Loading...
HomeMy WebLinkAboutCOM 0110.032 2024-2026 p IPcPLL O till 24 COMM. in CROWN 7192 Kalanianaole Hwy Ste A Email: ��+��� 143A#272 Adrian.Catalan@crowncastle.com a`7 Honolulu,HI 96825 wwwcrowncasuecom C UNTY CLERK CO TY OF HAWAI'I RECEIVED Time I;I3p41. By _ Date MAR 2 7 2025 Via Electronic Submittal at counciltestimony@hawaiicounty.gov 03/27/2025 RE: Crown Castle Oppose Bill 24(Draft 2) Chair Kierkiewicz,Vice Chair Galimba,and members of the Policy Committee on Planning,Land Use and Economic Development: My name is Adrian Catalan and I am a Real Estate Specialist for Crown Castle, a wireless communications infrastructure provider that constructs,operates and maintains a communications network on the big Island.With my experience in zoning and permitting for telecommunication projects, I am here today to oppose Proposed Bill 24,Draft 2 as currently drafted and to request amendments that will provide compliance with federal law while also preserving our ability to provide the critical wireless services that both the County and the community relies upon as part of their everyday life. Telecommunications infrastructure,including wireless infrastructure,is integral to daily life,business operations, and government purposes.No better recent example exists than the critical service that telecommunications provided for residents and first responders alike during and after the Maui wildfires.Wireless connectivity,is an essential service to our everyday lives and we welcome the opportunity to work with the County to ensure that the regulations adopted serves doesn't inadvertently create a"prohibition of service",which is explicitly prohibited under federal law. A summary of our concerns was provided to HI Co.last summer,and we participated in the wireless industry comments which were submitted on 2/3/25. To date,our concerns have not been addressed and we are concerned that Proposed Bill 24 will make it extremely difficult to build the critical infrastructure that we all rely upon for connectivity purposes. Specifically,we request amendments to address the following: 1. A clear distinction between new tower construction and modifications of existing infrastructure is needed. Section 6409 of the Middle Class Tax Relief and Job Creation Act mandates approval of modifications that do not constitute as a substantial change to the facility be approved within 6o days of submittal. Absent action by the County,the request is deemed approved. 2. Bill 24 conflates antennas and towers which are very different from one another. If the goal is to encourage collocation on existing infrastructure whenever possible,which we support,please provide language that recognizes that new antennas on existing infrastructure does not require the same level of regulation that a new tower might require. The Foundation for a Wireless World. Comm. tip ��T! i'1. • �::rr CrownCastle.com Ref. To: ;i �ii,rl���,�1< i� Ref. Date APR - 1 2025 3. Setbacks from residences,schools and hospitals—the current draft requires a 1200'setback from property lines adjacent to residences,schools and hospitals. No justification for this has been provided. This is significantly more stringent than current requirements(5 x tower ht)and is not common amongst other local jurisdictions. This level of setback is not required for safety purposes as towers are designed to not fail,and regulations that are based on perceived health and safety effects are prohibited by federal law. We support the proposed 120%setback from all property lines,regardless of the land use. Alternatively,we recommend a Director waiver of the 1200'setback if needed to avoid an effective prohibition of service. 4. Minimum lot sizes—Bill 24 proposes minimum lot sizes without any justification. If the purpose of these requirements is to provide visual screening,this doesn't necessarily accomplish that objective. Instead,we recommend adoption of objective design standards that takes into consideration some of the many issues that arise during the siting process. In summary,we appreciate the County's attention to this important matter and we urge you to postpone adoption of this ordinance until such time that these issues can be resolved. We stand ready to work with you at your earliest convenience. Mahalo. Sincerely, Adrian Catalan Real Estate Specialist Crown Castle Adrian.catalan@crowncastle.com The Foundation for a Wireless World. CrownCastle.com