of the Civil Rights Act of 1964(42 U.S.C. 2000d et seq.) and 7 CFR 1901, Subpart E,particularly as it relates to conductingUand.reporting of compliance reviews. Instruments of conveyance for loans and/or grants subject to the Act must contain the covenant required by Paragraph 1901.202(e) of this Title. c. The Americans with Disabilities Act(ADA) of 1990—This Act(42 U.S.C. 12101 et seq.)prohibits discrimination on the basis of disability in employment, State and local government services,public transportation,public accommodations,facilities, and ' telecommunications. d. Age Discrimination Act of 1975—This Act(42 U.S.C. 6101 et seq.)provides that no person in the United States shall on the basis of age,be excluded from participation in,be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. 20 • e. Limited English Proficiency(LEP) under Executive Order 13166-LEP statutes and authorities prohibit exclusion from participation in, denial of benefits of, and discrimination-under Federally assisted and/or conducted programs on the ground of race, color, or national origin. Title VI of the Civil Rights Act of 1964 covers program access for LEP persons. LEP persons are individuals who do not speak English as their primary language and who have a limited ability to read, speak,write, or understand English. These individuals may be entitled to language assistance,free of charge. You must take reasonable steps to ensure that LEP persons receive the language assistance necessary to . have meaningful access to USDA programs, services, and information your organization provides. These protections are pursuant to Executive Order 13166 entitled, "Improving Access to Services by Persons with Limited English Proficiency"and further affirmed in the USDA Departmental Regulation 4330-005, "Prohibition Against.National Origin Discrimination Affecting Persons with Limited English Proficiency in Programs and Activities Conducted by USDA." • • f. Controlled Substances Act-Even though state law may allow some activities, as a recipient of Federal funding,you are subject to the Controlled Substances Act. Specific questions about the Controlled Substances Act should be directed to the Servicing Official who will contact the Office of General Counsel, as appropriate. 52. Compliance Reviews and Data Collection—Agency financial programs must be extended without regard to race, color,religion, sex,national origin,marital status, age, or physical or mental handicap. You must display posters (provided by the Agency)informing users of these requirements, and the Agency will monitor your compliance with these requirements during regular compliance reviews. The Agency will conduct regular compliance reviews of the borrower and its operation in accordance with 7 CFR Part 1901, Subpart E, and 36 CFR 1191,Americans with Disabilities Act .(ADA)Accessibility Guidelines for Buildings and Facilities;Architectural'Barriers Act(ABA) Accessibility Guidelines. Compliance reviews will typically be conducted in conjunction with the security inspections described in this letter. . If beneficiaries (users)are required to complete an application or screening for the use of the facility or service that you provide,you must request and collect data by race (American Indian or Alaska Native,Asian,Black or African American, White); ethnicity(Hispanic or Latino,Not Hispanic or Latino); and by sex. The Agency will utilize this data as part of the required compliance review. • • SECTION VIII—REMEDIES FOR NON-COMPLIANCE • Non-compliance with the conditions in this letter or requirements of your security documents will be addressed under the provisions of Agency regulations, statutes, and other applicable • policies. 21 • We look forward to working with you to complete this project. If you have any questions,.please contact me by email at Lennie.Okano-Kendrick@usda.gov or by telephone at(808) 933-8304. Sincerely, j.Digitally signed by LENNIE LENNIE OKANO-;OKANO-KENDRICK KE N D R I C K bate:.,2022.08.25 12:33:00 • C -IuuU LENNIE OKANO-KENDRICK,P.E. State Engineer/Environmental Coordinator Attachments cc: Mr. Alton Kimura, Community Programs Director . Ms.Deanna Sako, County of Hawaii,Finance Director Ms.Kern Bandies, OGC Counsel FORMS.and BULLETINS: Form RD 442-2, "Statement of Budget,Income and Equity"—Items 45 Form RD 442-3, "Balance Sheet"—Item 45 Form RD 442-7,"Operating Budget"—Item 20 Form RD 442-20, "Right-of-Way Easement"—Item 14 Form RD 442-21, "Right-of-Way Certificate"—Item 14 Form RD 442-22,"Opinion of Counsel Relative to Rights-of-Way"—Item 14 Form RD 1927-10, "Final Title Opinion"—Item 28 Form RD 1940-1,"Request for Obligation of Funds"—Page 2 Form RD 1942-46, "Letter of Intent to.Meet Conditions"—Page 2 Form RD 3550-28, "Authorization Agreement for Preauthorized Payments"—Item 32 SF 3881, "ACH Vendor/Miscellaneous Payment Enrollment Form"—Item 24 RUS Bulletin 1780-7, "Legal Services Agreement"—Item 13 • RUS Bulletin 1780-12,"Water and Waste System Grant Agreement"-Item 6 •RUS Bulletin 1780-26,"Guidance for the Use of EJCDC Documents on Water and Waste Projects with RUS Financial Assistance"—Items 11 and 12 RUS Bulletin 1780-27, "Loan Resolution(Public Bodies)"—Item 6 �� oe � ,i,Hawai County Clerk 07f2412023 •03 45:32 PM e 1 /+�/ • i i. d+j��•pw d� �t EXHIBIT C 9 '. 'i. "i', TF o NPR r W . HAWAI`I COUNTY COUNCIL NOTI.CE OF PUBLIC: HEARING Date: August 15, 2023 . Time ;: 5 00 m P Place Kona Council Chambers, West Hawaii Civic Center; 74 5044 AneKeohokalole'Highway,Building A, Kailua Kona,Hawaii Pursuant to Section 92 41, Hawaii.Revised Statues,'and Sections,l2 10 and 12-27 of the Hawaii,County Code,notice is hereby given that the Hawaii County Council will hold a public hearing on the:establishment of a Water System;Improvement District for Iki Place, Kohanaiki 'Homesteads,'as proposed by Resolution No: 164=23. "' , '' Be it noted;that this is a combined hearing as permitted under,Sction 12=28 of.the Hawaii County.Code, and will address both 1)proposed improvements, e and 2)the preliminary, assessment roll of the Water System Improvement District Resolution`No. 164-23 Proposes to establish a Water System Improvement Distiict'(the `.`Improvement )istuct"),for Iki P1ace Kohanaiki Homesteads located in Kohanaikt,North Kona,`Hawai`i.'Proposed , :-.,:,- -''',,',;,,,','.1,i;:.,:-,",,.,-'.:''',-.':2..,',-„', improvements would include. e 1 The design, construction and installation of a new waters stem confornim to ;Y g current"Department of.Water;Supply standards; and 2) The installation_of fire hydrants for greater public'Safety and homeowner security, and rovidm residents with a reliable water supply and regular water pressure, and p g' Removal'of.all.existmg'meters and laterals within theImprovement�District,:and th ',.,,i. ,,:, ', ,, ',,. 1,,,,4--,:=2, 3) e installation of meters for each currently existinssithin the ;, Improvement IDistrict An"assessment unit', fg a essment unit within purposes of this Improvement District, is defined as property bearing a unique tax: map;key number :::::":-..',-:',:', ,:,,,,,,,,,,;:''''' Funds for the Improvement District would be derived from a,combination of a USDA Rural Utilities Service grant,and asses , ::'-',‘f,, ' '',.';',-.,''''' ' /:.,,,,',::: '''_ ''' sments paid by the owners of each`assessmentunit The approximate cost per assessment unit would equal the net cost of the proposed project a roximatel' $275'000 divided b the number of assessment units within the Im rovement DDimmum1 of itsive years proposed that assessments would be paid yearly or monthly over a r , Hawaii County Clerk 07/24/2023 03:45:32 PM Participation All interested.persons are invited to attend and will be afforded the opportunity to be heard. Persons who require special accommodations should call (808) 961-8255 by August 14,2023. Every effort will be made to obtain the required accommodation, though the County cannot guarantee that the requested accommodation can be provided. Testimony To provide Oral Testimony via Zoom, email councilrenlotetestimonv`c hawaiicotinty.gov or call (808) 961-8255 to register'and receive login:information..Written testimony may submitted via: (1)email to counciltestimony(vliawaiicountv.gov; or(2)mail to the Office of the County Clerk 25 Aupuni Street, Hilo, Hawai`i 96720. Upon timely request, this notice is available in alternate formats such as large print, Braille, or electronic copy. Availability of Documents Copies"of'Resolution No. 164-23,which includes all associated reports and data, are available for public inspection during regular business hours at the Office of the County Clerk, 25 Aupuni Street, Room 1402Hilo and at the Kona Council District Offices, 74-5044 Ane Keohokalole Highway, Building;A, Kailua-Kona.Resolution No. 164-23, may also be viewed"via the County's website at;https://records.hawaiicounty.govlweblink,`0/doc/10.5.6.51.6/Panel.aspx Questions Please call (808) 961-8532 for any inquiries regarding this public hearing. BY AUTHORITY OF THE HAWAI`I COUNTY COUNCIL COUNTY CLERK (West Hawai`i Today—July 29, August 5, August 8, and August 11) Hawaii County is an Equal Opportunity Provider and Employer • • AFFIDAVIT OF PUBLICATION IN THE MATTER OF } '� HAWAII COUNTY COUNCIL NOTICE OF PUBLIC HEARING } I. t� • Resolution No.164-23 } • HAWAII coup,COUNCIL • I .NOTICE OF PUBLIC HEARING • } Date: August 15,2023 Time: 5:00 p:fi, STATE OF HAWAII } Place: Kona•Council Chambers,West Hawaii Civic Center, •. }SS. 74-5044 Ane Keohokalole Highway,Building A,Kallua-Kona,Hawaii City and County of Honolulu } Pursuant to Section 9241,Hawaii RevJsed Statues,and Sections 12-10 and 12-27 of the Hawal'I,County Code,notice Is hereby given that the Hamill County Council will hold a public heating on the establishment of a Water AUG 0 51013 , System Improvement District for iki Place, Kohanalki Homesteads, as Doc. Date: #Pages: 1 proposedby,Resoiution No.164:23. Notary Name:COLLEEN E.SORANAKA First Judicial Circuit Be it noted that this is a combined hearing as permitted under Section 12-28 of . the Hawaii County Code,and will address both:1)proposed improvements;and I Doc. Description:OTT: `1 2)the preliminary assessment mil-of the Water System Improvement Disrict P Affidavit of �,• ''. Resolutloit No.164-23: : . Publication E:,SO �' Proposes to establish a Water System improvement District(the'Improvement •• 9 District"), for ikl'Piece, Kohanalki Homesteads, located In Kohanalld, North - •• •• • • ;��', Kona,Hawaii.Proposed Improvements would Include: S. "` NOTARY 1) The design,construction,end Installation of a new water system U 1 PUBLIC = conforming to current Department of Water Supply standards;and Notary Si ture Date - - -* r .90-263 /•*C .2) The Installation of fire hydrants for greater public safety and homeowner security;and,providing residents with a reliable water • �' supply and regular water pressure;and 1 Kimberly Masu being duly sworn,deposes and says that she is a clejt�� �Q.`' '• OF KP".� 3) Removal of all existing meters•and laterals within the Improvement authorized to execute this affidavit of Oahu Publications,Inc.publ ishei bfPJ 1 ,,,,‘`' • District,and the installation of meters.for each.currently existing Honolulu Star-Advertiser,Midweek,The Garden Island,West Hawaii Today,and assessment unit within the'Improvement District An"assessment unit", for purposes or this Improvement•District, is defined as Hawaii Tribune-Herald,that said newspapers are newspapers of general circulation in • . property bearing a unique tax map key number; 4;_s the State of Hawaii,and that the attached notice is true notice as was published in the Funds for the Improvement District would be derived from a combination of a USDA Rural Utilities Service grant,and assessments paid by the owners of Honolulu Star-Advertiser 0 times on: each assessment unit. . The approximate cost'per assessment unit would equal thet cost of the Midweek 0 times on:• proposed project (approximately.$275,000), div e'nided by the number of assessment units within the Improvement District(18 units).it Is proposed that assessments would be paid yearly or monthly.over a minimum of five years. . The Garden Island 0 times on: Participation • All Interested persons are invited to attend and will be afforded the opportunity to be heard.Persons who require special accommodations should call(808) Hawaii Tribune-Herald 0 times on: 961.8255,by August 14,2023.Every effort will be made to obtain the required accommodation,•though the County cannot guarantee that the.requested accommodation can be provided. . West Hawaii Today 1 times on: Testimony • To provide Oral Testimony via Zoom,email councilremotetestimony@hawallcounry.gov or call(808)961-8255 to milder 08/05/2023 and receive login information.Written testimony may lie submitted via:(1)email Other Publications: 0 times on: to counclitesttmonv@hawailcourdv.gov;or(2)mall Wile Office of the County Clerk,25 Aupunl Street,Hilo,Hamill 96720.Upon timely request-tits notice is • •nd thataffiant is not a party to or in any way interested in the above entitled matter. available In alternate formats such as large print Braille,or electronic copy. Copies of Resolution No.,164-23,which Includes all associated reports and data,are.gvaliable for public inspection during regular business hours at the. Kimberly Masu Office of the County Clerk,25 Aupunl Street,Room 1402,Hilo and at the Kona �j, Council District Offices,74-5044 And Keoholialole Highway,Building A,Kaliva- Su n to o before me this day of e. A.D.20 2/ Kona.Resolution No.164-23,may also be viewed via the s website at afidfhtips://records,hawaiicounty.goy/webllnk/0/dot/1056516/PagepageLi.aspx Questions - Please call(808)961-8532 for any inquiries regarding this public hearing. Colleen E.Soranaka,Notary Public of the First Judicial Circyit,,Stdtr'o6IT wail . My commission expires:Jan 062024 `.s_\ E• SO'•,,, BY AUTHORITY OF THE HAWAII COUNTY COUNCIL Ci\v �•9 COUN1Y CLERK sss Ad# 0001423781 v ? (WHT1423781 8/05/23) p: NOTARY 9� U: PUBLIC s` I. 1;o.90-263 • AFFIDAVIT OF PUBLICATION . [N THE MATTER OF } HAWAII COUNTY COUNCIL NOTICE OF PUBLIC HEARING } Resolution No.164-23 } } STATF.OF IIAWAII ) }SS. • ' a nos"' City and County of Honolulu } HAWAII COUNTY COUNCIL NOTICE OF PUBLIC HEARING Date: August 15,2023 Doc. Date: AUG O 8 2013 #Pages: 1 Time: 5:00 p.m. • Place: Kona Council Chambers,West•Hawai'ICIvicCenter; 74.5044 Ane Keohokalole'Highway,Building A Kailua•Kana,Hawaii Notary Name:COLLEEN E.SORANAKA First Judicial Circuit Pursuant to Section 92-41,Hawaii Revised Statues,and Sections 12-10 and Doc. Description: Affidavit of `,,," ''''a ,� 12-27 of the Hawaii County Code,notice is hereby given that the Hawaii ' I E. SO , County Council will hold a public hearing on the establishment of a Water Publication s �� •., /Q �', System.Improvement District for id Place, Kohanaiki Homesteads, as �!:'' '•...v., proposed by Resolution No.164-23. UG 0 8 2023 =o''• NOTARY ... . Be it noted that this is a combined hearing as permitted under Section 12-28 of , C)r PUBLIC y : the Hawar'i;'County Code,and will address both::d)proposed Improvements;and 2):the preliminary assessment roll cattle Water System improvement District: f Notary Signature Date - *': .* :NO.90-263 Resolution No.164-23: Proposes to establish a Water System Improvement District(the'Improvement t)� ' '•Q�s` District"),for Iki Place;Kohanaiki Homesteads, located in Kohanalki, North �; Kona,Hawaii.Proposed improvements would include:; •'• • . Kimberly Masu being duly sworn,deposes and says that she is a clerk;Baby`OF HP�� ._ ., , , .. `e a•a"o 1) The design, construction, and Installation of a new water system I authorized to execute this affidavit of Oahu Publications,Inc.publisher of The conforming to current Department of Water Supply standards;and Honolulu Star-Advertiser,MidWeek,The Garden Island,West Hawaii Today,and ': :W I ti 2) 'The installation of fire hydrants for greater.,public safety and Hawaii Tribune-Herald,that said newspapers are newspapers of general circulation in .:.'homeowner security,and"providing residents with a reliable water I i the State of Hawaii,and that the attached notice is true notice as was published in the supply and regular water pressure;and ' s Honolulu Star-Advertiser 0 times on: 3) Removal of alllexisting meters and laterals within the Improvement District;and the installation of meters for e,ach•currently existing ? assessment unit within the Improvement District.An"assessment • s unit", for purposes of this Improvement District, is defined as MidWeek 0 times on: . _ property bearing,a unique tax map key number. 'Funds for the Improvement District would be derived from a combination of a The Garden Island 0 times on: USDA Rural Utilities Service grant,•and assessments paid by the owners of } each assessment unit. 3 „ The approximate cost per assessment unit would equal the net cost of the I Hawaii Tribune-Herald 0 times on: proposed project (approximately $275,000), divided by the number of assessment units within the Improvement District(18 units).It is proposed that t assessments would be paid yearly or monthly over a minimum of five years. West Hawaii Today 1 times on: Participation •. All interested persons are invited to attend and will be afforded the opportunity 08/08/2023 to be heard.Persons who require special accommodations should call(808) r 961-8255 by August 14, 2023. Every effort will be made to obtain the Other Publications: 0 times on: -required accommodation, though the County cannot guarantee that.the i s requested accommodation can be provided: I Am..that affiant is not a party to or in anyway interested in the above entitled matter. Testimony ' r / To provide Oral Testimony via Zoom,email councilremotetestimonv@hawaiicountv.gov or call(808)961-8255 to register and receive login information.Written testimony may be submitted via:(1)email Kimberly Masu to counciltestlmonv@hawaiicountv.gov;or(2)mail to the Office of the County ' I �'¢�,ay of A.D.20 Zd� Clerk,25 Aupuni Street,Hilo,Hawai'I 96720..Upon timely request,this notice is i available In alternate formats such as large print,Braille,or electronic copy. • i • S ed to and sw re me this t+ d Availability of Documents Copies of Resolution No. 164-23,which Includes all associated reports and data,are available for public inspection during regular business hours at the r allotary Public of the First Judicial Circuit,StAt o aw$i0,' Office of the County Clerk,25 Aupuni Street,Room 1402,Hilo and at the Kona Colleenyo E.ssion expires: ., I My commission expires:Jan 06 2024 !\"_.••••••. Council District Offices,74-5044 Ane Keohokalole Highway,Building A,Kailua• ' ,`i ••..� '; Kona.Resolution No.164-23,may also be viewed via the County's website at � t �/.�' .4j . https://records.hawaiicounty.gov/weblink/0/doc/1056516/Pagei.aspx Ad# 0001423789 NOTARY - = 0-i I C questions ; (�e PUBLIC ? = Please call(808)961.8532 forany inquiries regarding this public hearing. • ' '•: t to.90-263 ;•*= BY AUTHORITY OF THE HAWAII COUNTY COUNCIL COUN1Y CLERK is• (WHT1423789 8/08/23)• + ''•q'OFNP. , i • • • . AFFIDAVIT OF PUBLICATION • IN THE MATTER OF } • HAWAII COUNTY COUNCIL NOTICE OF PUBLIC HEARING } Resolution No.164-23 • } HAWAII COUNTY COUNCIL • STATE OF HAWAII } NOTICE OF PUBLIC HEARING • • }SS. Date: August 15,2023 City and Comity of Honolulu } Time: 6;00 p.m; t Place: Kona:Council Chambers,West Hawaii Civic Center, 74-5044 Ane Keohokalole Highway,Building A,Kallua-Kona,Hawaii Pursuant to Section 92 41,Hawaii Revised Statues,and Sections 12-10 and t Doc. Date: �tUG 1 2� # Pages: 1 12-27 of the Hawaii County Code,notice Is hereby given that the Hawaii • County Council will a public hearing on the establishment of a Water Notary Name:COLLEEN E.SORANAKA FirstJudiciel,Qircuit System Improvement District for Iki Place, Kohanaiki Homesteads, as Affidavit of E- SQL proposed by.Resolution No.164-23. i on:Doc. Description:p ;+` . '--.-1 Be it noted that this is a combined.hearing as permitted under Section 12-28 of Publication v: :"v : 'the Newal'i.County.Code,.and will address both:1)proposed•improvements;and NOTARY —„: •.2)the preliminary assessment roll of the Water System Improvement District, / q qp =U; • PUBLIC �' = :Resolution No.16423: f _AUG 1 4 LSi23 *: Proposes te.establish e.Water System improvement:Distrct(the Improvement 'iC [;�.90-263 ::,...- ',„ Distdot"),for ihl Place,Kohanalki-.Homesteads,;located In Kohanalki;•North Notary Signature Date • Kona,limit Proposed Improvements would Include: S.;:,;'••........ • • t . " � 1) The design; constnrction, and lnstailaUcn of i neW water system OF �', ` conformie to currentDe artmentof,WaterSupplystandards;and '',,teeee.et. ,M1.: • .. `, f. Kimberly Masu being duly sworn,deposes and says that she is a clerk,duly 2) The Installation of Rre hydrants for greater public safety and i authorized to execute this affidavit of Oahu Publications,Inc.publisher of The homeowner,security,and,provlding residents whh a reliable water r .suppl;and regular.Waterpieeciinkand;:a Honolulu Star-Advertiser,MidWeek,The Garden Island,West Hawaii Today,and Hawaii Tribune-Herald,that said newspapers are newspapers of general circulation in 3) Rembvai of att existing metets•and*Mk;within the Improvement District,and the installation of meters for.each currently.existing I. the State of Hawaii,and that the attached notice is true notice as was published in the • assessment unit within the Improvement District. An "assessriient unit",for purposes of this improvement Distri t,.is defined as:property bearing a unique tax map key number.•' J Honolulu Star-Advertiser 0 times on: I 3 Funds far the Improvement District would be derived from a combination-of a T USDA Rural Utilities Service grant,and assessments paid by the owners of each + i MidWeek 0 times on: assessment unit, • • 1 a The approximate cost per assessment unit would equal-the net cost of•the I proposed project.(approximately $275,000), divided by the _number,of assesstgent'.Units.within tii@'Improvement District(18 units).It is proposed that ; The Garden Island 0 times on: assessments would be paid yearly or monthly over a minimum of tiveyears. t Participation i Hawaii Tribune-Herald 0 times on: Alilnterested persons are invited to attend and will be.afforded the opportunity r. to'be heard.Persons.who require special accommodations should Call(80B) JJ 961-8255-by August 14;2023.Every effort will be made to.obtaln the required I aCeernmodation•thou ..the Countycannot guarantee that the' requested 1 West Hawaii Today 1 times on: ate orninodation can be provided. g . 1 • r 08/11/2023 Testimony "' Other Publications: 0 times on: To provide:Oral Testimonyvla Zoom,email I counclIremotetestimonv@hawailcounty.gov or call(808)961-8255,.to'register : l and receive login Information.Written testimony-may be submitted did:(1)email And that affiant is not a party to or in any way interested in the above entitled matter. to counciltestrmonv@hawailcountv.Kov;or(2)mail to the;Offlce;of the County r Clerk,25 Aupuni Street,Hilo,IMAM 96720.Upon timely request,this notice is C_W ((-- available in alternate formats such as large print,Braille,or electronic copy.itita TVA I Availability of Documents Kimberly Masu Copies of Resolution No, 164-23,which includes all associatedreports and i • �7 data,are available for public Inspection during regular business-hours et:the Sub e to and fore me this'day of A.D.201717/ Office of-the County,Clerk,•25 Aupuni Street,Room 1402,Hilo and at the Kona ; Council District Offices,74-5044 Ane Keohokalole Highway,Building A,Kaliva- Kona.Resolution No.164-23,may also be viewed via the Counrttyy''s webslte at e,,,:,,,, https://records.hawaiicounty.gov/weblink/O/doc/1056516/Pagel.aspx Colleen .Soranaka,Notary Public of the First Judicial C�r•Cr) to of Tij`•,, Questions My commission expires:Jan 06 2024 .•" ���: Please call(808)961-8532 for any inquldes'regardingthis public hearing. • v Ad# 0001423793 :,p NOTARY ? BY AUTHORITY OF THE HAWAII COUNTY COUNCIL U PUBLIC A : COUNTY CLERK i • e (WHT1423793 8/11/23) %Y t o.90-263 �T' ,, r JON HENRICKS �.---Y. k' AARON BROWN County Clerk °J �`' Deputy County Clerk :Arv� aTst- County of Hawai`i EXHIBIT D Office of the County Clerk 25 Aupuni Street,Suite 1402 • Hilo,Hawai`i 96720 (808)961-8255 • Fax(808)961-8912 c-,.. Date: August 3, 2023 `` �'y -= S To: Heather L.Kimball, Council Chair --:-,,,.r and Members of the Hawaii County Council �_ = ' From: • Jon Henricks, County Cler N ---"---N* t Subject: Affidavit of Publication,Posting, and Mailings i Pursuant to Section 12-10(f) of the Hawai`i County Code 1983 (2016 Edition, as Amended), attached is an affidavit attesting that the publication, posting, and mailings for the establishment of a Water System Improvement District for lid Place, Kohanaiki Homesteads, as proposed by 1 Resolution No. 164-23,has been completed. i s 4 Thank you. i r JDH/nb . a att. s 1 i ri I r 1 6. i t i, 211 .2. 1 n Comm:No. 1 Ref:;To ... 'i Re ::"hate. AUG . 3 .2023.: Hawai`i County is an Equal Opportunity Provider and Employer AFFIDAVIT OF PUBLICATION,POSTING,AND MAILINGS STATE OF HAWAI`I ) ) SS. COUNTY OF HAWAII ) I, Jon Henricks,being first duly sworn on oath, deposes and says: 1. That I am the duly appointed County Clerk of the County of Hawai`i, and this affidavit is true pursuant to Sections 12-10(e) and (f) of the Hawai`i County Code 1983 (2016 Edition, as Amended),hereafter("the Code"); 2. That pursuant to Sections 12-10 and 12-27 of the Code and Resolution No. 164-23, adopted on June 21, 2023, the Hawai`i County Council has determined to hold a public hearing relating to the Water System Improvement District for Iki Place, Kohanaiki Homesteads,located at Kohanaiki,North Kona, Hawaii on August 15, 2023; 3. That pursuant to Section 12-27(d) of the Code, the notice of improvement and hearing shall be advertised, mailed, and posted in the same manner as provded in Section 12-10 of the Code; 4. That in accordance with Section 12-10(e)(1) of the Code, the notice of public hearing was, or is set to be, duly published in the West Hawai`i Today on July 29, 2023, August 5,2023,August 8,2023, and August 11, 2023; 5. That on July 31, 2023, in accordance with Section 12-10(e)(2) of the Code, copies of the notice of public hearing were duly posted at the following locations, at least ten days prior to the public hearing: a. Matsuyama Food Mart, 73-4354 Mamalahoa Highway, Suite B, Kailua-Kona, Hawai`i b. Matsuyama Market, 73-4040 Hulikoa Drive,Kailua-Kona,Hawai`i c. Kona Police Station, 74-611 Hale Maka`i Place,Kailua-Kona, Hawai`i d. Kailua-Kona (Kealakehe) Solid Waste Recycling and Transfer Station, 74-598 Hale Maka`i Place, Kailua-Kona,Hawai`i; and Affidavit of Publication,Posting,and Mailings ' Page 2 _ 6. That on July 24, 2023, in accordance with Section 12-10(e)(3) of the Code, copies of the notice of public hearing were duly mailed to all owners of the assessment units proposed € i to be assesed, at least two weeks prior to the hearing. i i t on enricks, County Cler I 1 Subscribed and sworn to me 0\0" ''''"""%>> this .� day of '111/l ��� 202� . ,,` �0�-R. �''�i i Nam, IC 1<- A•• �'ezL Notary of % � \ NIG � 0 HP P�/01;1I131`0 My commission expires fiLigW r IF 202E J I i Doc.Date: $/b 3120 #Pages: 2 Notary Name: Nicole R.K.Bello L3►"g Circuit `\��„�iliiiiiii.. 3 Doc.Description: -r fi d i v f of Publi tali t ����� \�R•k. �'�,� 1 1OSiill, and Mail iniq ..`�o-•........,., .-� a Nroic- K. K. 6 {,0-- gto Om ^ *i, 21-107 - Notary Signature Date (- .e Lit',e NOTARY CERTIFICATION '1` R C i to grim &)(ring: *rig- IF,202r �' qT'•o •• P 1 t Isy 1, C t 1 yE 't. r i PUBLIC HEARING EXHIBIT E OF THE HAWAI`I COUNTY COUNCIL • Water System Improvement District for Iki Place,Kohanaiki Homesteads West Hawai`i Civic Center 74-5044 Ane Keohokalole Highway, Building A Kailua-Kona, Hawai`i August 15, 2023 CALL TO ORDER: A public hearing to consider the establishment of a Water System Improvement District for Iki Place, Kohanaiki Homesteads was called to order at 5:03 p.m. in the Council Chambers, Kailua-Kona, by Ms. Heather L. Kimball, Chair. ATTENDANCE: Present: Ms. Heather L. Kimball, Chair Mr. Holeka Goro Inaba, Vice Chair Ms. Cindy Evans, Member Ms. Michelle M. Galimba, Member Ms. Jenn Kagiwada, Member Mr. Matt Kaneali`i-Kleinfelder, Member Ms. Ashley L. Kierkiewicz, Member Ms. Susan L. K. Lee Loy, Member Ms. Rebecca Villegas, Member PURPOSE OF THE Pursuant to Section 92-41, Hawaii Revised Statutes, and Sections 12-10 and HEARING: 12-27, Hawaii County Code,this public hearing is held in order for the County Council to hear testimony from the public prior to consideration of the establishment of a Water System Improvement District for Iki Place, Kohanaiki Homesteads, as proposed by Resolution No. 164-23. CHR. KIMBALL: Mr. Inaba, would you like to invite our guests from the Water Department to do their presentation? MR. INABA: Sure. If you could just please give us a quick overview, Mr. Quitoriano, of where we are for Resolution 164-23 and the plans and where we can expect some action in the coming months and years. Thank you. Hawai`i County Council—Public Hearing,Kailua-Kona,Hawaii August 15, 2023 Water System Improvement District for Iki Place,Kohanaiki Homesteads (Note: At this time, Civil Engineer Ryan Quitoriano, Department of Water Supply, came forward to address the members of the Council.) MR. QUITORIANO: This project is pretty straightforward as far as construction. Currently, as you have in your documentation, is the preliminary engineering report which came out with a total project cost of about a million dollars. That money is currently being obligated with the USDA (United States Department of Agriculture)loan and grant program. So they're ready to go as far as the funds. What is currently required as part of that program is a government bond. Once this public hearing ends,well,whatever testifiers there are, we can proceed with the project. We are ready to go out to bid. We have Palani Greenwell and Nancy Burns here today. They'll help us get the bidding documents ready, and we're kind of assuming within the next month or two to get that advertised and out to bid. MR. INABA: Thank you. Is there anything, Mr. Greenwell or Nancy,that you'd like to add to Mr. Quitoriano's kind of update on where we are? MR. GREENWELL(from audience): (Inaudible.) MR. INABA: Okey Jokey. With that, then,we do have physical copies of the plans in the back. Those are the draft plans. MR. QUITORIANO: Correct. MR. INABA: So they are not significantly different from the preliminary plans, which were done as this whole process got started,but they are more in detail and allow residents of the proposed improvement district to see where their water lines would be running. And this project, overall, appears to be moving along as quickly and as efficiently as possible. So,with that, I think that's generally the updates that we have this evening, and welcome the public to continue reaching out even after this public hearing if there are further specific questions that either the Council or the Depaitalent of Water Supply or Finance can provide answers to. Mahalo. CHR. KIMBALL: Thank you, Vice Chair Inaba. Okay. With that,we will move on to public testimony. So anybody wishing to make a public statement on the matter before us this evening may do so. You have three minutes. Mr. Clerk, can you begin calling our—? MR. HENRICKS: We don't have a formal list. I would just ask, if anybody is interested in testifying,to please come forward and state your name for the record and then provide your testimony. You'd have three minutes to do so. Page 2 Hawai`i County Council—Public Hearing,Kailua-Kona,Hawaii August 15,2023 Water System Improvement District for Iki Place,Kohanaiki Homesteads CHR. KIMBALL: All right, don't all leap up at once. Because we need to have it on the record,we'll need to have you sit in front of the mic,press the button, and then speak into the mic so we can record. Thank you. STATEMENTS The following individuals came forward to speak in support of the proposed water FROM THE system improvement district: PUBLIC: CHRISTY Hi, I'm Christy McCorstin. I live on Iki Place. Please let us have water. Please. MCCORSTIN: And I'm really glad that Adam is here today because I've just spotted—he's got a (See Comm. 271.31) leak and it's quite a gusher. And Adam is about 12 inches shy of the shutoff valve, so he'll have to go up to the meter to turn it off. And this is kind of what we do on a regular basis, is check all the pipes and make sure there's no leaks. And he's the lucky one today. But please let us have water. Thanks. JARINDA Jarinda Thatcher. I own Lot 5 on Iki Place, and I've been waiting for about seven THATCHER: years to build until there is water coming down Iki Place. So that's been a little bit of a hardship. Plus, we do have, like, a neighborhood hui that sends emails, and it's probably monthly I hear about a leak. And I think about all that water being lost; that's not a very good thing. So I really urge you to push this project forward , and to bring water to these 18 residents. Thanks. ELIZABETH Aloha, my name is Elizabeth Theriault. I live on Iki Place with my husband, THERIAULT: Gary Theriault, for more than 20 years now. I testified at the last hearing, so I'm (See Comm. 271.37) not going to repeat myself. I pushed that three minutes. And just to keep it short and—oh, gosh. Of course, I had it on my screen, and it's a repetitiveness of what I submitted with just a little addition from what I was feeling today. So we are in support and in favor of Resolution 164-23. This proposal to establish a water system improvement district for Iki Place is paramount and long overdue to bring substandard and unsafe living conditions securely forward to the multigenerational families that coexist within our neighborhood. We've had huge leaks actually, at one point, ending in a$2,000 water bill and 350,000 gallons lost that was unbeknownst to us. We usually use 6,000 a month; very modest. So that was devastating. We weren't informed in advance that was happening because it was concealed, and it took us four days and establishing many gates to discern even where it was. So this has been going on,but increasing in the last years. And we are water protectors and water conservers, so emotionally, spiritually, it was really devastating. And just thoughts that were emphasized today, and I know it's within all of our hearts too, but it cannot be from where we live. But with dramatically changing weather patterns,we are increasingly vulnerable, additionally in cases of Page 3 Hawai`i County Council—Public Hearing,Kailua-Kona, Hawai`i August 15, 2023 Water System Improvement District for Iki Place,Kohanaiki Homesteads emergency and wildfires. And when I witnessed one of so many things that we all witnessed, it was happening in North Kona last week in Hawi down to the golf course in Laniakea and then also in Pahala and Na`alehu, and then of course the most devastating, not that we can quantify anything, but on Maui. We're a little road, and we have to pull over to let our neighbors go by. And to see what happened, the loss of life and property because of the one-way road, we're very vulnerable. It feels like we're very vulnerable. And so we're very grateful for your, what feels like, positive support of the project. I thank you very much for your attention to these details, and for identifying the need and acting and going forward. Thank you so much. Aloha ke akua. DEBBIE HECHT: Aloha, Council Members. Thank you for staying after. It's getting pretty late. (See Comm. 271.35) I'm sure you all want to be home, so thank you for being here. My name is Debbie Hecht, and I've lived on Iki Place for the last 14 years. I very much support this project to bring water right to our homes. Right now, our meters are up on the Mamalahoa Highway, about a little over a quarter mile. So the pressure from the meters all the way 200 feet of elevation down to our homes explodes the PVC (polyvinyl chloride)lines. And when I moved in in 2009, I spent$3,000 to replace the old PVC line that was constantly cracking with a three-quarter inch Drisco line. But even that exploded like at the seams with all the pressure that builds up to come down that far. How many people are here from the neighborhood? Yeah, we have emails going around all the time, like, "Uh-oh, there's a water leak. Somebody, got to go up; check your meters." If we're not there or something, it's like you're constantly on call to go check your meters. And then you go up and your meter's spinning and spinning, and then you turn it off and go home and you have no water. So that's kind of a regular thing. Now, we are really looking forward to having a road. I mean, it's almost I jokingly call it a one-and-a-half road country,I mean, to live on Iki Place. I mean, I love it there and I love my neighbors, so it will be really nice to have water to depend on. I sent you a bunch of pictures. I don't know if you all got them. They went to counciltestimony@hawaiicounty.gov. Okay, so you kind of see the problem too. We very much appreciate the hard work of Council Members Karen Eoff, Holeka Inaba. And Wendy Baez, their legislative aide, has been a steadfast supporter to move this project forward. Wendy,thank you. And the Department of Water Supply,to help figure out which line was broken,we could call them and somehow they always sort of rode to our rescue. Page 4 Hawai`i County Council—Public Hearing,Kailua-Kona, Hawai`i August 15,2023 Water System Improvement District for Iki Place,Kohanaiki Homesteads So I personally want to thank all my neighbors who have come together to support this project. It's also brought the neighborhood together. So there is good things that come out of bad things, I guess. So mahalo. JANE THOMSON: Good evening. My name is Jane Thomson. I just wanted to let you know that I (See Comm. 271.38) wholeheartedly agree with what everybody has said, and would really appreciate this moving forward. Thank you. ADAM VAUGHN: Hello. My name is Adam Vaughn. I'm one of the newer tenants on that street. (See Comm. 271.39) When I first moved in,I fixed my leaks probably about 12 times in the first year. Luckily, I did it myself so it was not as costly but it was a lot. There was a lot. So the testimony I want to share,because I did send some in,was after I sent in that testimony, I did receive a call from the Kona water depai talent that my water bill was high. I hadn't checked it prior to that for a few weeks, so it had slipped through the cracks,but I used 24,000 gallons and my average was about 8,000. So,that notification,I went and walked the lines and ended up finding four leaks that evening after work. Because there's so many,I have gotten into the habit of just patching them. When I first moved in,I would cut them and then seal it, like the legitimate way. But because there's so many and those patches are more cost effective, I was just patching. So I've fixed four about a week or two ago, and yeah, the only positive I could say is that I learned how to use plumbing. But yeah, it would be very helpful for me at being new to have this and to just have the road. I think that's a big part of it,too, is having—it's very rocky right by my house, specifically, and to have a road and to sustain water and not waste. So thank you. CHR. KIMBALL: Thank you all for being here. Vice Chair Inaba, any closing statements before we wrap this up? MR. INABA: Just thank you all for being here this evening to share your thoughts on this project. And again,happy to talk story after this or at any time if you folks need updates. Mahalo again to the Department of Water Supply and Finance. Perhaps just giving a quick moment if there's anything from Finance that needs to be added,Director Sako? (Note: At this time, Finance Director Deanna Sako came forward to address the members of the Council.) MS. SAKO: I'm not sure how much the participants realize, but there is—we have done some math and Chris ran the numbers, and it's going to be roughly $600 a year, about$650 a year because of that USDA grant,which is really going to substantially bring down the cost. So the overall cost is $15,000 per lot that Page 5 Hawai`i County Council—Public Hearing,Kailua-Kona,Hawai`i August 15,2023 Water System Improvement District for Iki Place,Kohanaiki Homesteads will be amortized over 35 years. So, if anyone has any questions as the process moves on, either Chris Nakano, our treasurer, or myself are happy to answer those. MR. INABA: Thank you very much, Director Sako, for joining us and providing that update. Mahalo again to you all for being here. Chair, I yield. CHR. KIMBALL: Thank you, Vice Chair Inaba. With that, I will take a motion to adjourn. MR. HENRICKS: Prior to doing that,I just wanted to note that the Clerk's office will be issuing an affidavit to just show that this hearing was held and, furthermore, that we did not receive any protests from any of the owners;just to clear the path so that the next steps can be taken. CHR. KIMBALL: Thank you. And, Mr. Clerk, for the public,what is the next step following that notification of the affidavit and the—? MR. HENRICKS: There's more legislation coming forward. Water Supply has crafted a very specific time frame of events that are to come forward. So be patient. There's still more work to be done,but a lot of progress has been made. CHR. KIMBALL: Welcome to the sausage-making process. All right. ADJOURNMENT: The meeting was adjourned at 5:19 p.m. ` 1 COUNTY CLERK JH/dg Page 6 JONHENRICKS tv'os p • AARON BROWN County Clerk • Deputy County Clerk 7TE OF'N0' County of - Coun Hawai`i EXHIBIT F Office of the County Clerk 25 Aupuni Street,Suite 1402 • Hilo,Hawai`i 96720 r r� (808)961-8255 • Fax(808)961-8912 (17 1.--A Date: August 17,2023 To: Heather L. Kimball, Council Chair uW.� and Members of the Hawai`i County Council From: Jon Henricks, County C - L— - Subject: Affidavit of Public Hearing and Protest Procedures Pursuant to Sections 12-10 and 12-27 of the Hawai`i County Code 1983 (2016 Edition, as Amended), attached is an affidavit attesting that the public hearing and protest procedures were conducted on the establishment of a Water System Improvement District for Iki Place, Kohanaiki Homesteads, as proposed by Resolution No. 164-23. Thank you. JDH/nb att. Comm. No. �1 ' D Ref.:ToE_ Ref.Date AUG 2..1. 2023 Hawai'i County is an Equal Opportunity Provider and Employer AFFIDAVIT OF PUBLIC HEARING AND PROTEST PROCEDURES STATE OF HAWAI`I ) ) SS. COUNTY OF HAWAI`I ) I, Jon Henricks, County Clerk of the County of Hawai`i, being first duly sworn on oath, deposes and says: 1. That pursuant to Sections 12-10 and 12-27 of the Hawai`i County Code 1983 (2016 Edition, as Amended), the Hawai`i County Council held a public hearing on the establishment of a Water System Improvement District for Iki Place, Kohanaiki Homesteads, as propsed by Resolution No. 164-23; 2. That the public hearing convened as-scheduled on August 15, 2023, at 5:00 p.m, at the Kona Council Chambers, West Hawaii Civic Center, 74-5044 Ane Keohokalole Highway,Building A, Kailua-Kona, Hawai`i; 3. That six persons testified, all in support of the proposed improvement district; 4. That the Hawai`i County Council, after accepting all public testimony, adjourned the hearing at 5:19 p.m.; and 5. That no written protests were filed by any owners of an affected assessment unit. • d Jon Henricks, County Clerk Subscribed and sworn to me Doc.Date: $117/2023 #Pages: this 174h day of -hint, 2n23 . Notary Name: Nicole R.K.Bello &I-4 Circuit Doc.Description: t'4 TV14 of Public,-Negn nig and frn+es{ ProGedures K. -- Nat, 811712023 Notary Public, State of Hawai`i Notary Signature Date 2u25 NI(�iv R.K• $eIIO NOTARY CERTIFICATION Cemmi�s�tb11,�CpY �� _-�R,,,. mil- 15, My commission expires — joS- 1 2025 • ritri� s <ii • ADO ea,.........e.!< '�•�- *: 21-107 * _ F- : 21-107 a*E