Loading...
HomeMy WebLinkAboutCOM 0361.000 2024-2026C. Kimo Alameda, Ph.D. Mayor William V. Brilhante Jr. Managing Director County of Hawaii Finance Department 25 Aupuni Street, Suite 2103 • Hilo, Hawaii 96720 (808)961-8234 • Fax (808) 961-8569 June 19, 2025 Diane Nakagawa Director Malia A. Kekai Deputy Director •�J Dr. Holeka Goro Inaba, Council Chair and o C: ". Members of the Hawaii County Council Hawaii County Council 25 Aupuni Street, Hilo, Hawaii 96720 _q a 'c.J1 Re: Resolution to adopt the updated County of Hawaii Multi -Hazard Mitigation Plan Enclosed is a resolution authorizing the adoption of the County of Hawaii 2025 Multi -Hazard Mitigation Plan as required by 44 C.F.R. § 201.6(c)(5) and HCC § 7-14(a)(4). If there are any questions, please do not hesitate to call Talmage Magno, Civil Defense Administrator At (808) 935-0031. a Diane Naka wa Director of Finance Enc. c: CD Comm. Ref. To:'' Hawaii County is an Equal Opportunity Employer and Providef. Date Form #: B-52 7/18/91 DEPARTMENT: DEPARTMENT OF FINANCE REQUEST FOR COUNCIL ACTION Civil Defense DATE: -6/2/2025 STAFF CONTACT: Talmadge Magno, CD Administrator PHONE: 808-935-0031 A. REQUEST: Requesting adoption by resolution of the updated County of Hawaii Multi -Hazard Mitigation Plan. Current plan expires on September 15, 2025. B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): Code of Federal Regulations, Title 44, Chapter 1, Sub -Chapter D, Part 201, requires local governments to prepare and adopt a natural hazard mitigation plan as a condition for receiving grant funds under the Hazard Mitigation Grant Program (HMGP). The plan must be reviewed, updated, and adopted by the local government every five years. The current County of Hawaii Multi -Hazard Mitigation Plan was approved by FEMA on September 15, 2020. The Civil Defense Agency began the revision process of the current plan in April 2024 with the selection of a contractor to coordinate the review and revision process. After numerous community engagement events and work county group meetings to review the plan's goals, objectives, and mitigation actions, the revised plan was posted on the Civil Defense website on March 3, 2025 for public reivew. Some revisions were made as a result of the review process and the final plan was submitted on May 30, 2025, to the Hawaii Emergency Management Agency (HI-EMA) and FEMA for concurrent state and federal review. A requirement for plan approval is the local government adopting the plan in accordance with local laws. FEMA can review the plan prior to the local government adopting the plan. That is the case with this plan which was submitted to FEMA under "Submission without adoption resolution procedures." After FEMA reviews the plan and recieves any recommended changes, FEMA will issue an "approved pending adoption letter" to the County of Hawaii. Under these procedures, FEMA recommends that the plan be adopted inclusive of any minor additions or corrections that result from the review process. FEMA will issue an approval letter once they are notified that the plan has been adopted (the local jurisdiction has one year to adopt a plan that is approved pending adoption). Adopting the plan recognizes the current planning process and acknowledges changes from the past five years and validates the priorities for hazard mitigation actions. There are two attachments; the 2020 plan's executive summary which includes the goals, objectives and actions for the plan, and the final draft of the 2025 plan's goals, objectives, and actions. SIGNED: DATE: c) 2.0 Zs- Attachment 1 U M k-111 EXECUTIVE SUMMARY Hazard mitigation is the use of long-term and short-term policies, programs, projects, and other activities to alleviate the death, injury, and property damage that can result from a disaster. The County of Hawaii has developed an updated hazard mitigation plan to reduce risks from natural disasters on the island of Hawaii. This is a comprehensive update of the hazard mitigation plan that the County of Hawaii first developed in 2010 and previously updated in 2015. The plan complies with federal and state hazard mitigation planning requirements to maintain eligibility for funding under Federal Emergency Management Agency (FEMA) grant programs. Organization A core planning team consisting of a contract consultant and Hawaii County staff was assembled to facilitate this plan update. A working group was assembled to oversee the plan update, consisting of both governmental and non -governmental stakeholders. Coordination with other county, state, and federal agencies involved in hazard mitigation occurred throughout the plan update process. Organization efforts included a review of the 2015 County of Hawai `i Multi Hazard Mitigation Plan, the Hawaii statewide hazard mitigation plan, and existing programs that may support hazard mitigation actions. Public Outreach The planning team implemented a multi -media public involvement strategy utilizing the outreach capabilities of the County that was approved by the working group. The strategy included public meetings, a hazard mitigation survey, a project website, the use of social media and multiple media releases. Plan Document Development The planning team and working group assembled a document to meet federal hazard mitigation planning requirements. Adoption Once pre -adoption approval has been granted by Hawaii State Civil Defense and FEMA Region IX, the County will formally adopt the updated plan. Risk assessment is the process of measuring the potential loss of life resulting from natural hazards, as well as personal injury, economic injury and property damage, in order to determine the vulnerability of people, buildings, and infrastructure to natural hazards. For this update, risk assessment models were enhanced with new data and technologies that have become available since 2015. The working group used the risk assessment to rank TETRA TECH County of Hawaii Mufti -Hazard Mitigation Plan Executive Summary risk and to gauge the potential impacts of each hazard of concern on the island of Hawaii. The risk assessment included the following: • Hazard identification and profiling • Assessment of the impact of hazards on physical, social, and economic assets • Identification of particular areas of vulnerability • Estimates of the cost of potential damage. Based on the risk assessment, hazards were ranked for the risk they pose, as shown in Table ES-1. _ .. -. ;. - ._�_•__ fable ES-'f. Haiard Elide Rankin RankingHazard Hazard Event High V v_ - _ Wildfire 51, High _ Earthquake51 high High Windstorms - 45 High _ Trp ical C done 36 High y _ Flood 33 High _ Landslide High Volcanic Eruption 30 Medium _ Climate ChangeMea Level Rise 27 Medium High Surf/Storm Surgelcoastal Flood 24 Low Tsunami 10 Low _ T - ^ Dam Failure b - Law Drought _ $ a. Scores of 30 or greater are rated as "high," scores of 15 to 29 are "medium," and scores of less than 15 are "low MITIGATION GOALS AND OBJECTIVES The working group established the following goals for the plan update: 1. Utilize state-of-the-art methods and technologies as well as local knowledge to identify hazards, risks, and capabilities. 2. Ensure that all critical facilities and infrastructure withstand hazard incidents and have contingency plans to restore services quickly. 3. Protect natural and cultural resources to the extent practicable while mitigating hazards. 4. Promote actions that support land use planning and regulations designed to ensure long-term resiliency. 5. Promote community risk reduction and preparedness through public education, training and awareness. 6. Improve capabilities to implement response protocols and continuity of operations and services. 7. Strengthen partnerships and leverage existing resources and capabilities to identify, assess, and reduce the impact of hazards. The effectiveness of a mitigation strategy is assessed by determining how well these goals are achieved. Objectives were identified that meet multiple goals. The objectives also are used to help establish priorities. The objectives are as follows: 1. Improve warning and emergency communications systems. 2. Conduct studies to determine locations, potential impacts, and links among threats, hazards, and vulnerabilities to support the identification and implementation of mitigation and protection measures in Hawaii County. I TETRA TECH County of Hawaii Multi Hazard Mitigation Plan Executive Summary 3. Utilize the best available data, science and technology to identify and communicate the risk exposure to hazards and ways to increase the planning area's capability to prepare for, respond to, recover from, and mitigate the impacts of hazard events. 4. Promote and implement the retrofit, hardening, or replacement of at -risk structures and lifelines to increase community resilience. 5. Support hazard mitigation measures that promote and enhance natural processes and minimize adverse impacts on the ecosystem. 6. Research, develop, promote, adopt and enforce codes and standards that are affordable and feasible for life and property protection. 7. Establish and maintain partnerships among all levels of government, the private sector, community groups, and institutions of higher learning that improve and implement methods to protect life, property and the environment in the planning area. 8. Minimize impacts of hazard events on the economic drivers for the County. 9. Incentivize and implement mitigation measures for hazard risk and repetitive loss areas to address repairs, major alternations, development plans and practices. 10. Integrate local hazard mitigation plans with the general plan other local plans, and provide training and guidance to integrate and strengthen the linkages between the plans. 11. Advance community resilience through preparation, adoption, and implementation of state, county and local multi -hazard mitigation plans and projects. 12. Promote and implement mitigation measures such as fire breaks around communities and along roadways as needed to mitigate the risk of wildland fires. The County selected mitigation actions to work toward achieving the goals set forth in this plan update. Mitigation actions presented in this update are activities designed to reduce or eliminate losses resulting from natural hazards. The update process resulted in the identification of 31 mitigation actions for implementation, as listed in Table ES-2. The table shows two identified priorities for each action: priority for implementing the action and priority for pursuing grant funding. The working group developed an implementation and maintenance strategy that includes grant monitoring and coordination, a strategy for continued public involvement, a commitment to plan integration with other relevant plans and programs, and a recommitment from the County to actively monitoring and evaluating the plan over a five-year performance period. Full implementation of the recommendations of this plan will require time and resources. The measure of the plan's success will be its ability to adapt to changing conditions. Hawaii County will assume responsibility for adopting the recommendations of this plan and committing resources toward implementation. The framework established by this plan commits the County to pursue actions when the benefits of a project exceed its costs. The County developed this plan with extensive public input, and public support of the actions identified in this plan will help ensure the plan's success. TETRA TECH XXID County of Hawaii Multi -Hazard Mitigation Plan Executive Summary Action HC1—Microwave Network Upgrade. This project involves the hardening of fhe County's radio Medwm " High communications system through replacement of the following systems: microwave system, direct current ; (DC) power system, photovoltaic energy systems,_and tower refurbishment. _ Action HC2=Public Safety Building Flood MiUgation and Electrical Upgrade. This project will eliminate Medium High flooding that endangers the entire electrical system at the Public Safety complex and causes damage in other areas. The electrical system will be upgraded to prevent failure. Action HC3—IT Data Center. install a SmarfMod 12x45 with a 11x34 u6Tity skit to support the data center Medium High that supports critical services for the County currently housed at the CM Defense building (924 Ululani SL, Hito) and the IT Department bu➢ding (25 Aupuni St, Hilo) - Action HC4--Wafluku Bridge #1 and Waianuenue Avenue Bridge Hardening. Wailuku Bridge #1 over _ Medium High Wailuku River on Wainaku Street is an essential part of the traffic network in the area as it serves as a detour or important alternate route for Highway 19, The existing 129-foot, 2 span concrete bridge was built in 1919 and is not in compliance with today's engineering design standards, specifically in regard to resisting seismi.0brces. Action HC5--Generators for Wastewater Treatment Facilities. Install eight stationary generators to service Medium High the Hilo Wastewater Treatment Plant (WWTP); Kula1mano WWTP; PApalkou WWTP; Wa➢uku Sewer Pump Station (SPS); Pauka'a SPS; Wailoa SPS; Onekaakaha SPS; and Kolea SPS during severe weather events. These facilities experience significant power outages. The Installation of generators will mitigate outages during these events. Action HCS—Emergency Power Transfer Switching Capability for Critical Water Infrastructure. The Medium High hardening of the Parker#1, Parker#2, LAIAmilo B, Lalamilo C, Honoka'a, Makapala, Wal`aha, Kahaluu, Queen Lili'uokalani Trust, Pi ihonua #1, Pi1honua #3A and 'Ola'a #3 potable water producing facilities through the purchase and Installation of transfer switches and supporting infrastructure (generator tap boxes, junction boxes, conduit, wire, supports, etc.) will allow the County of Hawaii Department of Water Supply to better protect the health and welfare of the public. Action HC7 Watkoloa Reservoir No.1—Dam Failure Retrofit. The project requires the improvements to Medium Hgh address the stability of the embankments as well as the waterproofing of the reservoir itself. The embankments are being improved by widening the base of the embankment and increasing the overall strength supporting the reservoir walls. An underdrain at the toe of the embankment is also being installed to direct groundwater away from the embankment to minimize the chances of liquefaction. Also, waterproofing the reservoir will be accomplished by installing a synthetic liner, which eliminates the possibility of leaks through the numerous cracks in the concrete panels lining Pe interior of the reservoir. Action HC8—kcGIS Data Management, Collection and Tracking. Create an Information/data management Medium High system to provide actionable information to the planning process during an incident and to capture data for Impact statistics and hazard analysis post4ricidenL Action HC9—Volcanic Risk Home Buyout Program. Develop and institute a home buyout program that Medium high targets eligible properties impacted by lava flows from volcanic eruptions. 1 Action HC14—Maintain NFIP Compliance. Continue to maintain good standing and compliance under the High Medium NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. t • Participate in floodplain Identification and mapping updates. Provide public assistancetinformation on floodplain requirements and impacts. - Action HC11—Maintain CRS Participation. Continue to maintain and enhance (where feasible) the County's High Low classification under the CRS program. Action HC12—Flood Hazard Needs Assessments. Perform needs assessment and riverine flood studies for Medium High Puna, North Kona, and South Kohala to Identify flood control projects and for Hamakua (to figure out what is the real risk associated with landsides). xxly TETRA TECH County of Hawal'i Mul&Hazard Mitigation Plan Executive Summary Action HC13—Wailoa River Budge Retrofit Coordinate with the state to upgradefretrofit Singing Bridge to address chronic coastal flooding and impacts from tsunami. Tsunami project —criticality of the DPW bridge to get retrofitted to prevent isolated populations. Action H694--Tr6ining and Exerase. Augmentthe Coanty's annual emergency operations tralning and ; exercise program with relevant hazard scenario data and[models (Hazus) that were developed in support of the riskassessment for'this fiazairi mitigation Tannin effort 'High' i,ow Action HC15--Critical Infrastructure (roads and bridges) needs assessment. Conduct a vulnerability/needs Medium High assessment of identified critical roads and bridges that results in the identification of retrofitting projects and identifies critical routes in support of evacuation planning 'Action 9C16=Audible Notification•Needs'AssessmenL Conduct a needs assessment that identifies g@ps in fgadlurn low coverage in the Cauntjr's audible fwamirig,{sir`eris} system as well as existing systems that need to be replaced 'and/or updated. Action HC17--Rain Gauge Network. Purchase and install rain gauges in the Hnmakua Coast to support I Medium High landslide and flood risk identification and notification. 'Action'HC18—EargiquakefTrnOcal Cycioke Retrofit'Incentive Program. Cniiduct a study to determine tEie High High ,feasibility for 6e.County4to deploy an incentivd!based program that would encourage private property ,owners to rihfit their properties against the impacts of earthquakes and tropical cyclones: Key to this study , will be a wlnerabI . y analyst§ that attempts to idehffy the general building stock within the Couhty that is lmn vulnerable to these;tiazards. Action HC19—Vulnerable Property Protection. Where appropriate, support retrofitting, purchase or Medium ` Medium relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium -risk hazard areas.17L — -- 'Actlon'HC20--Plan' integration: Integrate the hazard mitigation plan into other-pians, ordinances and High Low programs that dictate land use decisions in the community, including capital improvement ptograms;'the 'general recovery_,plans end, strategic plans: Action HC21—Risk Communication. Leveraging existing County public outreach programs, utilize the best High Low available data and science to communicate the risk from all hazards assessed by this plan to the public to promote prevention, preparedness, response, recovery and mibgation actions at the local scale. Action'HC22--Damage Assessment 1rotocol and Capacity Building. Develop protocol for collecting and High Law ,storing data necessarOo develop damage assessments. Research use of drone technology and�IT solutions.fio take footage and convert into assessments. Action HC23—Codes and Policies for Sea Level Rise: Update county codes and policies to require that all High I Low coastal development consider and incorporate measures to address sea level rise. :Action'HC24—Fre Pmfeation: Establish fire Ixeaks around communities and_along taadways _ NO High Action HC25--Shoreline setback for Coastal Erosion: Update county shoreline setback policies to include High i Low coastal erosion in order to better regulate development in the high -risk areas Action HC26-Reduce development'in high -risk hazard areas: Update and overlay hazard zones and High Low ,develop conditions fbr land use and design within high risk zones and within or adjacent to urban growth areas outside of higW-sk areas. Action HC27—Evacuation and Sheltering Assessment and Protocol: Perform an assessment of facilities High Low utilized as shelters and identify mitigation needs as well as develop evacuation and sheltering protocol, policies, and procedures. 'Action HC2t3-Volcanl_c Gas Monitoring: Provide training and develop monitoring plan to support High Low :gaslpartfculate.moi ijb ng .._ _— Action HC29—Emerging Hazards: This plan update was being completed during the COVID-19 pandemic, Medium i High illustrating the need for the plan to be dynamic and have the flexibility to adapt to emerging hazards that fall outside of the traditional natural hazards targeted in the Disaster Mitigation Act. This action is an open- I ended call for the County to adapt this plan as needed through the plan maintenance period to address new and emerging hazards of concern as theX affect the Hawai'i County planning, area. TETRA TECH 7oCv County of Hawaii Multi -Hazard Mitigation Plan Executive Summary Acuon nw--uisaster uistnomw system: Develop internal protocol, policies and procedure for logistics, Medium Lour management and resource support during disasters, and develop agreement with state, federal and private partners ttr implement the plan.. k Action HC31--Mass Gathering Plan: Develop a plan that includes policies, procedures and prolocoi for Medium LOW conducting mass gathering events with an emphasis on terrorism. xw TETRA TECH Attachment 21.2 MITIGATION GOALS AND OBJECTIVES Hazard mitigation plans must delineate goals aimed at reducing long-term vulnerabilities to identified hazards, in accordance with 44 CFR Section 201.6(c)(3)(i). 21.2.1 Goals and Objectives from the 2020 HMP As part of the plan update process, the Mitigation Working Group conducted a,�Wew of the goals and objectives established in the 2020 plan. The 2020 version of the HMP identified the following mitigation goals: Goal 1: Utilize state-of-the-art methods and technologies as well as"Iocai knowledge to identify hazards, risks, and capabilities. Y � Goal 2: Ensure that all critical facilities and infrastructure withstand hazard incidents and have contingency plans to restore services quickly. f, • Goal 3: Protect natural and cultural resources to ihe`extent practicable while mitigating'hazards. FtF... s Goal 4: Promote actions that support land use planning . ;and regulations designed to ensure long-term resiliency. • Goal 5: Promote community risk reduc#lonland preparedness through public education, training and awareness. ® Goal 6: Improve capabilities to implement resp nse protocols and` ntinuity of operations and services. r + Goal 7: Strengthen partnerships and leverage. existing"resouraes and capabilities to identify, assess, and reduce the impact of hazards. The 2020 objectives were developed to meet multiple goals were as follows: 6 Objective 1: Improve warning and `emergency communications systems. e Objective 2: Conduct studies to determine locations, potential impacts, and links among threats, hazards, and vulnerabilities to support the identfication'and implementation of mitigation and protection measures in Haw4i; County. Objective 3: Utilize the best available data, science and technology to identify and communicate the risk 'exposure to hazards and ways to increase the planning area's capability to prepare for, respond to, y recover from, and mitigate the impacts of hazard events. + Objective 4: Promote a "I pie ment the retrofit, hardening, or replacement of at -risk structures and lifelines to increase community resilience. $ Objective'5 Support haze?mitigation measures that promote and enhance natural processes and minimize adve{rse impacts on the ecosystem. V •K� 6 .r..: - * Objective 6: Research; develop, promote, adopt and enforce codes and standards that are affordable and feasible for life ar tiI roperty protection. 4 Objective 7: Establish and maintain partnerships among all levels of government, the private sector, community groups, and institutions of higher learning that improve and implement methods to protect life, property and the environment in the planning area. • Objective 8: Minimize impacts of hazard events on the economic drivers for the County. • Objective 9: Incentivize and implement mitigation measures for hazard risk and repetitive loss areas to address repairs, major alternations, development plans and practices. ® TETRA TECH 21-19 2025 Hawaii County Hazard Mitigation Plan * Objective 10: integrate local hazard mitigation plans with the general plan other local plans and provide training and guidance to integrate and strengthen the linkages between the plans. • Objective 11: Advance community resilience through preparation, adoption, and implementation of state, county and local multi -hazard mitigation plans and projects. Objective 12: Promote and implement mitigation measures such as fire breaks around communities and along roadways as needed to mitigate the risk of wildfires. 21.2.2 Review and Update of Goals and Objectives for the 2025 HMP The Core Planning Team reviewed the 2020 HMP goals to determine their continuing applicability to County mitigation needs and decided to update them. The Core Manning Team noted that overall the 2020 goals capture the plan's intent, but the statements could be more specific and achievable, Following comprehensive discussions, the group determined that a reassessment and revision of the existing goals and objectives was necessary to achieve better alignment with community objectives and priorities. In partnership with the Mitigation Working Group, a review was conducted, and the goals and objectives were updated. This process involved a series of facilitated discussions and exercises, through which the working group developed a refined set of goals and measurable objectives for the hazard mitigation plan. Stakeholders were invited to participate by providing their individual suggestions and recommendations through surveys, which were subsequently addressed in three Mitigation Working Group meetings. The newly established goals and objectives in this updated plan are designed to complement each other effectively. Goals were selected based on their relevance and connections to other planning efforts, while objectives were crafted to advance multiple goals simultaneously. Additionally, a new goal was introduced to emphasize the importance of economic protection. More detailed information regarding the evaluation of each goal can be found in Table 21-2. Detailed evaluation of each objective can be found in Table 21-2. Evaluation of 2020 Goals Goal 1 Utilize state-of-the-art methods and Goal 1 technologies as well as local knowledge to identify hazards, risks, and capabilities. Goal 2 'Ensure that all critical facilities and Goal 2 1 infrastructure withstand hazard incidents and have contingency plans to restore {services quickly. Goal 3 I Protect natural and cultural resources to Goat 3 `the extent practicable while mitigating Ihazards. _ Goal 4 Promote actions that support land use planning and regulations designed to -fensure long-term resiliency. Goal 5 ' Promote community risk reduction and preparedness through public education, ,training, and awareness. (Reduce risk and build resilient communities to have the capacity to respond to and recover from the impacts of their primary hazards of concern. Build a resilient County government and critical infrastructure (including shelters) network to ensure a continuous stream of resources and information while also maintaining governmental operability during hazard impacts on the Island of Hawar L Protect natural and cultural resources using meaningful mitigation tactics that protect and promote !the natural environment in Hawaii County. (Combined with Goal 1 above) (Combined with Goal 1 above) TETRA TECH __� 21-20 2025 Hawaii County Hazard Mitigation Plan Goal 6 j Improve capabilities to implement I response protocols and continuity of i I _ !operations and services. 'Goa_ l 7-gStrengthen partnerships_ and leverage jexi§tirig re"s_ource`s;and capabilities to jidentify; assess;,and,reduc � q e the'impact of (Combined with Goal 2 above) Combined with Goals 1 _and;2 above} Naw N/A �Goal4 'Minimize ii (drivers for Table 21-3. Evaluation of ,e"waming and "emergency Objective 2 Conduct studies to determine locations, potential impacts, and links among threats, hazards, and vulnerabilities to support the identification ands implementation of mitigation protection measures in Hawai'i County. Objective 3 Utiflze the best available data, science and tecfiriology to identify and communicafe the risk exposure to hazards and ways ,to increase the planning area's capability to prepare for, respond to, recover from, and mitigate the impacts of hazard'events. events on the economic already has been adds (Eli- ir" to -will be addressed as an action '1liatherthan an objective) (Eliminate - addressed in objectives 6 and 7) Objective 4 Promote and `Imple '-t the trofit; O jeZive 1 t ,hardening, or replacement of at -risk 'Al,. r structures and lifelines to increase T �communiiy resilience Objective 5 Support hazard mitigation measures _ JObjective 2 that promote and enhance natural processes and minimize adverse impacts on the ecosystem. Objective 6 Research, develo romote adopt,Objective 3 hand°enforce codes and standards that are affordable antl feasible for life and _..bje�_ Octive 7 i Establish and maintain partnerships i jamong all -levels of government, the private sector, community groups, and institutions of higher learning that improve *and implement methods to proteci`life, property, and the 1 environment in the planning area. Promote and implement the retrofit, hardening, or replacement of at -risk structures and lifelines to increase community resilience. (no changes) T Support hazard mitigation measures by using nature and incorporating nature - based solutions for• mitigation agendas throughout Hawaii County. Research, develop, promote, adopt, and enforce codes and best practices that protect life and property during future hazard events in the most practical way, (Eliminate - covered by objective 6) TETRA TECH 21-21 2025 Hawai'i County Hazard Mitigation Plan Objective 8 iMinimize impacts of hazard events on (Reword as a new goat} the economic drivers for the County. Objective 9 I Incentivize and implement mitigation Objective 4 Encourage and implement mitigation x .;measures for hazard risk and repetitive measures in areas that need repairs or (loss areas to address repairs, major 1where major alternations/development are aftemations, development plans and ;required so that hazard risk areas are practices. better prepared for future events. —_ Objective 10 Integrate local hazard mitigation plans Objective 5 Integrate the 2025 Hawaii County Multi - with the general plan other local plans Hazard Mitigation Plan into other local and provide training and guidance to plannirg tools and provide guidance on integrate and strengthen the linkages ways this integration can strengthen the between the plans. Minks between each. Objective 11 Advance community resilience through ; (Eliminate — added "advance community preparation, adoption, and resilience" to Objective 7) implementation of state, county and 1 local multi -hazard mitigation plans and _ ,projects. Objective 12 Promote and implement mitigation (Eliminate —will be addressed as an action measures such as fire breaks around item rather than an objective) communities and along roadways as needed to mitigate the risk of wildfires. Objective 6 Establish and maintain partnerships among ;the private sector, community groups, and ,all levels of government to improve and/or implement programs that Improve hazard communication as well as help protect life, property, and the environment on Hawai'i i1sland. V Objective 7 _ Advance community resilience by creating i and implementing a comprehensive community engagement program designed to educate communities on their identified risks, prepare family emergency plans, prepare community response plans, and resource community capabilities across Hawaii County. 21.3 IDENTIFICATION AND ANALYSIS OF MITIGATiON TECHNIQUES The County and its stakeholders developed updated mitigation actions that include activities covering the range of mitigation action types described in FEMA planning guidance, "Local Mitigation Planning Handbook" (FEMA 2013). Mitigation action types listed in the FEMA guidance include the following techniques: Local Plans and Regulations —These actions include government authorities, policies, or codes that influence the way land and buildings are developed and built. • Structure and Infrastructure Projects —These actions involve modifying existing structures and infrastructure to protect them from a hazard or remove them from a hazard area. These project types TETRA TECH N 21-22 2025 Hawa?i County Hazard Mitigation Plan could apply to public or private structures as well as critical facilities and infrastructure. This type of action also involves projects to construct manmade structures to reduce the impact of hazards. Natural Systems Protection These are actions that minimize damage and losses and also preserve or restore the functions of natural systems. • Education and Awareness Programs —These are actions to inform and educate citizens, elected officials, and property owners about hazards and potential ways to mitigate them. These actions may also include participation in national programs, such as NFIP and CRS, StormReady (NOAA), and Firewise Communities (National Fire Protection Association). r ` 21.4 MITIGATION ACTIONS 2026 The County and its stakeholders selected mitigation actions to pursue until the next plarti.' update based on the risk -. assessment, capabilities assessment, and the goals and objectives, includes some actions identified during the 2020 update that are still relevant or in progress. Table 6-4 summarizes the updated m tigation actions, including the following information: • Mitigation actions for individual and multiple haza�dil • Mitigation action type., • Department or agency primarily responsible for project initiation and/or implementation .:a J.: ® Estimated cast for the mitigation actioWand•identification of kn n or potential sources of funding • Implementation schedule • Implementation priority` Specific mitigation actions were identifed.to prevent future'id ses. Current funding is not identified for all of these actions at present, but potential funding sources are indicated to support future implementation. The implementation of these mitigation actions�is dependent on the approval of the local elected governing body and the ability of the County t6obtain funding:from.lo_ cal or outside sources. In general, mitigation actions ranked as highest priorities should be addressed first, depending upon funding. Medium oryloW prrority;mitigation actions will be considered for implementation as funding becomes available. �n - Prioritys sh ould bev consideredvpreliminary. They will evolve based on prevailing priorities and discretion of 4. 1 � .rl I the foal)governments, the public, HI_EMA and FEMA as the plan update is implemented. The language in some actions being carried over has been adjusted to reflect changes to County needs and capabilities. N The timeframe indicated in the table is defined as follows: a Short Term: To be.completed in 1 to 5 years u Long Term: To be completed in greater than 5 years w Ongoing: Currently being funded and implemented under existing programs N TETRA TECH 21-23 2025 Hawai'i County Hazard Mitigation Plan Table 21-4. 2025 Mitigation Strategy HC1 Civil Defense N/A This project involves In progress the hardening of the CounWs radio communications system through replacement of the following systems: microwave system, direct current power i system, photovoltaic energy systems; tower refurbishment and the acgaisitlon of cell-on- 1wheets capability. KC2 Pollee Public Works This projectwill Unknown eliminate flooding that endangers the entire electrical system at the Public Safety complex and causes damage in otherareas. The electrical system will be upgraded to prevent ,failure. Efforts have been Y MfA 111A 'completed to integrate t redundancies in the communications systems, Additional work must be completed to harden the Infrastructure. { 1 Unknown at the - - time of this plan. N TETRA TECH 21.24 2025 Hawaii County Hazard Mitigation Plan t IC3 IT Civil Defense Install a SmartMod In progress 12x45 with a iax34 utility skit to support the data center that f supports critical services for the County currently housed at the Civil Defense building 1(920 U1uIanISt., Hilo) and the IT Department bullding (25 Aupuni St., Hilo) V WA I MA ® TETRA TECFE 21•2S 2025 Hawaii County Hazard Mitigation Plan HU Public Works r NIA Walluku Bridge #1 over 'in progress Wailuku Bridge #1- V WA NIA Waltuku River on ANottce of Intern Walnaku Street is an for Hazard essential part of the Mitigation Grant r Program funding f traffic network In the was submitted and area as it serves as a approved to move ! detour or important totheapplicatlon ' alternate route for stage. The Finance Highway 19. The ! Department Is existing 129-foot, 2 &atuatingfunding span concrete bridge feasibility before moving forward. was built in 1919 and Walanuenue Ave Is not in compliance Bridge —Phase 1 with today's (preliminary engineering design design, standards, specif[catty environmental, etc) In regard to resisting completed; currently working to seismic forces. getPhase2(final design, construction) approvedand funded. 1 TETRA TECH l _�1 21-26 2025 Hawaii County Hazard Mitigation Plan HC5 'Departmentofj N/A fInstall eight stationaty Unknown at - t unknown at the Environmental generators to service the time of this ,% �. I time of this Management , the Hilo Wastewater plan.: plan. Treatment Plant (WWTP); Kuta'imano WWTP; Papa'ikou k f &- WWTP; Waliuku Sewer Pump Station (SPS); ; Pauka'a SPS; Walloa l ` SPS;Onekahakaha SPS; and Knlea SPS t i during severe weather Ievents. These facilities � experience significarit3'`iiiiii, 4* ;power outages. The T Installation of s generators wilt (mitigate outages duringtheseevents. r � F �r r r � fry a a� i ¢ c � ® TETRA TECH 21ZT 2025 Hawaii County Hazard Mitigation Plan 14C6 Departmentof NIA The hardening of the 'In progress The different Water Supply Parker 01, Parker #2, project sites are at Utamilo 8, Lalamilo C. different stages of ' Honoka'a,Makapala, completion. Parker.#2,LalamiloO.and ,Wal'aha, Kahaluu, wal'aha is QueenLiU'uokatani I scheduledtobe ' Trust, Pi'lhonua #1, completed In 2025. PI'lhonua 113A and Parker #J, l.al$milo "Ola'a #3 potable water -C.Honoka'a, producing faclatles Makapala, Kahaluu, through the purchase p QueenUti'uokalant Jrust, P► lhonua III, and Installation of PI'Ihonua M and transfer switches and '61a'a#3Is supporting scheduled to be Infrastructure i completed In2026. (generator tap boxes, junction boxes, t conduit, wire, supports, etc.) will allow the County of ,HawaPi Department of Water Supply to better protect the health and i ,welfare of the publlc. a Y i N/A NIA S TETRA TECF9 21-28 2025 Hawai'f County Hazard Mitigation Plan HC7 Oepartmentof Water Supply 9 N/A The project requires 3Noprogress Progresses y the Improvements to ; dependent upon 'address the stability of project funding. the embankments as ° r` well as the waterproofing of the reservoir itself. The embankments are t r being improved by wideningthe base of ., the embankment and s - y N ` Increasing the overall strength supportingthe� reservairwalls. An• underdrain at the toe ` of the embankment is,. also being installed to direct groundwater ,away fr'omthe' lembankment'to .¢fmiriimize the chances j ,tof Uquefactlon. Also', waterproofingthe t resenrolrwill be' - ,accompUshed by NinstalUng a synthetic line- Z which eUminates i the possibility of leaks throughthenumerous cracks in the concrete panels lining the Interior of the WA I NIA IN TETRA TECH 21.29 2025 Hawail County Hazard Mitigation Plan HC8 CivIlDefense N/A, 'Create an In progress Y WA X/A -information/data management system to provide actionable Information to the planning process during an incident and to capture data for Impact statistics and hazard analysis post - incident. HC9 Planning Office of Develop and institute a unknown at - - Housing and home buyout program thetime of this Community that targets etigible plan, Development properties impacted by lava flows from volcanic eruptions. This program may be expanded to include homes exposed to other hazards as needs present themselves during the performance period of this plan. N TETRA TECH 2140 2025 HawaYl County Hazard Mitigation Plan HC10 I Public Works N/A Continue to maintain "Ongoing IDPWcontinuesto Y goodstandingand lCapability maintain good. compliance under the �standingand 1 NFIP through the + camplianceundes ItheNFIP/ I,/s Implementation of ,floodplain management- �programs that, at a rminimum, meet the INFIP requirements: !•Enforce the flood r ., , ,damage prevention % 'ordinance. • Participate in floodplain �= Identification and , mapping updates. • Provide public asslstancelitiformation on toodplain z 'rregttirementssnd � .Impacts t' HC11 i Public Works f� N/A Continue to rsiahitaln jOngoing 1DPW continues to Y ! A, " - ,and enhance (where tCapabtlity maintain the '(feasible}iheCounty's ' County's t classificatiOnilnder classification under 11 I a` Itlie�CRS program, theCft.Sprogram r WA MA i I i WA NIA ® TETRA TECH 21.31 2025 Hawaii County Hazard Mitigation Plan HC12 Public Works NIA Perform needs In progress DPW has utilized Y NIA WA assessmentand various sources to r i riverine flood studies progress with flood , Ito Identify flood risk hazard studies, i and flood mitigation including Puna r Flood Study projects In areas of completed by l need, Including but not USACEandaSouth ! limited to; Puna, North Kohata lWaikoloa # Xona, South Kohala Village/Puakoi sand Hamakua. flood Study In progress with a contracted design consultant. Further studies to be performed as neededand _ feasible. 1 HC13 Hawal'iState Hawal'i Coordinate with the Unknown at DOT County state to the time of this i upgrade/retrofit plan. Singing Bridge to address chronic coastal flooding and Impacts from tsunami. 1 Tsunami project — criticality of the DPW bridge to get retrofitted to prevent isolated populations. ® TETRA TECH 21-32 2025 Hawai'l County Hazard Mitigation Plan HC14 ! Civil Defense NIA ?Augment theCounty's lnprogress Y NIA WA ' annual emergency ' operations training and. }. exercise program with sur relevant hazard scenario data and models (Hazus) that twere developed in t ;support of the risk assessment for this mitigation =. �• t 'hazard planningeffort. HC15 Public Works Civil Defense Conduct In progress 10MIspursuing t Y WA � NIA vutnerabilitylneeds PRt77ECTgrant to 'fund t assessment of T a .identified critical roads w Vulnerabtttty/Needs 1Assessmentfor " and bridges that ; =fevactiation n results In the•, tplannlrig. Further t I off � ' `� � studlestobe' t ,idenRcavon ,reirOffttingproject' <_x ,Performed as ) 1 land identifies critical gmutesinsuppartof t neededand ? feasible. 1 t 1 ; ! evacuation planning. _ HC16 Civil Defense } '-N/A' �Conducta needs to progress V NIA NIA aassesstnesttthat ) identifies gaps in 3 icovgrage In the Counly's'audlble �.,. warning (sirens) 1 system as well as ;existing systemsthat Ittneed to be replaced in .&dr updated. TETRA TECH 21-33 2025 Hawaii County Huard Mitigation Plan 14C17 ' Civil Defense NQAA Purchase and install In progress Y NIA NIA rain and stream flow gauges in the Hamakua Coast to support landslide and , f lood risk Identification , and notification. ,., r r 4 KC18 CIvllDefense Finance Conduct a study to in progress r �Y f1fA � t1fA1 Department determine the , feasibility for the Y County to deploy an Incentive -based program that would encourage private property owners to retrofit their properties against the impacts of ' earthquakesand tropical cyclones. Key to this study wilt be a vulnerability analysis that attempts to identify the general building stock within the County that Is most vulnerable to these hazards. ® TETRA TECH 2i•34 2025 Hawal'I County Hazard Mitigation Plan HMS Planning I Public Works Mhere appropriate, . Unkmmn at °- 4 ,support retrofitting, thedme of this �l ipurchase or relocation plan. >-'t Hof structures located In hazard areas, prioritizing those that I have experienced repetitive losses_ �- p and/or are located in high- or medium -risk c ' hazard areas. Y Integrate the hazard ongoing H HC20 Planning Mayor's Office, mitigation plan into Capability JZ#Utly' Public Works other plans, referenced and ordinancesand Y Integratedinto -, other plannlag >, programs that dictate '!documents, such,, land use decisions in ;astiteGeneralPlan thecommtinity, ' 12045update. inclatlingcapital,, y t improvement 1 programs, the gerieral plan, recovery piaiis •_K_ and strategic plans. p, r K � 8 f 1 � t •. ® TETRA TECH 2145 2025 Hawaii County Hazard Mitigation Plan u HC21 CIviLDefense Mayor's 'Leveraging existing Ongoing Civil Defense Y WA WA Office, County public Capability established a Staff k County outreach programs, otficerposition j Public !utilize the best dedicated to information available data and comm unity outreachachand Officer science to engagementto communicate the risk supportthese from all hazards efforts• assessed by this plan to the public to promote prevention, t preparedness, response, recovery and mitigation actions at ? the local scale. HC22 CivllDefense Public Works Develop protocol for In progress Y WA H1A collecting and storing data necessary to develop damage ,assessments. Research use of drone technology and IT solutions to take footage and convert 'Into assessments. HC23 Planning Public Works Update county codes Unknownand policies to require that all coastal i development consider and incorporate 1 measures to address t sea level rise. IN TETRA TECH 21•38 2025 Hawaii County Hazard Mitigation Plan HWI Fire PubUc Works Establish fire breaks Unknown - - around communities >^ 4 _ and along roadways. t f. ! r Planning rrPubllcWorks Update county Unknown - shoreline setback I to include t �poucles coastaleroslon in t 4k jorderto better regulate :.� J "' development in the } high -risk areas. _` _ HC26 Planning Wyor's Office If Update and overlay Unknown lhazard zones (as } defined In Section '6.2.2) and develop r conditions for land use",' and design within high'j ! .� risk zones and within z i' or adjacent to urban 4 '* growth areas outside Hof high -risk areas. { Y HC27 Civil Defense ' DPR `t. Perform an ,e A In progress X WA N/A assessmentot F 'facilities uduzed as 1,a ishelters and Identify 'miri Ion needs as w s weU as develop evacuation and shelteringprotocol, policies, and procedures. s 1: NTETRA TECH 2147 2025 Hawall County Hazard Mitigation Plan HC28 ' CIvilDefense Fire ` Provide training and 'in progress Y WA WA develop monitoring plan to support gas/part(culate monitoring system. HC29 C(vIl Defense County This plan update was in progress Y WA WA Government beingcompleted during the COVID-19 t pandemic, illustrating i the need for the plan to i be dynamic and have ! the flexibility to adapt to emerging hazards that fall outside of the traditional natural hazards targeted in the z i Disaster Mitigation Act. This action is an open- ended caU for the County to adapt this plan as needed through the plan j maintenance period to i address new and emerging hazards of concern as they affect the Hawai'l County planningarea. ® TETRA TECH 31-3$ 2025 Hawaii County Hazard Mitigation Plan HC30 : Civil Defense County Develop Internal In progress Y N!A j pi1A Government protocol, policies and x ` procedure for logistics, management and } I( resource support during disasters, and t 4 develop agreement t �with state, federal and private partners to A i imptement the plan.`°� HC31 Civil Defense County 1 Develop a pla n that In progress Y NIA WAS Government (includes policies, - a ,procedures and x 1 iprotocois for x 3conducting mass. a `gathering events with `� c a an emphasis an 4 t 'terrorism. 1 K 7 � 4 ti4[ j ti 0 N spa TECH 21-39 2025 Hawal'i County Hazard MiWation Plan