My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2025-022 2024-2026
ClerkCouncil
>
Council Records
>
Ordinances
>
2025
>
ORD 2025-022 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2026 1:22:46 PM
Creation date
3/4/2025 3:53:33 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2024-2026
Year
2025
Ordinance
022
Effective Date
3/4/2025
Document Relationships
BIL 012 Draft 01 2024-2026
(Related)
Path:
\Council Records\Bills\2024-2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY OF HAWAI`I <br />JM.V 0r <br />.1,q�Y <br />STATE OF HAWAI`I <br />,r[ OF•H�'� <br />BILL NO. 12 <br />ORDINANCE NO. 25 22 <br />AN ORDINANCE AMENDING CHAPTER 5D, ARTICLE 1, SECTIONS 5D-1-3 AND <br />5D-1-6, OF THE HAWAI`I COUNTY CODE 1983 (2016 EDITION, AS AMENDED), <br />RELATING TO THE ELECTRICAL CODE. <br />BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAI`I: <br />SECTION 1. Chapter 51), article 1, section 5D-1-3, of the Hawaii County Code 1983 <br />(2016 Edition, as amended), is amended to read as follows: <br />"Section 5D-1-3. Scope; exceptions. <br />This chapter shall apply to electrical work and installations within the County <br />inland of the shoreline high-water line[. This ehapter- shall net apply to ] ex, cept: <br />(1) Work or installations not covered by the National Electrical Code, 2017 <br />Edition, as adopted [ .] in section 5D-2-1; <br />and <br />(2) Electrical work by an electrical utility on any generating plant, receiving <br />station, switching station, distributing station, supply lines or mains, overhead <br />service drop, and underground or station service supply conductor under the <br />control of the utilitv." <br />SECTION 2. Chapter 51), article 1, section 5D-1-6, of the Hawaii County Code 1983 <br />(2016 Edition, as amended), is amended by adding a definition to be appropriately inserted and <br />to read as follows: <br />""Electrical utility" means a: <br />(1) Public utilitv that produces. convevs, transmits. delivers, or furnishes <br />electricity to the public; or <br />(2) Person or entity who provides or intends to provide electricity for sale directly <br />to a public utility, subject to regulation by the Public Utilities Commission. <br />As used herein. "public utilitv" means the same as defined by section 269-1, <br />Hawaii Revised Statutes." <br />SECTION 3. Material to be repealed is bracketed and stricken. New material is <br />underscored. In printing this ordinance, the brackets, bracketed and stricken material, and <br />underscoring need not be included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.