Loading...
HomeMy WebLinkAboutCOM 0013.039 2022-2024 Mitchell D.Roth , tom~t't'oF H' ' +,,•., Diane Nakagawa Mayor VI;(' Director .yam • ?''+r�E•OF'Nn , '"• Aaron K.H.Brown '4 > Deputy Director County of Hawaii Finance Department 25 Aupuni Street, Suite 2103 • Hilo,Hawaii 96720 (808)961-8234 • Fax(808)961-8569 June 25, 2024 c CJ -=.• =▪ QC") Heather L. Kimball, Council Chair and • c,,. Members of the Hawaii County Council • —'' Hawai`i County Council v► --- 25 Aupuni Street „ ,, Hilo, Hawaii 96720Y Re: Report of Change Orders Authorized Pursuant to Hawai'i County Code Section 2-12.3, a revised Report of Change Orders Authorized for the period 6/1/2024 to 6/15/2024 is transmitted herewith for your review. Should you have any questions regarding the contracts, please contact the identified department. &k— Diane Nakagawa Finance Director Enc. Comm. No. 13.3 Ref. To: Ref. Date . N 2 5 2U2-3 Hawaii County is an Equal Opportunity Provider and Employer REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 06/01/2024-06/15/2024 Legend: CO Change Order SA Supplemental Agreement PS Professional Services C Construction PTA Price Term Agreement GS Other Goods&Services Original Original %of Cumulative %of Execution Job Contract Project Contract Dept. Contract Contract CO/SA CO/SA Orig CO/SA Orig Contractor Project Project Purpose Date # It Title Type Amount Date No. Amount Cont Total Cont Manager Status Price term agreement for the towing of vehicle disposal assistance program vehicles Extend by optional one-year period from August 01,2024 through July 30, 6/4/2024 IFB#4445 N/A for the Department of Environmental Management,COH PTA DEM $0.00 9/29/2023 2 $0.00 0.00% $0.00 0.00%Diamond Auto Works Nicole Charon Open 2025. Increase staff capacity to engage with unsheltered and unstably housed 6/4/2024 N/A C.011450 Develop&implement homeless engagement team SA OHCD $247,767.00 12/29/2023 1 $169,474.00 68.40% $169,474.00 68.40%Neighborhood Place of Puna Sharon Hirota Open transitional-age youth. General engineering-construction management service for various building projects B-377,B- in East Hawaii,such as the Hawaii Emergency Call Center,Job No B-3777,Public The call center has encountered contractor installation deficiencies that 4075,B- Safety Building Flood Mitigation,Job No B-4075,PGV Radio Equipment Structure and requires near full-time inspections.A contract supplement is needed to 4675,and B. site improvements,lob No.B-4675,and Civil Defense Radio Tower Remediation in provide the requisite inspection for the call center and other projects 6/4/2024 4676 C.011328 Ka'u,Na'alehua,and Kulani,Job No.B-4676 SA DPW $217,000.00 10/13/2023 1 $200,000.00 92.17% $200,000.00 92.17%Bower+Kubota Consulting Inc. James Imanaka Open requiring construction management services in the original contract. • This change order is for work associated with the depressed concrete slab for the raised floors in the dispatch centers and consists of temporary wall openings,a credit for decreased costs of slab grading,and additional waterproofing;metal deck supports;repositioning air conditioning diffusers in the communication room;and additional insulation fo the computer room 6/4/2024 B-3777 C.009108 Hawaii County Emergency Call Center SA DPW $31,070,000.00 6/2/2021 16 -$31,024.00 -0.10% $314,750.93 1.01%Hensel Phelps Construction Co. Julann Sonomura Open air condition unit(CRAC 2). The Motorola change order represents increased costs due to the 460-day project delay associated with the raised floor in the dispatch areas and the 6/4/2024 B-3777 C.009108 Hawaii County Emergency Call Center SA DPW $31,070,000.00 6/2/2021 17 -$211,649.12 -0.68% -$526,400.05 -1.69%Hensel Phelps Construction Co. Julann Sonomura Open NEC 708 code compliance changes. 6/10/2024 WW-4794 C.011671 Emergency work to remove and replace failed sewer lateral SA DEM $97,710.00 4/29/2024 1 -$31,460.00 -32.20% -$31,400.00 -32.14%Istemoto Construction Co.Ltd Mark Grant Open Deduction change order to reduce scope of work,services and materials. Routing for signature of vendor's zero usage document which should have 6/10/2024 IFB#4384 C.010724 Microsoft government enterprise agreement,COH SA FIN $1,253,103.51 3/13/2023 2 $0.00 0.00% $343,868.68 27.44%Zones,LLC Nicole Charon Open been routed with the Supp No 1 executed on 5/31/24. The emergencyAupuni Center sewer renovation project is being performed in phases to enable construction to proceed as quickly as possible.This supplement represents phases 2 and 3,Human Resources and Workers 6/10/2024 B-4763 C.011388 Professional consulting services for the Aupuni Center sewer renovations SA DPW $177,838.00 12/6/2023 1 $378,164.00 212.65% $378,164.00 212.65%Fleming&Associates LLC James Imanaka _ Open Comp,and DPW restrooms which are similar in design and location. A separate structural analysis of the hose tower recommended repairs to the hose tower that should be performed in the reroofing project and unforeseen drainage improvements are needed to receive the stormwater 6/10/2024 B-4748 C.011347 Professional consulting services for the Central Fire Station reroofing SA DPW $222,413.81 10/26/2023 2 $65,842.90 29.60% $140,706.73 63.26%Fleming&Associates LLC James Imanaka Open from the reroofing efforts. Rental of heavy equipment for the Department of Environmental Management, Extension beginning May 1,2024 and ending October 28,2024,or until a 6/10/2024 IFB#4333 N/A Department of Public Works and other agencies,COH PTA FIN $0.00 5/22/2023 1 $0.00 0.00% $0.00 0.00%Ludwig Construction Nicole Charon Open new contract is In place. Rental of heavy equipment for the Department of Environmental Management, Extension beginning May 1,2024 and ending October 28,2024,or until a 6/12/2024 IFB#4333 N/A Department of Public Works and other agencies,COH PTA FIN $1.00 5/22/2023 1 $0.00 100.00% $1.00 100.00%C&A Generator Services Inc. Nicole Charon Open new contract Is in place. Contracts 11 Total Original Contract Amount $64,355,833.32 Total CO/SA $539,347.78 Amount for Period