Loading...
HomeMy WebLinkAboutBIL 136 Draft 01 2024-2026 - Part II - CIPCOUNTY OF HAWAII PART II THE PROPOSED CAPITAL BUDGET AND SIX -YEAR CAPITAL IMPROVEMENTS PROGRAM FY 2026 - 2027 February 27, 2026 0111 INO TABLE OF CONTENTS Part II THE PROPOSED CAPITAL BUDGET AND SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FY 2026 - 2027 MAYOR'S TRANSMITTAL LETTER CAPITAL BUDGET ORDINANCE TABLE 1. LIST OF PROJECTS AND PROPOSED FUNDING SOURCES CAPITAL IMPROVEMENTS PROGRAM BY DEPARTMENTS CivilDefense................................................................... 11 Department of Environmental Management ................. 21 Department of Parks and Recreation................................35 Department of Public Works..........................................59 Fire Department............................................................. 81 Office of Housing and Community Development.......... 101 (This Page Intentionally Left Blank) C. Kimo Alameda, Ph.D. Mayor William V. Brilhante, Jr. Managing Director Merrick Nishimoto Deputy Managing Director County of Hawaii - office of the Mayor 25 Aupuni Street, Suite 2603 • Hilo, Hawaii 96720 • Phone (808) 961-8211 • Fax (808) 961-6553 KONA: 74-5044 Ane Keohokalole Hwy., Bldg C • Kailua-Kona, Hawaii 96740 , n Phone (808) 323-4444 • Fax (808) 323-4440 a p.n �T C.O February 27, 2026 a =a Honorable Members of the County Council County of Hawai'i 25 Aupuni Street Hilo, HI 96720 Aloha Council Members: Transmitted herewith is the Capital Budget for FY 2026-2027 submitted for your review and approval and the Capital Program for the next six years from FY 2026-2027 to 2031-2032. The Capital Budget includes 45 projects requiring a total appropriation of $358.74 million. Funding Sources Capital projects are typically funded by debt (bonds, State Revolving Fund loans), revenue sources (fuel tax, other special revenues), state grants, federal grants or loans, and other financing options (fair share contributions or special financing districts). The Capital Budget presented herein includes capital projects of which $42 million is intended to be funded by Federal Grants, $23 million funded by State funds, $285.24 million in whole or part by bonds, and about $8.5 million with private funds. (see Table 1). Debt Service Every year, we strive to present a budget that is fiscally constrained (in terms of prudent debt service planning) and selective based on rational criteria. The Government Finance Officers Association, a professional organization of government officials, recommends a prudent debt service limit to be 15 (fifteen) percent of general expenditures. The lower the interest rate and the greater the revenues, the more can be borrowed while staying within the prudent debt service limits. The proposed operating budget for this coming fiscal year includes debt service for short-term bond anticipation notes, which are used to reduce carrying cost and ensure that cash will be available for projects as needed. As budgeted, the resulting total debt service is estimated at 9.04 percent of the general expenditure. If all debt that has been authorized by the County Council was issued, the debt service percentage would be 14.31 percent of the general expenditures. Comm. N S1 County of Hawaii is an Equal Opportunity Provider and Employer. Ref.'To: 3 Ref. Date 7 ZUZb Honorable Members of the County Council February 27, 2025 Page 2 What is a Capital Improvement Project? A project is eligible for funding from the capital budget if it is a major nonrecurring expenditure, such as: 1. Land acquisition; 2. Infrastructure improvement other than buildings that add value to the land or improves utility (roads, drainage, sewer lines, parking, landscape or similar construction); 3. New buildings or structures or additions to buildings, including related equipment and appurtenances which are integral to the new structure; 4. Nonrecurring rehabilitation, remodeling or expansion of infrastructure and buildings; S. Planning, feasibility, engineering, or design studies related to capital improvement projects; 6. Information and communications technology infrastructure. Project Data/Financial Impact Statements Proposed capital projects are organized in sections by County agencies. The first document in each section is a Summary of Department Requests for FY 2026-2027. Following the Summary are the individual Project Data/Financial Impact Statements, which include information about the lead County agency, location, project description, Council benefit districts, project consistency with long range plans, impact on operating budget, sustainability focus, project readiness, etc. Fair Share Contributions A Fair Share Annual Report as of June 30, 2025, was submitted to the County Council on February 12, 2026. This document provides information on the total fair share contributions, appropriations, and funds available for capital improvements. We ask for your favorable consideration of this Capital Budget and Program. Aloha, C. Kimo Alameda, Ph.D. Mayor County of Hawaii is an Equal opportunity provider and Employer. COUNTY OF HAWAFI ORDINANCE NO. STATE OF HAWAFI BILL NO. 136 DRAFT 1 AN ORDINANCE RELATING TO PUBLIC IMPROVEMENTS AND FINANCING THEREOF FOR THE FISCAL YEAR JULY 1, 2026 TO JUNE 30, 2027. BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAI1: SECTION 1. The following amounts to be received from the sale of general obligation bonds, and other sources are hereby appropriated to the projects and for the purposes designated in Section 2. CAPITAL PROJECTS FUND Funding Source Amount Federal Grants Receivable $42,000,000 State Grants Receivable $23,000,000 General Obligation Bonds, Capital Projects Fund Balance $285,241,000 Private $8,500,000 Total $358,741,000 SECTION 2. The monies to be provided from the sources specified in Section 1 shall be appropriated for the purposes and in the amounts as follows: [The remainder of this page is intentionally left blank] FY NO. PROJECTS APPROPRIATIONS (in thousands) FEDERAL GRANTS RECEIVABLE 202621 DPW - Road and Bridge Improvement Projects, Federal and State -Funded 16,000 202625 DPW - Kilauea Avenue Safe Routes to School - Waiakea 16,000 202626 DPW - Ka'ahakini Stream Bridge [29-1] Replacement 10,000 Subtotal 42,000 STATE GRANTS RECEIVABLE 202612 DPR - Princess Abigail WahTka'ahu'ula Kawananakoa Center Renovation 3,500 202618 DPR - Spencer Kalani Schutte District Park New Community Center/Shelter & Improvements 7,500 202627 DPW - Four Mile Creek Bridge [22-7] Reconstruction 12,000 Subtotal 23,000 GENERAL OBLIGATION BONDS, CAPITAL PROJECTS FUND BALANCE 202601 CD - Land Mobile Radio (LMR) Core to West Hawaii 300 202602 CD - Kamehameha Park Building Replacement 300 202603 CD - Land Mobile Radio (LMR) Fire Suppression Installation 600 202604 DEM - Repair/Replacement of Wastewater Facilities 10,000 202605 DEM - Rural Transfer Station Repairs and Enhancements 2,000 202606 DEM - Kula'imano & Papa'ikou Rehabilitation and Replacement 9,500 202607 DEM - N5 'alehu Wastewater System 40,000 202608 DEM - Oceanview Transfer Station - Phase 2 500 202609 DPR - ADA Compliance 5,000 202610 DPR - Repairs/Improvements to Facilities 25,000 202611 DPR - Moku'ola Island and Bridge Improvements 20,000 202612 DPR - Princess Abigail Wahiika'ahu'ula Kawananakoa Center Renovation 7,500 202613 DPR - Isaac Kepo'okalani Hale Beach Park Improvements 15,000 202614 DPR - Papa'ikou Community Center 2,000 202615 DPR - Kikala-Keokea New Park Development (Reapp.) 1,500 202616 DPR - Laupahoehoe Boat Ramp 10,000 202617 DPR - Hawaiian Paradise Park New District Park 3,000 202619 DPW - Reroofing at Various Fire and Police Stations 6,000 202620 DPW - Facilities Improvements 14,000 202621 DPW - Road and Bridge Improvement Projects, Federal and State -Funded 4,000 202622 DPW - Road and Bridge Improvement Projects, Islandwide 10,000 202623 DPW - Drainage Improvement Projects, Islandwide (reapp.) 4,000 202624 DPW - Miscellaneous Improvement Projects, Islandwide 21000 202625 DPW - Kilauea Avenue Safe Routes to School - Waiakea 4,000 202627 DPW - Four Mile Creek Bridge [22-7] Reconstruction 6,000 202628 FIRE - NFPA 1851-Compliant PPE Extractor Installation 275 202629 FIRE - South Kohala Fire Station and Police Substation Emergency Generator Replacement 175 202630 FIRE - Kailua Fire Station Emergency Generator Replacement 175 202631 FIRE - Laupshoehoe Fire Station Emergency Generator Replacement 175 202632 FIRE - Kealakekua Fire Station and Police Substation Emergency Generator Replacement 175 202633 FIRE - Hawaiian Paradise Park Fire Station Dormitory Extension 1,500 202634 FIRE - Maintenance Shop - New Facility 66 202635 FIRE - Kea'au Fire & Police Station - New Facility 2,000 202636 OHCD - Facilities Repairs/Maintenance and Renovation 1,500 202637 OHCD - Old Hilo Memorial Hospital Renovations 10,000 202638 OHCD -'O okala Subdivision infrastructure 5,000 202639 OHCD - Kamakoa Nui Mini Loop Rd., Infrastructure and Housing 11,000 202640 OHCD - Kukuiola Village - Permanent Supportive Housing 20,000 202641 OHCD- 'Ouli'Ekahi Cottage Renovations 6,000 202642 OHCD - Kaiminani Affordable Housing 1,000 202643 OHCD -Affordable Housing Planning, Feasibility, and Design 1,000 202644 OHCD - Na Kahua Hale o Ulu Wini WWTP - PV System 9,000 202645 OHCD - Na Kahua Hale o Ulu Wini Roof and PV Refurbishment 14,000 Subtotal 285,241 PRIVATE 202612 DPR - Princess Abigail Wahiika'ahu'ula Kawananakoa Center Renovation 3,500 202618 DPR - Spencer Kalani Schutte District Park New Community Center/Shelter & Improvements 5,000 Subtotal 8,500 Grand Total 358,741 SECTION 3. The Director of Finance shall open appropriate accounts for each project, make monies available, and expend funds for the projects listed herein. SECTION 4. The appropriation and authorization in Section 2 includes land purchase, plans, site preparation, equipment purchase, improvements to land, and construction. SECTION 5. The Mayor shall initiate authorized projects taking into consideration the factors of public need, general financial condition of the general fund, highway fund, sewer fund, parking meter fund, bikeway fund, beautification fund, vehicle disposal fund, solid waste fund, golf course fund, geothermal relocation revolving fund, housing fund, and fair share contributions as well as the County's general economic conditions. SECTION 6. Severability. If any provision of this ordinance or the application thereof is held invalid, such invalidity shall not affect other provisions or applications of the ordinance which can be given effect without the invalid provision or application, and to this end, the provisions of this ordinance are declared to be severable. 7 SECTION 7.As required by Section 10-6(a)of the Hawaii County Charter,the estimated cost ofeach capital improvement pending or proposed to be undertaken,the estimated operating cost, and the pending or proposed method of financing are set forth in the attached Project Data and/or Financial Impact Statement sheets. SECTION 8. This ordinance shall take effect on July 1, 2026. INTRODUCED BY: COUNCIL MEM R, COUNTY F HAWAI`1 Hilo, Hawaii Date of Introduction: Date of 1st Reading: Date of 2nd Reading: Effective Date: REFERENCE: Comm. 755 8 , SEEN IMMUNE M= IMMUNE MONSOON ®�SIMMONS ONSIMONSEN MENOMONIE IMMUNE � mmllloOMNI SEMI (This Page Intentionally Leh Blank) CIVIL DEFENSE TALMADGE MAGNO, ADMINISTRATOR 11 (This Page Intentionally Left Blank) 12 Department: Civil Defense Agency SUMMARYOFDEPARTMENTREQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2026-2027 PRIORITY PROJECF 2026-27 FY FUNDING In thousands FUNDING FORECAST BY FISCAL YEAR in thousands TOTAL ESTIMATED PROTECT Courtly G.O. Bond State Federal Private' CBA, Otherea Prior�: Fundst Allotted ° 2027-28 2028-29 2029-30 2030-31 2031-32 Beyond6 yearsCOST 'i1 CD -land Mobile Radio (MR) ComtoWestHamad 30003,000 k4g-,�Z� 2 CD-Kamehameha Park Building Replacement 3DD Q 300 3 CD land Mobile Radio(WR) Tire Suppreeslon lmtallau0n 600 0 No No No 900 900 1,Bo0 6,600 y CD- New Emergency Operations Center 31,000 31,000 °�i7_sv_0 10dad3y91 =33,3W� ' "sati TOTAL 3,2DD 'I k200' said, she 90o I'M 39,900 Created By. Bliss Kato a Private: Foundation Grants W Date: 1/22/2026 —Community Bene7ltArsessments: Fair Shore, Park Dedication,Etc. Other. 6Er Fuel TaKond other non-6ondsourees A (This Page Intentionally Left Blank) County of Howai4 PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2016 - 2027 1. DEPARTMENT AND DIVISION: Civil Defense Agency 2. SUBMI'ITER: Talmadge Magna DATE: 1/22/2026 3. PROJECT NAME: CD- Land Mobile Radio (LMR) Core to West Hawai 4. LOCATION (COUNCIL DISTRICT): 7,8 _ S. COUNCIL BENEFIT DISTRICr(S): All G. TMK/CDP PLANNING AREA: 7-A-020:021/North Kona 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 300,000 8. PROJECT ELIGIBILITY,✓all ❑Land acquisition 0+ Infrestmcture improvement ❑New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: 9 Nonrecurring rehabilitation ❑Planning, feasibility, eng., or design study Dlnformation/communicationstech. 21High ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: Hawayi County Civil Defense Agency is proposing to move the backup Land Mobile Radio core from the Public Safety Building in Hilo to Kailua-Kona Police Station. 11. PROJECTJUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: O Needed to continue current levelofservices. A. Addresses public health/safety, ✓if Yes: El Eliminates o documented hazard. B. Service improvements, ✓all that apply: ❑ Access to 2Quality of ❑Quantity of E. Operational efficiency and leveraging opportunities: No change In operating costs. No opportunity, not adjacent to project to capitalize on cast saving. C. Repair/maintenance/replacement of facility/infmstmcture/building, 'if Yes: (] Necessary repair/maintenance/replacement F. Fosters inter -departmental collaboration ✓if Yes: p DPW Additional info: 12. LONG RANGE PLANS/ EDept.Priorlry Details: Maintaining WR system is an essential task. Comm. Value Details: COMMUNITY VALUES, cheukat OGeneml Plan Details: Coordinates the County's disasterpreporedness andrespanse program. ❑Admin Priority Detaih: least one and all that apply, �CDP Details: Qi Multi Hazard Mit Detolls:Diversity ofsystem distributlonforimpactsjrom incidents and/or events. provide details: D+Other Plans Deroils: Pont of thestatewideCommunlcatians lnteroperabiliry Plan(SOP). Additional info: 13. CIY. MATCHING FUNDS REQ'D? ✓if Ves: DESCRIBE: 14. LEGAL MANDATE? ✓if Yes: 0 DESCRIBE:Chanter 7 of Hawaii CountyCode requires Civil Defense to maintain the Land Mobile Radio System to provide first responder communications. 15. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: Promotes energy and resource conservation El Reduces hazard risk ❑Preserves/protects our notural/cultural env. ElCostbenefltanoiysis ❑ Promotes economic vitality El Strengthens andsustains our community Additional info: 16. PROJECT READINESS, Vail project currently underway 10 Previously Appropriated O Staff available to manage project ❑Wernalfunirlresources ready to proceed that apply: ElIden[iJied andreques[ed operating budget needs El Can realistically encumber/ands List phases already Completed: Additional info: 17. EXPENDITURE PHASING (K $1000): Prior Funds Allotted not la ThISRaques[ FY 2.7.28 FY 28-29 1 FY 29-30 FY 30.31 FY 31-32 Beyond 6 Years TOTAL• Planning Land Acquisition -"' Design/Survey Construction ":Ii+ Vl.'300� 1,7001 1 1 $2,000 TOTAL: 00! $1,700 $2,000 18. 0 & M COSTS x $1000 : =n gig .^%i7 19. FUNDING SOURCE (x $1000: Cry G.O.Bond "1„'°1.$e„�3Do, e 1,700 $2,000 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Sham, Park Dedication, etc) a OtherC Fund -(describe) zT_`'_"=��"C^1-'_'E ToTAL:1 1 $2,000 8 (This Page Intentionally Left Blank) County of Hawaili PROJECT DATA/FINANC/AL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Civil Defense Agency Z. SUBMRTER: Talmadge Magna DATE: 1/22/2026 3. PROJECT NAME: CD- Kamehameha Park Building Replacement 4. LOCATION (COUNCIL DISTRICT): 9 S. COUNCIL BENEFIT DISTRICT(S): All 6. TMN/CDP PLANNING AREA: 5-4-009:004 / North Kohala 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 300,000 8. PROJECT ELIGIBILITY,✓all ❑Land acquisition p Infrastructure improvement New bldg., structure, or addition 9. PROJERURGENCY/NEED,✓one: that apply: tZ Nomecurringrehabilitation ❑Planning, feasibility, eng.,ardesign study Information/communisations tech. ElHigh El Mad. El Low 10. PROJECT/PROGRAM DESCRIPTION: Purchase and install a replacement building at Kamehameha Park Land Mobile Radio site that houses current radio system equipment. Recommend a composite building that is bettersuited to withstand the harshenvironmental conditions in this location. Estimate cost estimates shown to install the structure at the site are available. 11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ Needed to continue current leVClDJ3SEWCes. A. Addresses public health/safety, ✓if Yes: ❑+ EI1mNatesa documented hazard. S. Service improvements, ✓all that apply: ❑ Access to ❑+Quality of ❑quantity of E. Operational efficiency and leveraging opportunities: Results In net decrease In operating cast andmaintainsservices. No opportunity, not adjacent to project to capitalize on costsaving. C. Repair/maintenance/replacementof aciliry /infrastructure/building, ✓if Yes: ❑' Necessary repair/maimenance/replacement. F. Fosters inter -departmental collaboration ✓if Yes: El DPW Additional info: LONG RANGE PLANS/ 12Lddlt �DepLPrlojrq, Detalk:Moinmining the lMRSy"on, Is an essential task. ❑Comm. Valve Details: Lcheckat ❑i GenemlPlan Detalk: Coordinates the Caunty's disaster preparedness and response proram. ❑Adminrilthatpply, ❑CDP Details: QMUluNamnimk Details: Other Plans Detalls:Statewide communications lnteroperobllty Plan(SCIP). 13. CTY. MATCHING FUNDS REQ'D7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? ✓ifYes: 0 IDESCRIBE, Chapter 7 of Hawaii County Code requires Civil Defense to maintain the land Mobile Radio System to provide first responder communications. 15. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy an dresourceconservation Provide additional information as appropriate: ❑ Cost 6eneJit analysis ❑+ Reduces hazard risk ❑Preserves/protects our natural/cultural env. ❑ Promotes economic vitality El Strengthens andsustains our community dditional info: 16.PROJECTREADINESS,✓all ❑ Project currently underway ❑Previously Appropriated ❑' 5taff available to manage project ❑ Externalfunds/resources ready to proceed at apply: ❑mentped and requested operating budget needs El con realistically encumberfunds llstphases alreadycompleted: dditional info: 17. EXPENDITURE PHASING (X$1000): Prior Funds Allotted This Request (not lapsed) FY I�x27�_'< FY27-28 FY28-29 FY29-30 FY30.31 FY3132 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey =100i $100 Construction '=§L+12001 $200 TOTAL:ms''t$3001 $300 18. 0 & M COSTS x $1000 : 19. FUNDING SOURCE x $1000 : Cty G.O. Bond €1 xnim 'Booi $300 State Revolving Fund " t rKr�n'��: State CIP FederalT,rgil-b^:"+s:; Private (Grants) t CBA (Fair Share, Park Dedication, etc) Other Cry Fund - (describe)?=o+as:;=„-v;s„ii TOTAL: .°wis•' ` 5300i1 $300 8 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 -1027 1. DEPARTMENTAND DIVISION: Civil Defense Agency 2. SUBMnTER: Talmadge Magna DATE: 1/22/2026 3. PROJECT NAME: CO- Land Mobile Radio (LMR) Fire Suppression Installation 4. LOCATION (COUNCIL DISTRICT): All Districts 5. COUNCILBENEFN'DISTRICT(S): All 6. TMX/CDP PLANNING AREA: Multiple locations 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 600,000 S. PROJECT ELIGIBILITY, ✓ all ❑Land acquisition ❑+ Infrastructure improvement ❑ New bldg., structure, or addition 9. PROJECr URGENCY/NEED, ✓one: that apply: ❑ Nonrecurring rehabilitation ❑ Planning, feasibility, eng., or design study I U Information/communications tech. M High ❑ Mad. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: Procure and install a clean agent fire suppression system. Currently there is no automatic fire suppression system at any of the Land Mobile Radio and microwave sites. This not only protects County -owned equipment, but also equipment from State, Federal and external partners. 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: 21 Pls gap In currentservires. A. Addresses public health/safety, ✓ifyes: El Ellm/nates a documented hazard. B. Service improvements, Vail that apply: ❑ Access to ❑+Quality of El Quantity of E. Operational efficiency and leveraging opportunities: Resultslnnetlncreosein operatingcast. No opportunity, not adjacent toproject to capitalize on cost saving. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: ❑' Necessary repair/maintenance/replacement. F. Fosters inter -departmental collaboration ✓if Yes: ❑+ DPW Additional info: 12. LONG RANGE PLANS/ ODept Priority Details:Maintaining the LMRSystem 6 an essential task. ❑Lamm. Value De[alls: COMMUNITY VALUES, check at 2Genera/Plan Details: Coordinates theCounty's dumterpreparednessandrespomepwgram. Pri ❑admen ariry Detalk: least one and all that apply, ❑cDP Details: I ❑WuHaaardMlt Details: provide details: DOther Plans Details:StatewideCommunications lnteropembility Plan(SOP). Additional info: 13. CTY. MATCHING FUNDS REQ'D7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE] ✓if Yes: ❑ I DESCRIBE: Chapter 7 of Hawaii County Code requires Civil Defense to maintain the Land Mobile Radio System to provide first res ponder communications. 15. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy and resource conservation Provide additional information as appropriate: El benefit analysis OReduces hazard risk ❑Preserves/protects our natural/cultural env. ❑ Promotes economic vitality ❑+ Strengthens andsustains ourcommunity Additional info: i6.PROJECTREADINESS,✓all ❑ Project currently underway ❑ PreviouslyApproprioted ❑' Staffavoilable tomonagepro%ect ❑Externalfunds/resources ready to proceed that apply: ❑Identlpedandrequestedopemting budget needs ❑ Can realistically eneumberfunds List phases already completed: Additional Info: 27. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (notla sed) ThURe rl'esC FY 27-28 1 FY 28.29 1 FY 29.30 FY 30.31 FY 3132 Beyond Years TOTAL: Planning '.ik„`"-:�OOi S00 150 150 "1 150 300 $1,100 Land Acquisition 'i5i Design/Surve ' :'1100' 100 1501 1501 1501 1501 300 $1,100 Construction 4D0 1 6001 6001 6001 6001 1,200 1 84.400 TOTAL:1 -,m S6g0, $600 1 $900 $900 $900 $900 $2,800 $6,600 18. 0 & M COSTS (x $1000):„a;. 19. FUNDING SOURCE (X $3000): NERNMAWMM IM - CtyG.O.Bond �i�-660i 600 900 900 900 900 1,800 $6,600 State Revolving Fund State CIP Federal . .seese Private(Grants)- CBA (Fair Share, Park Dedication, etc) - Other Cty Fund - (describe) 5'i'W�;1 TOTAL: $900 $900 $900 5900 $1,800 I$6,600 (This Page Intentionally Left Blank) DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DANIEL GIRVAN, DIRECTOR 21 (This Page Intentionally Left Blank) 22 SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRa Department: Department of Environmental Management FISCAL YEAR 2026-2027 PRIORITY PROJECT 2026-27 FY FUNDING in thousands County CBA, G.O. Bontl State Federal Private, Other^ FUNDING FORECAST BY FISCAL YEAR in thousands Prior d Beyond6 Funds Aeguw Allotted 2 2b27, 2027-28 2028-29 2029-30 2030-31 2031-32 Years a.0 TOTAL ESTIMATED PROJECT COST uxe�:srx 1 DEM-Repair/Replacementof Wastewater FacnAies m,000 14,022 1O W0, lecdo ID,000 lo,WO HE,= 10,D00 10,000 MG23 2 DEM-Rural Transfer Station Repain and Enhancements 2,000 13,M7 '!eP:,r2,000 2,000 2,000 2,W0 2,Ooo 2,000 ZON 27,097 3 DEM-Kulaimano&P3pa'Ikou Rehabilitation and Replacement 9,500 300 Z61991500, slow 17,530 4 DEM- Ni'alehu Wastewater System CoNO 5,10 .40,000; 28,000 28,000 101,160 5 DEM- Oceanview Transfer Station - Phase 2 500 y_500, 3,5130 4,000 6 DEM- rue Sewer Pump Station Farce Main Replacement 3,927 s 32,000 28,000 63,927 7 DEM-Impravemen(sto East Hawal9 Son5tatkm 27D r 0,500 4,770 R DEM- Replacement of Kona Baseyard Building _ ir^ 600 2,000 Z600 9 OEM -Rept-mem of Waimea assayed Building 600 },WO Z600 10 DEM• Leachate Mitigation System, DIM 250 2,000 2,750 11 DEM• Leathers Mitigation System, East Hamill Stations 2,000 z000 2,000 2,000 Z000 10,000 12 DEM-Ksalakehe scrap MtW Site Remediatlo, Phase 2 Son 1,50D 2,WO 13 DEM-leathate MidgaOon Sytem, Hila TS 2,000 2,Wo 14 DEM- Replacement of Kilua Disposal Area 600 2,000 2,000 3,00 35 OEM- Replacement of Hilo Disposal Area 600 I,WO 3,000 4,600 16 DEM- Leachate Mitigation System, West Howell 1,0W 1,WO 1,000 I'M 1,00o 5,000 17 OEM- landfill Gas Collection and Control System, WHSL 4,606 2,000 6,606 18 OEM- Ka'amana Gardens Collector SaweI VIM GEED 6,600 19 OEM-Pua SPSRenavation 2,561�` 32,000 34,561 20 OEM-Wa6aa SPS Renovation and Dual Farce Mains fi r%N' 10,000 10,00E 21 DEM-Onakahakaha $PS Renovation and Dual Force Mains , 12,000 12,00E 22 DEM-Ainako'Alna Nani Collector Sewer 10,250 10,25E 23 DEM- Pauka'a SPS New Fora Main" 8,80E 0,00E 24 DEM - North Kona SPS, Ell, Hine tool Gravity Sewer, West Hawai'I Busness Park Gravity Sewert�m,'s,? 2,662 y`i'5�e°e� 24,000 26,662 2S DEM-Alnakolnterceptm Sewer Phase2 "§' 10,200 10,2m 26 DEM- Kulea SPS Renovation and Duel Fora Mains 10,W0 lD,OW 27 DEM- 64anlana'ole Collector Sewer Phase 2 12,000 12,00E 28 DEM-Wailuku Force Main and Gravity Sewer Replacement}' 16,W0 16,OOD 29 DEM-KecpGFMReplaomenUSPSRenavationaad Relocation F MUM Zonal 2,ODO 30 DEM- gealakehe SPS lenoation and Fora Main Replacement °; is'noo 15,DOo 31 DEM-Puu'eo Gravily Sewer Replacement x-MIRM 8,BD0 8,80E 32 DEM- lanihau SPS Upgrade '�-, 3,Oon 3,000 33 DEM-P-I9 SPS and Force Main Replacementva�- 5,50E 5,50E 34 DEM- Closed Kolbe tandtill lmprowmenrs and Other Mitigation 25,OOD 25,00E 6ZOOD 46,60fii2,00E 55,95E OJ00 20 0 224,TOTAL 560,4M treated By: Robin Bauman a Pri.te: Foundation Grants Data: 1/25/2026 e1 CommunlN Benefit Assesements:FalrShare, Park Dedimtion,Etc. Other. GET, Fuel Taxondothernar-bondsources A (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Environmental Management- Wastewater Division Z. SUBMITTER: 'Chris Laude DATE: 1/5/2026 3. PROJECT NAME: DEM- Repair/Replacement of Wastewater Facilities 4. LOCATION (COUNCIL DISTRICT): 1, 2, 3, 6, 7, 8 S. COUNCIL BENEFIT DISTRICr(S): 1, 2, 3, 6, 7, B 6. TMKJCDP PLANNING AREA: 3 - Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000 8. PROJECr ELIGIBILITY, ✓ all ❑ land acquisitlon O Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROIECr URGENCY/NEED, ✓one: that apply: 1 ❑+Nonrecurring rehabilitation OPlanning, feasibility, eng., or design study 2Information/communications tech. El High ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: Major repairs and/ or replacement of wastewater facilities at various locations to ensure compliance with regulations under HAR 11-62, Wastewater Systems HAR 11-54, State Water Quality Standards; HAR 11-55, State Water Pollution Control; and the US Environmental Protection Agency. 11. PROJECTJUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. "ifyes: ❑ N/A A. Addresses public health/safety, 'If Yes: ❑+ Eliminates g documented hazard. B. Service improvements, ✓all that apply: ❑ Access to ❑' Quality of ElQuantity of E. Operational efficiency and leveraging opportunities: Results in net decrease in operating cost and improves services. No opportunity, not adjacent to project to mpitaliie on cost saving. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: ❑' Project will restorefull operations to asset. F. Fosteminter-depanmentalcollabomtion ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept Primlty DetalE:Aging"fadlitiesrepairorreplarementtoensurecontinuedoperations. ❑camm. Value Detalls: COMMUNITY VALUES, check at❑Generale/an Derails: ❑Admin Pdariry Oetalls: least one and all that apply, ❑cDP Details: ❑MuluxammMa petalls: provide details: ❑other Plans Details: Additional info: 13. CTY. MATCHING FUNDS REQ'D? ✓If Yes: ❑ IDESCRIBE, 14. LEGAL MANDATE? ✓if Yes: LtJ IDESCRIBE, DOH HAR 11-62 and all NPDES permits require utilites to repair their facilities to maintain compliance. 15. SUSTAINABILRY FOCUS, ✓ali thatappy; Provide additional information as appropriate: ❑+ Promotes energy andresource conservation ❑+ Reduces hazard risk OPreserves/protects our natural/cultural env. ❑ Cost benefit analysis 12 Promotes economic vitality El Strengthens and sustains our community Additional info: 16. PROJECr READINESS,✓all ❑ Project currently underway O Previously Appropriated O Staff available to manage project ❑Fxtemolfunds/resources ready to proceed that apply: ❑Identifed andrequested operating budget needs [I Can realistically encumberfunds listphases already completed: Additional info: 17. EXPENDITURE PHASING (X $100D): Prior Funds Allotted notla sed This Reg4es4 ,FY26.27,, FY27-28 FY2849 FY 79-30 FY 30d1 FY 31-32 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey 1,369 ===f1060° 1,000 1,000 1,000 1,000 1,000 1,000 $8,369 Construction 12,654 .des -da.=`.'$;006 91000 9,000 ' 0 00 91000 9,000 9,000 $75,654 TOTAL: $14,023 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $84,023 18. 0 & M COSTS x $1000): 19. FUNDING SOURCE xS1000): Cry G.O. Bond 14,023 �10,000 10,000 10,000 10,000 10,000 10,000 10,000 $84,023 State Revolving Fund State CIP Federal s 3:( Private (Grants) CBA(Fair Share, Park Dedication, etc) Other City Fund -(describe) TOTAL: $14,023 -Slk000� S10,000 $10,000 $50,000 $10,000 $50,000 $50,000 $84,023 (This Page Intentionally Left Blank) County of Howai i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Environmental Management -So lid Waste Division 2. SUBMITTER: Mike Rivera DATE: 12/30/2025 3. PROJECT NAME: DEM- Rural Transfer Station Repairs and Enhancements 4. LOCATION (COUNCIL DISTRICT): All S. COUNCIL BENEFIT DISTRICT(S): All 116. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000 11 8. PROJECT ELIGIBILITY, ✓ all ❑Land acquisition 0lnfrastructure improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: ❑Nonrecurring rehabilitation ❑ Planning, feasibility, eng., or design study ❑ Information/communications tech. High ❑ Med. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: This project is for necessary infrastructure repairs and improvements to the rural trensferstation locations such as construction of recycling and green waste collection facilities and modifications to refuse collection facilities. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑ N/A A. Addresses public health/safety, ✓if Yes: ❑+ Reduces risk of o datum ented hazard. B. Service improvements, ✓all that apply: 0 Access to ❑+Quality of ❑+Quantity of E. Operational efficiency and leveraging Opportunities: Resulm In net increase in operating cost but lmpmves services. No opportunity, not adjacent to projea to capitalize an cost saving. C. Repair/maintenance/replacement of acility/infrastmcture/building, ✓if Yes: 21 Neressaryrepair/maintenanwlreplacement. F. Fosters inter -departmental collaboration ✓if Yes: ❑ NSA Additional info: 12. LONG RANGE PLANS/ Details: Improves overallservices to thepubllc ❑+Comm. Value Details: lmpmves amm to disposal and recycling COMMUNITY VALUES, check atmlplan t2Dap!1.PiorJtyf octal&: ❑Admin Priority Details: IeaS[One and all that app/, Details: E]WOHarard Mit Details: provide details: ❑Dther Plans Detolls: Additional info: 13. Cry. MATCHING FUNDS REQ'D7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? VifYes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑Promotes energy andresource conservation ❑+ Reduces hazard risk Preserves/protects our notural/culturol env. ❑ Cost benefit analysis 121 Promotes economic vitality O Strengthens andsustains our community Additional info: 16. PROJECT READINESS,✓all ❑ Project currently underway ❑+ Previously Appropriated 2 Staff available to manage project ❑ Externalfunds/resources ready to proceed that apply: MIdentiJledandrequestedoperating budget needs ❑+ Can realistically encumberfunds tistphases already completed. Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (notlapsed Thls Request _ FY 25t27 a FY27-28 FY28-29 FY29-30 FY3G.31 FY 31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey 947 $947 Construction 12,150 _ �`2;000� 2,000 2,000 2,000 2,000 2,000 2,000 $26,150 TOTAL: $13,097 7SZOOO! $2,000 $2,000 $2,000 $2,000 $2,000 Sum $27,097 18. 0 & M COSTS Jx $1000 : 19. FUNDING SOURCE x$1000):- CryG.O.Bond 13,097 t m`2;ODp; 2,000 �2,000 2,000e 2,000 2,000 2,000 $27,097 State Revolving Fund01, State CIP Federal �L Private (Grants) CBA (Fair Share, Park Dedication, etc) "^3 Other Cry Fund - (describe) TOTAL: $13,097�$2;000t $2,000 $2,000 $2,000 $2,000 $2,000 $500 $27,097 m (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACTSTATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Environmental Management- Wastewater Division 2. SUBMITTER: Chris Laude DATE: 1/5/2026 3. PROJECT NAME: DEM- Kula'imano & P3pa'ikou Rehabilitation and Replacement 4. LOCATION (COUNCIL DISTRICT): 1 S. COUNCIL BENEFIT OISTRIC17(5): 1 6. TMK/CDP PLANNING AREA: 2-7-004:126, 2-8-007:075/H8m8kua 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 9,5()0,()00 8. PROJECr ELIGIBILITY, ✓all ❑ Land acquisition Infrastructure improvement 0 New bldg., structure, or addition 9. PROJECTURGENCY/NEED,✓one: that apply: Elni Nonrecurring rehabilitation Planng, feasibility, eng., or design study I ❑Information/communication tech. 121High ❑Med. El Low 10. PROJECr/PROGRAM DESCRIPTION: Project will address various Items at the Kula'imano & PSpa'ikou W WTPs such as replacement of inoperable headworks screening equipment, headworks electrical and motor control center improvements, headworks odor control replacement, new grit removal screening equipment, aeration basin blowers and turbine aerator replacement, aeration line replacement, site improvements for portable dewatering equipment, and secondary clarifiers equipment replacement. 11. PROJECr JUSTIFICATION& OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifYes: ❑+ Needed to continue cumntlevel ofsemices. A. Addresses public health/safety, ✓ifYes: ❑+ Eliminates a documented hazard. B. Service improvements, ✓all that apply: ❑ Access to 2Quality of ❑p Quantity ofE. Operational efficiency and leveraging opportunities: Results In net decrease in operating cast and lmmovessomices. No opportunity, not adjacent to project to capitalize on cast saving. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓ifYes: ❑' Necessary repair/malntenance/replacementper maintenanceplarn/zchedule. F. Fosters inter -departmental collaboration ✓ifYes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Deptpriority Detalls: Upgmdeseverely damaged WWrPs due to age of asset ❑Comm. value Details: COMMUNITY VALUES, check at ❑Generalplan Derails: ❑Admin Priority Detalls: least one and all that apply, ❑COP Details: ❑MultillamniMit Detail: provide details: ❑Dther ra Detail: Additional info: 13. CTY. MATCHING FUNDS REq D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? ✓ifYes: 0 DESCRIBE: Compliance with Administrative Order on Consent EPA Docket No. SDWA-UIC-AOC-2017-OD02). 15. SUSTAINA01LITY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑p Promotes energy and resource conservation 0 Reduces hazard risk O Preserves/protects our notural/cultural env. ❑ Cost benefit analysis El Promotes economic vitality El Strengthens andsustains our community Additional Info: 16. PROJECTREADINESS, ✓all ❑, project currently underway O Previously Appropriated ❑' staff available to manage project ❑EMernolfunds/resources ready to proceed that apply: ❑identifledandrequestedoperadng budget needs ❑ Can realistically encumberfunds List phase$ already completed: Preliminary Engineering Report Additional Info: 17. EXPENDITURE PHASING (X$S0o0): Prior Funds Allotted, notlapsed i{Reggesf �cFY�26=27 FY 27-28 FY28.29 FY29-30 FY30.31 FY31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey 300 'rIi500f $1,800 Construction ..-=8;000- 8,000 $16,000 TOTAL: $300 sae=$9;500; $8,000 $17,800 18. O & M COSTS (x $1000): 19. FUNDING SOURCE x$1000:- CtyG.O.Bond 300 -9,300 81000 $17,800 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) Other Cty Fund - (describe) ----- t«� TOTAL-.1 $300 s °s$8;$00 $8,000 $17,800 o (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 -1027 1. DEPARTMENT AND DIVISION: Department of Environmental Management- Wastewater Division 2.SUBMIITER: Chris Laude DATE: 1/5/2026 3. PROJECT NAME: DEM- N5'51ehu Wastewater System 4. LOCATION(COUNCIL DISTRICT): 6 S. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK/CDP PLANNING AREA: 9-5 / Ka'D 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 40,0D0,000 8. PROJECT ELIGIBILITY, ✓ all ❑+ land acquisition Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, --one: that apply: ❑ Nonrecurring rehabilitation (] Planning, feasibility, eng., or design study I ❑+ Information/communications tech. 0 High ❑ Med. ❑ Low 10. PROJECr/PROGRAM DESCRIPTION: Project is to close three large capacity cesspools and construct: new transmission main; new pump station; new package treatment plant; a reuse or disposal system forthe treated wastewater; and new wastewater collection system. 11. PROJECTJUSTIFICATION&OUTCOME(S),select and/or answer all that apply: D. New facility/infr./bldg. ✓ifYes: ❑+ Fills gap In eurrentservicesfor underserved area/demogrophic. A. Addresses public health/safety, ✓ifYes: ❑' Ellmfnates a documentedhazard. B. Service improvements, 'all that apply: R1 Access to ❑+Quality of ElQuantity of E. Operational efficiency and leveraging opportunities: Resultsinnetlncrewefn operating cost but lmprovesservices. Has no reduction of construction costs. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓ifYes: ❑' Necessary repotr/molntenance/replammentper main tenanceplan/schedule. F. Fosters inter -departmental collaboration ✓ifYes: ❑ N/A Additional info: - 12.LONG RANGE PLANS/ [2]Dept. Priority Details: Expandsevrerservice to underserved and underrepresentedcommunity. ❑Comm. Value Details: COMMUNITY VALUES, check at ❑GenemlPlan Dennis: ❑Admin Priority Details: least one and all that apply, ❑CDP Detalls: ❑MultiNazord Mtt Details: provide details: ❑Other Plans Details: Additional info: 13. CTY. MATCHING FUNDS REO'D2 ✓if Yes: ❑ IDESCRIBE, 14. LEGAL MANDATE? Vif Yes: O IDESCRIBE, Compliance with Administrative Order onConsent EPA Docket No. SDWA-UIC-AOC-2017-0002). 1S. SUSTAINABILITY FOCUS, ✓all that apply: O Promotes energy and resource conservation Provide additional information as appropriate: ❑ Cost benefit analysis O Reduces hazard risk 2]Preserves/protects our natural/cultura/env. El Promotes economic vitality ❑+Strengthens andsustalns our community Additional Info: 16. PROJECT READINESS, ✓all ❑, Project currently underway ❑+ Previously Appropriated F1 Staff available to manage project ❑ Extern/funds/resources ready to proceed that apply: ❑Idemifed andrequestedopemtfng6udgetneeds Can realistically encumberJunds listphases already completed: PreliminaryEnp(needng Report Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted This Rggoes[ (notla sed) _FY 26=2 ¢= FY 27-28 FY 28.29 FY29-30 FY30-31 FY31-32 Beyond Years TOTAL: Planning 1,844 $1,844 land Acquisition 22 r $22 Design/Survey 3,294 Ly $3,294 Construction -'3'"!.�:40,ObiT 28,000 28,0001 $96,000 TOTAL: $5, $28,0001 $101,160 18. 0 & M COSTS a $1000 : _. 19. FUNDING SOURCE (x $1000: s a..... $"."� __ �eP.� . Cty G.O. Bond 5,160 € t""I 40,o00i 28,000 28,000 $101,160 State Revolving Fund` State CIP Federal e Private (Grants) CBA (Fair Share, Park Dedication, etc) - Other CN Fund - (describe) -�'."--.",-�. TOTAL: $5,160 $n ny='$40;000. $28,000 $28,000 5103,160 N (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACTSTATEMENT Fiscal Year 2026-2027 1. DEPARTMENT AND DIVISION: Department of Environmental Management- Solid Waste Division 2. SUBMITTER: Mike Rivera DATE: 12/30/2025 3. PROJECF NAME: DEM- Oceanview Transfer Station - Phase 2 4. LOCATION (COUNCIL DISTRICT): 6 S. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK/CDP PLANNING AREA: 9-2-150:060/Ka'0 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 500,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROTECT URGENCY/NEED, ✓one: hatapply: O Nonrecurring rehabilitation ❑Planning,feas,b',rty,eng., ardesignstudy ❑Information/communications tech. ❑+High ❑Med. ❑Low 10. PROJECT/PROGRAM DESCRIPTION: This project is to complete the site design and construction of Phase 2 which will provide improvements to utilize 120-CY open top walking floor trailer to collect and transport MSW. Project will also provide spaces for recycling components. 11. PROJECrJUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ Fills gap In currentservices. A. Addresses public health/safety, ✓if Yes: ❑+ Reduces risk of a datum en [ed hazard. B. Service improvements, ✓all that apply: R1 Access to ElQuality of El Quantity of E. Operational efficiency and leveraging Opportunities: Results in net decrease In operating cast and improves services. N/A C. Repair/maintenance/replacement of acility/infrastructure/huilding, ✓if Yes: 0 Necessaryrepalr/maintenance/replacement. F. Fosters inter -departmental collaboration ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept Priority Details: Develop into rally Operatingfocility QWmm. Value Details: Fullyfunctioning transfer station COMMUNITY VALUES, check at❑Genera/plan Details: ❑Admin Priority Details: least one and all that apply, El :DP Details: []Muhl HasaMMR Details: provide details: ❑Other Plans Details: Additional Info: 13. CTY. MATCHING FUNDS REWD7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? Vif Yes: ❑ DESCRIBE: 15. SUSTAINABIUTY FOCUS, ✓all that apply: ❑ Promotes energy and resource conservation Provide additional information as appropriate: p Cost ben eft analysis ❑ Reduces hazard risk El Preserves/protects our natural/cultural env. El Promotes economic vitality ❑+ Strengthens andsustains ourcommunity Additional info: 16. PROJEcr READINESS,✓all ❑projectcurrentiyunderway ❑ Previously Appropriated ❑' stoff available to manage project ❑Externalfunds/resources ready to proceed that apply: Oldentified andmquestedoperating budget needs ❑' Can realistically encumberfunds Listphoses already completed: Additional info: 27. EXPENDITURE PHASING (X $1000): Prior Funds Allotted Thls Reg4est not la sed a FY 26.27 ' FY 27.28 FY 28-29 FY 29-30 H30-31 FY 31-32. Beyond Years TOTAL: Planning Land Acquisition Design/Survey '€5W $500 Construction 3,500 $3,500 TOTAL:"I'`m't°-'i$SOti $3,500 $4,000 18. O & M COSTS (x $1000): 19. FUNDING SOURCE (x $1000): Cty G.O. Bond � �,,.,...._..-dt%� � � °w.-5003 .. _ 3,500 $4,000 State Revolving Fund State CIP Federal -+Y" Private (Grants) - CBA (Fair Share, Park Dedication, etc) -- _ OtherC Fund -(describe) - TOTAL: -=:"•$500: 53,500 $4,000 A (This Page Intentionally Left Blank) DEPARTMENT OF PARKS AND RECREATION CLAYTON HONMA, DIRECTOR 35 (This Page Intentionally Left Blank) 36 Department: Parksand Recreation SUMMARYOFDEPARTMENTREQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2026-2027 PRIORITY PROJECT 2026-27 FY FUNDING in thousands FUNDING FORECAST BY FISCALYEAR in the sands)TOTAL ESTIMATED PROTECT COST County G.O. Band State Federal Private- CBA, Other" Prior Funds Allotted '�EEThis ,� Reglfest� '�yy��y�E27i 2027-26 2028-29 2029-30 2030-31 2031-32 Beyond6 years 1 DPR-RDA Compliance 5,000 20,000 9095,090 25W0 2 DPR- Repalm/Improvements to FaulWes MM 25,WoR%N--)S,090, 25,o00 25,000 nWo 2$000 25,0D0 ongoing 175,000 3 DPR- Moku'ola Island and Bridge Improvements 20'ro0 I'soo tuza,OW. 21,500 4 DPR- Princess Abipil Wah'ofa'ahu'ula remananakoa Center Renowidon 7,500 3,500 3,500 i (5-Q0- 14,500 5 DPR-IsaacRepo'okalanl Hale Beach Park Improvements IS,OW 3,000 S,��r 13,000 6 DPR- Papa9kau Community Center 2,000 d fr?000: 12,500 14,500 7 OPR-KUsla-REakea New Pork Development lReapp.) 1,5W 1.5oa 1,500 8 0PR-IaupShoeh.E6tRamp leock, OOy; 10,000 9 DPR-Nawallan Paradise Park New District Park 3,DD0 . 'OR4,==35,000 3,000 25,000 66,W0 10 DPR-5pevicer 0alanl SNutte District Pork New Community Center/Shelter&Improvements 2,500 5,0W 15,750 s 17,5W 20,250 TOTAL 89OW 11,0W 8,500 65,250 �'A10B,5W: 20,000 25,000 50,000 3J4,25o Greatest By: James M. Komata, Park Planner • Prvate: Foundation Gents Date: January 23, 2026 ••Community Benefit Assessments: Fair Share, Park Dedication, Etc Other: GET, Fuel Tax and othernon-bond sources (This Page Intentionally Left Blank) County of HawaYj PROJECT DATA/FINANCIAL IMPACTSTATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation Z. SUBMTTTER: James M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: OPR -ADA Compliance . LOCATION (COUNCIL DISTRICT): Island -wide S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 5,G00,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition O Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: ❑' Nonrecurring rehabilitation ❑' Planning, feasibility, eng., or design study ❑Information/communications tech. High ❑ Med. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: Elimination of architectural barriers and the provision of accessibility improvements at various recreational sites, facilities, amenities, etc. asset forth in the County of Hawais Self -Evaluation and Transition Plan, as amended by the federal court, and as determined in conjunction with ongoing priorities and needs identified with the federal court, as required to comply with the Americans with Disabilities Act and similar accessibility regulations and obligations of the County. Includes improvements necessary to ensure the longevity and viability of the assets. 11. PROJECTJUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ rills gap In current sevicesfor unda,,c td area/demographic A. Addresses public health/safety, ✓if Yes: ❑+ Reduces risk of a documented hazard. B. Service improvements, ✓all that apply: El Access to 21Quality of 2Quantity of E. Operational efficiency and leveraging opportunities: Results in net decrease In operating cost and Improve$ services. Reduces cast by less than 10%by bundling with adjacent projects. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓ifyes: ❑' Nec dry repair/mulmomance/replacement per malntenanceplan/schedule. F. Fosters inter -departmental collaboration ✓If Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ Priority Details: DPR's highestpriority ❑comm. value Details: Community members consistently odvacateforgreaterADA compliance ofparksCOMMUNITY VALUES, Check ateralPlan Detolls:Reference 12.1(a) andI2.3(b) amongst others Elmmin Prioriy Details: Administration acknowledges need to increase ADA compliance ofpnrks island -wide least one and all that apply, rF]Dept. Detalls. All approved CDPs recognize ADA compliance as a priority ❑Muhl Hazardmit Details: provide details: er Plans Detalls: Additional info: 13. Cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? ✓if Yes: (] DESCRIBE: ADA Act 1990 ,Title 28 CFR 35.150, COH's Consent Decree U.S.D.C. Civil No. 97-011025PK -June 4,1998 including ongoing court proceedings 15. SUSTAINABILTTY FOCUS, ✓all that apply: Provide additional information as appropriate: (] Promotes energy and resource conservation Al educes hazard risk pPreserves/protects our natural/cultura/env. pCost benefit analysis Promotes economic vitality ❑+ Strengthens and sustains our community Additional info: 16. PROJECTREAOINFSS, ✓aj 2 Project currently underway El Previously Appropriated ❑'StaJfavailable to manage project ❑Etternalfunds/resources ready to proceed that apply: Oldentlfied andregvesred operating budget needs (]Can realistically encumberfunds List phases already completed: Planning, Design, Permitting (varies byindividual project) Additional info: 17. EXPENDITURE PHASING (K$1000): Prior Funds Allotted not la sed ThrsQrlpuestl FY26.27 FY 27.28 FY 28-29 FY 29-30 FY 30.31 FY 31.32 Beyantl6 Years TOTAL: Planning 41 Land Acquisition Design/Survey 1,500 $1,500 Construction 18,500 �EL"L+ia!`w$i000 $23,500 TOTAL: $20,000 4-,P'='$5;000' $25,000 Is. O & M COSTS x $1000): 19. FUNDING SOURCE(x$3000): Cty G.O. Bond 20,000 ?; N;'`0&-ow, $25,000 State Revolving Fund:r;'3,9_dSie3u;a State CIP Fedeml r Private (Grants) CBA (Fair Share, Park Dedication, etc) " OtherC Fund -(describe) - - TOTAL: $20,000 s.Ja't$5,006'' $25,000 $ (This Page Intentionally Left Blank) County of Hawai i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. SUBMITTER: lames M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR- Repairs/Improvements to Facilities . LOCATION (COUNCIL DISTRICT): Island -wide 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 25,000,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition Olnfrastructure improvement 0 New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: Nonrecurring rehabilitation ❑' Planning, feasibility, eng., or design study ❑ Information/communications tech. High ❑ Med. ❑Low 10. PROJECT/PROGRAM DESCRIPTION: The repair, renovation, upgrade, addition to, modification, alteration, improvement, demolition, landscaping, development, etc. of park sites, facilities, amenities, infrastructure, utilities, components, etc. necessary to facilitate and support safe use thereof and to address the needs of department staff, programs, activities, communities, recreational groups, etc. to fully or best utilize the department's inventory of land and recreational developments to support the needs of the public. 11. PROJEC17IUSTIFICATION&OUTCOME(5), select and/or answer all that apply: D. New facility/infr./bidg. ✓ifyes: O Fills gap in cumentservices. A. Addresses public health/safety, ✓if yes: Reduces risk of a documented hamrd. B. Service improvements, ✓all that apply: R1 Access to ❑'Quality of ❑+Quantity ofE. Operational efficiency and leveraging opportunities: Results in net decrease In operating cast and improves services. Reduces cost by less than 2096by bundling with adjacent projects. C. Repair/maintenance/replacement of acility/Infrastructure/building, ✓if Yes: Necessary repair/maintenance/replacement per maintenance plan/schedule. F. Fosters inter -departmental collaboration ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ QDept.Ptlariry Oetoils:DPR'shighatprioriryfollowing ADA.mmplianceprojmts ❑+Comm. Value Details: community members consistently a&vcateforgrt.erupkeep and maintenance eJfarts COMMUNITY VALUES, check all ❑Generol Plan Details: Reference 12.2(o) and 12.3(b) amongstothers 12AdmlrPriorily Details: Adminlstratlon acknowledges need to enhance repair and maintenance efforts least one and all that apply, ❑+cDP Details. -All approved COPS recognize the need to address deterioratingfacilitles ❑Multi HazardMit Details: provide details: ❑Other, Plans Details: Additional info: 23. Cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILRY FOCUS, ✓all that apply: 12 Promotes energy and resource conservation Provide additional information as appropriate: 112 Cost benefit analysis 0 Reduces hazard risk p Preserves/protects our natural/cultural env. O Promotes economic vitality El Strengthens and sustains our community Additional info: 16. PROJECT READINESS,✓all ❑, project currently underway 2 Previously Appropriated �StaJ/available to manage project ❑' Externalfunds/resources ready to proceed that apply: ❑+Identi)ied and requestedoperatlnp budgetneeds Can realisticall encumber ands Y I list hoses already completed. Planning, Design, Permittin variesb ra act/ P Y P 9 gl yP 1 Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted notla sed This Rei7ues rFY,2647„.i FY27-28 FY28.29 FY29.30 FY3031 FY3132 Beyond Years TOTAL: Planning Land Acquisition Design/Survey 2,500 ,�2,500 2,500 2,500 2,500 2,500 2,500 ongoing $17,500 Construction 22.500 --N-22,560?1 22,500 22,500 22,560 22,500 22,SOD on oin $157,500 TOTAL: $25,000 $25,000 1 $25,000 $25,0001 ongoing $175,000 1a. O & M COSTS Ix $1000 : 19. FUNDING SOURCE x $1000 : ...A eta , I� -- e k _ Cty G.O. Bond 25,000 r"T yg25,000'. 25,000 25,000 25,000 25,000 251000 ongoing $175,000 State Revolving Fund` State CIP Federal Private (Grants) - CBA (Fair Share, Park Dedication, etc) s = �s Other Cty Fund-(descrihe) TOTAL: $25,000 �1' 8,000 $25,000 $25,000 $25,000 $25,000 ongoing $175,000 N (This Page Intentionally Left Blank) County of Hawai'l PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation Z. SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR- Moku'ola Island and Bridge Improvements 4. LOCATION (COUNCIL DISTRICT): 3 S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/CDP PLANNING AREA: (3)2-1-003:001 & 019 and bridge/Hilo 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 20,000,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition D Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: thatapply: El Nonrecurring rehabilitation ❑Planning. feasibility, eng., or design study I ❑Information/communications tech. 121High ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: Addresses replacement/reconstruction of the failed/compromised bridge to restore access to Mokuola Island. Includes improvements to bridge abutments and adjoining ramps/stairs for improved maintenance access and accessibility compliance,repair/replacement of compromised seawalls, repairs to existing comfort station and pavilion on the island, upgrades to the deteriodated utilities (power, water, wastewater, etc.) serving the island, and appurtenant improvements to ensure integrity of park services on the island for the public to utlitize. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. if Yes: ❑+ Needed to continue current level o)services. A. Addresses public health/safety, ✓if Yes: ❑' Eliminates a documented hazard. B. Service Improvements, ✓all that apply: El Access to 21Quality of OQuantity of E. Operational efficiency and leveraging opportunities: Results in net decrease in operating cast and maintains services. Reduces cost by less than 20% by bundling with adjacent projects. C. Repair/maintenance/replacementof facility/infmstmcture/building, ✓ifyes: ❑' Project will resrore)ull operations to asset. F. Fosters inter -departmental collaboration ✓if Yes: El N/a Additional info: 12. LONG RANGE PLANS/ ❑+Dept Priariy Details:DPR's highest prlorityfollowing ADA-complianre projects QUmm. Value Oetalls:Attess to the Island is imperative far cultural, recreational, and maintenance purposes COMMUIN VALUES,checkat ElGenerol Plan Details: Reference 12.2(0)aad 12.3(b)&(I), amongst others ❑+Admen PnorlN Detalls: Mayor has expressed mpmci, in restoring access to the island least one and all that apply, ❑CDP Details; ❑MultlHaandMit Details: provide details: ❑0thervtans Detalls: Additional info: 13. CTY. MATCHING FUNDS REQ'D7 ✓If Yes: ❑ DESCRIBE: 14. LEGAL MANDATE]✓if Yes: ❑ DESCRIBE: IS. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy andresource conservation Provide additional information as appropriate: ❑ Cost benefit analysis 0 Reduces hazard risk ❑+ Preserves/protects ournatural/cul[umlenv. ❑ Promotes economic vitality p Strengthens and sustains our community [Additional info: 116. PROJECT READINESS,✓all ❑, Project currently underway ❑+ Previously Appropriated ❑' 5taffavoilable to manage project ❑ Externolfunds/resources ready to proceed that apply: ❑Identlnedandrequestedoperating budget needs ❑p Can realisticallyencumberfunds Listphoses already completed: Consultant contractforplanning, design andpermitting is underway Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (notlapsed) This Request; FY46';27- FY27.28 FY28-29 FY29-30 FY30.31 FY31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey 2,500 $11500 Construction -".16d00 $20.000 TOTAL: $1,500 "t $20101103 $21,500 18. O & M COSTS (x $1000): 19. FUNDING SOURCE (x $1000): _ _ w a s wammm Cty G.O. Bond 1,500 1''0 20,000' $21,500 State Revolving Fund State CIP Federal , N"'-; Private (Grants) r CBA (Fair Share, Park Dedication, etc) Other Cty Fund - (describe) TOTAL: A (This Page Intentionally Left Blank) County of Hawaii PROIECPDATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. SUBMITTER: lames M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR- Princess Abigail WahTika'ahu'ula Kawananakoa Center Renovation 4. LOCATION (COUNCIL DISTRICT): 3 5. COUNCIL BENEFIT DISTRICT(5): All 16. TMK/CDP PLANNING AREA: (3)2-1-023:120 / Hilo 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 7,500,000 8. PROJECT ELIGIBILffY, ✓all ❑Land acquisition ❑+ Infastmcture improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, -one: hatapply: ONonrecurring rehabilitation ❑Planning, feasibility,eng., ordesign study ❑Information/communications tech. 121 High ❑Med. ❑Low 10. PROJECT/PROGRAM Addresses repairs and improvements at the facility and its site to remedy conditions that affect the playabilty and usability of the multi -purpose center in support of community functions, school DESCRIPTION: functions, and recreational uses and programs that rely on this facility for success. Roofing, paintin& Flooring, sports equipment, bleachers, electronic systems, fenestrations, kitchen, doors and windows, and numerous other building components require repair, replacement, or provisions for success of current, ongoing and future uses of this vital community resource. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: 21 Needed to continue current levelolservices. A. Addresses public health/safety, ✓if Yes: ❑+ Reduces risk of o datum en fed hazard. B. Service improvements, ✓all that apply: 0 Access to OQualkyof El Quantity of E. Operational efficiency and leveraging opportunities: No change in operating costs. No opportunlq, not adjacent to project to capitalize on cost saving. C. Repair/maintenance/replacement of facility�nfrastructure/building, "if Yes: ❑' Necessary repolr/maintenance/replacement. F. Fosters inter -departmental collaboration ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept Prlorlry Details:DPR's highest prloriryfollowing ADA-compliance projects ❑+Comm. Value Debails:Access to the island is lmpemtiveforcuhural, recrectfonal, andmaintenaacepurpases COMMUNTyvAuU ,CheCk at ❑+General Plan Details:Reference12.2(a)and12.3(b),amongstothers QAdmin Prlodry Derails: Administmtionstmnglysupporathispmjea least one and all that apply, ❑CDP iDetalls. ❑Multina:ardMa Detalls: provide details: 130therplans Detalls: Additional info: 13. CTY. MATCHING FUNDS REQ'D7 ✓if Yes: ❑+ DESCRIBE: State CIP and OHA Grant funds require COH match 14. LEGAL MANDATE? "if Yes: ❑ DESCRIBE: 15.SUSTAINABILI'TY FOCUS, ✓all that apply: I ❑ Promotes energy and resource conservation Provide additional information as appropriate: ❑Costbenefitonalysis ❑+ Reduces hazard risk ❑+ Preserves/protects our natural/cultural env. ❑ Promotes economic vitality ❑+ Strengthens andsustains our community [Additional info: 16. PROJECT READINESS, Vail ❑, Project currently underway ❑+ Previously Appropriated 21 Staff available to manage project ❑ Externalfunds/resources ready to proceed that apply: ❑ldentlfiedandrequested operat/ng budgetneeds 12 Can realistically encumberfunds Ustphases already completed: Design andpermining in -progress Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (notlapsed) This Request FY 2G-27„`,-° FY 27-28 FY28-29 FY 29-30 FY30-31 FY 31-32 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey Construction "i`34t500' I I I I I I$14,500 TOTAL: 14,500'. $14,500 18. 0 & M COSTS (x $1000): 19. FUNDING SOURCE x$1000: Cry G.O. Bond `,« .F 4 5DO $7,500 Sate Revolving Fund Sate CIP '1A `.''3;500i $3,500 Federal Private (Grants) °`-°""r=s3;500; $3,500 CBA (Fair Share, Park Dedication, etc) OtherC Fund -(describe) ",7716ete>^s'i' TOTAL: i7"d;'$1`4,500t $14,500 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026-2027 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. SUBMITTER: lames M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR-Isaac Kepo'okalani Hale Beach Parklmprovements 14. LOCATION (COUNCIL DISTRICr): 4 5. COUNCIL BENEFITDISTRICT(S): 4&5 6. TMK/CDP PLANNING AREA: 1-3-008:014,016,021& 14-093:048, etc./Puna 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 15,000,000 8. PROJECT ELIGIBILITY, ✓ all 10 Land acquisition E] Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, vane: that apply: O Nonrecurring rehabilitation ❑Planning, feasibility, eng., or design study ❑Information/communications tech. ❑+ High ❑Med. El Low 10. PROIECr/PROGRAM Addresses the restoration and enhancement of the existing park facility to address heightened needs for recreational oppomnities in lower Puna following the 2018 lava flow and its impacts to DESCRIPTION: this park and inundation of'Ahalanui Beach Park. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ Fills gap in currentservlcesfor underserved area/demographic A. Addresses public health/safety, ✓if Yes: ❑ N/A B. Service improvements, ✓all that apply: 0 Access to 2Quality of ❑+Quantity of E. Operational efficiency and leveraging opportunities: Results In net increase in operating cost but Improves services. No opportunity, not adjacent to project to capitalize an cost saving. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: � Necessaryrepair/maintenance/replacement. F. Fasters inter -departmental collaboration ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ [EDept.Priority Details: Consistent with Department's vision, mission, and goals QCamm. Value Detalls: Desiredandvalued by the community, COMMUNITY VALUES, check at E]Generdplan Detalls: Restoration andenhancemen!supports the General Plan's goals&objectives I ❑'Admin Priority Detalls:Administration strongly.supports this project least one and all that apply, ❑rop Details: ❑MultmczardMit Details: provide details: ❑other Plans Details: Additional info: 13. CTY. MATCHING FUNDS REVD? ✓if Yes: El I DESCRIBE: Use of allocated FEMA funding requires signifant sup plemenml Coun funds far ro ect to be viable (though not a tme matching requirement) 14. LEGAL MANDATE? "if Yes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: ❑p Promotes energy and resource conservation Provide additional information as appropriate: U Cost benefit analysis 0 Reduces hazard risk i] Preserves/protects our naturallcultural env. O Promotes economic vitality ❑+ Strengthens and sustains our community Additional info: 16. PROJECT READINESS,✓all ❑ Project currently underway ❑ Previously Appropriated ❑' Stoffavailable to monageproject ❑Externalfunds/resources ready to proceed that apply: []identified and requested operaflag budget needs ❑+ Can realistically encumber funds Dstphases already completed. N/A Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted notla sed Thls Request „_FY 26.27.°. FY 27-28 FY 28-29 FY 29.30 FY 30.31 FY 31-32 Beyori Years TOTAL: Planning Land Acquisition Design/Survey 3,000 $3,000 Construction :''=15;000` $15,000 TOTAL: $3,0 00 °<3 $15,000, $18,000 18.0&MCOSTS (x$3000): ; 19. FUNDING SOURCE (x $1000): $18,000 Cty G.O. Band 3,000 15,000"- State Revolving Fund 3 tiees State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) Other Cty Fund -(describe) TOTAL: $3,000 '^5^$15,000 $38,000 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 -1027 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. SUBMTTfER: James M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR- PSpaikou Community Center 4. LOCATION (COUNCIL DISTRICT): 1 S. COUNCIL BENEFIT DISTRICT(5): 1,2&3 16. TMK/CDP PLANNING AREA: (312-7-004:121 / HSmSkua 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000 8. PROJECT ELIGIBILITY, ✓all ❑Land auisition Oinfrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: thatapply: ❑ Nonrecucqrrmgrehabilitation ❑Planning, feasibility, eng., ordesignstudy li ❑Information/communications tech. ❑+High ❑Med. El Low 10. PROJECr/PROGRAM DESCRIPTION: Replacement of the existing plantation -era designed/constructed community center facilty determined to be irreperable due to extent of deteriotation throughout the single -wall, wood construction facility and for Building Code compliance cocnems as a high occupancy facility. Facility has been closed to all uses for over a year with no practicable means of restoring to safe use Short of replacement. 11. PRC ECIIUSTIFICATION&OUTCOME(5), select and/or answer all that apply: D. New facility/infr./bidg. ✓ifyes: ❑+ Needed to continue currenllevelofservices. A. Addresses public health/safety, ✓if Yes: El Eliminates a documented hazard. B. Service improvements, ✓all that apply: ❑+ Access to 2Quallty of ❑'Quantity of E. Operational efficiency and leveraging opportunities: Results in net decrease In operating cost and lmprovessemices. No opportunity, not adjarent to project to mpitolize on Costsoving. C. Repair/maintenance/replacement of facility/infrastructure/building, /If Yes: ❑' Necessary repair/mvlmenance/replacement F. Fosters inter -departmental collaboration ✓Ifyes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept Priority Detolls: Consistent with Department's vision, mission, andgaals 12Comm. Value Details: Desired and valued by the community COMMUNITY VALUES, Check at ❑' General Plan Details: 21Admin Priority Delails.Administrationstronglysupports this project least one and all that apply, 2CDP oetalls: ❑MuidxommiWit Detolls: providedetails: 00therplans joetalls. Additional Info: 13. CfY. MATCHING FUNDS REQ'D? ✓if Yes: ❑ 1 DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: O Promotes energy and resource conservation ❑ Reduceshazardrisk R]Preserves/protects our natural/cultural env. ❑Cost benefit analysis 121 Promotes economic vitality ❑+ Strengthens and sustains our community Additional info: 16. PROJECT READINESS, ✓all ❑' Project currently underway O Previously Appropriated ❑'Staff available to manage project 0Wernalfunds/resources ready to proceed that apply: ❑+Identified and requested operating budget needs Can realistically encumber/ands List phases already completed: design andpermitting in -progress Additional info: 17. EXPENDITURE PHASING (X$1000): Prior Funds Allotted not la ed This Request. . FY 26 27' _ FY 27.28 FY 28-29 FY 29-30 FY 30.31 FY 31-32 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey i"_"2,000: $2,000 Construction e 12,500 512,500 TOTAL: '-!Z�$2,000' $12,500 $14.500 18. O & M COSTS (x $1000): %� 1, ->*74 , 1, 19. FUNDING SOURCE(x$1000): — - ¢m ° �p-- - - - ' -- - `F °'�e. -- Cry G.O. Bond :.M..r. - .. Ir.mz.2,000: 12,500 $14,500 State Revolving Fund°'._. State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) Othe,Ei Fund-Idescribe) TO $12,500 $14,50 o (This Page Intentionally Left Blank) County of Hawa� i PROJECT DATA/FINANCIAL IMPACrSTATEMENT Fiscal Year 2026 - 2027 3. DEPARTMENT AND DIVISION: Department of Parks and Recreation 112. SUBMfTTER: lames M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR-Kiliala-Wkea New Park Development(Reapp.) 4. LOCATION (COUNCIL DISTRICT): 4 S. COUNCIL BENEFIT DISTRICT(S): 4 16. TMK/CDP PLANNING AREA: (3)1-2-043:068/Puna 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,500,000 8. PROJECT ELIGIBILITY, ✓all ❑ Land acquisition ❑+ Infastructure improvement El New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: hat apply: ❑ Nonrecurring rehabilitation LE Planning, feasibility, eng., or design study ❑Information/communications tech. 2High ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: Development of a new public parkin the Kalapana area intended to support the desire and efforts of the residents in the surrounding areas forgathering and other park -related functions. 12. PROJECTJUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifym: ❑+ Fillsgop in currentsemicesformderservedarea/demographic. . Addresses public health/safety, "If yes: ❑ N/A B. Service improvements, ✓all that apply: El Access to 21Qualityof OQuarityo/E. Operational efficiency and leveraging opportunities: Resuitsinnetincreosein operutingcostbutimprovas.services. No opportunity, not adjacent to project to capitalize on cost swing. C. Repair/maintenance/replacement of facility/infmstructure/building, ✓R Yes: El NIA N/A F. Fosteminter-departmentalcollabomtion Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ QDept. Priority Derails: Consistent with Deportment's vision, mission, andgaals ❑+Comm. Value Detal4:Deslredand valuedby the community COMMUNITY VALUES, check all ElGenerolp/on Details: Consistent with Genera/Plans'gools and objectives ports this project least one and all that apply, ❑+cop Detoils:Augment'sparkandrecreationalfacillryinventorympopulation grows ❑WOHazard Mit Details: provide details: ❑Other Plans Details: Additional info: 13. Cry. MATCHING FUNDS REQ'D?✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: �Promo[es energy and resource conservation ❑ Reduces hazard risk EI Preserves/protectsournatural/cultural env. ❑Ccstbenefitonalysis ❑+Promotes economic vitality ❑+Strengthens and sustains our community Additional info: 16. PROJECT READINESS,✓all O Project currently underway O Previously Appropriated ❑' Staff available to manage project ❑' cdernalfunds/resources ready to proceed that apply: Identified and requested operating budget needs El Can realistically encumberfunds List phases already completed: Planning documents in progress Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (notlapsed) Thls Request FY27.28 FY28.29 FY2.9-30 FY30.31 FY31-32 Beyond Years TOTAL: Planning°"'% Land Acquisition Design/Survey 3i+2U0 $200 Construction $2,300 TOTAL: m'$1;5001 $1,500 18. O & M COSTS (x $1000): ge'&sl:a "rrw.:^w 19. FUNDING SOURCE(x$3000):(a a` m. WN,¢t, Cty G.O. Bond $1,500 State Revolving Fund "- State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) Other Cry Fund - (describe) TOTAL: '3a;`$1;500`. $1,500 N (This Page Intentionally Left Blank) County of Hawai i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 11z. SUBmirrER: James M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR- Laupahoehoe Boat Ramp . LOCATION (COUNCIL DISTRICT): 1 S. COUNCIL BENEFIT DISTRICT(S): 1 fi.TMK/CDP PLANNING AR EA: (3)3-6-002:024/Hamakua 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000 8. PROJECT ELIGIBILITY, ✓ all ❑Land acquisition � Infrastructure improvement 0 New bldg., structure, or addition 9. PROIECTURGE7/NEED, ✓one: thatapply: ❑ Nonrecurring re habilitation OPlanning,feasibility, eng., or design study ❑Information/communications tech. High ❑Med. El Low 10. PROJECr/PROGRAM DESCRIPTION: Reconstruction of the sole public boat rampservingthe HSmSkua Coast, currentlyclosed dueto deterioration. 11. PROJECr1USTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: 0 Needed to continue current levelofservicec A. Addresses public health/safety, ✓if Yes: �' Eliminates a documentedhazard. B. Service improvements, Vail that apply: El Access to 2Quality of El Quantity of E. Operational efficiency and leveraging opportunities: No change in operating costs. No opportunity, not adjacent to project to capitalize an cast saving. C. Repair/maintenance/replacementof facility/infrastructure/building, ✓if Yes: �' Project will restore full operations to asset F. Fosters inter -departmental collaboration ✓if Yes: 0 N/A Additional info: 12. LONG RANGE PLANS/ +Dept. Priority Detalls:consistent with Department's vision, mission, andgoals Qrsmm. Value Detalls.-Desired andvaluedby the community COMMUNITY VALUES, check a[ QGeneml Plan Detalls:cansisten[with General Plans' goals andobjectives ElAdmin Priority Detalls: Administratianstronglysupporis thispmject least one and all that apply, 2CDP Detalls: Qm.lutizaniMit Detalls: provide details: pother Plans Details: Additional info: 13. Cry. MATCHING FUNDS REQ'D? ✓If Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15.SUSTAINABILITY FOCUS, ✓all that apply: O Promotes energy and resource conservation Provide additional information as appropriate: Cos[benefit analysis ❑ Reduces hazard risk El Preserves/protects our natural/cuilural env. R1 Promotes economic vitality 0Strengthens and sustains our community Additional info: 16. PROJECT READINESS, ✓all El Project currently underway 0+ Previously Appropriated 2 Staff available to manage project 0 Cdernal funds/resources ready to proceed that apply: 0identi/iedandrequestedoperating budget needs O Can realistically encumberfunds Ustphoses already completed: Planning and design in -progress dditional info: 17. EXPENDITURE PHASING(X$1000): Prior Funds Allotted Inotlapsed) This Request FY2647, FY27-28 FY28.29 FY29.30 FY30.31 FY31-32 Beyond6 Years TOTAL: Planning '' i=s,i.; )•r Land Acquisition Design/Survey -'-'250- $250 Construction $9,750 TOTAL: ? 1„s-$10,000:1 $50,000 18. O & M COSTS x $1000 : 19. FUNDING SOURCE (x $1000): e s rya eN - Nasa�e�s=�awv Cry G.O. Bond :a,,.,;=10,000' $101000 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) - - OtherCryFund-(describe) E a^r5�' TOTAL-.1 $10,000 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2016 - 2027 1. DEPARTMENTAND DIVISION: Department of Parks and Recreation 12. SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026 3. PROJECT NAME: DPR- Hawaiian Paradise Park New District Park 4. LOCATION (COUNCIL DISTRICT): 4 5. COUNCIL BENEFIT DISTRICT(S): 3,4&5 6. TMKJCDP PLANNING AREA: (3)1-5-039:267/Puna 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 3,000,000 8. PROJECT ELIGIBILITY, ✓ all 10 Land acquisition 2 Infrastructure improvement New bldg., structure, or addition 9. PROIECTURGENCY/NEED, ✓one: that apply; ❑ Nonrecurring rehabilitation ❑Planning, feasibility, eng., ordesign study ❑Information/communication tech. ElHigh ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: Development of a new district park in the Hawaiian Paradise Park subdivision to include initial offsite and onsite infrastructureand utilities, new sports and recreational facilities, and complementary park amenities in accordance with final park master plan document. 11. PROIECr1USTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: 21 Fills goo in currentservicesforunderserved area/demogrcphlc . Addresses public health/safety, ✓ifyes: (]+ N/A B. Service improvements, ✓all that apply: 21 Access to 21 Quality of 2 Quantity Of E. Operational efficiency and leveraging Opportunities: Resuluinnetmcreasein operating mst but impmvesservices. No opportunity, not adjacent to projet to capitalize on cost saving. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: N/A F. Fosters inter -departmental collaboration ✓ifyes: 2 N/A Additional info: 12. LONG RANGE PLANS/ QDept. Priority Details:Consistent with Department's vlslon, mission, andgwis OComm. Value Details: Desired andvaluedby the community COMMUNITY VALUES,aheck at2General Plan Details: Consistent with General Plam'goals and ob/ediver 21M.MPriority Details:Adminhtratianstmnglysuppor thisprojed least one and all that apply, QTDP Details: QMuldnazard Mit Details: provide details: ❑other Plans Detoils.' Additional info: 13. CTY. MATCHING FUNDS REQ'D7 ✓if Yes: ❑DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILTIV FOCUS, ✓all that apply: g frorm"' energy and resource conservation Provide additional information as appropriate: p, Cost benefit analysis ❑Reduces hazard risk O Preserves/protects our natural/cuftura/env. 21 Promotes economic vitality Strengthens andsustains ourcommunity Additional info: 16.PROJECTREADINESS,✓all El Project currentlyunderwoy 2 Previously Appropriated OS[af/available to manage project 0' Ewernolfunds/resources ready to proceed hat apply: �ldentlfiedandrequeseedoperatingbudget needs (]Can realistically encumberfunds Ust phases already completed: Pork mosterplan and FA completed. - Additional info: 17. EXPENDITURE PHASING (%$1000): Prior Funds Allotted not la ad Tnis Rr:gisest s.FY 2627; eS FY 27-28 FY 26.29 FY 29-30 FY 3031 FY 31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Surve '3'(Xia 35,000 3,000 25,000 $66,000 Construction TOTAL: ','s`a-'$3,,000'1 $35,000 $3,000 $251000 $661000 I8. O & M COSTS NUMB): ' 19. FUNDING SOURCE(x$3000: aM. 9` ;00'0'; 35,000 3,000 25,000 $66,000 Cty G.O. Bond State Revolving Fund State CIP''� Fedeal m-" `" Private (Gams) - CBA (Fair Share, Park Dedication, etc) 0ther qty Fund - (describe) TOTAL:%";.=53;000: $35,0001 $3,000 1 1 $251000 $66,000 n (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2016 - 2017 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. SUBMTTTER: James M. Komata, Park Planner DATE: 1/23/2026 3. PROJECT NAME: DPR -Spencer Kalani Schulte District Park New Community Center/Shelter & Improvements . LOCATION (COUNCIL DISTRICT): 9 S. COUNCIL BENEFIT DISTRICr(S): 3,4&5 6.TMKICDP PLANNING AREA: (3) 6-7-002:063 /South Kahala 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 8. PROJECT ELIGIBILITY, ✓ all ❑ Landacquisition Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECr URGENCY/NEED,✓one: that apply: I ❑Nonrecurring rehabilitation ❑ Planning, feasibility, eng., or design study ❑Information/communicatians tech. 21 High ❑ Med. El Low 20. PROJECT/PROGRAM DESCRIPTION: Development of additional phased recreational improvements at the facility, formerly known as Waimea District Park, consistent with the master pan as well as addressing supplemental needs identified with existsing improvements for enhanced usability. 11. PROJECr JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: p FIIB gap In currentservicesfor underserved area/demographic A. Addresses public health/safety, ✓ifyes: ❑' eommunityconcerns exists aroundmnditlom. B. Service improvements, ✓all that apply: O Accessto OQualkyof ❑Quantitycf E. Operational efficiency and leveraging opportunities: Resulninnetincreasein operating cost but improves services. No opportunity, not adjacent to project to capitalize on castsming. C. Repair/maintenance/replacement of facility/infrastructure/building, -'IfYes: ❑' Necessolympab/maintenance/replocementper maintenanceplan/schedule. F. Fostersinter-departmentalcollabomtion ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept.Priority Details: consistent with Department's vision, mission, andgoals ❑i fnmm. Value Details: Dalred and valued bythecommunity COMMUNITY VALUES, Cheek at ❑+General Plan Details: Consistent with Geneml Plam'gouh and objectives ❑'Admin Priority Details. Administration strongly supports this project least one and all that apply, 3CDV Detalls: ❑MultiH.dMit Detalls: provide details: ❑other Flans Detalls: Additional info: 13. Cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑+ DESCRIBE: State funding is anticipated to require a 1:1 match (State:County+Private) 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: IS.SUSTAINABILIfY FOCUS, ✓allthatapply: Provide additional information as appropriate: ❑+ Promotes energy and resource conservation ❑, Reduces hazard risk 0 Preserves/protects our natural/cultural env. p Cost benefit analysis O Promotes economic vitality 21 Strengthens andsustains our community dditional Info: 16. PROJECT READINESS,✓all ❑ Project currently underway O Previously Appropriated ❑' 5taffavailable to manage project ❑' Externalfunds/resources ready to proceed that apply: ❑Identiliedandrequested operating budget needs Can realistically encumber)unds ❑stphases already completed: Pork design complete. Additional Info: ' 17. EXPENDITURE PHASING (X$1000): Prior Funds Allotted not la sed This Request", `. FY Z64T"' I FY 27-28 I FY 28-29 1 FY 2930 FY 3031 FY 31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey 750 a $750 Construction 15,000 �':'F€"IkI2,500 $27,500 TOTAL: $15,750 'm!"!'$12,5001 $28,250 1a. O & M COSTS (x $1000): - - 19.FUNDING SOURCEx$1000: Cry G.O. Bond 14,930 $14,930 State Revolving Fund veVwA State CIP :i7,500. $7,500 Federal Private(Grants) 750 r' '96A1'5;000 $5,750 LBA (Fair S'are ,Park Dedication, etc) 70."-� .-:•: raw., $70 OtherCty Fund- describe) TOTAL: $15,750 :':'#=$12y500' $28,25 p (This Page Intentionally Left Blank) DEPARTMENT OF PUBLIC WORKS WESLEY SEGAWA, DIRECTOR I (This Page Intentionally Left Blank) Department: Public Works SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2026,2027 PRIORITY PROJECT 2026-27 FY FUNDING in thousandsI FUNDING FORECAST BY FISCAL YEAR I.thousands TOTAL ESTIMATED PROJECT COST County G.O. Bond State Federal Private• [BA, Other•• Prior Funds Allotted - C 75 2027-21 112g-2B 2025-30 2030-31 2031-32 Beyond 6 years a,° 1 DPW- Reroofig at Varlaus Fire and Police Statlons 6,000 0 k 6,000 2 OPW- Fadfldes Improvement; 14, 00 22,83200 14,000 14,000 14,000 14,000 14,ON 106,832 3 DPW -Road and Bridge lmprevement Proleds, Federal and St2wnunded 4,000 16,000 00 20,o00 20,000 20,000 20,000 20,000 120,000 4 DPW - Road and Bddge Improvement Proleds, Islandwide 30,000 o 50,000 1owo 10,000 30,000 20,000 60,OD0 5 DPW - Drainage Improvement Proleds, IslandwidelceapP) 4,000 3,000w 4,000 4,oW 4,000 4,000 4,000 27,000 G DPW- Miscellaneous Improvement Projeds, islandwlde 2,000 D0 2,000 2,000 2,000 2,000 2,000 7 DPW- Kilauea Avenue Safe Routes to R.hool-Wal3kea 4,000 16,000 s2DcRo 8 DPW -Ka'ahaOni Stream Bridge [29d]Peplacement platrodlan - 1D,000 lO,WQ B DPW- Pour Mlle Ueek Bridge 1(29-1 a 6,000 1;000 �ge18,00LL TOTAL 50,000 12,000 42,000 25,832 'Y04,000 5D,DOD 50,.0 so, o. 50,00D 50.000E-d [seated By: Kelsey Kalua-Lewis ' ftheam Foundation Grants Date: Business Manager "•Communfry Benefit Assessments:FairSham, Park Dedication, Etc Other. GU, Fuel Tax and other nor-6andsouraes N (This Page Intentionally Left Blank) County of Hawai l PROIECPDATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: DPW Building Division 2. SUBM17TER: Aaron Spielman DATE: 12/29/2025 3. PROJECT NAME: DPW -Reroofing at Various Fire and Police Stations 4. LOCATION (COUNCIL DISTRICT): 1,2,3,8 S. COUNCIL BENEFIT DISTRICT(5): Various 6. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: $6,000,000.00 S. PROJECT ELIGIBILITY,✓all ❑Land acquisition ❑ Infmstmcture improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: 3 Nonrecurring rehabilitation ❑Planning. feasibility, eng., or design study ❑Information/communications tech. 21 High ❑ Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: This projectwill replace the roofs for Waiakea Fire Station, Kaumana Fire Station, Kailua Fire Station, and Honokaa Police Station. 21. PROJECTJUSTTFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑p Neededto continue current levelof services. A. Addresses public health/safety, "if Yes: ❑+ Reduces risk of a documentedhazard. B. Service improvements, ✓all that apply: ❑ Access to 2Quality of ❑+Quantity of E. Operational efficiency and leveraging opportunities: Results In netdecrease In operating cost andimprove$services. Has no reduction of construction costs. C. Repair/maintenance/replacement of ✓, ❑' facility�nfmstmcture/building, if Yes: Necessoryrepair/maintenance/replacement. F. Fosters inter -departmental collaboration ✓if Yes: ❑+ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept. Priority Details: Project consistent with multi -departmental goals. ❑camm. value Details: COMMUNITY VALUES, check at ❑' General Plan Details: Project consistent with General Plan section 10 Public Facilities. QAdmin Priority Details: Canslsten[with penemlpriorides of administration, least one and all that apply, ❑CDP Details: QMuitwazommit Details. - provide details: ❑other Plans Details: Additional info: 13. Cl MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?,/if Yes: ❑ IDESCRIBE, 25. SUSTAINABILITY FOCUS, ✓allthatapply: Provide additional information as appropriate: ❑p Promotes energy and resource conservation ❑+ Re duces hazordrisk ❑Preserves/protects our natural/cultural env. ❑Cost benefit analysisI ❑ Promotes economic vitality ❑ Strengthens andsustains ourcommunity Additional info: New roof will be builtto meet current energy code standards. 16. PROJECT READINESS, Vail ❑, Project currently underway ❑ Previously Appropriated ❑ Staff available to manage project ❑Fxternalfunds/resources ready to proceed that apply: ❑Identified and requested operating budget needs I [I Can realistically encumber funds List phases already completetl: Additional info: Funds were encumbered for design. Project is currently still in the design phase. 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted notla sed This Request -_FY2637_' FY27-28 FY28-29 FY29-30 FY3031 FY3132 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey Construction !6;OOD $6,000 TOTAL: `I"-3'"$6;000= $6,000 18. O & M COSTS x $1000 : i n�:,j�.Poiyp 19. FUNDING SOURCE K$3000): Cry G.O. good �' '�®� t "fa `"A6,0001 fi a m - MOMS $6,000 State Revolving Fund €F State OF Federal a ,.` Private (Grants) C8A (Fair Share, Park Dedication, etc) OtherC Fund - (describe) - - TOTAL: s^°:$6,OW $6,000 p (This Page Intentionally Left Blank) County of Hawai l PROJECT DMA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 I. DEPARTMENT AND DIVISION: DPW Building Division 11Z. SUBMITTER: Aaron Spielman DATE: 12/29/2025 3. PROJECT NAME: DPW- Facilities Improvements 4. LOCATION (COUNCIL DISTRICT): All 5. COUNCIL BENEFIT DISTRICT(S): All 6.TMX/CDP PLANNING AREA: All 7. TOTAL COUNTY FUNDS NEEDED THIS FY: $14,000,000.00 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition O lnfrastmcture improvement �+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: 21 Nonrecurring rehabilitation 2Planning, feasibility, eng., or design study 10Information/communication tech. OHigh ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: This project represents various facility improvements to address energy efficiency, ADA compliance, hardening, deferred maintenance, additions, renovations, and repairs. It also includes new facilities to replace exisiting facilities that are beyond service life. 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: 0 Needed to continue current level ofservices. . Addresses public health/safety, ✓ifyes: �+ Reduces risk of o documented hazard. B. Service improvements, ✓all that apply: 0 Access to D+ Quality of 2 Quantity of E. Operational efficiency a nd leveragi ng opportunities: Results in net decrease In operating cost and improves services. Has no reduction ofconstruction casts. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓ifyes: Necessary repair/maintenance/replacement. F. Fosters inter -departmental collaboration ✓if Yes: 0 N/A Additional info: 12. LONG RANGE PLANS/ 2+Dept. Priority Details: Project on, istent with multi -departmental goals. ❑comm. Value Details: COMMUN17YVALUESo Check at El General Plan Details: Project consistent with General Plan Section 10 Public Facilities. DAdmin Priority Details: consistent with generolpricritles of administration. least one and all that apply, �CDP Details: 113multinazordmk Detolls: provide details: E]Othsr Plans Details: Additional info: 13. CIY. MATCHING FUNDS REQ'D7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? VifYes: ❑ DESCRIBE: 15.SUSTAINABILITY FOCUS, ✓all that apply: O Promotes energy and resource conservation Provide additional Information as appropriate: p Cost benefit analysis 2Reduces hazard risk ❑Preserves/protects our naturaVcultural env. ❑ Promotes economic vitality ❑ Strengthens andsustafns our community Additional info: 16. PROJECT READINESS,✓all 2, project currently underway OPreviouslyAppropriated ❑ Staffavailable to manage protect ❑E.ternolfunds/resources ready to proceed that apply: Dldentified andrequested opentfng budget needs I ❑ Can realistically encumberfundt I (ittphases already rompleted: dditional info: 117. EXPENDITURE PHASING (X $1000):Prior Funds Allotted notla ed This Request= FY26.27, FY 27.28 1 FY 28-29 FY 29.30 FY 30-31 FY 31-32 Beyond 6 Years TOTAL: Planning land Acquisition Design/Survey Z634 '1,4061 1,400 1,400 1,400 1,400 1,400 $11,034 Construction 20,198 �°f.I?s`32,6W 12,600 12,600 12,600 12,600 12,600 $9S,798 TOTAL: $22,B32 M"m $14,000; $14,000 $14,000 $14,0001 $14,000 $14,000 $106,832 18. O & M COSTS (x $1000): ......`-__; 19. FUNDING SOURCE(x$1000): 22,8321d;006 14,000 �., 14,000 _ 14,000 ��• . 14,000 .. 14,000 r� ... $106,832 Cty G.O. Bond State Revolving Fund _°-: State CIP �'---'b'"° _ Federal Private (Grants)r '�` CBA (Fair Share, Park Dedication, etc) agge Other Cry Fund - (describe) M aF TOTAL: $22632 �'°'=53b'00, $14000 $14000 $14000 $14,000 $14,000 $106,832 n (This Page Intentionally Left Blank) County of Hawai'i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENTAND DIVISION: DPW- Engineering Division 2.SUBMIIIER: Alan Keane Thompson DATE: 12/26/2025 3. PROJECT NAME: DPW - Road and Bridge Improvement Projects, Federal and State -Funded 4. LOCATION (COUNCIL DISTRICO: All 5. COUNCIL BENEFIT DISTRICT(5): All 6. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 4,000,000 8. PROJECT ELIGIBILITY, ✓all 1 ❑ land acquisition O Infrastructure improvement ElNew bldg., structure, or addition 9. PROJELTURGENCY/NEED,✓one: that apply: 2Nonrecurring rehabilitation ❑Planning, feasibility, eng., or design study ❑Information/communication tech. ❑High 2Med. ❑Low 10. PROJECr/PROGRAM DESCRIPTION: Road and bridge infrastructure improvement projects or required inspections receiving Federal or State funding through various methods, including Statewide Transportation Improvement Program (STIP), grants, etc. 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: ❑ N/A A. Addresses public health/safety, "ifyes: ❑+ Community concerns exists around conditions. 8. Service improvements, ✓all that apply: ❑+ Access to 2Quality of ❑Quantity of E. Operational efficiency and leveraging opportunities: Results In net decrease in operating cast and improves services. No opportunity, not adjacent to project to capitalize on cast saving. C. Repair/maintenance/replacementof acility/infrastructure/building, /If Yes: ❑' Necessary repair/mafntenance/replacemenG F. Fosters inter -departmental collaboration ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ +❑Dept. Priority Details. Improve roadway and bridge safety. ❑+Comm. Value Oetolls: Enhances quality ofllfefarresldents. COMMU LAITY VALUES, Check at General Plan Details:06j.22: Soferyfor vulnerable user;Obl.23: Maintain public transport system. QAdmin Priority Details: Provide matchingfunos to leverage non-Counryfunding sources. leastane and all thatapply, ❑CDP 0etads. ❑MulnHowniMit Demlls: provide details: ❑Other Plans Oetalls: Additional info: 13. Cry. MATCHING FUNDS REQ'D7 ✓if Yes: Ej I DESCRIBE: Typically 80%Federal, County �14. LEGAL MANDATE? Vifyes: ❑ [DESCRIBE: 15. SUSTAINABILNY FOCUS, ✓all that apply: Provide additional information as appropriate: I ❑ Promotes energy and resource conservation 0 Reduces hazard risk ❑+ Preserves/protects our natural/cultural env. I ❑ Cbst benefit analysis ❑ Promotes economic vitality p Strengthens and sustains our community Additional info: 16. PROJECT READINESS, Vail ❑Prolectcurrentlyunderway ❑ Previously Appropriated O Staffavailable to manage project U1Wernalfunds/resources ready to proceed that apply: ❑Idenaged andrequested operating budget needs ❑' Can realistically encumberfunds Listphoses already completed: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted not le sed This Begties[_ . FY 26a27" = FY 27-28 FY 28-29 FY 29-30 FY 30.31 FY 31-32 Beyond Years TOTAL: Planning Land Acquisition e Design/Survey Construction ^''20,0W 1 20,0001 20,0001 20,000 1 20,000 1 20,000 $120,000 TOTAL:-eP"'$20A00: 1 $20,00011 $20,0001 $20,000 1 $20,000 1 —$20,0001 1 $120,000 IB. O& M COSTS x $1000 : r"J";:�;'. n"=«i 19. FUNDING SOURCE (x $1000): . " '". ®C WINFAM Cry G.O. Bond '!!4,00'0' 4,000 4,000 4,000 4,000 4,000 $24,000 State Revolving Fund State CIP Federal "s�13;660= 16,000 16,000 I6,000 16,000 16,000 $96,000 Private (Grants) 4K 1, CBA (Fair Share, Park Dedication, etc) Other Cty Fund - (describe) TOTAL: 'd =i$20,000I $20,000 $20,000 $20,000 $20,000 $20,000 $120,000 (This Page Intentionally Left Blank) County of Howa� i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: DPW- Engineering Division 2. SUBMITI`ER: Alan Keane Thompson DATE: 12/26/2025 3. PROJECT NAME: DPW - Road and Bridge Improvement Projects, Islandwide 4. LOCATION (COUNCIL DISTRICT): All 5. COUNCIL BENEFIT DISTRICT(S): All 16. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition El Infrastructure improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: 0 Nonrecurring rehabilitation ❑ Planning, feasibility, eng., or design study I ❑ Information/communications tech. ❑ High 0 Med. ❑ Low 10. PROJECr/PROGRAM DESCRIPTION: Inspection, repair, and construction of road and bridge improvement projects, islandwide. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑ N/A A. Addresses public health/safety, ✓ifyes: ❑' Communitywncernsexlstsaroundconditions. B. Service improvements,✓allthatapply: 2 Access to 2Quality of ❑quantity of E. Operational efficiency and leveraging opportunities: Results in net decrease in operating cost and improves services. No opportunity, not adjacent to project to capitalize on cost saving. C. Repair/maintenance/replacement of acility/infrzstmcture/building, ✓if Yes: ❑' Newman, repair/maintenance/replarement F. Fosters inter -departmental collaboration ✓,if Yes: El NIA Additional info: 12. LONG RANGE PLANS/ 2ept Priority Detalk: Improve roadway and bridge safety. ODomm. value Dstails: Enhances quality offifefor residents. COMMUNIT(VALUES, check at ❑+GenenlPtan Details:06J.23: Malntalnpubllc transport system. DAdmin Priority Detalls: Prioritized In Genemlilan. lI least One and all that apply, ❑CDP Details: ❑MWUHar.MMrt Details: provide details: ❑Other Plans Detalls: Additional info: 13. CTY. MATCHING FUNDS REO'D7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? ✓if Yes: ❑ DESCRIBE: 25. SUSTAINABILITY FOCUS, ✓ all that apply: I ❑ Promotes energy and resource conservation Provide additional information as appropriate: I ❑ Cost benefit analysis Ej Reduces hazard risk 2Preserves/protects our natural/cultural env. ❑ Promotes economicvitolity El Strengthens andsastains our community Additional info: 25. PROJECT READINESS,✓all ❑ ProJect currently underway, ❑ Previously Appropriated O Staffavailable to manage project ❑Fxternalfunds/resources ready to proceed that apply: ❑Identified andrequested operating budgetneeds ❑ Can realistically encumberfunds fistphases already completed: Additional info: 17. EXPENDITURE PHASING(%$1000): Prior Funds Allotted notlased This Request; FY26r27,'1 FY 27.28 FY 28.29 FY 29-30 FY30.31 FY 3132 Beyond Years TOTAL: Planning Land Acquisition Design/Survey Construction 01,000'. 1 10,0001 50,000 1 10,000 1 10,0001 $60,000 TOTAL: ;'u$10,0001 $10,000 $10,000 $10,000 $10,000 $10,000 $60,000 18. O & M COSTS (a $1000): 19. FUNDING SOURCE(x$1000): .:_.__..wmw»,Cty G.O. Bond10,000 10,000 10,000 10,000 10,000 $60,000 State Revolving Fund State CIP iiF * 'dal. Federal Private (Grants) CBA (Fair Share, Park Dedication, etc)," OtherC Fund-(describe),"PIIr°::r=' TOTAL.]`—�.'` e'$1D,M $1Q000 $10,000 $10,000 $10,000 S10,000 $60,000 o (This Page Intentionally Left Blank) County of Hawai'i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: DPW- Engineering Division 2. SUBMITTER: Alan Keone Thompson DATE: 12/26/2025 3. PROJECT NAME: DPW- Drainage Improvement Projects, Islandwide 4. LOCATION (COUNCIL DISTRICT): All 5. COUNCIL BENEFIT DISTRICr(5): All 16. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 4,000,000 8. PROJECT ELIGIBILITY, ✓all ❑ Land acquisition Infrastructure improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: 2 Nonrecurring rehabilitation El Planning, feasibility, eng., or design study 10Information/communications tech. ❑High ❑+Med. El Low DESCRIPTION: 10. PROJECT/PROGRAM Inspection, repair, and construction of drainage improvement projects, islandwide. 11. PROJECT JUSTIFICATION&OUTCOME(5), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑ N/A A. Addresses public health/safety, ✓if Yes: O Community concerns exists around conditions. S. Service improvements, ✓all that apply: ❑ Access to 21Quality of E] Quantity of E. Operational efficiency and leveraging opportunities: Results In net decrease In operating mstand improves services. No opportunity, not adjarent to project to capitalize on cost saving. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: ❑' Necessary repair/maintenance/replocemen[. F. Fosters inter -departmental collaboration ✓if Yes: E] N/A Additional info: LONGRANGEPLANS/ 12L.n,n ❑+Dept P"omy Details: Improveflooding safety concerru�. Comm. Value Details: Community safety driven. [heck et QGeneralP/on Details:Addressrsjlooding ondather natural hazards. QAtlmfn Pooriry Details: Protecnpublk health and/orsafety. that apply, QCDP Details: Community safety. ❑MURIHaardMR Details: Other Plans Derails: 13. CJY. MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as a ppropriate: ❑Promotes energy and resource conservation 2 Reduces hazard risk El Preserves/protects our natural/cultural env. ❑ Costbenefit analysis ❑ Promotes economic vitality ❑+ Strengthens ondsustains ourcommunity, Additional Info: 16. PROJECT READINESS, ✓all ❑ Project currently underway E) Previously Appropriated 12 5toff available to manage project TO Extemol funds/resources ready, to proceed that apply: ❑Identified andrequestedoperating budget needs O Can realistically encumberfunds List phases already completed: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted notla sed This Retiuest, FY,26-27% FY7.7.28 FY28.29 FY29-30 FY30-31 FY31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey s Construction 3,000 ,-A,0D0!1 4,0001 4,0001 4,0001 4,000 1 4,000 1 1 $27,000 TOTAL: $3,000 o —,$4,000` $4,000 $4,000 $4,000 $4,000 $4,000 $27,000 18. 0 & M COSTS x $1000 : - - 19. FUNDING SOURCE x$1000: Cty G.O. Bond 3,000 --4,000; 4,000 4,000 4,000 4,000 4,000 $27,000 State Revolving Fund - State CIP Federal Private (Gran") - CBA (Fair Share, Park Dedication, etc) ; °= Other Cry Fund - (describe) - aril:a TOTAL: $3,000 8"°==54,000= $4,000 $4,000 $4,0001 $4,000 $4,000 $27,00 N (This Page Intentionally Left Blank) County of Howai i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: DPW- Engineering Division 2.SUBMITTER: Alan Keane Thompson DATE: 12/26/2025 3. PROJECr NAME: DPW- Miscellaneous Improvement Projects, Islandwide 4. LOCATION(COUNCIL DISTRICT): All S. COUNCIL BENEFIT DISTRILT(S): All 16. TMK/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,OGO,000 8. PROJECT ELIGIBILITY, ✓all ❑ Landacquisition Infrastructure improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: ❑+Nonrecurring re habilitation ❑Planning, feasibility, eng., or design study ❑Information/communications tech. El High ❑+Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: Acquisition, design/survey, inspection, repair, and construction of miscellaneous improvement projects, islandwide. 11. PROJECTJUSTIFICATION&OUTCOME(5), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: ❑ N/A A. Addresses public health/safety, ✓if Yes: O Community concerns exists aroundcanditions. B. Service improvements, ✓all that apply: ❑ Accessto ElQualityof ❑Quantityof E. Operational efficiency and leveraging opportunities: Results In net decrease In operating cost and improvesservices. No opportunity, notadjacent to project to capitalize on costsaving. C. Repair/maintenance/replacement of acility/infrestructure/building, ✓if Yes: � Necessary repair/malntenanm/replacement. F. Fosters inter -departmental collaboration ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ DDept. Priority befalls: Improve varioussofery concerns. ❑+Comm. Value Details: Communitysafery driven. COMMUNITY VALUES,checit at ❑' Gen era/Plan Defplls:obl. i3: Maintain public transport system. QAdmin Priority Details: Protects public health and/or safety. least one and all that apply, 21CDP Details: Communlfysofety. ❑MuWHamrdMlt Details: provide details: ❑other Plans Details: Additional info: 13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?✓If Yes: ❑ DESCRIBE: 15. SUSTAINABlUTY FOCUS, ✓all that apply: ❑ Promotes energy and resource conservation Provide additional information as appropriate: ❑ Cost benefit analysis Reduces hazard risk OPreserves/protects our natural/cultural env. ❑ Promotes economic vitality ❑+ Strengthens andsustains ourcommunity Additional info: 16. PROJECr READINESS,✓all ❑Projectcurrentlyunderway ❑ Previously Appropriated ❑' Staff available to manage project ❑Externallunds/resources ready to proceed that apply: ❑Idenu led and re requested eratin budget needs 1 a operating 9 Can realistically encumber ands Y I list hoses alrea P alreadyCompleted.- Additional info: 17. D(PENDITURE PHASING (K$1000): Prior Funds Allotted (not lapsed) This Regdest FY26,'27 m FY27-28 1 FY28Q9 1 FY29.30 1 FY3G.31 I FY31-32 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey Construction r+= ,2,000' 2,000 1 2,000 1 2,0001 2,0001 2,000 $12,OD0 TOTAL: $21000 $2,0001 $2,0001 $IA00 11 $12,000 18. 0 & M COSTS x $1000): ".a°9:1n:F`-°".- a ..a 19. FUNDING SOURCE x$1000: Cty G.O. flood l='.:---°<2;000 2,000 2,000 2,000 2,000 2,000 $12,000 State Revolving Fund State CIP Fedeal Private (Grants) CB(Fair Share, Park Dedication, etc) Other cty Fund -(describe) -- TOTAL 2"51.=.=$YjOW $2,000 $2,000 $2,000 $2,000 $2,000 532,000 A (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: DPW- Engineering Division 2. SUBMTTTER: Alan Keane Thompson DATE: 1/20/2026 3. PROJECr NAME: DPW - Kilauea Avenue Safe Routes to School- WaiBkea 4. LOCATION (COUNCIL DISTRICT): 2 5. COUNCIL BENEFIT DISTRICTS): 2&3 6. TMK/CDP PLANNING AREA: 2-2/S. Hilo 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 4,000,GD0 8. PROJECT ELIGIBILITY, ✓ all I ❑ Land acquisition D Infrastructure improvement ❑ New bldg.,structure, or addition 9. PROJECr URGENCY/NEED,✓one: that apply: ❑ Nonrecurring rehabilitation ❑Planning, feasibility, eng., or design study ❑Information/communications tech. OHigh ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: This project will construct concrete sidewalks and drainage improvements. 11. PROJEC!JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ Fillsgopincumentsemicesferundersemedarea/demographic A. Addresses public health/safety, ✓Ifyes: ❑' Community cam:ems exkts around conditions. B. Service improvements, ✓all that apply: El Access to RlQuality of ❑Quantity of E. Operational efficiency and leveraging opportunities: Results in net decrease in operating cast and Improves services. Has no reduction ofcorutructlon casts. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: El WA WA F. Fosters inter -departmental collaboration ❑ rv/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept Priority Detolls:lmproveroadwaysafery, ❑i Comm. value Details: Enhances quolity oflifeforresldents. COMMUNITY VALUES, check et 2Genera[Plan Detalls: Ohl. 22:Safetyfar vulnerable users. ❑+Admen Prloriry Details: Provide matchm9fundsto/everage non-Countyfunding sources. least one and all that apply, ❑+CDP Details. Communitysofety. ❑mulaHas.mmit Detalls: provide details: ❑Other Plans Detalls: dditional info: 13. cry. MATCHING FUNDS REQ'D? ✓if Yes: 1711 DESCRIBE: 80% Federal 20% County 34. LEGAL MANDATE?✓if Yes: ❑ JDESCRIBE, 15. SUSTAINABILTTY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑ Promotes energy and resource conservation R1 Reduces hazard risk ❑Preserves/protects our natural/cultural env. ❑Cost benefit analysis 21 Promotes economic vitality ❑+ Strengthens and sustains our community Additional info: 26. PROJECT READINESS, Vail E] Project currently underway ❑ Previously Appropriated O Stoffavailable to manage project ❑Eaernalfunds/resources ready to proceed that apply: ❑Identified andrequested operating budgetneeds ❑+ Can realistically encumberfunds Listphases already completed: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (notlapsed This Regoes[, FY26F2Z.'s, FY 27.28 FY 28-29 FY29.30 FY 30.31 FY 31-32 Beyond Years TOTAL: Planning land Acquisition Design/Survey Construction -°i20;000 $20,000 TOTAL'.1 $20,000 18.0&M COSTS x$1000: �aace:rfr=" 19. FUNDING SOURCE(x$3000: s w -ate _ __ " w -- .� °. a •` �. Cty G.O. Bond - `:-r14000 $4,000 State Revolving Fund State CIP -�^-- -, - Federal $16,000 Private (Grants) } CBA (Fair Share, Park Dedication, etc) s Other Cry Fund -(describe) TOTAL: ;^-$20,0061 $20,000 (This Page Intentionally Left Blank) County of Hawai i PROJECTDATA/FINANCIAL IMPACFSTATEMENT Fiscal year 2026 - 2027 1. DEPARTMENT AND DIVISION: DPW- Engineering Division 2. SUBMTTTER: Alan Keane Thompson DATE: 1/20/2026 3. PROJECT NAME: DPW-Ka'ahakini Stream Bridge 129-1] Replacement 4. LOCATION (COUNCIL DISTRICn: 1 S. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK/COP PLANNING AREA: 2-8-04,09 / Hamakua 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 0 8. PROJECT ELIGIBILITY, ✓ all ❑Land acquisition 21 Infrastructure improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: ❑ Nonrecurring rehabilitation ❑ Planning, feasibility, eng., or design study ❑ Information/communications tech. 2 High ❑ Mad. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: Project will replace the existing bridge superstructure with a similar superstructure on new abutments. Bridge is currently closed to traffic. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: ❑ N/A A. Addresses public health/safety, ✓if Yes: O Reduces nsk o f a documented hazard. B. Service improvements, ✓all that apply: 0 Access to ❑+Quality of El Quantity of E. Operational efficiency and leveraging opportunities: Resuloinnetincremein operating cost but improves services. Has no reduction of construction cask. C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: ❑' Necessary repair/maintenance/replacement. F. Fosters inter -departmental collaboration 'If Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ ❑+Dept Priority Details: Assessment and repairs requbedbyState and Fedemlprogmms. MComm. Value Detalb. Enhances quality of llfeforresidents. COMMUNITY VALUES, check at ❑+General Plan Demils:obJ. 23: Mainminpublk vansportsystem. Dadmin Priority Details: Provide matchingfunds to leverage non-counryfundingsources. least one and all that apply, ❑+CDP Details:Communirysafety. QMuluHarordMll Details: provide details: ❑other Plans Detalls: Additional info: 13. Cry. MATCHING FUNDS REQ'D?✓if Yes: ❑ IDFSCRIBE, 100%Federal 14. LEGAL MANDATE? 'if Yes: ❑ IDESCRIBE, 15. SUSTAINABILITY FOCUS, ✓all that apply: I El Promotes energy andresource conservation Provide additional information as appropriate: ❑ Cost benefit analysis 12 Reduces hazard risk EjPreserves/protects our notural/cultural env. ❑ Promotes economic vitality ❑ Strengthens andsustains ourcommunity [Additional info: 16. PROJECT READINESS, ✓all ❑, Project currently underway ❑ Previously Appropriated O Staff available to manage project ❑ External funds/resources ready to proceed that apply: ❑Identifledandregvestedopero[ing budgetneeds ❑' Can realistically enCumberfunds List phases already completed: Additional in 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed Thf;Ret�BesY s-FY26.27''= FY27-28 FY28-29 FY2930 FY3031 FY31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey Construction '=-0110,000 qln,(X)ol TOTAL:?T".?510,000` $10,000 is. 0 & M COSTS (x $1000): 29. FUNDING SOURCE(x$1000: ., , m P®... S _ Cry G.O. Bond State Revolving Fund State Cip federal 0-'10'000' $10,000 Private (Grano) CBA (Fair Share, Park Dedication, etc) 0ther Cty Fund -(describe) TOTAL: w$1000D. $10.00 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 -1027 1. DEPARTMENT AND DIVISION: DPW- Engineering Division 2. SUBMITTER: Alan Keane Thompson DATE: 1/20/2026 3. PROTECT NAME: DPW -Four Mile Creek Bridge 122-7] Reconstruction 4. LOCATION (COUNCIL DISTRICT): 3 5. COUNCIL BENEFITDISTRICT(S): 3 16. TMK/CDP PLANNING AREA: 2-4-04/S. Hilo 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 6,000,000 B. PROJECT ELIGIBILITY,✓all 12 Land acquisition Dlnfrastructureimprovemen[ ❑Newbldg., stmaure, oraddition 9. PROJECT URGENCY/NEED,✓one: ihatapply: ❑Nanrecurringrehabilita[ion Oplanning,feasihiliry, eng.,ardesign study ❑Information/communications tech. 121 High ❑Med. ❑low 10. PROJECT/PROGRAM DESCRIPTION: This project will design and constructa new reinforced concrete bridge to replace/reconstruct the exlsting4 Mile Creek Bridge.TheexistingoneJane100-yearoldbrWgelsa historical bridge and its historic features will be retained while mW raltingand implementing the necessary structural and safety improvements. Hydmlogk and hydaillcstudies will determine its associated upstream and downstream channel improvementsto ensure its 100-yearstorm design conveyance opacity. The intersection at Haihai Street and Kilauea Avenue will be analned to determine what improvements will be needed to be Implemented in order to accommodate the proposed new two lane bridge, all In accordance with AASHT0 Desin. 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: El Addresses coticipatedfuture need. A. Addresses public health/safety, ✓if Yes: 0 Reduces risk of a documented hazard. B. Service improvements, Vail that apply: 21 Accessto ElQualityof ❑Qunntityof E. Operational efficiency and leveraging opportunities: Resullsionetiacrease in operating cost but improvessemires. Has no reduction ofcomtruction costs. C. Repair/maintenance/replacement of acility/infrastructure/building, ✓if Yes: 0 Necessary repair/maintenance/replacement per maintenance plan/schedule. F. Fosters inter -departmental collaboration ✓ifyes: 0+ Fire Additional info: 12. LONG RANGE PLANS/ 2+OepLPtiorhy Derails: Bridge andsvrrounding area needs impmvementsfarsaJeryandincrevse In opadty. Qfomm. Value Debods:BrIdgeandsurmunding area needs lmph,waentsforrofetycndfncreaseinopodry. COMMUNITY VALUES, aheckat General Plan Oetalls:Obj.33: Maintain public tronsportsystem. QAdmlO Priority 0etalls:Pro/M isafocusJorbath [he State and County. least one and all that apply, pcDP Datnih: I C]MultiHatardMit 0etalls: provide details: Other Plans Detalls: dditional info: 13. CTY. MATCHING FUNDS REQ'D7 ✓if Yes: 21 DESCRIBE: State Provide $12M (2/3 cost), County provide $6M (1/3 cost). 14. LEGAL MANDATE? 'If Yes:❑ DESCRIBE: 15. SUSTAINABILTTY FOCUS, ✓all that apphr:--]_g Provide additional information as appropriate: Promotes energy and resource conservation O Reduces hazard risk 21 Preserves/protects our natural/culturalenv. Cost benefit analysis ❑ Promotes economic vitality ❑ Strengthens and sustains our community Additional info: 16. PROJECT READINESS,✓all 2, Project currently underway O Previously Appropriated OStaJJavailable to manage project OFxternalfunds/resources ready to proceed that apply: Oldentifled and requested operating budget needs 0 Can realistically encumberfunds List phases already completed: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (notlapsed ThISRquest, F1i 26$T5 FY27.28 FY28-29 FY29-30 FY30.31 FY31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey Construction °,e'48,000 $18,000 TOTAL: $18,000 18. O & M COSTS (x $1000): 19. FUNDING SOURCE(x$1000:.-se Cty G.O. Bond 6;DOD, $6,000 State Revolving Fund State CIP '^"12'0& $12,000 Federal`-'^l"i Private (Grants) d CBA (Fair Share, Park Dedication, etc) Other Cty Fund - (describe) �-r 1 - - TOTAL:1 $18,000 $ (This Page Intentionally Left Blank) FIRE DEPARTMENT DANIEL VOLPE, TEMPORARY FIRE CHIEF 81 (This Page Intentionally Left Blank) 82 Department: FIRE SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 201E-2027 PRIORITY PROJECT 2026.27 FY FUNDING in thousands FUNDING FORECAST BY FISCAL YEAR (In thousands) TO TAL ESTOA PROJECT COST County G.O. Bond State Federal Private" CBA, Other'. Prior Funds Allotted °"ys"=°,`Tin iIss lRe past, 202627r 2027-28 2028-29 2029-30 2030-33 2031-32 Beyond years oa 1 FIRE -NFPA 2951{ mpllant PPE Emactor Installation 275 d 3,300 3,575 2 FIRE-Southkohala Rm Stationand Police Substation Emorgenq Generator Replacement 175 }7 175 3 FIRE -Gail.. Firc Sf.don Emergemy Generaor ReDlecemmt 175 ��{' 175 175 4 FIRE-Laupahoehoe rare Station Emergency Generator Replacement 175 '3us` p"elli. 175 5 FIRE-aealakekua Rm Station and police Substation Emergenry Generator Replacement 175 ,"j�fptJTS; 175 6 FIRE -Hawalian Paradise Pad Fire Station Dormitory Extension 1,500 1500 7 FIRE -Maintenance Shop -New Facility 66 6" %66 1500 2.500 2,500 8,no B FIRE- Ycaau Fire Is Police Station-NearFatlllty 2,M 5,000 5,000 5,000 17,000 9 FIRE- Central Fire Station - Now Facility - 750 2,500 25Do 7.500 8,IIO 10 FIRE- Honobb Fire Station- Now Facility - 750 2,500 2,500 2,500 9,25a 11 FIRE- Hawallan Paradda Park - Rim A PPmms Building °� 300 1 $W 1,wo 12 FIRE- naau Fire Station tempting 95 750 935 13 FIRE -Central Fire Slid.. (Complete Rehabilitation) h, ,1 j 31000 3,000 3,000 2,000 ll,000 14;i%W;ae:a. 15 TOTAL 4,541 684 ,SYS 12,300 15,g85 27.750 Bwo 10.1 61,160 Created an Ian Chadwick • Private: Foundation Grants Data: 1/21/2026 •• Community Benefit Assessment: FalrShare, Park Dedlcation, Etc Other. GET, Fuel Tax and other non-bondsources (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Fire 112. SUBMTTTER: Ian Chadwick DATE: 12/30/2025 3. PROJECT NAME: FIRE- NFPA 1851 Compliant PPE Extractor Installation . LOCATION (COUNCIL DISTRICT): Various S. COUNCIL BENEWDISTRICT(S): Various 6. TMR/CDP PLANNING AREA: Various 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 275.000 S. PROJECT ELIGIBILITY, ✓ all 10 Land acquisition Infrastructure improvement p+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: I ❑ Nonrecurring rehabilitation UJ Planning, feasibility, eng., or design study 10 Information/communications tech. [21 High ❑ Med. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: This project will ensure that we thoroughly clean our firefighter turnout gear, increase safety for our first responders, mitigate rising firefighter cancer rates and exposure, and become compliant with the NFPA 1851 guidelines for turnout gear cleaning. Improvements will be made to our facilities to accommodate the 17 extractors that were funded by a federal grant. 31. PROIECTJUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: 21 Fills gap In current services. . Addresses public health/safety, ✓if Yes: 121 Reduces risk of a documented hazard. S. Service improvements, ✓all that apply: 0 Access to El Quality of j]Quantity ofE. Operational efficiency and leveraging opportunities: Results In net decrease In operating cost and improves, services. N/A C. Repair/maintenance/replacement of facility/infrastructure/building. ✓ifyes: Necessary repair/maintenance/replacement. F. Fosters inter -departmental collfbor tion❑ Fire Additional info: These extractors could be used by any county department that has contaminated clothing and/or PPE that needs to be cleaned. 12. LONG RANGE PLANS/ (]+Dept. Prlariry i'dwils:Thlsprolect 9 essential to ensure the safety ofourpersonnel and thepublic. ❑[arum. value Details: COMMUNITY VALUES, the[k at �Generol Plan Details: �Admin Priority Details: least one and all that apply, j]cOP Detalls: ❑Multifferrd Dem11s: provide details: ❑Other. Plans Detolls: ❑Mltlaatlon Plan Details: Additional info: 13. Cry. MATCHING FUNDS REQ D7 ✓if Yes: OTDESCRIBE: 14. LEGAL MANDATE]✓if Yes: L-IJ OESrABE;Tbapnerd deNd..,eofOSWAnMion Slaihl afthe OSHA[tl,Wh" requires employerato preadea xohphce he. form remeMxd havdaNat.r... de o,fikl to..,,death orsedaus Physical ham. 15.SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑ Promotes energy and resource conservation 0+ Reduces hazard risk �+ Preserves/protects our naturatIcultural env. 10 Cost bend analysis ❑ Promotes economic vitalityI ❑Strengthens and sustains our community Additional info: 16. PROJIECTREADINESS, ✓all 0' Project currently underway (]+ Previously Appropriated 2' Staff available to manage project ❑ Externalfunds/resources ready to proceed that apply: �+Identifed andrequested openting budget needs �+ Can realistically encumber funds Ustphases already completed: dditional info: Project is currently in Planning phase with Epi Consultants. 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed This Request; FY 26=2`/�^ FY27.2 FY 28-29 FY 29-30 FY 30-31 FY 3132 Beyond Years TOTAL: Planning Land Acquisition Design/Survey 275_ $275 Construction 3.300 $3,300 TOTAL: * $3,575 18. O & M COSTS x $1000): 19. FUNDING SOURCE x$3000): Cty G.O. Bond ( _ -'" kO---275$ ;. �� 3,300 '® m a°, a .. A _ , g - . elm ,M% $3,575 State Revolving Fund a -- StateClP Federal Private (Grants) dsr' CBA (Fair Share, Park Dedication, etc):--"=€:ilw"'7:9i; Other Cry Fund - (describe) ' "'$275; $3,300 $3,575 (This Page Intentionally Left Blank) County of Howai i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026-2027 1. DEPARTMENT AND DIVISION: Fire Z.6DBMITTER: Ian Chadwick DATE: 12/30/2025 3. PROJECT NAME: FIRE -South Kohala Fire Station and Police Substation Emergency Generator Replacement 4. LOCATION (COUNCIL DISTRICT): 9 S. COUNCIL BENEFIT DISTRICr(5): 8,9 16.TMKICDP PLANNING AREA: 6-MG1:055/5. Kohala 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 175,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition infrastructure improvement 0 New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: 2 Nonrecurring rehabilitation I ❑' Planning, feasibility, eng., or design study 1 ❑ Information/communications tech. El High ❑ Med. ❑ Low 10. PROJECr/PROGRAM DESCRIPTION: The emergency generator that supplies power to the South Kohala Fire Station and police substation is out of commission. This hampers our ability to receive time -sensitive calls for service during a power outage. It should be noted that this station is located in a Hawaiian Electric Public Safety Power Shutoff location. This project will provide us with a replacement emergency power backup generator. 11. PROJECTIU5TIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑ N/A A. Addresses public health/safety, ✓if Yes: ❑' Lack ofdaameated hazard but safety concern exists. B. Service improvements, ✓all that apply: ❑O Accessto ❑+Qualityof ❑Quantityaf E. Operational efficiency and leveraging opportunities: N/A N/A C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: 2Project will restorefull operations to asset. F. Fosters inter -departmental collaboration "if Yes: ❑' Police Additional info: The backup generator will supply emergency power to the Fire Station and the Police substation. 12. LONG RANGE PLANS/ ODepc Ptlor" Derails: Provldeallhazardemergencyservices to residents and visitors. ❑fumm. Value Details. COMMUNITY VALUES, check at ❑aeneralplan letaib: ❑Admin Priority Details: least one and all that apply, ❑CDP Details: ❑WItMazard Details: provide details: ❑ other Plans Derails: ❑Mitipoeion Plan Details: dditional info: 13. Cry. MATCHING FUNDS REQ'D?✓if Yes: ❑ DESCRIBE: 114. LEGAL MANDATE?✓if Yes: ❑ (DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy and resource conservation Provide additional information as appropriate: ff Cost benefit analysis ❑+ Reduces hazard risk ❑Preserves/protects our natural/cultural env. ❑ Promotes economic vitality ❑+ Strengthens and sustains our community [Additional info: 16. PROJECT READINESS,✓all ❑ Project currently underway ❑ PreviouslyApproprioted ❑Staff available to manage project ❑Esternolfunds/resources ready to proceed that apply: ❑Identifedondnequestedop.ting budgetneeds ❑ Can realistically encumberfunds Listphoses already completed. Additional info: 17. EXPENDITURE PHASING (x$3000): Prior Funds Allotted (notlapsed) Thls Retjue!E 41126.27' FY27.28 1 FY28.29 1 FY29.30 1 FY30.31 1 FY31.32 Beyond 1 Years I TOTAL: Planning ,.,_rt,;,:'se•;:„;4 Land Acquisition s r - Design/Survey >.vr $25 Construction am'SSdi $150 TOTAL: - =i=`-r{$175t $175 18.0&MCOSTS x$1000: r °EF_E 41 19. FUNDING SOURCE (x $3000: Cry G.O. Bond � � :.W,w'��� mi-ROM i;iSi;;R,",.5175� e $175 State Revolving Fund` State CIP T7 Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) ""-""t`°'"s OtherC Fund - (describe) TOTAL: $375 n (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACrSTATEMENT Fiscal Year 2026-2027 1. DEPARTMENT AND DIVISION: Fire Z. SUBMFTTER: Ian Chadwick DATE: 12/30/2025 3. PROJECT NAME: FIRE- Kailua Fire Station Emergency Generator Replacement 4. LOCATION (COUNCIL DISTRICT): 8 S. COUNCIL BENEFITDISTRICT(S): 2,6,7,8,9 6. TMK/CDP PLANNING AREA: 7-4-008:027/N. Kona 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 175,000 t 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition 0 Infrastructure improvement 0 New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: 0 Nonrecurring rehabilitation 0 Planning, feasibility, eng., or design study ❑ Information/communications tech. 0 High ❑ Med. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: The emergency backup generator that supplies power to the Kailua Fire Station is out of commission. This hampers our ability to receive time -sensitive calls for service during a power outage. This project will provide us with a replacement emergency power backup generator. , 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bidg. ✓ifyes: ❑ N/A A. Addresses public health/safety, ✓ir Yes: O Lackofdacumentedhazardbutsaferyroncern .1sts. B. Service improvements, ✓all that apply: 21 Access to MQuality of ❑+Quantity of E. Operational efficiency and leveraging opportunities: N/A N/A C. Repair/maintenance/replacement of acility/infrastructure/building, ✓if Yes: � Project will restorefull operations to asset. F. Fosters inter -departmental collaboration ✓if Yes: ❑ N/A Additional Info: 12. LONG RANGE PLANS/ ❑+Dept Prloriry Details: Provide allhatardemergencyservices to residents and visitors. ❑Comm. Value Details: COMMUNIT9VALUES,checkat ❑General Plan Details: ❑Admin Pdorlry Details: least one and all that apply, ❑CDp Details: ❑Multi Hazard Detalls: provide details: ❑other Plans Detalls: ❑Mitfpatbn P/an Detalls: Additional info: 13. MY. MATCHING FUNDS REQ'D?✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: ❑Promotes energy and resource conservation Provide additional information as appropriate: ❑Costbenefit analysis O Reduceshozard risk - ❑Preserves/protects our natural/cultural env. ❑ Promotes economic vitality ElStrengthens and sustains our community [Additional info: 16. PROJECT READINESS, ✓all ❑ Project currently underway ❑ Previously Appropriated ❑ Staff available to manage project ❑ Erternalfunds/resources ready to proceed that apply: ❑Identified and requested operating budgetneeds Can realistically encumber funds Listphases already completed: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Fund z Allotted (notlapsed) This �tegbesE FY,28r27 ! FY 27.28 FY 28-79 FY 29-30 FY 30.31 FY 3132 Beyond Years TOTAL: Planning ee Land Acquisition Design/Survey ��`25= $25 Construction wi50; $150 TOTAL: 't='t=W'$175' $175 18. O & M COSTS (z $3000): 19. FUNDING SOURCE (x $3000): Cry G.O. Bond ,175 $175 State Revolving Fund"': State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) Other Cty Fund -(describe)`- TOTAL: $175 o (This Page Intentionally Left Blank) County of Hawai4 PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2016- 2027 1. DEPARTMENTAND DIVISION: Fire 112. SUBMITTER: [an Chadwick DATE: 12/30/2025 3. PROJECT NAME: FIRE- LaupBhoehoe Fire Station Emergency Generator Replacement 4. CATION (COUNCIL DISTRICT): 1 5. COUNCIL BENEFIT DISTRICr(S): 1 6. TMKJCDP PLANNING AREA: 3-6-M:031/N. Hilo 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 175,000 8. PROJECT ELIGIBILITY, ✓all ❑ Land acquisition Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: El Nonrecurring rehabilitation OPlanning, feasibility, eng., or design study [AInformation/communications tech. ❑+High ❑Mad. ❑Low 10. PROJECr/PROGRAM DESCRIPTION: The emergency power backup generatorat the LaupBhoehoe Fire Station is out of commission. This hampers ourabilityto receive time -sensitive calls for service during a power outage. This generatoralso provides backup power to theCounty's fiber ring network. This project will provide us with a replacement emergency power backup generator. 11. PROJECTIUSOFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: ❑ N/A A. Addresses public health/safety, ✓if Yes: ❑+ Lackofdocumentedhasardbut safety ccncera exists. B. Service improvements, ✓all that apply: 2 Access to 2 Quality of 2 Quantity of E. Operational efficiency and leveraging opportunities: N/A N/A C. Repair/maintenance/replacement of acility/infrastructure/building, ✓if Yes: ❑' Project will restore full operations to asset. F. Fosters inter -departmental collaboration ✓if Yes: El NIA dditional info: 12. LONG RANGE PLANS/ ❑+Dept. Priority Detalk: Provide all hazard emergencyservices to residents and visitors. ❑rnmm. Value Details: COMMUNITY VALUES, check at❑Genera/Plan Detaik: ❑Admen Pdorlry Detaik: least one and all that apply, ❑DDp Details: ❑Multi Hazard Details: provide details: ❑Other Plans Detolli: ❑Mklgatlon Plan Detaifs: dditional info: 13. CJY. MATCHING FUNDS REQ'D7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? Vif Yes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy andresource conservation Provide additional information as appropriate: ❑ Cost benefit analysis . Reduces hazard risk ❑ Preserves/protects our naturallculturol env. ❑ Promotes economic vitality OStrengthens andsustains our community dditional info: 16. PROJECT READINESS, ✓all ❑ Project currently underway ❑ Previously Appropriated ❑ Staff available to manage project ❑ External funds/resources ready to proceed that apply: ❑Identfedandrequestedoperating budgetneeds ❑ Can realistically encumberfunds Listphoses already completed: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted not la sed This Request. FY 2647 t: FY 27-28 FY 28-29 FY 29-30 FY 30-31 FY 31-32 Beyond years TOTAL: Planning Land Acquisition Design/Survey -"25'1 $25 Construction -„=350, $15 TOTAL: - .3`.` $1755 $175 18. O & M COSTS x $1000 : 19. FUNDING SOURCE (x $1000):7 e s " v9 ' Cry G.O. Bond $175 State Revolving Fund State CIP Federal Private (Grants) CBA(Fair Share, Park Dedication, etc) P - Other Fund -(describe) TOTAL 1 $175 N (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Fire 2. SUBMIITER: [an Chadwick DATE: 12/30/2025 3. PROJECT NAME: FIRE- Kealakekua Fire Station and Police Substation Emergency Generator Replacement 4. LOCATION (COUNCIL DISTRICT): 6 S. COUNCIL BENEFIT DISTRICTS): 6,7 6. TMKICDP PLANNING AREA: 8-2-001:084/S. Kona 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 175,000 8. PROJECT ELIGIBILITY, ✓all 1 ❑ Land acquisition R1 infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓ that apply: 91 Nonrecurring rehabilitation L�l Planning, feasibility, eng., or design study ElInformation/communications tech. 0 High ❑ Med. ❑ Low 10. PROIECr/PROGRAM DESCRIPTION: The emergency backup generator that supplies backup power to the Kealakekua Fire Station and Police substation is out of commission. This hampers our ability to receive time -sensitive calls for service during a power outage. This generator also provides backup power to the County's fiber ring network. This project will provide us with a replacement emergency power backup generator. 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bidg. 'if Yes: ❑ N/A A. Addresses public health/safety, ✓if Yes: 2 Lockofdocumented hazard butsafery concern exists. B. Service improvements, ✓all that apply: 0 Access to ElQuality of ❑+Quantity ofE. Operational efficiency and leveraging opportunities: N/A N/A C. Repair/maintenance/replacement of facility/infrastructure/building, /If Yes: ❑ Project will restore full operations to asset. F. Fosters inter -departmental collaboration ✓if Yes: p Police Additional info: The backup generator will supply emergency power to the Fire Station and the Police substation. 12. LONG RANGE PLANS/ QDept. Pzlonry DettProvide all hazardemergenryservicestoresldentsandyisltors. ❑Comm. Value Details: COMMUNITYVALUES, check at ❑General Plan lails:: Deais ❑Admin Pdariry Details: least one and all that apply, ❑CDP Detalls: ❑Multi Nazard Detalls: provide details: ❑Dther Plans Detalls: ❑Mltfpatlon Plan Detalls: Additional info: 13. Cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILTY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑ Fromotesenergy and resource conservation ❑+ Reduces hazard risk ❑Preserves/protects our natural/cultural env. ❑Costbenefitano/ysis ❑ Promotes economic vitality ElStrengthens andsustains ourcommunity Additional info: 16. PROJECr READINESS,✓all ❑ Project currentlyunderway 10 Previously Appropriated ❑ Stoffavallable to manage project ❑EYternoifunds/resources ready to proceed that apply: ❑Identifed vndrequestedapemtinp budgetneeds El can realistically encumberfund5 Ustphases already Completed: Additional info: 17. EXPENDITURE PHASING(X$1000): Prior Funds Allotted (not lapsed) This Reque f; FY26:T.7,t FY27.28 FY28.29 1 FY29-30 FY30-31 FY31-32 Beyond Years TOTAL: Planning Land Acquisition _ Design/Survey {-s` 29= $25 Construction .-. `trio $150 TOTAL: ";£$175'. $175 18. O & M COSTS (x $3000): IN 19. FUNDING SOURCE(x$10011): ..... .: .. .... ... .. >'.._ e Cry G.O. Bond" ,�T-^°^175'=. $175 State Revolving Fund State CIP Federal rA--7l Private (Grants) F °'a9E CBA (Fair Share, Park Dedication, etc) Other Cry Fund - (describe) TOTAL i-:`;$'asp: °'.$175'. $175 U A (This Page Intentionally Left Blank) County of Howai l PROIEcrDATA/FINANCIAL IMPACT STATEMENT Fiscal year 2026 - 2027 1. DEPARTMENT AND DIVISION: Fire Z. SUBMHTER: Ian Chadwick DATE: 12/30/2025 3. PROJECT NAME: FIRE- Hawaiian Paradise Park Fire Station Dormitory Extension 4. LOCATION (COUNCIL DISTRICT): 4 5. COUNCIL BENEFIT DISTRICT(5): 3,4 6. TMK/CDP PLANNING AREA: 1-5-040:065/Puna 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,500,000 8. PROJECT ELIGIBILITY,✓all ❑ Land acquisition ❑+ Infrastructure improvement 0 New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: ❑ Nonrecurringrehabilitation ❑Planning, feasibility, eng., or design study ❑Information/communications tech. EHigh ❑Med. ❑Low 10. PROJEC7/PROGRAM DESCRIPTION: The current station configuration is meant for two personnel with afire engine. Now that there are five personnel at this station with the addition of an ambulance unit and a brush truckmore living space is needed. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. 'If Yes: ❑+ Needed to continue current level of services. A. Addresses public health/safety, ✓if Yes: ❑+ Elim inates a documented hazard'. B. Service improvements, ✓all that apply: 0 Accessto ❑+Qualityof ❑+Quantity of E. Operational efficiency and leveraging opportunities: N/A N/A C. Repair/maintenance/replacement of facility/infrastructure/building. ✓if Yes: 0 Project wlllres[arefull operations to asset j F. Fosters inter -departmental collaboration ✓if Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ t Priority Details: Provide all hazard emergenryservices to residents andvaitors. ❑Comm. value Detalls: COMMUNITY VALUES, check atenlplan Detalls: ❑Admin Priority Details: least one and all that apply, rOCDP petals: ❑Mukl Nazard Detalls: provide details: er Plans Detalls: ❑ Mitlaatlon Plan Details: Additional info: 13. Cry. MATCHING FUNDS REQ'D7 /if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? Vif Yes: ❑ ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy and resource conservation Provide additional information as appropriate: ❑Costbenefitanalysis O Reduces harardrisk ❑Preserves/protects our natural/cultural env. ❑ Promotes economic vitality ElStrengthens andsustains our community Additional info: 16. PROJECMEADINESS,✓all ❑' project currently underway 2] PreviouslyAppropriated O staff available to manage project ❑Extemolfunds/resources ready to proceed that apply: ❑identified ondrequested operating budAetneeds El Can realistically encumber/ands List phases already completed: Project currently in design phase. dditional info: The project is currently in the Design Phase 17. EXPENDITURE PHASING(X$1000): Prior Funds Allotted (not lapsed Thts Request FY2fi 27". FY27.28 FY 28-29 FY 29-30 FY 3631 FY 31-32 Beyond Years TOTAL Planning Land Acquisition Design/Survey Construction :1;500; $1,500 TOTAL 500° $1,500 18. O & M COSTS (x $1000): ,a 19. FUNDING SOURCE (x $3000: Cty G.O. Bond _.... _ 1}500i �e�,a�:e r-ONE s' $1,500 State Revolving Fund State CIP Federal as 'e '•" Private (Grants) ' CBA (Fair Share, Park Dedication, etc) Other Cry Fund - (describe) L` TOTAL: -=a$1j500�T $1,500 (This Page Intentionally Left Blank) County of Howaiii PROIECrDATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Fire . SUBMITTER: Ian Chadwick DATE: 12/30/2025 3. PROJECT NAME: FIRE- Maintenance Shop - New Facility . LOCATION (COUNCIL DISTRICT): 3 5. COUNCIL BENEFIT DISTRICT(S): Various TMK/CDP PLANNING AREA: 2-1-013:148/5. Hilo f6. 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 66,000 8. PROJECT ELIGIBILITY, ✓ all 0 Land acquisition ❑ Infrastructure improvement 0 New bldg., structure, or addition 9. PROJECTURGENCY/NEED, ✓one: that apply: ❑ Nonrecurring rehabilitation 0 Planning, feasibility, eng., or design study I ❑ Information/communications tech. ❑ High 0 Med. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: With —growing Fleet of apparatus, we have outgrown our current facility, which is also located in a tsunami inundation zone. Fire has recently secured verbal permission to build a new maintenance facility on State land at KMR. Department Of Defense (DOD) leadership is currently working with Board of Land and Natural Resources (BLNR). Once BLNR approval has been obtained, Fire is hopeful the County will enter into a Memorandum of Understanding (MOU) with DOD. 11. PROJECTJUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: O Needed to continue current level ofsemices. A. Addresses public health/safety, ✓if Yes: 0 Ellminites a documented hazard. B. Service improvements, ✓all that apply: 0 Access to 21Quality of 21Quantity of E. Operational efficiency and leveraging opportunities: Results in net decrease In operating cost and improves services. N/A C. Repair/maintenance/replacement of acility/infmstructure/building, ✓if Yes: 0 Assetlikely to cease operating within nw5 to to years. F. Fosteminter-depanmentalcollabumtion ✓if Yes: 0 N/a Additional info: LONG RANGE PLANS/ 12L1east,,e,l,c1.nUidLdPP1y' DOept Priorlry Details: Provide all hazard emergencyservlces to residents andvbitors. ❑tdmm. Value Details: YVALUES, ChetIt at �Geneml Plan Details: QAdmin Priority Details: �DDP Details: ❑MultiHazard Details:ils: otherPlans Details: ❑MltigmianPlan Details:fo: 13. CIY. MATCHING FUNDS REO'D7 ✓if Yes: O DESCRIBE: 14. LEGAL MANDATE]✓if Yes: 0 arscaiez:n.eeo.m dray daose ofasan(Semenslal(11 of OSHx),whmh requires emptaven to orovidea wvnpizm tree from mmrnizm hazams the are ausme oriilerm ausedom orW.ta ohvdai h... 15. SUSTAINABILITY FOCUS, ✓all that apply: O Promotes energy and resource conservation Provide additional information as appropriate: ❑ Cost benefit analysis El Reduces hazard risk ❑Preserves/protects our natural/cultural env. JEJ Promotes economic vitality OStrengthensandsusteins our community - Additional info: 16.PROJECT READINESS, ✓all 2+Prejectcurrentlyunderway ❑ Previously Appropriated ❑ Staff available to manage project ❑Externalfunds/resources ready to proceed that apply: ❑IdenH,edandre uestedo eratfn bud etneeds f q p g g Can realistically encumber funds Uttphases already completed: LondAcquisition Additional info: 17. EXPENDITURE PHASING (X$1000): Prior Funds Allotted notia ed) This Request,I FY 27.28 FY 28-29 FY 29-30 FY30.31 FY31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey 6114 _-. = i°»56$i $750 Construction - - n 2,500 2,500 2,5001 $7,500 TOTAL: $684 "=*.'-` su= $661 $2,500 $2,500 $2,500 $8,250 38.0&MCOSTS x$1000:gig, 19. FUNDING SOURCE(x$1000): _ .. - m .. -s;_ . °' m .. . , Cry G.O. Bond 2,500 2,500 2,500 $7,566 State Revolving Fund r ne mil' State CIP Federal Private (Grants) CBA(Fair Share, Park Dedication, etc) 684 a� $684 Other Cty Fund -(describe) TOTAL: $684 »P"spa:=$66l $2,500 $2,5001 $2,5001 1 $8,250 (This Page Intentionally Left Blank) County of Hawairi MULTI AGENCY- PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. LEAD DEPARTMENT AND DIVISION: Fire 2. SUBMITTER: ]an Chadwick DATE: 12/20/2025 3. PROJECT NAME: FIRE - Kea'au Fire & Police Station - New Facility 4. LOCATION (COUNCIL DISTRICT): 3 S. PARTNER AGENCY/DIVISION(S): Police 6. TMK/CDP PLANNING AREA: TBD/Puna 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000 8. PROJECT ELIGIBILITY, ✓all I 0 Land acquisition ❑Infrastructure improvement ❑� New bidg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: ❑Nonrecurring rehabilitation OPlanning, feasibility, eng., or design study IDlnformation/communicationtech. El High ❑Med. ❑Low 10. PROJECT/PROGRAM Construction of a new fire station to replace the Kea'au fire station. The Kea'au Fire Station is located in a fast growing community, and a new facility that can accommodate DESCRIPTION: additional personnel and apparatus is desperately needed. Additionally, the current station's roof design makes it nearly impossible to prevent water intrusion and mold growth, posing health hazard to employees. The proposal includes a shared facility between Police and Fire. 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: IC. Repair/maintenance/replacement of /If Yes: 21 Asset likely to cease operating within next5 to 10 years. A. Addresses public health/safety, /If Yes: [Z ILack of documentedhazard butsofery concern exists.]facility/infrastructure/building, B. Service improvements, /all that apply: 2 Access to 121Qualityof 2Quantiryo D. New facility/infr./bldg. ✓if Yes: ❑ Needed to wntinue current level ofservices. Additional info: 12. LONG RANGE PLANS/ COMMUNITY VALUES, check at least one and all that apply, provide details: QGenerai Plan Detoils: Provide oil homrdemergencyservices to residents and visitors. ❑Multi Hazard Details: ❑cOP Details: �MitiOation Plan Details: ❑Other Fans Detoils: 33. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: 12] Promotes energy and resource conservation 0 Reduces hazard risk ❑Preserves/protects our natural/cultural env. ❑ Cost benefit analysis ❑+Promotes economic vitality 'Strengthens andsustains ourcommunity, 14. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This Request; Pl' Z6-27 � � FY 27-28 FY 28.29 FY 29.30 FY 30.31 FY 31-32 Beyond Years TOTAL: Planning $500 Land Acquisition Design/Survey 5°.1;500' $1,500 Construction - 5,000 5,000 51000 $15,000 TOTAL:"s"°;',S°$x,000' $5,000 $5,000 $5,000 $17,000 115. FUNDING SOURCE (x $1000): Cty G.O. Bond ° ti1Sh0 • tie"WWOPUMMMMOWN ,.`1,�00s 5,000 5,000 . 5,000 en $17,000 State Revolving Fund - -_ State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) Other Cty Fund -(describe) TOTAL: 7771W $5,000 $5,000 $5,000 $17,000 16. FUNDING SOURCE(x$1000): " _� "�•• "�•�-t7 • • ram m "` �� m Cty G.O. Bond `-�"`a-'• State Revolving Fund State CIP Federal Private (Grants) CBA(Fair Share, Park Dedication, etc) Other Cty Fund - (describe) TOTAL: i +r (This Page Intentionally Left Blank) OFFICE OF HOUSING AND COMMUNITY DEVELOPMENT KEHAULANI COSTA, HOUSING ADMINISTRATOR 101 (This Page Intentionally Left Blank) 102 SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM Department: Office of Housing & Community Development FISCAL YEAR 2026-2027 PRIOR" PROJECT 2026.27 FY FUNDING Iin thousands! FUNDING FORECAST BY F16CALYFAR (in thousands) TOTAL County G.O. Bond State Federal Private• CBA, Other" Prior Funds Allotted M`r,Thifi nest �-P=. R026.27i 202711 112111 2121-11 211011 2031-32 Beyond 6 years E6TIMATEO PROJECT COST 1 OHW-Fa tides Rrpaila/Maivtemnttam R<nontbn L6W SW ;J'.Wu L6W L9W L9W L9W 1,9W 9,SW 2 OHO- Did Hilo Mememl H.Puad henwanana 101000 16jW 19 10,UW 1gCW 46,900 3 DHco- aatala subdimaan inm,"anne 51003 'a3.5'�'-AAo4 B.Wp 4 OHCn- Kamatm Hal Mini wan Rd., Immidrucwre and Hand, Lodo ls'm gil,00p 26,= 6 ONCB-KuwiaB Ylbge-Iamanenr9uppaNve HousNg 201000 70 3o,0on 10,000 W,710 6 0110B-0uli'EAahlwabFe Penew6em 6,000 6,eW is seas 7 OHCU- KalminaNMordable Housing I'm 0,2W .WQ 4,900 Io,1W B OHCO-Affordabb Housi, Plenum& Fea ILWI ,and resign 1,OOo LWO myrcatAilp 1,0001 LOW 1 into 1 1,000 1 1,000 7,000 9 011CB-112 Kahua Wleomu Win1W-PVSntem 9= ? 9.W] 10 OHCO-HF rahua Hale o mu Winl Amfond WneNrbWment 14Ap i lit 0,tl0 11 OHCO- Halhal Affordable Hou9ng Proled 1,003 f,-," rFAF 14,000 ]6,0.m 12 OHCB-'linadd Wadable Housing Project g' iRaco 16,002 am W5 TOTAL ]ajD] 39,630 e,Sft,§,d 63pW la,9W 2$O] 2,9W 2,SW 2W,93n Creamer Kehaulml M. Costa Private Foundation Grants Carr. 10/2026 • Community BenefitAssessments: Fair Sharp Park Oedimtbq Era Other. GET, Fuel Tax and other: dn-bondcou 'g (This Page Intentionally Left Blank) County of Hawai i PROIECTDATA/FINANCIAL IMPACTSTATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENTANDDINISION: Office of Housing& Community Development 2. SUBMIT TER: Kehaulani M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD- Facilities Repairs/Maintenance and Renovation 4. LOCATION (COUNCIL DISTRICT): ALL S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/CDP PLANNING AREA: Various Island Wide 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,500,000 PROJECr B. PROJECr ELIGIBILITY,✓all ❑ Land acquisition �Infrastmcture improvement ❑+ New bldg., structure, or addition 9. PROIECi URGE hat apply: ❑ Nonrecurring rehabilitation OPlannin&feasibility, eng., or design study ❑Information/communications tech. OHigh ❑Med. ❑Low 10. PROJECT/PROGRAM OHCD maintains several facilities throughout the island. Three ofthese facilities are over20years old and require significant renovations, repairs, and maintenance beyond routineupkeep. DESCRIPTION: Repairs, maintenance & renovations projects are medium to large scale and are necessaryto ensure continued project viability. Repairs include resurfacing of roads, ADA compliance, interior unit renovations including energy efficiency fixtures and appliances, photovoltaic systems, and tree trimming. 11. PROJECr JUSTIFICATION &OUTCOME(5), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ Neededto continue current levelofsomices. A. Addresses public health/safety, ✓if Yes: O Reduces risk of a docum en ted hazard. B. Service improvements, ✓all that apply: ❑+ Access to ❑Quality of ❑Quantity of E. Operational efficiency and leveraging opportunities: Results in net decrease in operating cost and maintains services. N/A C. Repair/maintenance/replacement of ✓, ❑' facility/infrastructure/building, if Yes: Necessaryrepair/maintenance/replacement. F. Fosters inter -departmental collaboration ✓If Yes. ❑ N/A Additional Info: 12. LONG RANGE PLANS/ QDepCPriorry Maintains and extends the lUe cy0110jacilities/project ❑Wmm. Value COMMUNITY VALUES, check at 00eneralPlan Section 9, Housing ❑Admin Priority least one and all that apply, ❑cop ❑MulnH.rdMR provide details: ❑0therPlans Additional info: Reduce expenditures on operational budgets to address aging facilities before it becomes a bigger problem. Eliminate temporary and piecemeal faces. 13. CIY. MATCHING FUNDS REWD? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? ✓if Yes: LA DESCRIBE: ADA accessibility as required & DOH requirements (where applicable) 15.SUSTAINABILrtY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑p Promotes energy and resource conservation Reduces hazard risk ❑' Preserves/protects ournotural/cuRural env. 0 Cost benefit analysis O Promotes economic vitality 0 Strengthens ondsustains our community Additional info: Reduce operational costs through sustainable, long-term facility solutions, avoiding temporary and piecemeal fixes that lead to greaterfuture expense. 16. PROJECr READINESS, ✓all ❑, project currently underway ❑ Previously Appropriated 0 Staff available to manage project ❑ External funds/resowres ready to proceed that apply: ❑IdentPed andrequested operating budaerneeds ❑+ Can realistically encumber funds list phases already completed: Additional Info: $500,000 alloted; Trimmed trees, renovation of Kualimano Elderly housing units underway -50 units. 17. EXPENDITURE PHASING (K$1000): Prior Funds Allotted not la sed This Requeit tea - ==��E1'r26:27,: �=e FY 27-28 FY 26-29 FY 29.30 FY 30.31 FY 33d2 Beyond Years TOTAL: Planning Land Acquisition Design/Survey ;z35U 350 350 3501 350 350 1 $2,10C Construction 500 ?=.:„(3&0 1,150 1,15ol 1,1501 1,150 1 1,150 1 $7,400 TOTAL: $Soo 1"-K1'4$:('SoOJ $1,500 $1,500 $1,500 $1,500 $1,500 $9,500 is. 0& M COSTS x $1000): '4r;b-' r z 19. FUNDING SOURCE x $1000):"` Cty G.O. Bond ' �''a'a , Soo 6+ 'Tlzf� Soo< 1,500 1,500 1,500 1,500 1,500 $9,500 State Revolving Fund " State CIP Federal. Private (Grants) CBA(Fair Share, Park Dedication, etc) s" OtherCty Fund- (describe) TOTAL: $500 ?s%' 5s1;500' $1,500 $1,500 $11500 $1,5001 $1,500 $9,50 (This Page Intentionally Left Blank) County of Hawaii PROJECT'DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Office of Housing& Community Development 2. SUBMITTER: Kehaulanl M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD - Old Hilo Memorial Hospital Renovations 4. LOCATION (COUNCIL DISTRICT): 2 S. COUNCIL BENEFIT DISTRICr(5): All 6. TMK/CDP PLANNING AREA: 2-3-026:008 / Hilo 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000 8. PROJECT EUGIBILI71', ✓all ❑Land acquisition Q Infrastructure improvement ❑+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: that apply: ❑ Nonrecurring re habilitation QPlanning, feasibility, eng., or design study ❑Information/communications tech. QHigh ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: This prolea will continue to renovate the Old Hib MemorlaI Hospital building(56,852 square feet) to provide safe and habitable 'white box- public spaces that meets Hawarl County code, State and fed am requirements. The project will Involve plumbing, electrical, mechanical work leg. fire sprinklea fire alarms, and elevatorsystaml, ADA improvements, selective matccation/repWcement of lnterlorwindows to seal the building, new flooring, repalrexterlor finishes and exterior painting. Site work activities will Include soil erosion control, trading, excavation, drainage, and water systems,sewersystem installation, asphalt pavin& and other utilities. Demolition of delapldated workshop buildin& misc. debris and solid waste 11. PROJECfJUSIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ Needed to continue current level ofservices. A. Addresses public health/safety, ✓Ifyu: ❑' Eliminates documented hazard. B. Service improvements, ✓all that apply: ❑+ Access to ElQuality of QQuantity of E. Operational efficiency and leveraging Opportunities: Results in net increase in operating cost but improves services. N/A C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes:. ❑' Necessaryrepair/malnrenance/replacemenr. F. Fosters inter -departmental collaboration ✓ifyes: El N/A Additionalinfo: Federal funds totaling$16.5M have been secured to date for the renovation 12. LONG RANGE PLANS/ QDept. Priority PreservatlonoJpubllcspacesforcommunlrysemkesforres!dents ❑Comm. Value COMMUNITY VALUES, check at Q General Plon Sectlan 9, Housing QAdmin Priority Priorirytomgintgin office spaces Jorpubllc&communityservlcesforresidents least one and all that apply, ❑c0P QMultlHazardMlt Hazardous materials, ADA compliance issues, FlreSferylssues provide details: QDther Plans Priority #1In the Homelessness& Housing Strategic Roadmrp Additional info: Reduce expenditures on operational budget to address aging facilities before it becomes a bigger more expensive problem. Eliminate band aid fines. 13. Cry. MATCHING FUNDS REQ D7 ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE]✓if Yes: Q I DESCRIBE: ADA accessibility as required & DOH requirements(where applicable) 35. SUSTAINABILffY FOCUS, ✓all that apply: Provide additional information as appropriate: El Promotes energy and resource conservation Q Reduces hazard risk ❑+ Preserves/protects our natural/cultural env. Q Cost benefit onalysis Q Promotes economic vitality Q Strengthens andsustains ourcommunity Additional info: Reduce operational costs through sustainable, long-term facility solutions, avoiding temporary and piecemeal fixes that lead to greaterfuture expense. 16.PROJELTREADINESS,✓all Q project currently underway 10 Previously Appropriated Q Staffavailable tomanageproject 21Wernalfunds/resources ready to proceed that apply: ❑Identified andrequestedoperating budget needs Q Can realisticallyencumberfunds Listphases already completed: EIS completed; 16.5M infederolfunds received Additional info: Re -roofing, hazmat removal, and tree trimming is currently out for bid ($16.5M) 17. EXPENDITURE PHASING (X$1000): Prior Funds Allotted not lapsed Thls liegvest; -.FY26217-i: N27-28 FY28-29 FY29-30 FY30.31 FY 31.32 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey Construction 16,5001 iA'7'r+10"000'1 10,0001 10,0001 1 $46,500 TOTAL $16,S00 I "$se$16,o00' 1 $10,0001 $10,000 $46,500 18. O & M COSTS (x $1000): 19. FUNDING SOURCE(x$1000: Cty G.O. Bond .- ... - '-emalm a e e 10,000 �� m 10,000 -. ...__ $30,000 State Revolving Fund 'ss";w= State CIP 'moo' %%i Federal 16,500 L w'= - $16,500 Private(Grants) CBA (Fair Share, Park Dedication, etc) Other Cty Fund - (describe) - TOTAL: $16,500 ¢'m'n$10.000i $10,000 $10,000 $46,500 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACTSTATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENTAND DIVISION: Office of Housing & Community Development 2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026 3. PROIECT NAME: OHCD-'0'ekala Subdivision Infrastructure .LOCATION (COUNCIL DISTRICT): 1 5. COUNCIL BENEFIT DISTRICT(5): All 6.TMK/CDPPIANNING AREA: 3-9-001:034 / H5mdkua 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 5,000,000 8. PROJECT ELIGIBILITY, ✓all ❑Land acquisition Infrastructure improvement ❑ New hldg., structure, or addition 9. PROJECT URGENCY/NEED, --one: that apply: ❑ Nonrecurring rehabilitation OPlanning,feasibility, eng., or design study ❑Information/communications tech. 12High El Mod. El Low 10. PROJECT/PROGRAM DESCRIPTION: OHCD expects to receive permits to install roads and infrastructure for the'0'6kala Affordable Housing Project The installation of a road and infrastructure for this subdivision will allow for the development of about 30 homes by OHCD and non-profit self-help affordable housing developers. 11. PROJECr1USTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: 0 Fills gap in current servicesfor underserved area/demographic A. Addresses public health/safety, ✓ifyes: 121 Community concerns exists around conditions. B. Service improvements, ✓all that apply: 21 Access to []'Quality of pQuantity ofE. Operational efficiency and leveraging opportunities: No change In operating costs. N/A C. Repair/maintenance/replacement of acility/infrastmaure/building, ✓ifyes: N/A F. Fosters inter -departmental collaboration ✓ifyes: 1 DPW Additional info: 12. LONG RANGE PLANS/ (]aept.Priority Creating affordable housing opportunities is the Department's mission ❑rumm. value COMMUNITY VALUES, cheek at OGemralPlan Section 9, Housing DAdmin Priority Affordable housing andinfmstructure least one and all that apply, EICDP Identify andfacilitare use ofsuimbfepublic landsforogordable housing EIMulu HamdMit provide details: ❑DtherPlans Additional info: OHCD has identified this County -owned parcel as suitable a suitable location to build an affordable housing subdivision in this Council district. 13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? -'If Yes: ❑ IDESCRIBE, 15. SUSTAINABILFTY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑ Promotes energy and resource conservation ❑ Reduces hazard risk OPreserves/protects our naturaVicultural env. El Cost benefit analysis 10 Promotes economic vitality O Strengthens and sustains our community Additional info: Stable housing supports long-term health and safety, sustainable and resilient households, and stronger communities for generations to come. 16. PROJECT READINESS, ✓all (] Project currently underway ❑ Previously Appropriated 0 Stof/available to manage project ❑ External funds/resources ready to proceed that apply: Dldentifed andrequestedopemting hudgerneeds p Can realistically encumberfunds LJstphases already completed: Feasibility study Additional info: Completed a feasibility study for building affordable housing at this site; completed road and infrastructure design. Ready to bid. $4M alloted then realloted to cover renovation of OuII VMTP. 17. ERPENDITURE PHASING (K$1000): Prior Funds Allotted not la ed) This Request_ FY 27.28 FY 28-29 FY 29-30 FY 30.31 FY 31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey - ConstructionNA =''5.0w, $5,000 TOTAL: l'° 35,0001 $5,000 18. 0 & M CO5T5 x $1000): pair... °":a��,"s- 19. FUNDING SOURCE(x$1000): Cty G.O. Bond "�"a:r`$;000l $5,000 State Revolving Fund a - StateClP Federal Private (Grants) CBA(Fair Share, Park Dedication, etc) a -" Other C!y Fund - (describe) t - TOTAL: "==`$5;0001 $5,000 o (This Page Intentionally Left Blank) County of Hawai l PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 Aehaulani DEPRTMENT AND DIVISION: Office of Housing& Community Development 2. sUBMrITER: K M. Costa DATE: 1/5/2026 F1. 3. PROJECT NAME: OHCD - Kamakoa Nui Mini Loop Rd., Infrastructure and Housing . LOCATION (COUNCIL DISTRICT): 9 5. COUNCIL BENEFITDISTRICT(S): 5,6,7,8,9 16. TMK/CDP PLANNING AREA: 6.M41:002 - 006,:012 / South Kohala 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 11,000,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition Infrastructure improvement (] New bldg., structure, or addition 9. PROJECT URGENCY/NEED, -one: that apply: ❑ Nonrecurring rehabilitation 0Plannin&feasibility, eng.,or designstudy ILIInformation/communication tech. 12High ❑Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: OHCO will construct the next infrastructure phase for the Caunty-ownedsubdivision which allows for single-family units for workforce housing in Waikoloa.Infrastructure includes roads, sidewalks, curbs, gutters, all related utilities, and housing. A request for proposal will be issued forthese parcels once the infrastructure is constructed with CIP FY 2024-25 funds forthis subdivision. This subdivision will meet the affordable workforce housing demand in this area for families with income up to 140%AML This request includes any and all related costs. 12. PROJECTJUSTIFICATION&OUTCOME(5), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: O Fills gap in cunnentservicesfor anderserved area/demographic A. Addresses public health/safety, ✓if Yes: El Communiryconcerns exists around conditions. B. Service improvements, ✓all that apply: 2 Access to ElQuality of ❑Quantity of E. Operational efficiency and leveraging opportunities: I No change In operating costs. N/A C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: WA F. Fosters inter -departmental collaboration ✓if Yes: O DPW Additional info: OHCO completed a master plan in 2022. OHCD is awaiting DPW permits to build the mini loop road and advertise the construction bid. 12. LONG RANGE PLANS/ Priority Creating afjordoblehousing opportunitirs is the Department's misslan �comm.Value COMMUNITY VALUES, check aral TE]DepL P/an sectlan 9, Housing QAdmlaPiority Affordablehousinginfrastructureandhousinglsoprlolty least one and all that apply, Ident✓h ondfuciitate useofsuitablepubliclands, expandafJordable housing ElMultmazard Mir provide details: ❑other Plans Additional info: 13. CJY. MATCHING FUNDS REWD?✓if Yes: DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: p Promotes energy and resource conservation Reduces hazard risk OPreserves/protects our natural/culturol env. [2 Cost benefit analysis i] Promotes economic vitality 0 Strengthens and sustains our community Additional info: Stable housing supports long-term health and safety, sustainable and resilient households, and stronger communities for generations to come. 16. PROJECT READINESS, ✓all R] Project currently underway ❑ Previously Appropriated (] Staff available to manage project El Eeternalfunds/resources ready to proceed that apply: Dldentifiedandrequestedoperatrng budgerneeds D+ Can realistically enrumberfunds Ustphases already completed: 91 homes,park, mini loop rand planning and infrastructure design Additional info: Ready to bid mini loop road; Allocateded $122M; plan to request addhonal $8M this FY.Received $5.41A AHP, and $9.6M home sale receipts 17. EXPENDITURE PHASING (%$1000): Prior Funds Allotted (notlapsed) This Request FY25-27%' FY27.28 1 FY28-29 1 FY29d0 FY 3631 FY31-32 Beyond6 Years TOTAL: Planning 500 $500 Land Acquisition Design/Survey S00 $500 Construction 122 10,000 $10,122 TOTAL: $122 '-!>"".S11;OOOi $11,122 18. 0 & M COSTS (x $1000): 19. FUNDING SOURCE (x $1000: Cty G.O. Bond 122 1111,000i $11,122 State Revolving Fund -- State CIP 1 Federal Private (Grants)--'=_'="�""'' CBA (Fair Share, Park Dedication, etc) Other CtV Fund -(AHP and Revolvin Fund) 14,998 'i`emeda..::.=s.- $14,998 TOTAL: 515,120 FtAS11100. $26,120 (This Page Intentionally Left Blank) County of HOWaI l PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Office of Housing & Community Development 2. SUBMfTTER: Kehaulani M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD - Kukuiola Village - Permanent Supportive Housing 4. LOCATION (COUNCIL DISTRICT): 8 5. COUNCIL BENEFIT DISTRICT(5): 6,7,8,9 6. TMK/CDP PLANNING AREA: 7.4-020:004 / Kona 7. TOTAL COUNTY FUNDS NEEDED THIS FY. 20,000,000 8. PROJECT EUGIBILITr,✓all El Land acquisition 2, Infrastructure improvement 0 New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: ❑ Nonrecurring rehabilitation ❑+ Planning, feasibility, eng., or design study ❑Information/Communications tech. 2 High ❑ Med. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: The Kukulola Project continues the development of 19.1 acres consisting ofthe Kukuiola Shelter and the Kukuiola Permanent Supportive Housing Project with the following components: infrastructure and 50single-family units with kitchen and bathroom and a multi -purpose center for service providers, laundryservice, meeting and gathering space, storage and tool shed, solar hot water system and PV system. These funds are needed to supplement/replace federal funds received to coverall of the planned units. 11. PROJECT JUSTIFICATION &OUTCOME(5), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: ❑+ Fillsgap in currentservlcesfor underserved area/demographic. A. Addresses public health/safety, "if Yes: 2 Coro moot ty cancems exists around conditions. 8. Service improvements, ✓all that apply: 0 Access to ❑+Quality of ❑Quantity of E. Operational efficiency and leveraging opportunities: Resultsinnerincreasefn operating cost but fmprovesservices. N/A C. Repair/maintenance/replacementof facility/infrastructure/building, ✓if Yes: ❑ N/A F. Fosters inter -departmental collaboration ✓If Yes: ❑ N/A Additional info: 12. LONG RANGE PLANS/ QDept.Prforfty Buildsnewpermanentsupp nivehousingforhomeless&lowincomeresidentt ❑Comm. Value COMMUNITY VALUES, check at 2 General Plan section 9, Housing ❑+Admin Priority PHorlrytoIncrease af/ardable housing in the County least one and all that apply, ❑CDP ❑MultmaiardMR provide details: ❑+Other Plans lPriority#2in the Homelessness& Housing5tmtegic Roodmop Additional info: 13. CTY. MATCHING FUNDS REQbT ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? Vif Yes: 0 DESCRIBE: Fair Housing Act and ADA accessibility as required 15. SUSTAINABILTTY FOCUS, ✓all that apply: Provide additional Information as appropriate: O Promotes energy and resource conservation ❑ Reduces hazard risk EjPreserves/protects our natural/culturaf env. ❑+Cast benefit analysis 0 Promotes economic vitality 05trengthens and sustains our community Additional info: Housed individuals and families reduces homelessness and allows for improved health and safety, while promoting economic improvements within a household, and strengthening our communities. 16. PROJECT READINESS,✓all ❑' project currently underway ❑ Previously Appropriated O Staff available to manage project I ❑Wernalfunds/resources ready to proceed that apply: ❑ Identified and requested operating budget needs ❑+ Can realistically encumberfundt Litt phases already Completed: Road completed; Shelter currently under vertical build now; plans and specifications for permanent supportive housing complete with permits; ready to bid permanent supportive housing Additional info: Ready to Bid 17. EXPENDITURE PHASING (%$1000): Prior Funds Allotted (notlapsed) Thrs Request; FY26r27„'i= FY27.28 FY28-29 FY29-30 FY30-31 FY31-32 Beyond6 Years TOTAL: Planning Land Acquisition Design/Survey ]710 r $710 Construction 20,000 10,000 $30,000 TOTAL: $710 $30,710 18. O & M COSTS (x $1000): 19. FUNDING SOURCE x$3000: Cty G.O. Bond 710 20,000 ,... 10,000 . e - &'+ Ada $30,710 State Revolving Fund-`'�1+='=`�":�=' State ClPtsg Federal ,T>' Private (Grants) e�s€ CBA (Fair Share, Park Dedication, etc) OtherCty Fund -(describe) �`�t:�"°-:'�k' TOTAL: $710 '�$20,000: $10,000 $30,710 (This Page Intentionally Left Blank) County of Hawaii PROJECrDATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Office of Housing& Community Development 2. SUBMIITER: Kehaulani M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD-'Ouli'Ekahi Cottage Renovations 4. LOCATION (COUNCIL DISTRICT): 9 S. COUNCIL BENEFIT DISTRICl`(S): 9 116. TMK/CDP PLANNING AREA: 6-2-015:045/South Kohala 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 6,000,000 11 S. PROJECT ELIGIBILITY,✓all ❑ Land acquisition Infrastructure improvement El New bldg., structure, or addition 19. PROJECT URGENCY/NEED,✓one: that apply: ❑ Nonrecurring rehabilitation 121 Planning, feasibility, eng., or design study ❑ Information/communications tech. I El High ❑ Med. ❑ Low 10. PROJECT/PROGRAM DESCRIPTION: The'Ouli'Ekahi affordable housing project features 33 cottages that have not been renovated since being built approximately 30 years ago. These aging units need upgrades to meet current code and in 2024 DPW bid this renovation project at$14M. Bidscamein much higher than the federal funds available. There are permits available for the project. 11. PROJECrJUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: 2 Neededto continue current level ofservices. A. Addresses public health/safety, ✓if Yes: �+ Community concerns exists around conditions. B. Service improvements, ✓all that apply: 2 Accessto 20ualityof ❑Quantitycl E. Operational efficiency and leveraging opportunities: Results in net decrease in operating cost andimproves services. N/A C. Repair/maintenance/replacement of facility/infrastructure/building, ✓if Yes: Necessary repair/mvintenvnce/replacement. F. Fosters inter -departmental collaboration ✓if Yes: 1 ovw Additional info: 12. LONG RANGE PLANS/ QOept. Priority Maintains and wends the life of OHCOfvcilides/project comm.❑Value COMMUNITY VALUES, check at E]Genervl Plan Sectlon9, Housing QAdmin Priority Maintainsand wends the life of county ownedfadlitles least one and all that apply, �CDP QMultiHazordMM provide details: �otherPlans Additional info: Reduce expenditures on operational budgets to address aging facilities before it becomes a bigger problem. Eliminate temporary and piecemeal fixes. 13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: 0 1 DESCRIBE: 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15.SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: El Promotes energy and resource conservation OReduces hozard risk ❑Preserves/protects our natural/cultural env. EI Co stbene)itanolysis El Promotes economic vitality pstrengthens and sustains our community Additional info: Reduce operational costs through sustainable, long-term facility solutions, avoiding temporary and piecemeal fixes that lead to greater future expense. 16. PROJECr READINESS,✓all E3 Project currently underway I ❑ Previously Appropriated 121 staff available to manage project ❑Edernalfunds/resoumesreadytoproceed that apply: Dldentified and requested operating budget needs Can realistically encumberJundS list phases already tpmpleted: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not la ed This Request 1FY26.27 a FY27-28 FY28.29 FY29-30 FY30.31 FY31-32 Beyond Years TOTAL: Planning Land Acquisition ;a : -: Design/Survey �6;000 Construction 6,000 I 6,000 1 $18,000 TOTAL:1 `,o$6,000,1 $6,000 1 $6,000 $18,000 18. 0 & M COSTS (x $1000): 19. FUNDING SOURCE(x$1000): CtyG.O.Bond '1-1°m'�'°6,off 6,000 6,000 $18,000 State Revolving Fund State CIP Federal Private (Grano) CBA (Fair Share, Park Dedication, etc) t Other Cry Fund - (describe) - TOTAL: _^*$6,6f10 $6,000 $6,000 $181000 (This Page Intentionally Left Blank) County Of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENTANDDIVISION: Office of Housing& Community Development Z. SUBMITTEM Kehaulani M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD-Kaiminani Affordable Housing 4. LOCATION (COUNCIL DISTRICT): 9 5. COUNCIL BENEFIT DISTRICT(S): 9 6. TMX/CDP PLANNING AREA: 7-3-030:056/Kona 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,000,000 8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition E] Infrastructure improvement �+ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: at apply: ❑ Nonrecurring rehabilitation 21 Planning, feasibility, eng., or design study ❑Information/communications tech. 12 High ❑ Med. ❑Low 10. PROJECT/PROGRAM DESCRIPTION: will construct infrastructure for the County -owned workforce housing subdivision in Kailua-Kona to enable workforce rental housing. Improvements include roads, sidewalks, curbs, gutters, E.ndrelated utilities. Upon completion, an RFPwill be issued using FY 2024-25 Affordable Housing Production funds. Any bid cost overruns will be covered by CIP funds. This request includes all project costs. 11. PROJECTIUSTIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓ifyes: 2 Fills gap in currentservicesjorunderserved nree/demographic. A. Addresses public health/safety, ✓if Yes: O Communiryconcerns exists aroundconditians. B. Service improvements, ✓all that apply: El Access to ElQuality of 2+Quantity of E. Operational efficiency and leveraging opportunities: No change in operating rusts. N/A C. Repair/maintenance/replacement of acility/infrastructure/building, /if Yes: N/A F. Fosters Inter -departmental collaboration ✓if Yes: 2 DPW Additional info: 12. LONG RANGE PLANS/ D+Oept. Prioriry c7tingphordable housing opportunities is the Department's mission �Comm.Volue COMMUNITY VALUES, check at OGeneral Plan Section 9, Housing I Elmolin Priority Affordable housing andinfrostructure least one and all that apply, I ❑CDP I 10mularto,.nimir provide details: FE101her Plans Additional Info: 13. MY. MATCHING FUNDS REQ'D7 ✓if Yes: O DESCRIBE: 14. LEGAL MANDATE? Vif Yes: ❑ IDESCRIBE, 15. SUSTAINABILITY FOCUS, ✓all that apply: Provide additional information as appropriate: ❑ Promotes energy and resource conservation ❑ Reduces hazard risk ❑Preserves/protects our natural/cultural env. ❑ Cost benefttmlysis OPromo[es economic vitality El Strengthens andsustains ourcommuniry Additional Info: Stable housing supports long-term health and safety, sustainable and resilient households, and stronger communities for generations to come. 16. PROJECT READINESS,✓all 21 Project currently underway ❑ PreviouslyApproprioted O Staff available to manage project ❑Fxternalfunds/resources ready to proceed that apply: Dldentlfled and requested operating budgetneeds �+ Can realistically encumber/ands Ustphases already completed: Additional info: Funds alloted. Environmental assessment complete; SHPD 6E and AIS underway. Rcvd $4.2M AHP grant. 17. EXPENDITURE PHASING (X$1000): Prior Funds Allotted (notlapsed This Rei7Jest sa FY¢6-27^3 FY 27-28 FY 28.29 FY 29.30 FY 30-31 FY 31-32 Beyond Years TOTAL: Planning Soo $500 Land Acquisition Design/Survey 700 $700 Construction 3,000 4,900 $8,900 TOTAL: $4,200 n .,"4l"'Ooo $4,900 $10,100 18.0&MCOSTS (x$1000): sr a<mas 19. FUNDING SOURCE(x$1000: Cty G.O. Bond :000� $1,000 State Revolving Fund a State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) OtherCty Fund -(AHP) 4,200 T'a'r _-'h"=" 4,900 $9,100 =;'=$111000= $4,900 $10,30 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENTAND DIVISION: Office of Housing& Community Development Iz. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD -Affordable Housing Planning, Feasibility, and Design . LOCATION (COUNCIL DISTRICT): All S. COUNCIL BENEFIT DISTRICT(S): All fi.TMK/CDP PLANNING AR EA: Various Island Wide 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,000,000 6. PROJECr ELIGIBILITY, ✓ all ❑land acquisition ❑ Infrastructure improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one: at apply: ❑Nonrecurring rehabilitation Planning, feasibility, eng., or design study ❑Information/communications tech. 0 High ❑ Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: To increase affordable housing, OHCD is focusing on utilizing5tate-and County -owned lands for development. The process to identify and determine lands suitable for affordable housing requires planning, feasibility, engineering, survey, and design services prior to acquisition or seeking public/private partnerships for development This funding will allow OHCD to absorb preplanning costs such as planning, feasibility, engineering, or design studies to prepare the parcel for housing development This includes any and all related costs. 11. PROJECT JUSTIFICATION &OUTCOME(5), select and/or answer all that apply: D. New facility/infr./b[dg. ✓if Yes: @+ gap In cementservicesfor underserved area/demographic A. Addresses public health/safety, ✓if Yes: 0+ Community concerns exists around conditions.Fills B. Service improvements, ✓all that apply: El Access to 21Quality of E]Quantity of E. Operational efficiency and leveraging opportunities: N/A N/A C. Repair/maintenance/replacement of acility/infrastructure/building. ✓if Yes: � N/A F. Fosters inter -departmental collaboration ✓if Yes: 121 Planning Additional info: 12. LONG RANGE PLANS/ QDept Priority 1 ❑Carom. Value COMMUNITY VALUES, check at 2OeneralPlan 5ection9,Housing OAdmia Priority Development oflnfrostructureforalfordable housing least one and all that apply, Qcop IdemifyandJacilitate use ofsuitablepubliclandsfor affordable housing QMuld HmmdMir provide details: Other Plans Additional Info: 13. CTY. MATCHING FUNDS REQ'D7 ✓if Yes: ❑ IDESCRIBE, 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15. SU5TAINABILITY FOCUS, 'all that apply: I ❑ Promotes energy and resource conservation Provide additional information as appropriate: FO Cost benefit analysis ❑Reduceshazardnsk ❑Preserves/protects our natural/cultural env. 21 Promotes economic vitality El Strengthens andsustains our community Additional info: Stable housing supports long-term health and safety, sustainable and resilient households, and stronger communities for generations to come. 16. PROJECT READINESS,✓all El Project currently underway ❑ Previously Appropriated El Staffavailable to manage project ❑FxternalJunds/resources ready to proceed that apply: OIdentified and requested operating budgetneeds 12 Can realistically encumberfunds Listphases already completed: Additional Info: 17. EKPENDITURE PHASING (K$1000): Prior Funds Allotted not la Thls Request FY 27-26 1 FY 28-29 1 FY 2930 FY 3031 FY 31-32 Beyond Years TOTAL: Planning 278 5001 500 500 500 Soo $3,278 Land Acquisition - Design/Survey 722 ==500; 500 500 500 500 Soo $3,722 Construction +. TOTAL: $1,000 I $1;000;1 $2,0001 $1,000 $1,0o0 1 $1,0001 $1,000 1 1$7,000 18. O & M COSTS x $1000 : y-%^T_?.?:",%,:: 19. FUNDING SOURCE x$3000: Cty G.O. Bond 1,000 OF, W"�.i;000i ZWo 1,000 1,000 1,000 1,000 s 1,000 va� m $7,000 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share, Park Dedication, etc) Other Cty Fund -Fun a ' TOTAL: $1,000 '_:��$UOW $1,000 $1,000 $1,000 $1,000 $1,000 $7,000 (This Page Intentionally Left Blank) County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Office of Housing& Community Development Z. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD - N5 Kahua Hale o Ulu Win! WWTP - PV System 4. LOCATION (COUNCIL DISTRICT): 8 S. COUNCIL BENEFIT DISTRICT(S): 819 S. TMK/CDP PLANNING AREA: 7-3-009:055 / Kona 7. TOTAL COUNTY FUNDS NEEDED THIS FY: 9,000,000 B. PROJECT ELIGIBILITY, ✓all ❑ Land acquisition O lnfmstmcture improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: ❑ Nonrecurring rehabilitation Planning, feasibility, eng., or design stud ILI Information/communications tech. 121High ❑Med. ❑Low 10. PROJECT/PROGRAM DESCRIPTION: NA Kahua Hale a Ulu Win! affordable housing project operates a separate WWTP from the Kealakehe WWTP serving Kona. The Ulu Wini WWTP electrical bills are the second highest for all County facilities per OSCER. OHCD desires to install a PV system to offset the electrical hills for the low-income affordable housing project. The funding will allow OHCD to design and build the system. This includes any and all related costs. 11. PROJECTJUSIFICATION&OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: 21 Fills gap in current services for underserved area/demographic A. Addresses public health/safety, ✓if Yes: [' Community caMerns exists around conditions. S. Service improvements, ✓all that apply: 21 Access to [+Quality of El Quantity of E. Operational efficiency and leveraging opportunities: Results In net decrease in operating cost andmaintains services. N/A C. Repair/maintenance/replacement of facility/infrastructure/building, ✓ifyes: N/A F. Fosters inter -departmental collaboration 'if Yes: 0+ DEN[ Additional info: 12. LONG RANGE PLANS/ o Creatingoffordable housing opportunldes is the Department's mission ❑CommCOMMUNITY VALUEScheck atlthp7ririty Genem[plan Sectlong,Housing EAdminPdoriry Development of infrastmaurefor affordable housing least one and all that apply, CDP QMu1NHotordMit provide details: 20ther Plans Prlarirypl In the Homelessness& Housing Strategic Roadmap Additional info: OHCO and OSCER have identified the Ulu Win! WWTP as a candidate fora PV system to cut costs to this affordable housing project. 13. CTY. MATCHING FUNDS REO'D? ✓if Yes: ❑ DESCRIBE: 14. LEGAL MANDATE? 'If Yes: ❑ IDESCRIBE, 15. SUSTAINABILITT FOCUS, ✓all that apply: Provide additional information as appropriate: O Promotes energy and resource conservation [7] Reduces hazard risk ❑Preserves/protects our natural/cultural env. p Cost benefit analysis 2 Promotes economic vitality [21 Strengthens andsustains our community Additional info: State mandate to convert to as much renewable energy generation by 2040, This project will assist with achieving that goal and reduce operational costs for this affordable housing project. 16. PROJECr READINESS, ✓all project currently underway ❑ Previously Appropriated 2' Staff available to manage project ❑ Externalfunds/resources ready to proceed that apply: Dlden[iJied and requestedopemting budget needs M Can realistically encumber funds Utt photet already completed. Additional info: Initial funds need for planning and Design -$SM 17. EXPENDITURE PHASING(X$1000): Prior Funds Allotted notlapsed This RequesF_ _.. F'LZ637,; �, FY27-28 FY28-29 FY7.9-30 FY3031 FY31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey Construction $9,000 $9,000 TOTAL: .i^$9,O0O, $9,000 1e. O & M 19. FUNDING SOURCE x $1000 : Cty G.O. Bond 9,d001 $9.000 State Revolving Fund -mr�as°41 State CIP Federal Private (Grants) :.5 CBA (Fair Share, Park Dedication, etc) - OtherCtyFund -(AHP) TOTAL: a egd ,S91'0gg'. $9,000 N N (This Page Intentionally Left Blank) J County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2026 - 2027 1. DEPARTMENT AND DIVISION: Office of Housing & Community Development 2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026 3. PROJECT NAME: OHCD-N5 Kahua Hale o Ulu Win! Roof and PV Refurbishment 4. LOCATION (COUNCIL DISTRICT): 8 S. COUNCIL BENEFIT DISTRICT(5): 8,9 6. TMK/CDP PLANNING AREA: 7-3-009:055 / Kona . TOTAL COUNTY FUNDS NEEDED THIS FY: 14,000,000 8. PROJECT ELIGIBILITY, ✓ all ❑land acquisition []+ Infrastructure improvement ❑ New bldg., structure, or addition 9. PROJECT URGENCY/NEED,✓one: that apply: ❑ Nonrecurring rehabilitation 0 Planning, feasibility, eng., or design study ❑Information/communications tech. 0 High ❑ Med. El Low 10. PROJECT/PROGRAM DESCRIPTION: N5 Kahua Hale o Ulu Wini affordable housing project is approx. 15 years old.The PV system is obsolete and needs to be replaced with new panels to insure the longevity ofthe roofing material. The roof will be repainted which requires removing existing solar water heater panels and the PV system. A new PV system with roof repairs will ensure 96 units are continuously available to rent to low-income families by the County. The capital project will design and refurbish the system. This includes any and all related costs. 11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. ✓if Yes: 0 - Fills gap In camentservicesforunderserved area/demographic A. Addresses public health/safety, ✓if Yes: �+ Communityconcerns exists around conditions. B. Service improvements, ✓all that apply: 0 Access to []Quality of []Quantity of E. Operational efficiency and leveraging opportunities: Results In net decrease in operating cast and maintains services. N/A C. Repair/maintenance/replacement of acility/infrastructure/buiId! ng, ✓if Yes: Cl NIA N/A epartental collaboration F. Fosters inter -departmental Yes: O DEM Additional info: 12. LONG RANGE PLANS/ []+Dept Priority CrewingaJJordoblehausing opportunities is the Deportment's mission []Comm. Value COMMUNITY VALUES, check at E]GsnemlPlan Section9,Housing []+Admen P.ladt, Development of infrostructureforoffordable housing least one and all that apply, []CDp []MuItlHazordMR provide details: []other Plans Additional Info: 13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑ IDESCRIBE, 14. LEGAL MANDATE?✓if Yes: ❑ DESCRIBE: 15.SU5TAINABILITY FOCUS, Vail that apply: []+ Promotes energy and resource conservation Provide additional information as appropriate: p Cost benejrt analysis 0 Reduces hazard risk E Preserves/protects our natural/cultural env. []Promotes economic vitality []+Strengthens andsustains ourrommunity, Additional info: State mandate to convert to as much renewable energy generation by 2040. This project will assist with achieving that goal and reduce operational costs for this affordable housing project and tenants. 16. PROJECT READINESS,✓all I [] project currently underway ❑Previously Appropriated O Staff available to manage project ❑Externalfunds/resources ready to proceed that apply: []identified and requestedopemting budgetneeds []Con realistically encumberJunds List phases already completed: Additional info: 17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted not la ed This Request l „ FY 26127", FY 27-28 FY 26.29 FY 29-30 FY 30-31 FY 31-32 Beyond Years TOTAL: Planning Land Acquisition Design/Survey Construction i:i514-;000' $14,000 TOTAL "i m"-"$14;000 $14,000 18. O & M COSTS (x $1000): 19. FUNDING SOURCE(x$1000: Cty G.O. Bond . �........w_..�,._ ''^`s`*:ZM'J4,000' w - .. . ...... ,. .__-.. _ .�. $14p00 State Revolving Fund - StateClP Federal "t^ Private (Grants) CBA (Fair Share, Park Dedication, etc) rr other C Fund -(AHP) TOTAL: ti " $14OW $14,000 (This Page Intentionally Left Blank)